This Request for Proposals (RFP) #11-2027 is issued by the District of Columbia Housing Authority (DCHA) to contract for HVAC Preventive Maintenance, Repair, and Water Treatment Services across multiple DCHA properties. The scope of work encompasses preventive maintenance, inspection, testing, repair, emergency response, and water treatment services for HVAC systems at 16 senior properties and 5 family properties, including boiler rooms, chillers, cooling towers, and related mechanical equipment. Services must be performed by licensed, fully qualified technicians during standard business hours (8:15 a.m. to 4:45 p.m., Monday through Friday), with emergency response capability. The RFP was issued on November 9, 2026, with a mandatory pre-proposal conference on November 30, 2026. The deadline for submission of inquiries is December 7, 2026, with proposals due by December 22, 2026 at 12:00 p.m. The contract term is five years (Contract Years 1–5) with no optional renewal periods. DCHA reserves the right to make single or multiple awards by individual property or groups of properties and may terminate contracts for convenience with 30 days' written notice.
The pricing structure requires respondents to submit firm fixed annual prices for preventive maintenance, inspection, testing, chiller disinfection, and water treatment services for each property across all five contract years on Exhibit 1, along with fully burdened hourly labor rates for regular-hours, after-hours, and weekend/holiday service. Individual work orders for repairs or replacements exceeding $2,000 will be negotiated separately. This solicitation is limited to self-performing contractors that must perform 100 percent of the work with their own W-2 employees; subcontracting, joint ventures, and use of 1099 workers or labor brokers are strictly prohibited. Contractors must be licensed in the District of Columbia, maintain at least three factory-certified technicians for chiller and boiler work, and demonstrate a minimum of 10 years of comparable experience with at least three similar projects for public housing agencies, governmental entities, or comparable organizations. Evaluation will be based on experience and qualifications (30 points), past performance (20 points), staffing plan and methodology (15 points), references (15 points), and cost proposal (20 points). Respondents must provide references including at least one from a public housing authority or governmental agency, and DCHA may conduct financial and technical capacity reviews of firms in the competitive range.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
(RFP) #11-2027
HVAC Preventive Maintenance, Repair and Water Treatment Services
Contracting and Procurement District of Columbia Housing Authority
300 7th Street, SW, 10th Floor Washington, D.C. 20024
DISTRICT OF COLUMBIA HOUSING AUTHORITY
CONTRACTS AND PROCUREMENT
Table of Contents
Part Description Page Table of Contents
1.0 General Information
1.1 Introduction 4
1.2 Background 4
1.3 RFP Intent 4
1.4 Agency’s Reservation of Right 4
1.5 Schedule of Events 5
1.6 Proposal Audit 6
1.7 Contract Terms 6
1.8 Communications 7
2.0 Description of Services
2.1 Description of Services 8
3.0 Proposal Evaluation
3.1 Clean Hands Policy 31
3.2 Submittals 32
3.3 Evaluation Process, Evaluation Factors and Award 32
3.4 Proposal Format 33
3.5 Proposal Content 33
3.6 Evaluation Factors and Award 33
3.7 Evaluation Factor Description 34
3.8 Responsibility Determination 36
3.9 Point Awarded Range 38
3.10 DC Council Approval Mandate 39
4.0 General Conditions
4.1 Licenses, Permits and Certifications 41
4.2 DCHA Section 3 Policy 41
4.3 Certification Regarding Debarment 42
4.4 Respondents’ Status 42
4.5 Funding Limitations 42
4.6 Government Restrictions 42
4.7 Insurance 43
4.8 Indemnification 44
4.9 Method of Compensation 44
4.10 Ceiling Price 45
HVAC Preventive Maintenance, Repair and Water Treatment Services 3 | Page
Part Description Page
4.11 Compliance with Laws 45
4.12 Termination for Convenience and Default 48
4.13 Disputes 49
4.14 Examination and Retention of Contractor’s Records 50
4.15 Ownership Rights in Works 50
4.16 Intellectual Property 50
4.17 Confidential Information 50
4.18 Conflicts of Interest 51
4.19 Prohibition against Gifts/Favors/Anything of Monetary Value 52
4.20 Assignment 52
4.21 Non-Exclusive Rights 52
4.22 Contract Modification 53
4.23 Governing Law 53
4.24 Required DCHA Vendor Registration 53
5.0 Form of Contract
5.1 Sample Agreement 54
5.2 Exceptions to Contract 54
5.3 Contract Terms and Conditions 54
5.4 Exceptions 54
5.5 Right to Negotiate 54
5.6 Right to Reject 55
6.0 Right to Protest
6.1 Protest 56
6.2 Definitions 56
6.3 Procedures 56
7.0 EXHIBITS, APPENDICES & ATTACHMENTS
7.1 Exhibits 1-4 57
7.2 Attachments A-V 57
4 | Page
PART 1 – GENERAL INFORMATION
1.1 Introduction
The District of Columbia Housing Authority (“DCHA”) is dedicated to enhancing the quality of life in the District of Columbia by providing and effectively managing affordable housing, which is diverse, well maintained, and aesthetically pleasing for those whose circumstances prevent them from competing in the general marketplace. Besides operating approximately 7,700 units with public housing operating subsidy, DCHA also contracts approximately 25,000 units through its Housing Choice Voucher Program (“HCVP”). DCHA has embarked on an ambitious program of development and redevelopment to create economically diverse communities and neighborhoods.
DCHA is one of the most innovative housing authorities in the nation and is actively pursuing non-governmental sources of financing to promote HCVP homeownership assistance programs, project-based public housing subsidies, and implement more creative uses of its authority through the United States Department of Housing and Urban Development (HUD)’s Move to Work (MTW) Demonstration Program.
