This document is a Request for Quotation (RFQ) from the U.S. Embassy in Lusaka, Zambia for the installation and recommissioning of decommissioned Solar Battery Backup units from U.S. Embassy and consulates in South Africa. The solicitation seeks a contractor to install 36 PV panels, three power walls, Enphase microinverters, and associated equipment at the Lusaka embassy, with a base period from July 7, 2025 to July 7, 2026 and an optional one-year extension. The contract will have a minimum of 2 and maximum of 100 complete installations, with the contractor required to be Tesla-certified and provide a minimum of two years of maintenance support.
Key submission requirements include electronic quotation to Lusaka-Procurement@state.gov by June 26, 2025, with a file size limit of 30MB, SAM registration, and inclusion of specific documentation such as the SF-1449, pricing section, representations and certifications, and proof of SAM registration. The government will evaluate offers based on lowest price, acceptable, and responsible offeror, with emphasis on the contractor's ability to obtain necessary licenses, perform the installation, and maintain warranty on the existing equipment in Zambia.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Embassy Lusaka
May 28, 2025
Dear Prospective Offeror:
Subject: Request for Quotation Number 19ZA6025R0005: Installation and recommissioning of the decommissioned Solar Battery Backup units from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka, Zambia.
Enclosed is a Request for quotation (RFQ) for Installation and recommissioning of decommissioned Solar Battery Backup Units from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka Zambia. If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.
The quotation is due by Thursday, June 26, 2025, at 17:00hrs Central African time. No quotation will be accepted after this time, Proposal must be in English an incomplete proposal will not be accepted.
Your quotation must be submitted electronically to: Lusaka-Procurement@state.gov It is important to make sure the submission is made in specific size and format; the file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
For a quotation to be considered, you must also complete and submit the following:
1. SF-1449
2. Section 1, Pricing
3. Section K Representations and Certifications
4. Additional information as required in Section 3
5. Proof of SAM Registration
Offerors shall be registered in the SAM (System for Award Management) Database at https://www.sam.gov prior to contract award pursuant to FAR provision 52.204-7. Failure to be registered at time of proposal submission may deem the offerors proposal to be considered non-responsive and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Sincerely, Evelyn Okoth Contracting Officer mailto:Lusaka-Procurement@state.gov https://www.sam.gov/
Enclosure:
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 19ZA6025R0005, Prices, Block 23
• Continuation To SF-1449, RFQ Number 19ZA6025R0005, Schedule of Supplies/Services, Block 20 Description/Specifications/Work Statement
• Attachment 1 to Description/Specifications/Performance Work Statement, Government
Furnished Property
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not
Prescribed in Part 12
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR15308260
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
19ZA6025R0005
6. SOLICITATION ISSUE DATE
05/28/2025
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Evelyn Okoth
b. TELEPHONE NUMBER (No collect calls)
0211357000
8. OFFER DUE DATE/ LOCAL
TIME
06/25/2025
9. ISSUED BY CODE ZA600 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: ____ % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
AMERICAN EMBASSY LUSAKA
PO BX 31617 Ibex Hill Rd, Stand 694 Lot 100, HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS:
Lusaka, 10101 Zambia
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8 (A) SIZE STANDARD:
11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
AMERICAN EMBASSY LUSAKA
PO BX 31617 Ibex Hill Rd, Stand 694 Lot
100, ATTN: NEC
LUSAKA
ZAMBIA
AMERICAN EMBASSY LUSAKA
PO BX 31617 Ibex Hill Rd, Stand 694 Lot 100, ATTN: Procurement Unit
LUSAKA
ZAMBIA
17a. CONTRACTOR/
OFFERER
CODE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY
AMERICAN EMBASSY LUSAKA
PO BX 31617, IBEX HILL RD, ATTN: FMO- DESIGNATED
BILLING OFFICE
LUSAKA
ZAMBIA
CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Installation and recommissioning of the decommissioned Solar Battery Backup Units from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka Zambia.