1.2 Background
The District of Columbia Housing Authority (DCHA) is dedicated to providing quality affordable housing to extremely low- through moderate-income households, fostering sustainable communities, and cultivating opportunities for residents to improve their quality of life. To support this mission, DCHA requires one or more qualified contractors to provide HVAC Preventive Maintenance, Repair , and Water Treatment Services. These efforts are specifically designed to support DCHA’s core initiative to provide livable housing that fosters healthy and sustainable communities
1.3 RFP Intent
The DCHA intends to use this Solicitation to contract with one or more qualified, licensed, and insured HVAC contractors that perform the work themselves, with their own employees, to provide the above noted services for a five (5) year term. DCHA reserves the right to make a single award or multiple awards, including separate awards by individual property or by group of properties (see Part 3, Multiple Awards). Your response to the Scope of Services must be complete, as it will become part of any contractual agreement. We appreciate the investment of time and resources firms are making by participating in this process. All submitted proposals shall be evaluated for responsiveness to the requirements of the Request for Proposal (“RFP”). Those submissions not in accordance with the RFP shall be deemed non-responsive and eliminated from further evaluation.
1.4 Agency’s Reservation of Rights
The DCHA reserves the following right in association with the RFP process and upon contract award.
1. Right to Reject, Waive, or Terminate the RFP. Reject any or all proposals, or to terminate the RFP process at any time, if deemed by the Agency, to be in its best interest.
2. Right to Not Award. Not to award a contract pursuant to this RFP.
5 | Page
3. Right to Terminate. Terminate a contract award pursuant to this RFP, in whole or in part (including as to any individual property), at any time for the Agency’s convenience upon thirty
(30) days’ written notice to the successful offeror(s).
4. Right to Determine Time and Location. Determine the days, hours, and locations that the successful offeror(s) shall provide the services called for in the RFP.
5. Right to Retain Proposals. Retain all proposals submitted and not permit withdrawal for a period of 90 days subsequent to the deadline for receiving proposals.
6. Right to Negotiate. Negotiate the fees proposed by the offeror(s).
7. Right to Reject Any Proposal. Reject and not consider any proposal that does not meet the requirements of this RFP, including but not necessarily limited to, incomplete proposals and/or proposals offering alternate or non-requested services.
8. No Obligation to Compensate. Have no obligation to compensate any offeror(s) for any costs incurred in responding to this RFP.
9. Subcontracting Prohibited. This solicitation is limited to firms that self-perform the work. The successful offeror(s)/contractor(s) shall not subcontract any portion of the work, and shall not assign any right, nor delegate any duty for the work proposed pursuant to this RFP (including, but not limited to, selling or transferring the contract) without the prior written consent of the Agency. Any purported assignment of interest or delegation of duty, without the prior written consent of the Agency shall be void and may result in the cancellation of the contract with the Agency or may result in the full or partial forfeiture of funds paid on the contract, as determined by the Agency.
10. Project Staffing Changes. Managers, other supervisory staff, and accountants may be changed if those personnel leave the firm, are promoted, or are assigned to another area.
These personnel may also be changed for other reasons. However, in either situation, the Agency retains the right to approve or reject replacements.
11. Right to Make Multiple Awards. Award one contract or multiple contracts pursuant to this RFP, by individual property, by group of properties, or for all properties, to the Respondent(s) whose proposals are most advantageous to DCHA, price and other factors considered.
1.5 Schedule of Events
DCHA will endeavor to follow the schedule set forth below; however, the activities and timetable represented below are a guideline only and are subject to change at DCHA’s sole discretion and without prior notice:
6 | Page
RFP Advertise Date: November 11, 2026 Issuance of RFP: November 9, 2026 Pre-Proposal Conference (Mandatory) & Virtual Q & A Pre-Proposal Conference & Q & A Session Link
November 30, 2026 12:00 PM
Deadline for Submission of Inquires/Questions: December 7, 2026 12:00 PM Submission of Proposals: December 22, 2026 12:00 PM Evaluation Period: December 23, 2026 DCHA Board Committee Review: TBD Presentation of DCHA Board of Commissioners for Contract Approval:
TBD
DC Council Review & Approval (Passive: 10 days; Active:
up to 45 days):
TBD
Contract Award: TBD
NOTE: DCHA reserves the right, at its sole discretion, to adjust this Schedule of Events as it deems necessary. If necessary, DCHA will communicate adjustments to any event in the Schedule of Events in the form of an addendum to this RFP. Addenda to this RFP will only be issued and posted on DCHA’s website at https://ha.internationaleprocurement.com/requests.html?company_id=506 and Housing Agency Marketplace (e-procurement) Vendor Portal. Addenda will not be mailed to potential Respondents. It is the responsibility of the Respondent to monitor DCHA’s website and electronic sourcing tool, Housing Agency Marketplace, for any addenda issued. Each Respondent must acknowledge all addenda issued so as to ensure that addenda are considered in their proposal response by submitting it with their proposal. Failure to include the Form in the proposal response may subject your Firm to disqualification.
1.6 Proposal Audit
Please note that all proposals will be retained by DCHA for audit purposes. DCHA reserves the right to reject any and/or all proposals, or to waive any informality in the proposals. Submissions received after the deadline will not be considered. An Offeror submitting a late proposal will be notified. All material submitted in the proposal becomes the property of DCHA and will not be returned.
1.7 Contract Term
Contract(s) awarded from proposals received in response to this solicitation will have a firm term of five (5) years from the date of award (Contract Years 1 through 5). There are no option years;
Respondents shall price all five (5) Contract Years for each property on Exhibit 1 – Cost Sheet. DCHA may terminate any resulting contract, in whole or in part (including as to any individual property), at any time, without cause, upon thirty (30) days’ written notice to the Contractor, and shall be liable only for services satisfactorily performed through the effective date of termination. Additionally, DCHA may, at its sole discretion and subject to any required DC Council approval, extend the contract on a month-to-month basis under the same terms and conditions to ensure continuity of services.
https://teams.microsoft.com/meet/2537030132412270?p=lHypyp45y5nh5BQOXQ https://ha.internationaleprocurement.com/requests.html?company_id=506
7 | Page
1.8 Communications
In order to maintain a fair and impartial competitive process, DCHA and any outside consultants assisting DCHA with this solicitation, shall avoid private communication concerning this procurement with prospective Respondents during the entire procurement process. From the issue date of this RFP until the final award is announced, Respondents are not allowed to communicate about this RFP for any reason with any DCHA staff and/or outside consultants assisting DCHA with this solicitation except:
(1) through the RFP Point of Contact named below;
(2) as otherwise specified in this RFP; and / or
(3) as provided by existing work agreement(s) (if any).