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT
TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________.
YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.2
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT 37. CHECK NUMBER
PARTIAL FINAL
COMPLETE PARTIAL FINAL
38. S/R ACCOUNT NO.
39. S/R VOUCHER NO. 40. PAID BY
41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41C. DATE
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19ZA6025R0005
PRICES, BLOCK 23
I. PERFORMANCE WORK STATEMENT
A. The purpose of this firm fixed price contract is to for the installation of decommissioned
Solar Battery Backup Units (Tesla Powerball lithium residential backup battery packs, Tesla Gateways, PV Panels, Enphase alternating and current microinverters from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka, Zambia. in accordance with Attachment A.
B. The contract will be for a one-year period from the date of the contract award, with one-year option.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work
Paragraphs Performance Threshold
Services.
Performs all installation of decommissioned Solar Battery Backup Units (Tesla Powerball lithium residential backup battery packs, Tesla Gateways, PV Panels, Enphase alternating and current microinverters_ from the U.S Embassy in South Africa to Lusaka, Zambia services set forth in the scope of work.
___ thru ____
All required services are performed and no more than three (3) customer complaint is received per month and that no record of any damage to government property is recorded
JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF
2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS
SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE
TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.
1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
2. STANDARD. The performance standard is that the Government receives no more than three (3) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial Services (NOV 2023), if any of the services exceed the standard.
3. PROCEDURES.
(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
(b) The COR will complete appropriate documentation to record the complaint.
(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.
(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.
https://www.acquisition.gov/far/52.212-4
Base Period (7 July 2025 to 7 July 2026)
A. Installation and recommissioning of the decommissioned Solar Battery Backup units (from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka, Zambia.
CLIN. Description Each Unit Price Estimated
Quantity Total Estimated Amount
1. Installation and recommissioning of the Solar Battery Backup units (Powerwall lithium residential backup battery packs, Gateways, PV panels, alternating and current microinverters)
Each 80
Base Year Total Amount
Option Year 1 (7 July 2025 to 7 July 2026)
A. Installation and recommissioning of the decommissioned Solar Battery Backup units from the U.S Embassy and consulates in South Africa to the U.S Embassy in Lusaka, Zambia.
CLIN. Description Each Unit Price Estimated
Quantity Total Estimated Amount
1. Installation and recommissioning of the Solar Battery Backup units (Powerwall lithium residential backup battery packs, Gateways, PV panels, alternating and current microinverters)
Each 10
OY1 Total Amount
Total of base period _____________
Total of optional period 1 _____________
GRAND TOTAL _____________
MINIMUM AND MAXIMUM AMOUNTS
During this contract period, the Government shall place orders totaling a minimum of 2 complete installations. This reflects the contract minimum for this period of performance. The amount of all orders shall not exceed 100 complete installations. This reflects the contract maximum for this period of performance.”
II. PRICING
The currency for this contract will be priced in USD.
III. VALUE ADDED TAX
VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period.
CONTINUATION TO SF-1449,
RFQ NUMBER 19ZA6025R0005
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
The proposed Scope of Work for the installation Stage includes the following:
a) Contractual
- Installers Contractual obligations
- Arrangements for access to sites
- Security process (clearance on all personnel to execute work on premises)
b) Installation
- Associated clearing, protection and barricading
- Adherence to Occupational Health and Safety (OHS) Act
- Removal and trimming of trees as required.
- Replacement of existing electrical distribution boards with new larger capacity boards if necessary.
- Installation of PV solar system
- Excavation and installation of comms cabling to standby diesel generator if the need is confirmed by COR.
- Additional / supplementary cabling, wiring and conduits
- Additional grounding equipment to meet the system requirements of 0.2-ohm ground resistance.
c) Close-out
- Test and commission of system
- Training, manuals, COC’s and handover of sites
- Servicing and maintenance baseline design
The vendor shall install all equipment to meet the following requirements.