Prohibited communication includes all contact, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. DCHA reserves the right to reject the quote of any Respondent violating this provision.
A. Inquires and /or questions must be submitted via the DCHA’s E-Procurement Vendor Portal at the following link: https://ha.internationaleprocurement.com/requests.html?company_id=506.
DCHA will receive requests for additional information and/or clarification relative to this solicitation no later than 12:00 Noon on or before Monday, December 7, 2026.
B. Responses to these questions will be addressed in writing via the DCHA’s electronic procurement system. DCHA will not respond to questions and/or requests for information after the date stated above or received via e-mail or any other means.
C. It is the responsibility of the Respondent to monitor DCHA’s website and the E-
Procurement Vendor Portal for any addenda issued. All Respondents are encouraged to frequently check DCHA’s website/portal for additional information.
All requests for information or clarification pertaining to this solicitation must be addressed in writing.
RFP Point of Contact
Deborah Y. Barnes, Procurement Specialist Email: dybarnes@dchousing.org District of Columbia Housing Authority Contracts & Procurement Department 300 7th Street, SW 10th Floor Washington, DC 20024
[END OF PART 1 – GENERAL INFORMATON]
https://ha.internationaleprocurement.com/requests.html?company_id=506 mailto:dybarnes@dchousing.org
8 | Page
2.1 Description of Services
2.1.1 The work shall consist of the performance of Preventive Maintenance and Repair Services of HVAC Systems and Water Treatment at various DCHA public housing developments.
Services include, but are not limited to, the performance of cleaning, restoration and de-contamination, inspection, testing, Preventive Maintenance, repair service, emergency and non-emergency repair, and water treatment and building automation system controls. All HVAC and services performed under this contract shall comply with the most current approved edition of the National Fire Alarm Code (NFPA) including all appendix chapters, ASHRAE (American Standards of Heating Refrigeration and Air-Conditioning Engineers), ASME (American Society of Mechanical Engineers) standards, and act in accordance with District and Federal codes. The scope of services shall also comply with the prescriptive maintenance plan as detailed in the 2021 O&M Plan. The Contractor shall clean, provide scheduled maintenance and repairs to every component part of the HVAC and System;
whichever the case may be to provide continual operations of refrigeration, heating, ventilation, air conditioner, boiler, chiller, and water systems and water treatment systems and building.
2.1.2 The following Properties are included in this Scope of Work:
Senior Properties: Carroll Apartments, Claridge Towers, Ft. Lincoln Apartments, Garfield Sr., Greenleaf Sr. Harvard Towers, Horizon House, James Apartments, Judiciary House, Kentucky Courts, Knox Hill, LeDroit Sr. Potomac Sr. Regency House, Sibley Plaza, Colorado Apartments.
Family Properties: Potomac Gardens (8 Boiler Rooms), Stoddert/Ft. Dupont (11 Boiler Rooms), Syphax Gardens (5 Boiler Rooms), Greenleaf Family – 203 N Street, SW. (1 Boiler Room), Kelly Miller (1 Chiller Only).
2.1.3 Mechanical Equipment Summary: Mechanical Equipment Summary XL Spreadsheet is attached for reference only. The listed data may not be up to date due to continuous alterations/replacement of the equipment. The list provides the major equipment (such as the boilers, Domestic Hot Water Heaters, Chillers and Cooling Tower) Manufacturer/Model Number only.
2.1.4 Description and locations of systems are meant to be representative of the major equipment systems at each building, but in no way should be interpreted as a complete list of each building system. Equipment not listed but requiring servicing under the service and maintenance schedules is also to be considered a part of the contract. It will be the Contractor’s responsibility to survey each building and compile a list of all equipment required under the Service and Maintenance Schedules. The Contractor shall provide a copy of the building survey to DCHA within sixty (60) days of contract award.
2.2 Technical Specifications
2.2.1 The Contractor shall schedule and perform under the contract as outlined in the DCHA
9 | Page
Building Requirements and consistent with DCHA to cause minimum inconvenience to tenants affected by the work.
2.2.2 The Contractor shall provide services at the properties owned and/or operated by DCHA which includes Senior High Rise, Mid-Rise, and Family properties.
2.2.3 The Contractor shall provide all supervision, labor, tools, equipment, and materials necessary to inspect, adjust, replace or repair, in strict accordance with the items hereinafter specified:
a. Heating
b. Cooling
c. Domestic Hot Water Heaters
d. Chillers (Air Cooled, Water Cooled and Magnetic Bearing)
e. Pumps
f. Cooling Towers
g. Unitary Equipment
h. Water Treatment
i. Automatic Temperature Control
j. Heat Exchanger/Converter
k. Air Handling Units
l. Mechanical/Boiler Room Exhaust Fans including Roof Top Exhaust Fans
m. Heating/Cooling/Domestic Hot Water Expansion Tanks
n. Domestic Hot Water Storage Tanks
o. Fan Coil Units
p. Boiler (Natural gas-fired)
q. Oil/Gas Burners
r. Water Source Heat Pumps
s. HVAC System Air Filters
t. Mechanical Room Sump Pumps
u. Building Automation System Controls
2.2.4 The Contractor shall perform all system inspections, testing and balancing in accordance with the most current approved IMC International Mechanical Code, IMC National Fuel Gas Code, the SMACNA Sheet Metal Air Conditioning Contractors National Association standards, and all applicable District of Columbia and National Codes.
2.2.5 The Contractor shall perform all services, maintenance and repairs by fully qualified manufacturer-trained technicians. The Contractor shall maintain at all times a sufficient number of technicians to service the contract adequately. Evidence suggesting lack of knowledge or training by technician(s) shall be deemed a contract default and may result in contract termination. The Contractor shall submit a list of all service personnel and their qualifications that will perform work under the contract.
2.2.6 The Contractor is required to monitor equipment warranties and provide DCHA a minimum
90-day notification of equipment or service expiration. Contractor shall make every attempt
10 | Page to use environmentally safe and energy efficient equipment, products, and materials.
Replacement parts and equipment shall meet DCHA's energy program standards.
2.2.7 The Contractor shall provide and maintain insurance coverage for all materials and portions of work stored in an off-site, bonded warehouse, after written approval of DCHA, at the value established in the approval, and for the portions of the work in transit for the term of the contract.
2.2.8 Contractor shall be required to make renewal, repair, replacement, or perform any work necessitated by reason of deliberate vandalism of the equipment by others or other causes beyond the Contractor's control, when directed by DCHA, in writing. Contractor reimbursement for such work shall be in accordance with the established hourly rates and presented in the Unit Price Schedule.
2.2.9 All defects or damages caused by normal wear and tear shall be contract responsible items.
2.2.10 The Contractor shall be fully responsible and pay for any damages such as freezing pipes, flooding, etc., resulting from Contractor’s actions or negligence.
2.2.11 In the event repair parts are unavailable due to obsolescence, the Contractor shall exercise reasonable efforts to obtain replacement parts. In the event replacement parts are unobtainable, Contractor shall submit a written proposal to DCHA outlining an alternative solution or parts to repair the equipment, if possible.
2.2.12 The Contractor shall inform and coordinate all System Shutdowns with the COTR and
Property Manager. Contractors shall maintain consistent communication with DCHA to convey the status and specify shut down reason(s), parts on order, major repairs, etc. For Shutdowns that will last more than twenty-four (24) hours in duration, Contractor shall carefully schedule all non-emergency shut downs of HVAC Systems with the Property Manager and COTR. In addition, the affected portion of the system shall be tested to ensure that full operation has been restored.
2.2.13 The Contractor shall notify the COTR immediately of the necessity to drain any part of the systems serviced under the contract.
2.2.14 All work required herein shall be performed as promptly as possible, and within the response time set forth herein. Such work shall be subject to approval and acceptance by DCHA;
however, such approval and acceptance shall not relieve Contractor from the obligation to correct any incomplete, inaccurate or defective work, all of which shall be promptly remedied by the Contractor on demand and without cost to DCHA.
2.2.15 Each Contractor employee shall sign in when entering the building, state the purpose of the visit, (for example, scheduled maintenance, service call, or repairs), and sign out when leaving the building. Supervisory employees shall indicate their titles adjacent to their signatures. The COTR will designate the location of the log and type of form used.
11 | Page
2.2.16 Services that are not listed in the Contractor's Proposal will be set forth as individual work orders. Such services shall be forwarded to the COTR in the form of a Proposal with a detailed scope of work and cost of services. Service Proposals shall be negotiated with the contractor, and services shall be performed only after the Scope of Work and Cost of Services have been agreed upon by DCHA's Contracting Officer and or COTR.
2.2.17 The premises used by the Contractor for the work shall be kept clean and in a neat condition at all times. Any and all debris shall be removed and disposed of, off the site, by the Contractor. The Contractor shall leave areas where he performs work neat, clean, orderly, and free of excess debris and materials generated by these operations.
2.2.18 The Contractor shall perform all work at the site on a continuous basis with minimum interruption to the system (as much as practicable). The Contractor shall provide twenty-four (24) hour notice prior to and coordinate with the Property Manager and COTR all System Shutdowns.
2.2.19 DCHA will provide information concerning the heating and air conditioning systems pertinent to this contract. Model number and capacity sizes are subject to change due to the replacement or upgrade of the equipment.
2.2.20 The Contractor understands and agrees that DCHA reserves the right to add, delete, or otherwise make reasonable changes to provisions of the contract as conditions change, with a 30-day written notice.
2.3 Preventive Maintenance
2.3.1 The HVAC Systems Preventive Maintenance at various DCHA Properties shall be performed by the Contractor to ensure that HVAC systems and Water Treatment remain operable at all times, except while being tested or repaired.
2.3.2 Preventive Maintenance Services shall be performed Monday through Friday between the hours of 8:15 A.M. and 4:45 P.M. Services shall include, but are not limited to, the inspection, testing, preventive maintenance, seasonal start-up and shut down services, annual service, and Water Treatment of a variety of HVAC equipment and components.
2.3.3 The Contractor shall develop and submit an Annual Preventive Maintenance Program
Schedule to include PM Code, service intervals (day and dates) with a service checklist for each PM Code based upon all components and consistent with the DCHA HVAC Systems and Water Treatment Preventive Maintenance Building Requirements and the Water Treatment Operation and Instruction Guide.
2.3.4 The Contractor shall perform all work items prescribed herewith as the Preventive
Maintenance Scope of Work for the full five (5) year contract term, at the service intervals indicated.
12 | Page
2.3.5 In addition to the aforementioned maintenance, the Contractor shall inform DCHA of any required additional maintenance or unscheduled work that is part of the equipment manufacturer's standard recommendations and perform such work.
2.3.6 The Contractor shall prepare and submit monthly Preventive Maintenance Schedules describing the preventive maintenance activities planned for the ensuing month. The report shall list the PM Code, Dates, Preventive Maintenance to be performed by location and address, and the equipment serviced. The purpose of the schedule is to permit DCHA Mechanical Operations Division and/or Property Management personnel to observe the work in progress if so desired.
2.3.7 The Contractor shall provide monthly Maintenance Schedules based upon the approved
Annual Preventive Maintenance Schedule and update the Maintenance Schedules upon completed Preventive Maintenance.