- Install three power walls in series.
- Install 36 x PV panels.
- Install an Enphase micro-inverter to each PV panel.
- Install wiring reticulation as per supplied SLD.
- Consider entire house load as essential based on load calculation.
- The entire circuits shall be powered during the day from the PV array.
- Ensure that during the evening the whole circuits are powered by the power walls.
- The ATS shall monitor power from the Gateway and will start the generator if necessary to switch the entire load to the generator, switching back to either city/PV or power wall when available.
- The generator shall not charge the power walls.
- Should the measured ground resistance fail to meet the specified requirements for the PV system installation, the contractor shall implement a new grounding system or modify the existing system to achieve the necessary ground resistance value.
- For compounds supplied by a single generator and single transfer switch, the contractor will be required to furnish and install dedicated transfer switches or relays for individual houses, in accordance with the proposed wiring configuration.
- In cases where a residential transfer switch lacks single-phase configuration capability, the contractor will be required to furnish and install a replacement transfer switch that supports single-phase operation.
- For appliances with high current draw or substantial load demands, load control relays shall be installed to maintain the total load within the system’s rated capacity at any given time, thus preventing overcurrent and potential damage
- Supply and setup two-year monitoring services.
SOLAR ROOFTOP DESIGN
a) Proposal for Solar rooftop project
• Contractor will be responsible for the design and installation of the system.
b) Site survey and assessment of existing roof structures
• Contractor needs to fully familiarize himself with site condition specifically to electrical work that is required.
c) Design and Material Approval Request (DAR/MAR)
d) Prepare installing drawing (Electrical drawings)
• A single line drawing will be required to show the full integration of all supply generations.
e) Installation of PV panel (batteries, gateway, etc)
f) Inspection and QC/QA installation works
g) Test and Commissioning
h) Prepare Manual O&M (Operation and Maintenance)
i) Handover project to Owner and Monitoring & Report via app and web base systems
Design
a) All installations will be Integrated or Grid-Tie Systems with battery backup. The PV, power wall system shall be the primary source, city power secondary, and the generator tertiary power.
b) The proposed system size for each site is designed on the following.
i. based on load calculations as the utility data was found to be not scope representative.
ii. to keep the residence current comfort level as far as possible.
iii. to support and comply to the full essential load requirements as listed in the load schedule.
iv. to operate in the required sequence to ensure a saving on utility expenditure.
Site Assessment
a) The appointed solar contractor needs to familiarize himself with all aspects of the site of which some include the following.
i. Execute a shade analysis caused by shade from neighbouring trees, height differences in roof structures and chimneys.
ii. Fixing of solar systems to walls and roofs.
iii. Access to site for store, off-load and installation of units.
iv. Available facilities.
Main Distribution Boards The average main connection of the residence has a 63A three-phase connection installed to the house and includes isolators and breakers on samite rails with specific splits to sub distribution boards. There is no need to install a DB only to separate essential and non-essential loads and tie this into the main DB in the residence.
Provision is made for Sub-DB’s where only one or two circuits are non-essential will be wired back to the main DB. The total sub-DB will then remain an essential load.
Sun Hours
Solar radiation table for Lusaka Zambia is used for this proposal.
Lusaka has relatively high solar radiation in comparison with other countries such as in Europe. The average specific energy yield in Lusaka is around 1 706 kWh/kWp/y. That means for every one-kilowatt peak (kWp) of solar panels installed, one can expect it to produce 1 706 kilowatt-hours (kWh) of energy, on average, per year.
• Lusaka, Zambia falls within the 5.5kWh/kWp radiation levels.
• For the high-level design of this PV proposal system a 5 kWh/kWp yield was used.
Tilt Angle
All PV modules will be flush roof mounted with no elevation structure unless the base roof angle requires such structures.