2.3.8 The Contractor shall submit Monthly and Annual Preventive Maintenance Schedules in written and electronic format to facilitate Contractor and COTR review and revision(s). [Microsoft Project, Excel, or fillable PDF files are acceptable and preferred.]
2.3.9 The Contractor shall submit Monthly Preventive Maintenance Schedules to the COTR by the first Friday of the month prior to service. The COTR shall review and approve prior to performance of the scheduled Preventive Maintenance.
2.3.10 Chiller Disinfectant Cleaning: This Scope of Work also defines the requirements for the disinfectant cleaning of chiller systems located at DCHA operated facilities. The objective is to ensure that all chiller components, including evaporator and condenser water circuits, are cleaned and disinfected in compliance with industry standards to eliminate biofouling, bacterial growth (including Legionella), scale, and other contaminants that may affect system efficiency, safety, and indoor air quality.
2.3.11 Services to be Performed
The Contract shall provide all labor, supervision, tools, equipment, personal protective equipment (PPE), and cleaning/disinfectant materials necessary to complete the following tasks:
a. Pre-Cleaning Inspection -Visually inspect chiller and associated water circuits (evaporator and condenser side) for biofilm, corrosion, scale, and debris.
b. Document water quality parameters (pH, conductivity, microbiological levels)
c. Notify DCHA of any conditions that may affect cleaning or require additional corrective actions.
2.3.12 System Isolation and Preparation
a. Coordinate with the Property Manager and COTR to schedule and isolate the chiller for cleaning.
b. Lockout/tagout electrical and mechanical systems as per safety protocols.
13 | Page
c. Drain and finish the chiller water circuit prior to applying cleaning chemicals.
2.3.13 Chemical Cleaning and Disinfection
a. Apply a manufacture-approved, non-corrosive biocidal disinfectant solution formulated for HVAC water systems.
b. Circulate the disinfectant solution through the chiller system (minimum 6 hours or as a recommended by the product manufacturer.)
c. Ensure cleaning reaches all areas including tubes, heat exchangers, and reservoir tanks.
d. Monitor pH and chemical concentration throughout the process.
2.3.14 Rinse and Neutralization
a. Thoroughly flush the system with clean water to remove all residues of disinfectant and loosened debris.
b. Apply a neutralizing agent if required to return water to acceptable pH levels before system startup.
c. Dispose of all wastewater and cleaning fluids in compliance with federal, state, and District of Columbia environmental regulations.
2.3.15 Post-Cleaning Verification
a. Re-inspect system for cleanliness
b. Collect and analysis water samples to confirm bacterial counts are within acceptable limits (e.g., <10 CFU/mL. Legionella).
c. Submit cleaning report, including:
• Pre- and post-cleaning water test results
• Description of chemicals used
• Date/time of cleaning
• Observation and recommendations
2.3.16 Performance Standards and Compliance. All work must be conducted in accordance with:
o ASHRAE Guideline 12-2020: Minimizing the Risk of Legionellosis
Associated with Building Water Systems o OSHA 1910.1200: Hazard Communication Standard o EPA and CDC guidelines for HVAC system sanitation
a. Contractors must wear appropriate PPE and following DCHA safety policies
b. Chemicals used must be EPA-Registered and compatible with chiller system components.
2.3.17 Schedule and Coordination
a. Cleaning services shall be performed during the off-peak seasons (spring/fall) or during a scheduled system outage.
b. A minimum 72-hour notice must be provided to DCHA before system shutdowns.
14 | Page
c. Emergency chiller cleanings may be requested and performed upon written approval by DCHA.
2.3.18 Deliverables – Chiller Disinfection Report, including:
a. Inspection findings
b. Cleaning methodology
c. List of chemicals of SDS
d. Water test results
e. Certification of system readiness for operation
2.4 Service Call Requirements
2.4.1 General Service Call Requirements
Service calls—including shutdowns, correction of deficiencies, callbacks, and both scheduled and unscheduled repair items—shall be performed Monday through Friday between 8:15 A.M. and 4:45 P.M., as requested by the Contracting Officer’s Technical Representative (COTR). A list of authorized representatives will be provided to the Contractor.
a. Classification of Service Calls: Service calls for repair shall be classified as either:
o Critical: Affects building occupancy or essential operations.
o Non-Critical: Minor issues that do not impact immediate use or function.
Classification will be determined by the Ordering Official or the Authority Having Jurisdiction (AHJ).
b. Response Time- Non-Critical Service Calls:
o The Contractor shall respond to Non-Critical Service Calls within four (4) hours to repair, replace, or correct HVAC system and/or equipment malfunctions.
c. Response Time – Critical/Emergency Service Calls:
o The Contractor shall respond to Critical to Emergency Service Call withing two
(2) hours. These are defined as situations that affect.
o The continued occupancy of a building or Vital operations within a building.
d. Maintenance Service Calls o These are related to the routine maintenance of HVAC systems and are non-reimbursable under this full-maintenance contract.
e. Reporting of Deficiencies o The Contractor shall report all deficiencies. A deficiency is defined as any component or device that cannot be calibrated, tested, or serviced in accordance with the preventive maintenance schedule or the manufacturer’s recommendations.
15 | Page
f. Minor Repairs under $500 o The Contractor shall correct, at its own expense, all minor malfunctions of
HVAC systems costing less than $500 per device as part of the routine preventive maintenance program.
o Repairs exceeding $500 per device must follow the Scheduled and Unscheduled Work Procedures.
o Once all repairs’ listed deficiencies are corrected, the Contractor shall sign and date the inspection report and return it to the COTR.
o DCHA may re-inspect the work at its discretion.
g. Approval for Repairs over $500 o The Contractor must obtain prior approval from the DCHA Contracting Officer or COTR for all repairs that exceed $500 per device.
h. Service Callbacks (Non-Emergency) o The Contractor shall respond to callbacks within 48 hours to address unresolved or recurring issues from a previous service call. Labor shall be provided at the Contractor’s expense, except for the cost of new parts.
i. Breach of Contract o Failure to meet the required response times for any service call classification will be considered a breach of contract.