Equipment
The same proposed equipment will be used throughout the total project to standardize all properties as well as to have the option to remove solar equipment on Operational Leased (OL) properties for installation at other residences.
All equipment is to comply and to be installed in accordance with Item 1.3 above.
Feedback into Grid
The system will be designed in such a way that no feedback will be possible.
Local Authority Regulations and By-Laws
*It will be the responsibility of the appointed contractor to complete all required documentation and submit for approval to the respective local authorities of the embedded generation installation.
Reference to Schedule of Quantities (Material description)
a) A design estimation of 15kW was used considering the full usage of the micro-inverter capability related to the available sun hours. Thus 36 PV panels @ 425W ≈ 15300W, Micro-Inverter branch limitations will dictate the panel configuration during detail design.
b) Most of the residential homes have tiled roofs fitted on timber trusses. However, it is a contractor’s responsibility to check the roof structure to ensure proper brackets and anchoring system is applied.
c) Due to regulations a No-electrical grid feedback unit was allowed for at all premises as it has a build-in grid disconnection functionality which must be isolated from the service provider grid in case of network failure / outage. The system must be able to communicate with all equipment that form part of the solar system.
d) To effectively measure and monitor the PV system an online web base portal is required that is permanently connected to the web and be able to monitor from an approved app.
e) The PV solar system (Battery units) must be able to communicate with the locally installed diesel standby generator system. This functionality will be via the battery gateway portal and will communicate with the generators relay port.
TYPICAL SOLAR GENERATION ESTIMATE
Guestimate Total kWh usage per month : 2,454 kWh (Three phase) Total kWh usage per month : 1,660 kWh (Three phase – Entire loads) Usage per month per phase : 553 kWh (essential loads) Usage required : 553/30 = 18.4kWh/day Yield Factor used : 4.3 kWh/kWp PV Size (per phase) : 4,28 kWp ≈ 5kWp (400W panels x 12)
Table 1: Estimated Consumption Profile
• 13,5kWh Battery system should last throughout the night without grid / generator requirements
• Estimated DoD (depth of discharge) @ 80% (Battery capable of 100% DoD)
-1000
0:
2:
4:
6:
8:
:0
:0
:0
:0
:0
:0
:0
0:
2:
Total of Averages Consumption
Solar Summer
Solar winter
0:
1:
2:
3:
5:
6:
7:
8:
:0
:1
:3
:4
:0
:1
:3
:4
:0
:1
:3
:4
Summer Throttle
Batt Charge
Battery Discharge
Grid
Direct Consumption
• Grid / Generator will be required for winter load usage estimation.
CONSTRUCTION METHOD STATEMENT
Scope
The project involves the installation of approximately 36 Photovoltaic (PV) solar on the roof of the listed house and which will have an energy generation capacity of approx.
15kW. The proposed works include: the erection of scaffolding (where required), installation of mounting structures, PV panels, microinverters, batteries, a router with data plan, and cabling.
Duration of Works
The expected installation duration is approximately 3 days per residence due to re-wiring of main DB’s.
General Site Health and Safety
All conditions of the Occupational Health and Safety (OHS) Act must be complied with as well as for the duration of the project.
The Contractor will also ensure that.
• Personnel have a responsibility to conduct work in a safe manner.
• Appropriate warning signs will be used on site were relevant – these may include, but are not limited to:
o Hard Hats to Be Worn o No Entry to Unauthorised Persons o Works in Progress
• All operatives will be made aware of the site-specific fire evacuation procedures during the site induction.
0:
1:
2:
3:
5:
6:
7:
8:
:0
:1
:3
:4
:0
:1
:3
:4
:0
:1
:3
:4
Winter Throttle
Batt Charge
Battery Discharge
Grid
Direct Consumption
• All routes will be kept free of obstacles and trip hazards during the period of installation.
• Appropriate PPE will be worn by all individuals on site during the period of works, including hard hats, high visibility vests, and safety footwear, as well as gloves and goggles where required.
• Two or more people will carry larger or heavier items.
• The scaffolding will be checked to ensure safety. (If erected)
• All areas of work will be left in a clean, orderly condition everyday.
• All items of equipment are to be stored appropriately on site.
PV Specific Health and Safety
• All PV panel is live when exposed to light and cannot be switched off.
• DC voltages are more hazardous than AC voltages due to the nature of the shock, which causes contraction and can lead to the victim been in a state of shock holding onto the conductor.
• Arcs created when attempting to break a DC current can be alarming and can damage test equipment. Test leads with PV shielded connectors at one end must be used, not standard multi meter test probes.
• All persons overseeing the installation work shall be qualified and experienced with proper specific training on such systems.
Operatives / Competence
• All personnel on site shall be competent to perform the task at hand
• All electrical works shall be undertaken by qualified electricians.
Scaffolding The design of all working platforms, their supporting structures and means of protection from falling material or objects, used on this contract must comply with the Construction Health and Safety Regulations The Contractor will ensure that all working platforms, supporting structures and edge protection are erected by competent personnel who possess the adequate training, knowledge, and experience. They must also ensure that the personnel who erected the scaffolding issues a handover certificate containing the following information:
• That the erected structure is complete and complies with the Construction (Health and
Safety) Regulations and all relevant SABS Standards.
• The distribution loads permitted on the working platforms.
• That guard rails, working platforms, toe board braces and ties are complete and comply with the Construction (Health and Safety) Regulations and Standards.
• That the Contractor using the platform is now responsible for their employees working on it and ensure the requirements under regulation 4 of the Construction (Health and Safety) Regulations
• Lights, or coloured tapes, should be placed so that the public or other contractors are protected from accidentally damaging themselves or the scaffold.
• Each morning the scaffolding is to be checked to ensure it has not been interfered with.
• During dismantling, at no time is the scaffold to be left in an unstable condition.
All scaffolding is to be left at the end of each working day in a manner to prevent unauthorised access and use. Ladders are to be locked away or removed from site at the end of each working day. Where there is an increased risk of children using scaffolds to climb to high levels, access at ground level should be prevented by a barrier at least 1.5m high.
Installation
Working Environment:
• The site is exposed to the elements, being outside.
• All personnel will be required to wear appropriate PPE to protect them from adverse weather conditions and will be encouraged to use sunscreen as required.
• Works should cease in bad weather (persistent heavy rain, storm, high winds) as instructed by the site manager.
Deliveries:
• The PV modules are delivered packaged in cardboard on pallets. The modules will be marked and identifiable into power bands.
• The framework will be delivered strapped together in bundles secured to pallets.
• All other goods will be delivered to the site secured and removable via tail lift or onsite plant.
• Deliveries will be made in a timely manner to avoid any delays in installation.
Distribution of Goods:
• PV modules should remain in their packaging until they are installed onto the support framework. All packaging will be removed from site daily.
• The support framework and modules will need to be manually handled; protective gloves should be used for this.
Storage:
• Solar modules and framework will be protected from the elements and securely stored.
• PV module packaging should be kept dry to avoid collapse or compression of the packaging which might lead to damage to the modules or other equipment.
• All other equipment will be stored and secured until ready to be installed.
Installation:
• Gloves are to be worn by personnel whilst installing the framework to protect against sharp edges and hot / cold surfaces and final connections to complete works.
• Gloves should be worn when lifting and carrying modules to protect against sharp edges and corners.
• Modules are fixed to the mounting structures.
• PV modules only weigh approximately 15kg but have a large wind uplift area and so should be handled by 2 persons. Works may need to be discontinued in adverse weather conditions.
• PV modules are made of glass and are there for at risk of fracture or cracking. Care of handling is to be a priority.
• Any damaged modules are to be wrapped and repackaged to avoid any further damage and risk of injury to persons. They are to be clearly marked as damaged and returned to a storage area. The site manager must be notified.