2.4.2 After Hours and Premium Services Requirements
The Contractor shall provide HVAC service response 24 hours a day, 7 days a week, including holidays, at premium rates during the following hours;
o Monday through Friday: 4:45 P.M. to 8:15 A.M.
o Saturday and Sunday: 24-hour availability o All Holidays: 24-hour availability
a. Emergency Callbacks (After-Hours) The Contractors shall respond to emergency callbacks within 24 hours for critical HVA system malfunctions previously reported. Labor for such follow-up services shall be provided at the Contractor’s expense, excluding the costs of parts, as part of the original emergency service call.
2.5 Scheduled and Unscheduled Work Items
2.5.1 Repairs are defined as unscheduled work required to repair or modify HVAC systems and water treatment equipment.
2.5.2 Parts and Material Standards
a. Replacement parts must be delivered and installed within 24 hours, unless an extension is approved in writing by the COTR.
16 | Page
b. The Contractor shall maintain a stock of common replacement items at all times.
c. All replacement items must:
o Match the style, size, and appearance of existing components o Be new, not refurbished or used o Comply with all District of Columbia building codes.
2.5.6 Unit Price Schedules
Unit Price Schedules shall cover the cost of labor, materials, tools, and equipment for repairs up to $2,000.00 per single repair. These schedules must itemize:
a. Units
b. Components parts
c. Labor hours
d. Material descriptions
2.5.7 Cost Proposals for Larger Repairs
For any single repair estimated to exceed $2,000.00, the Contractor shall:
a. Prepare and submit a detailed cost proposal.
b. Include all necessary materials, labor, equipment, and other relevant information.
2.5.8 Proposal Approval
The Contractor may begin work only after written approval of the cost proposal by the DCHA Contracting Officer or COTR.
2.5.9 Competitive Solicitation Option
For repairs where the total estimated cost exceeds $2,000.00, DCHA reserves the right to:
a. Solicit proposals from multiple vendors to ensure best value and competitive pricing.
2.6 Emergency Services
2.6.1 Definition
Emergency services include any situation that:
a. Poses a threat of injury to persons or damage to property, or
b. Could cause further equipment damage or create unsafe conditions for residents if not corrected immediately.
2.6.2 Availability
The Contractor shall provide emergency HVAC service 24 hours a day, 7 days a week, including weekends and holidays.
17 | Page
2.6.3 Emergency Response Time
The Contractor shall respond to emergency calls within two (2) hours of notification.
2.6.4 Major Malfunctions
A major malfunction is defined as:
a. A repair that requires more than $500.00 in parts, labor, and equipment per item, per occurrence.
b. The Contractor must immediately report such malfunctions to the COTR and await further instruction.
2.6.5 Emergency Call Cost Policy
Emergency service calls shall be provided at no additional cost to DCHA, except under the following conditions:
a. Malfunctions previously reported to DCHA
b. Missing or inoperable items noted at contract award.
c. Major malfunctions previously corrected.
d. Inability to access equipment due to circumstances beyond the Contractor’s control.
2.6.6 Emergency Service Callbacks
For critical systems previously reported and not properly restored:
a. Emergency callbacks must be responded to within 24 hours
b. Labor for callbacks shall be the Contractor’s expense, excluding the costs of replacement parts.
2.7
Inspection and Acceptance.
2.71. Permits and Regulatory Compliance
The Contractor shall procure and pay for all inspections, permits, and licenses necessary to perform the work defined in this contract. All regulatory approvals must be secured prior to system operation.
2.7.2 DOB Inspections
a. The Contractor shall coordinate directly with the District of Columbia Department of
Buildings (DOB) to request and schedule required inspections in accordance with local building codes.
b. The Contractor is responsible for ensuring that all required inspections are completed and approved by DOB at least thirty (30) calendar days before any seasonal equipment start-up.
c. If DOB approval is not secured within this period, the Contractor shall be responsible for
18 | Page providing temporary heating or cooling at no additional cost to DCHA to maintain resident safety and comfort.
2.7.3 DCHA and Third-Party Oversight
a. DCHA reserves the right to conduct inspections or tests at any time to verify compliance with contract performance requirements, applicable codes, and the manufacturer’s specifications.
b. In addition, DCHA may, at its discretion, engage a third-party independent inspection service to:
o Audit preventative maintenance, repairs, or major system replacement o Confirm code compliance, operational reliability, and quality of workmanship o Verify accuracy of Contractor-reported inspection findings or completion reports
c. The Contractor shall fully cooperate with third-party inspectors, provide access to work sites and documentation, and address any deficiencies noted in third-party reports promptly and at no additional cost to DCHA.
2.7.4 Material and Workmanship Standards
a. All work performed and materials furnished by the Contractor shall be subject to inspection and testing by DCHA, DOB, and any third-party inspector designated by
DCHA.
b. Nonconforming work or materials shall be rejected and must be corrected or replaced at the Contractor’s expense without delay.
2.7.5 Inspection Reporting Requirements
The Contractor shall submit written inspection reports to the COTR within five (5) business days following each inspection. Reports must include:
a. Date of inspection
b. Property and equipment inspected
c. Findings and results
d. Corrective actions taken (if applicable)
e. Inspector’s name and credentials
f. Certification of compliance
Reports must be submitted in a format approved by DCHA (e.g., Microsoft Word, Excel, or fillable PDF).
2.7.6 Combustion Testing
a. The Contractor shall conduct combustion testing a minimum of three (3) times per heating season (October, December, and February).
b. Additional testing may be required at the request of DOB, DCHA, or a third-party inspector.
19 | Page
2.7.7 Annual Boiler Room Inspection
The Contractor shall perform an annual inspection of the boiler room during the heating season. These inspections shall cover:
a. Operational status of all components
b. Code compliance and system safety
c. Cleanliness and physical condition
d. Labeling, documentation, and emergency procedures DCHA and its designated third-party inspector may jointly participate or audit these inspections.
2.8 Deliverables
2.8.1 Service and Maintenance Reports
Serve and Maintenance Report (Forms 1000) for each service call and shall clearly indicate the nature of the work performed in accordance with the guidelines stated in the section: Special Conditions.
2.8.2 HVAC Permits
The Contractor shall renew HVAC permits, as necessary, prior to expiration. The Contractor shall pay all fees associated with the permit renewal and perform all required testing, adjustments, and repairs as mandated by the District of Columbia for permit issuance.
2.8.3 Manufacturer’s Price Listing
Before any work begins, the Contractor shall provide three (3) copies of manufacturer’s price listings or catalog and/or company pricing for stock materials, equipment, and parts, inclusive of mark-up, to be used under this contract. Acceptable examples include United Refrigeration, Inc., W.W. Grainger, and R.E. Michel Co. Failure to submit this may delay payment.
2.8.4 Notifications to Property Manager and COTR
Prior to beginning any site work, the Contractor must notify the respective Property Manager and
DCHA COTR.
2.8.5 Material Safety Data Sheets (MSDS)
Contractor shall provide current MSDS for all hazardous materials used onsite. Copies must be delivered to both the COTR and Property Manager.
2.8.6 Monthly Service Records
The Contractor shall submit monthly service records to DCHA, including reports for repairs, 20 | Page service calls, and inspections. Reports must identify the cause of the issue and the resolution.
Submission is a condition of payment.
2.8.7 Annual Detailed Condition Report
Within 30 days of contract award—and annually by October 1 thereafter—the Contractor shall submit a detailed written report listing: property name, equipment condition, required repairs or replacements, and estimated costs. This report will inform DCHA’s planning decisions.
2.8.8 60-Day System Assessment
Within 60 days of contract execution, the Contractor shall submit an updated inventory of all HVAC equipment, including model numbers, serial numbers, and condition. The assessment shall also include recommendations for repair and estimated costs, submitted in a format approved by
DCHA.
2.8.9 Check In/Out Procedures
All maintenance personnel must log in and out and submit a signed job work ticket to the Property Manager or designee. After-hours tickets must be forwarded to the DCHA HVAC COTR on the next business day.
2.8.10 Logbook Entry Requirements
Each logbook entry must include:
o Time-in/out o Full name of employee(s) o Type of service (e.g., Repair, PM, Service Call) o Date and time of DCHA's service request o Requestor and responding Contractor personnel
This information must be logged in both the Property Manager’s and Boiler Room HVAC logbooks.
2.8.11 HVAC Logbooks
Two (2) HVAC logbooks shall be maintained per location: one in the Manager’s Office and one in the equipment room. A secure, locked cabinet (approx. 18” W x 7” D x 18”H) shall be installed in the boiler room by the Contractor, at Contractor’s expense. Cabinets must be keyed alike, and one key provided to the COTR. All cabinets, keys, and logs become DCHA property at contract termination.
Job Work Tickets
For every job, the Contractor must complete a work ticket including:
o Date, time-in/out (AM/PM)
21 | Page o Building name and address o Description of work performed o Onsite conditions and recommendations o Replacement part/equipment model and serial numbers o Names of mechanic(s) and helper(s)
a. Tickets must be signed by the Property Manager or designee, with all handwritten changes initialed.
b. After-hours tickets must be submitted to the COTR the following business day.
c. Tickets must be submitted by the second Friday of the month after work completion.
Incomplete tickets may delay invoice processing.
2.8.12 Monthly Preventive Maintenance Schedules
Contractor shall provide a monthly PM schedule identifying:
a. Planned activities
b. Property locations
c. Equipment serviced
d. Steam boiler blow-down tasks (if applicable)
DCHA Mechanical Operations Division and Property Management staff may observe the work.
2.8.13 Maintenance Scheduling
Before any work, the Contractor shall submit a written weekly maintenance schedule to the COTR, detailing dates, times, and locations of service. DCHA reserves the right to modify this schedule.
2.8.14 Maintenance Reports
A maintenance report shall be submitted for each scheduled service—monthly, quarterly, semi-annually, and annually—as specified in the technical requirements.
2.8.15 Monthly Log Sheets
Submitted with each monthly payment request, the log sheet shall include:
a. Property name
b. Type of service (PM, inspection, repair, service call)
c. Date of service
d. Contractor work ticket and control number
e. Invoice amount
22 | Page
Provide a log sheet with all the properties with their total amount billed for the month. Each sheet shall also be subtotaled by service type.
2.8.16 Daily Activity Reports
Contractor shall email a Daily Activity Report by 4:00 PM each business day, showing:
a. Date and day of week
b. Property and address
c. DCHA personnel requestor
d. Contractor responder
e. Names of dispatched staff
f. Control numbers
g. Nature of complaint
h. Status (e.g., completed, in-progress, parts ordered)
2.8.17 Submission Requirement
Daily Activity Reports must be emailed to the COTR and DCHA Utility Systems Operations Manager.
2.8.18 As-Built Wiring Diagrams
When any modification to HVAC systems occurs, Contractor shall submit two complete sets of updated “As-Built” wiring diagrams. Diagrams must include:
• Straight-line diagrams
• Electrical functions and sequences
• Cuts, part numbers, and symbols
• Identifying equipment names
DCHA will provide current diagrams upon award if available.
2.8.19 Operation & Maintenance Manuals
Following major equipment installation, Contractor shall:
• Provide one day of in-person training by factory-trained technicians for DCHA staff
• Deliver service and maintenance manuals to the COTR
2.8.20 Third-Party Inspection Documentation
If DCHA designates an independent third-party inspector for any part of the system, the Contractor shall:
• Coordinate access and provide all necessary documentation and system data requested
23 | Page
• Respond in writing to any deficiencies or findings reported by the third-party inspector within five (5) business days
• Submit written documentation confirming resolution of issues identified by third-party inspections
Failure to comply with third-party inspection protocols may result in payment delays or corrective action.
2.9 Contract Administration Summary
o Contract Authority
Only the Contracting Officer (Executive Director of DCHA or designee) can legally bind DCHA.
2.9.1 – Monthly Payment Request Requirements
Package #1: Payment Request Documents
Due: By 2nd Friday of the month after the service month
1. Form DCHA 306A o Annual contract value (purchase order amount) o % of work completed (based on annual work in place) o PM and repairs for the month
2. Original Invoice must include: Contractor name and address o Service and invoice dates o Contract, order, job ticket, and invoice numbers o Property name/address o Service description (PM codes, parts, labor) o Remit address o A/R contact info o Unit and extended prices o Total cost
3. Optional: Monthly summary invoice (but not in lieu of individual ones) o Categorized and subtotaled by: Preventive Maintenance o Inspection o Repairs < $2,000 o Repairs ≥ $2,000 (listed individually)
4. HUD Form 51000 (Schedule of Amounts) o Totals by category: PM, inspections, small/large repairs
5. Copy of Purchase Order
6. Approved Proposals with Scope of Work for each repair ≥ $2,000
Package #2: Supporting Documentation
1. Monthly Log Sheet o By property and type of service o Visit date
24 | Page o Contractor/work ticket number o Billable vs. non-billable o Invoice amount o Subtotals per service type
2. Approved PM Schedule (Monthly)
3. Work Tickets
4. Inspection Reports
2.9.3 Major Installations
• Submit 3 copies of the following:
o Contractor Warranty o Certificate and Release
2.9.4 Work Tickets
• Must be signed by authorized building staff
• Must include:
o Name/location, service date, arrival/departure time o Work description o Model/part/serial numbers o Deficiencies noted o Name/titles of servicing personnel
2.9.4 Cost Proposals for Additional Work
• Must be approved by COTR before stating
• Written cost proposal required if over $2,000
Must include:
o Job location and scope o Labor and material breakdown o Manufacturer, part numbers, warranties o All parts/equipment must be new
CO will issue official contract modification or change order
2.9.5 Material Cost Reimbursement
• Reimbursed cost + 10% markup, with manufacturer invoice
2.9.6 Labor Cost
• Paid at the hourly labor rates in Exhibit 1 – Cost Sheet, Part B, for the Contract Year in which the work is performed (Contract Years 1–5)
25 | Page
2.9.7 Unauthorized Work
Work is considered unauthorized if:
• Done before Notice to Proceed
• Beyond project scope
• Extra work not approved in writing
• Deviates from contract without written permission
DCHA not liable for unauthorized work; may order rework at Contractor’s expense
2.9.8 Guarantee of Work
General Guarantee (1 Year)
• From date of written acceptance
• Contractor must fix/replace defects in material/workmanship at no cost to DCHA.
• Disturbed Work from Other Contracts
Must restore and guarantee disturbed work at same level as originally guaranteed
Failure to Fulfill Guarantee
• DCHA may fix it and charge Contractor, or leave it defective and deduct estimated repair cost
Special Guarantees
• New HVAC Equipment: 1 full operating season (excludes vandalism/improper maintenance)
• Compressors (>5 HP): 5 years
• If there's a conflict between general and special guarantees, the special one prevails.
Compliance Checklist: Section 2.9.9
26 | Page
Task Frequency/Trigger Responsible Submit Form 306A with invoice & PM summary Monthly Contractor Provide individual invoices + monthly summary invoice Monthly Contractor Complete HUD Form 51000 Monthly Contractor Include purchase order copy & proposals for repairs ≥ $2K
Monthly Contractor
Submit logs, approved PM schedule, work tickets & inspections
Monthly Contractor
Submit warranty & release cert for new installations Upon major installation
Contractor
Obtain signature on all work tickets Per service call Contractor Submit written cost proposal for all jobs > $2K Before work Contractor Provide manufacturer invoice for all reimbursed materials As applicable Contractor Maintain compliance with all labor rates in Unit Price Schedule
Ongoing Contractor
Avoid unauthorized work or deviation Always Contractor Fulfill 1-year general guarantee, 5-year for large compressors
Post-installation Contractor
2.10 Special Conditions
2.10.1 Access to the Buildings and House of Work
The Contractor shall have access to sites from 8:15 a.m. to 4:45 p.m., Monday through Friday, or in the case of emergencies, as directed. Other periods of access or work must be approved by the Contracting Officer. It is the Contractor’s responsibility to pay personnel the appropriate wage rates, as set forth in Part 4, Labor Standards, Prevailing Wages and Davis-Bacon Requirements, including for all after-hours, weekend and holiday work.
2.10.2 Communications
All notices, demands, requests, instructions, approvals, proposals, and claims must be submitted in writing to the Contracting Officer.
2.10.3 Replacement Items
The Contractor shall maintain a complete and ample stock of standard replacement items.
Replacements must conform in style, size, and appearance to existing items. Major replacements, as determined by the COTR, shall require DCHA approval prior to installation. Wiring must comply with the D.C. Electric Code and National Electrical Code.
2.10.4 Preventive Maintenance
a. Contractor shall assign a full-time locally based (DC Metropolitan Area) Contract
Representative to DCHA. This representative must be available for general and technical
27 | Page contract-related inquiries during normal business hours.
b. Individuals performing services shall be appropriately trained and qualified.
c. Contractor shall provide written monthly or quarterly lists of critical maintenance items by property, for planning and budgeting, aligned with DCHA’s Maintenance Plan. The monthly report must summarize the prior month’s maintenance and flag any capital planning needs.
d. All work shall comply with applicable local codes. Bar code tags on equipment must be replaced when removed or when equipment is replaced.
2.10.5 HVAC System and Water Treatment…