• Once a module is exposed to daylight, it generates a DC voltage.
• The modules are pre-wired with touch-proof connectors which isolate the current, but care must be taken not to interfere with or expose the terminals. The voltage generated from one module is not considered dangerous (approximately 48 Volts). As the modules are connected to each other, the voltage increases and so does the risk of a harmful shock.
• Before each module is fixed into the framework, a simple voltage check should be carried out to ensure that the module is operating.
• Any suspected faulty modules should be set aside for return.
• Protect the cables from stress (i.e., ensure they are not trapped or trodden on) during installation as well as during storage prior to installation.
• All cables must be fitted with multi contact shielded connectors at both ends before connection to the modules is made to prevent the possibility of personnel being exposed to bare live conductors.
• Keep the DC connectors dry where possible.
• As the modules are installed, they will be cabled up in series-connected ‘strings. As each string is connected, a string voltage and polarity check will be carried out to ensure that all connections are sound, and findings recorded on a DC test sheet.
• All DC cables are to be labelled at both ends with the string number.
• All DC cables will be tested and logged on test sheets.
Discovery of Asbestos Based Materials
Should any materials be discovered during any works, which are considered to possibly contain asbestos fibres, then works in that area will stop immediately.
• No materials will be disturbed or removed by site personnel at any time.
• A specialist asbestos removal sub-contractor will be appointed by the contractor to analyse and remove any asbestos-based materials.
• The specialist contractor will also submit a site-specific method statement and risk assessment prior to commencing works on site.
• If asbestos-based materials are found to be present on site the relevant notice will need to be issued to the Health and Safety Executive.
Amenity
a) Noise:
• Best practice means to minimise noise and vibration from the site will be always employed,
• The Environment Protection Act 1993 (EP Act) requires that all reasonable and practicable measures are taken by building companies and contractors to always minimise noise.
• Working hours will be limited to 08:00 and 17:00, Monday to Friday, to avoid noise at unreasonable hours.
• Care will be taken when loading and unloading vehicles, installing, and dismantling scaffolding, etc to minimise noise impact.
b) Waste:
• Contractors will remove all debris and rubbish from site and dispose of it appropriately.
c) Dust:
• The installation of PV panels on to the roof of the building is unlikely to result in a dust nuisance.
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,
BLOCK 27A)
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025)
(DEVIATION FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
__ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (6) [Reserved].
__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14
__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).
__ (11)
(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).
__ (ii) Alternate I (Dec 2023) of 52.204-30.
__ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).
__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).
__ (14) [Reserved].
__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).
__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (17) [Reserved] __ (18)
(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-6.
__ (19)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-7.
__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).
__ (21)
(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Jun 2020) of 52.219-9.
__ (v) Alternate IV (Jan 2025) of 52.219-9.
__ (22)
(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
__ (ii) Alternate I (Mar 2020) of 52.219-13.
__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).
__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).
__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).
https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27
__ (26)
(i) 52.219-28, Postaward Small Business Program Representation (Jan 2025) (15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (Mar 2020) of 52.219-28.
__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).
__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).
__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
__ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.
13126).
__ (33) (reserved) __ (34)
(i) (RESERVED) __ (ii) (RESERVED) __ (35)
(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).
__ (ii) Alternate I (Jul 2014) of 52.222-35.
__ (36)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).
__ (ii) Alternate I (Jul 2014) of 52.222-36.
__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).
__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
__ (39)
(i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.
13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ (41)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).
https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim
__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.
8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
__ (47)
(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
__ (48)
(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
__ (ii) Alternate I (Oct 2022) of 52.225-1.
__ (49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109- 169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (Jan 2025) of 52.225-3.
__ (iv) Alternate III (Feb 2024) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).
__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
__ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).
__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).
__ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L.
118-31, 41 U.S.C. 3901 note prec.).
__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 https://www.acquisition.gov/far/52.226-8#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-30#FAR_52_232_30 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim…