RFP-00055711-JD_Appendicies 1-5_11.17.26.pdf

PDF 697 KB Posted

Attached to
Enrollment & Tuition Strategic Service
Solicitation number
BPM059796
Issued by
Prince George's County, Choptank CDP, Maryland

About this file

This document comprises Appendices 1-5 of a Request for Proposal (RFP-00055711-JD) issued by the University of Maryland College Park, containing instructions to bidders, evaluation criteria, standard terms and conditions, and required affidavits and certifications. The RFP requires submission of proposals in two separately sealed volumes—a Technical Volume and a Financial Volume—delivered electronically to a designated Box folder by December 8, 2026, at 1:00 p.m. EST/EDT. Proposals must be prepared in the official name of the bidding firm or individual, signed by an authorized representative, and clearly marked with the RFP number and contractor name. The University reserves the right to request oral presentations and product demonstrations from short-listed proposers, with dates to be determined following technical proposal evaluation. Award will be made to the responsible offeror whose proposal represents the best value to the University. Proposals remain valid for a minimum of 120 days following the closing date, with automatic renewal for successive 120-day periods until an award is made or proper written notice of withdrawal is provided.

The evaluation methodology employs a concurrent technical and financial review process utilizing a "go/no-go" or "pass/fail" standard for technical specifications and business requirements, with only technically acceptable contractors advancing to financial evaluation. Technical evaluation criteria include contractor qualifications and references, demonstrated understanding of mandatory and preferred requirements, financial proposal completeness, proposal clarity, and economic benefit to Maryland's economy. The financial proposal must be submitted on the University's provided pricing sheet, with the University reserving the right to request best and final offers. Contractors must comply with all applicable federal, state, and local laws, including Maryland's Commercial Nondiscrimination Policy, Minority Business Enterprise requirements, and Social Responsibility Laws. Required affidavits include certifications regarding commercial nondiscrimination, bribery convictions, tax payment, MBE compliance, drug and alcohol-free workplace compliance, and financial and political contribution disclosure. All contractors exceeding $200,000 in contract value must file financial disclosure and political contribution statements with the appropriate Maryland state entities within specified timeframes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIVERSITY OF MARYLAND COLLEGE PARK REQUEST FOR PROPOSAL

Appendix #1-Instructions to Bidders

RFP Appendix #1 1 of 4

A1-1. Submission of Proposals Proposals must be:

A. submitted in the designated format B. made in the official name of the firm or individual under which Contractor's business is conducted (including the official business address), C. signed by a person duly authorized to commit Contractor to the proposal, electronic signatures are acceptable D. submitted electronically clearly marked with the assigned RFP number and Contractor name as described below E. separated into Technical and Financial volumes, and F. addressed to the Procurement Officer identified as the Point of Contact in the Issuing Office

The Contractor must submit one electronic version of the Technical volume plus one electronic version of the Financial volume separately to the following Box folder: https://bit.ly/00055711-

JD.

Commingling of technical and financial information or failure to submit the two volumes separately, or as instructed, may result in the proposal being deemed non-acceptable.

Submittals deemed non-acceptable will be rejected. The volumes, which contain the offer to be considered, must be clearly identified as the RFP-00055711-JD-Contractor Name, Technical Volume and RFP-00055571-JD-Contractor Name, Financial Volume.

NOTE: PROPOSALS SUBMITTED THROUGH MEANS OTHER THAN IDENTIFIED WILL NOT BE

ACCEPTED.

A1-2. Due Date Proposals must arrive at the location identified in Section 2.4 of this document on or before December 8, 2026, 1:00 p.m. EST/EDT as applicable, in the designated format.

Depending upon the subject matter of the RFP, Contractors may be required to submit hard copy proposals. In these instances, Contractors are to allow sufficient time for delivery to ensure timely receipt by the Issuing Office.

Proposals, amendments to proposals, or requests for withdrawal of proposals arriving after the closing time and date shall not be considered.

There shall be no public opening of the proposals. The names of Contractors will not be released until after award.

A1-3. Late Proposals

Any proposal, request for withdrawal, or modification of a proposal including a Best and Final Offer (BAFO) that is not received at the designated location at the designated due date and time will be considered late and will be rejected as non-acceptable. Delivery of the proposal to the specified location by the prescribed date and time is the sole responsibility of the Contractor. Exceptions may be authorized, at the sole discretion of the Procurement Officer, when the reason for the late proposal, late request for withdrawal, late modification of a proposal or BAFO is due to the action or inaction of the University. A record of the late proposal, request for withdrawal, modification of a proposal or BAFO will be retained in the appropriate procurement file.

https://bit.ly/00055711-JD https://bit.ly/00055711-JD

RFP Appendix #1 2 of 4

A1-4. Duration of Proposal Offer Proposals will be valid for a minimum of 120 days following the closing date of this RFP. If an award is not made during that period, the proposal will automatically extend for another 120 days, unless the Contractor gives specific written notice to the Procurement Officer at least 15 days before the expiration of the then current 120-day period. Proposals will automatically renew for an additional 120 days until such time as an award is made or proper written notice is given to the University of Contractor's intent to withdraw its proposal. By submission of a proposal, Contractor guarantees that its offer shall be firm for the period specified in this clause.

A1-5. Amendments to the RFP

If it becomes necessary to revise any part of this RFP, notice of the revision will be issued in the form of an Amendment to Contractors on record with the Procurement Officer as having received this RFP. All Amendments shall become a part of this RFP. Each Contractor is required to acknowledge receipt of Amendments. Failure of a Contractor to acknowledge any Amendment will not relieve the Contractor of responsibility for complying with the content of the Amendment.

A1-6. Alternate Proposals Alternate proposals shall not be allowed or accepted, nor will they be considered, for this solicitation.

A1-7. Economy of Preparation Each proposal is to be prepared simply and economically, providing a straightforward, concise description of the Contractor's offer and capabilities to satisfy the requirements of this RFP.

Emphasis is to be placed on clarity of content and providing a complete response.

A1-8. Unable to Propose If Contractor is unable or unwilling to submit a proposal in response to the requirements, Contractor must indicate this in writing to the Procurement Officer on or before the proposal due date. Electronic mail is an acceptable delivery method for submittal of the Contractor’s inability to submit a proposal. UMD requests that Contractors who are unable to respond include a brief explanation of the rationale for non-submission of a proposal.

A1-9. Public Information Act Notice Contractors are required to specifically identify those portions of their proposals that they deem to contain confidential, proprietary information, or trade secrets. The Contractor is further required to provide specific justification, with respect to each separate portion identified, as to why the materials, upon request, should not be disclosed by the State under the Access to Public Records Act, State Government Article, Title 10, Subtitle 6, Annotated Code of Maryland.

For claims of confidentiality to be considered, Contractors must clearly identify and provide individual justification for each and every section that is claimed to contain confidential, proprietary information or trade secrets. It is not sufficient to preface your proposal with a proprietary statement, or to use a page header or footer that arbitrarily marks some or all pages as confidential. General claims of confidentiality or similar blanket designations will not be accepted and may result in a proposal being deemed non-acceptable, at the discretion of the Procurement Officer.

RFP Appendix #1 3 of 4

A1-10. Cancellation of the RFP The University may cancel this RFP, in whole or in part, or reject any or all proposals submitted in response to the RFP when such action is determined to be fiscally advantageous to the University and/or the State or otherwise in the best interest of the University and/or the State.

A1-11. Two Volume Proposal The selection procedure for this procurement requires an independent evaluation of the technical and financial proposals. This separation allows for evaluation of technical proposals, on a “go/no-go” or “pass/fail” decisional rule based on meeting the technical specifications and business requirements. Consequently, Contractor is required to submit its proposal in two separately sealed volumes as indicated in Section 1.

A1-12. Volume 1-Contractor Qualifications, Technical Requirements/Specifications, Business Requirements

A. Executive Management Summary The Contractor’s response is to contain an Executive/Management Summary. This section of the Contractor’s offer is to contain a brief synopsis of how the Contractor's proposal meets the needs of the University.

B. Technical Proposal Contractors are expected to read the specifications, requirements, and qualifications very carefully and to submit questions, in writing, by the due date for questions.

Misinterpretation of specifications, requirements, or qualifications by the Contractor do not relieve the Contractor of responsibility to accurately address these components of this RFP or to perform the contract, if awarded.

The information/items specified as Specifications, Requirements, and/or Qualifications must be addressed in the technical proposal. The proposal must expressly indicate that it satisfies each point of the RFP Requirements, Specifications and/or Qualifications referenced in Section 4.1. Simple YES or NO responses to stated requirements are insufficient. The Contractor must describe in detail how the proposed products and/or services meet or exceed the stated requirements. The Contractor must explain any exception or deviation from the requirements. In cases where the Contractor cannot or does not meet a requirement, this must be clearly stated along with the reason for not meeting the Requirement, Specification, or Qualification.

C. Technical Volume Contents-the Technical Volume must contain the following:

i. Completed Section 3, Supplier Qualifications

a. All required information listed as Contractor Data Requirements (Section 3.1) including but not limited to required demographic information, resumes, references, past performance documentation

b. All required information in sections 3.2 through 3.4

ii. Completed Section 4, Technical Specifications/Requirements/Scope of Work documents including

a. Specifications/Requirements/Scope of Work documentation and Matrix, as provided

b. Narrative Specification/Requirements responses, as required

c. Additional support documentation, as required

RFP Appendix #1 4 of 4

iii. Confirmation of acceptance of UMD Terms and Conditions as provided in Appendix #3.

iv. Completed Appendix #4 documents, affidavits, addenda, disclosures and exhibits as required

v. Completed and signed Appendix #5, Solicitation/Contract Form Contractors must complete Appendix 5, Solicitation/Contract Form Offer as part of the Technical Volume. Failure to submit this document, signed by a person duly authorized to commit the Contractor to the proposal may cause the Contractor’s proposal to be rejected, at the sole discretion of the University.

The University may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The University is under no obligation to seek clarification for missing information or to repair responses that are deemed to be incomplete.

D. Financial Volume This volume consists of and must contain the offered pricing information in the format required by the University. Contractors are not to include any technical information or specifications in the financial volume. Inclusion of technical requirements in the Financial Volume, unless technical details are necessary to provide pricing clarity, may result in in disqualification of the Contractor’s response particularly if said technical details are not included in the Technical Volume.

i. Pricing Section The Contractor is required to use the provided pricing submittal documents as included.

The pricing submittal documents will either be provided in the form of an electronic Pricing Matrix for those RFPs with numerous line items, complex pricing, etc. A Price Proposal Form will be used in instances when the pricing is simple and straightforward.

a. The Contractor is required to complete the electronic Pricing Matrix when provided

b. The Contractor is required to submit their proposal for pricing on the Price

Proposal Form provided when an electronic Pricing Matrix is not used. Using Price Proposal Form will help ensure consistency in the financial evaluation. The price proposal form is to be completed in full when used for submittal of pricing.

ii. Best and Final Offers The University reserves the right to request best and final offers (BAFO) following evaluation of technical and pricing proposals. Contractors must submit BAFO pricing information in the format required, on or before the date and time indicated on the BAFO request, and using the means of submission indicated by the Procurement Officer.

Appendix #2-Evaluation, Award, Contract Formation, Debriefing of Unsuccessful Proposers, Protests and Claims, Contract Implementation Meeting

A2-1. Evaluation Method A. The University intends to make an award to the best value acceptable offeror. Technical and Financial Proposals will be evaluated concurrently. In order to be considered technically acceptable, Contractors must meet all technical specifications and business requirements as delineated in this solicitation. Only those Contractors meeting the technical specifications and business requirements (supplier qualifications, including financial viability) will be considered in the Financial evaluation stage.

A2-2. Technical Evaluation A. Evaluation Committees The Procurement Officer shall establish separate technical and financial evaluation committees to review and rate the proposals. The financial evaluation committee may be composed of the Procurement Officer and any other individuals appointed by the Procurement Officer. The technical evaluation committee shall be composed of other individuals appointed by the Procurement Officer.

B. Acceptability of Proposals

i. The Procurement Officer shall determine which contractors have met the basic requirements of the RFP.

ii. Failure to comply with any mandatory requirement will normally result in disqualification.

iii. The Procurement Officer shall have the sole authority to determine whether any deviation from the requirements of this RFP is substantial in nature.

iv. The Procurement Officer may waive or permit to be cured minor irregularities or minor informalities in proposals that are immaterial or inconsequential in nature, whenever it is determined to be in the University’s best interest.

v. The Procurement Officer may reject in whole or in part any and all proposals if such is in the University’s interest, and may conduct discussions with contractors in any manner deemed necessary to best serve the interests of the University.

vi. The University reserves the right to make an award to more than one contractor or to split an award among contractors.

vii. Evaluation of technical proposals will be based on “go/no-go” or “pass/fail” decisional rule, applied to each technical specification and business requirement delineated below.

viii. A no-go or fail rating will eliminate a Contractor from further consideration. The Contractor either meets or does not meet each of the technical specifications and business requirements.

ix. There is no merit or extra credit awarded for exceeding the requirements.

x. Only those Contractors meeting the technical specifications and business requirements will be considered for financial evaluation.

xi. The Technical Evaluation Committee may request site visits for the purpose of evaluating proposals and/or Contractor's responsibility. The Committee may request additional technical assistance from any source. Industry standard references may be used during the evaluation process.

C. Evaluation Criteria

The following minimum technical requirements must be met for the Contractor proposal to be considered technically acceptable. They are listed in the order of importance.

i. Qualifications-references; key personnel qualifications including having performed the work on a similar project at another R1 institution, appropriateness of labor mix to sample tasks as defined, appropriateness of the level of effort hours defined for each labor category when contract services are involved; past performance as determined by references; project approach and methodology in alignment with UMD expectations.

ii. Mandatory Requirements- Contractor’s demonstrated understanding of the University’s Mandatory Requirements and the nature of work to be performed. This includes the quality and soundness of the offeror’s approach.

iii. Financial proposal- the contractor is to complete the supplied pricing sheet titled “RFP- 00055711-JD Pricing Sheet”

iv. Preferred/Desired Requirements- Contractor’s demonstrated understanding of the University’s Preferred/Desired requirements and the nature of work to be performed.

This includes the quality and soundness of the offeror’s approach.

v. Clarity of Proposal-The Contractors response will be evaluated based on clarity and conciseness of their response with how their proposed solution satisfies each of the criteria specified in Section 4.

vi. Economic Benefit- Proposals will be evaluated per to assess the benefit(s) to Maryland’s economy specifically offered

The terms "must" or "shall” and “required” are used throughout this document to indicate mandatory requirements. Contractors must meet all the requirements and specifications;

that is, that the Contractor is fully capable of delivering the items and providing the services as specified in this RFP.

D. Oral Presentations

i. At the sole discretion of the Procurement Officer, short-listed Proposers may be invited to provide an oral presentation and product demonstration. Information provided during this phase will be used to supplement the prior evaluation of the written technical proposal and the final evaluation of technical capabilities will take into account both the written technical proposal and the oral presentation/product demonstrations.

ii. The University reserves the right to waive the Oral Presentation/Product Demonstration, in which case the technical evaluation will be based on the written technical proposal submittal alone. Proposers are therefore encouraged to submit the best possible proposal at each opportunity for submittal

iii. The due date and time of the oral presentation/product demonstration will be determined by the University upon evaluation completion of Technical Proposals. The actual date will be verified with the applicable Proposers at the time the presentation is requested. Refer to the Solicitation Schedule for tentative dates. Proposers are advised to set these dates aside so as to avoid a conflict

iv. The oral presentation will be informal, as the University is not interested in a marketing presentation, rather, it will be a casual and informal format in which to view the Proposers presentations, etc.

v. The purpose and parameters of the Oral Presentation/Product demonstration will be defined by the Procurement Officer at the time of scheduling. This information may be included in Technical requirements in those instances when it is a requirement for short-listed Contractors.

vi. The criteria and format of the demonstration will be provided with the written request to conduct an oral presentation.

A2-3. Financial Evaluation Financial offers will be evaluated simultaneously with technical proposals. Contractors will be evaluated on the technical specifications and business requirements as well as the financial volume evaluation. The Financial Volume evaluation will consist of ranking on the basis of overall best value to the University and State. Information from the pricing proposal sheet contained in the Pricing Matrix or on the Price Proposal Form will be used to compute the total price.

A2-4. Evidence of Responsibility Prior to the award of a contract pursuant to this RFP, the Procurement Officer may require Contractor to submit such additional information bearing upon Contractor's ability to perform the contract as the Procurement Officer deems appropriate. The Procurement Officer may also consider any information otherwise available concerning the financial, technical, and other qualifications or abilities of the Contractor.

A2-5. Solicitation, Proposal, Acceptance, Award and Discussion This RFP creates no obligation on the part of the University to award a contract or to compensate Contractors for proposal preparation expenses. The University reserves the unilateral right to cancel this solicitation at any time and to accept or reject any and all proposals, in whole or in part, received in response to this RFP; the unilateral right to award a contract in whole or in part; to award a contract to one Contractor; and to waive or permit cure of minor irregularities; and to conduct discussions with Contractors in any manner necessary to serve the best interest of the University.

Discussions may be conducted with those Contractors who submit proposals initially judged by the Procurement Officer to be reasonably susceptible of being selected for award. However, the University reserves the right to award a contract based upon the proposals received without further discussions.

A2-6. Negotiation The University has the right to accept the best proposal as submitted, without discussion or negotiation. Contractors should therefore not rely on having a chance to discuss, negotiate and adjust their proposals.

Contractors who submit proposals initially judged by the Procurement Officer to be reasonably susceptible of being selected for award may be asked to discuss their proposals with the University to facilitate arrival at a contract most advantageous to the University. If the Procurement Officer determines that discussion is in the best interest of the University, the Procurement Officer will advise contractors to submit a best and final offer for consideration after discussions are held.

However, discussions may not be conducted if the Procurement Officer determines either that discussions are not in the best interests of the University or that discussions need not be conducted: (a) with respect to prices that are fixed by law or regulation, although consideration shall be given to competitive terms and conditions; (b) because the time of delivery or performance does not permit discussions; or (c) because it can be demonstrated clearly from the existence of adequate competition or accurate prior price experience with the particular item that acceptance of an initial offer without negotiation would result in a fair and reasonable price.

A2-7. Basis of Award The University will award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the solicitation and is determined to be the best value to the University.

Recommended contract awards, if any, resulting from this RFP, may be subject to State and University approvals.

A2-8. Formation of Agreement/Contract with Successful Contractor This RFP and any resulting contract shall be governed by the University System of Maryland Procurement Policies and Procedures. These policies and procedures may be viewed at the following web site: https://www.usmd.edu/usm/procurement/procedures.html.

A2-9. Debriefing of Unsuccessful Proposers A debriefing of an unsuccessful proposer shall be conducted upon written request submitted to the Procurement Officer within ten (10) days of the date on which the proposer knew, or should have known, its proposal was unsuccessful. The debriefing shall be limited to a discussion of the proposer’s unsuccessful proposal. The debriefing will be oral and shall provide information on areas in which the proposal was deemed weak or insufficient. The debriefing will NOT include discussion of a competing offeror’s proposal or discussion, thoughts, notes or ranking from individual evaluation committee members. A summary of the Procurement Officer’s rationale for the selection may be given. Debriefings shall be conducted at the earliest feasible time.

A2-10. Protests and Claims Any protest regarding the award of this contract or claim arising out of this contract shall be administered in accordance with the University System of Maryland Procurement Policies and Procedures, Section X - Protests and Claims. Detail is available by accessing the following web site https://www.usmd.edu/usm/procurement/procedures.html.

A2-11. Contract Implementation Meeting Contractor receiving an award under this solicitation may be required to attend a Contract

Implementation Meeting to be held after contract award, as scheduled by the Procurement Officer. The location and agenda for this meeting will be communicated to the Contractor by the Procurement Officer.

https://www.usmd.edu/usm/procurement/procedures.html about:blank

UNIVERSITY OF MARYLAND RFP-00055711-JD

University of Maryland College Park RFP Appendix 3 1 of 11

The University of Maryland Standard Terms and Conditions apply to University of Maryland College Park (UMD) procurements.

AFFIDAVITS, ADDENDA, AND FEDERAL FLOW DOWNS- The following affidavits, addenda, and Federal flow downs may apply to this Contract and will automatically attach based upon the nature of the procurement and/or funding source. All Affidavits and Addenda requiring signature must be completed by the Contractor and returned to the UMD Procurement and Business Services and must reference the associated Solicitation Number, Contract Number, Purchase Order Number or transaction number (if ordered by credit card).

UMD ACCESSIBILITY ADDENDUM (for any and all web-based deliverables (including, but not limited to, off the shelf software, custom developed software, and related goods or services used to create, maintain or update the University’s Web pages, Web content, Web-based applications, online instructional content, services and resources.)

UMD CONTRACT AND BID/PROPOSAL AFFIDAVITS (for all Contracts exceeding $200,000, Contractor shall execute the Bid/Proposal and Contract Affidavit required by the University, which shall be in substantially the same form as the Maryland forms at the time the Contract is executed by the University. Additional University certifications may be required for Contracts of any dollar amount. Any additional required documents and certifications, not included herein, will be identified and provided by the Procurement Officer as part of the procurement process.)

UMD FEDERAL FLOW-DOWN CLAUSES (for any Contract funded by a federal contact, grant, or cooperative agreement.) https://purchase.umd.edu/umd-federal-uniform-guidance-flowdown-provisions or https://purchase.umd.edu/umd-federal-government-flowdown-provisions

UMD SECURE/SENSITIVE DATA ADDENDUM (for contracts involving sensitive data, including but not limited to Personal Data and identifiers, FERPA Data, Cardholder or other PCI Data, or Health Information.)

UMD PROCUREMENT INSURANCE ADDENDUM (for contracts over $200,000, or for work performed on University premises, or using equipment or facilities owned, occupied or used by the University, or as otherwise required by the University.)

SECTION 889 AFFIDAVIT (for procurements for equipment/devices or services that include video surveillance, cameras, telecommunications. This federally required affidavit must be completed by the Contractor and returned to the buyer.

A3-1. ANTI-BRIBERY

Contractor warrants that neither it nor any of its officers, directors, or partners nor any of its employees who are directly involved in obtaining or performing contracts with any public body has been convicted of bribery, attempted bribery, or conspiracy to bribe under the laws of any state or of the federal government or has engaged in conduct since July 1, 1977, which would constitute bribery, attempted bribery, or conspiracy to bribe under the laws of any state or the federal government.

University of Maryland College Park RFP Appendix 3 2 of 11

A3-2. COMPLIANCE WITH LAWS

Contractor hereby represents and warrants that:

A. It is qualified to do business in the State of Maryland (whether a domestic business or a foreign corporation subject to registration under the Corporations and Associates Article of the Maryland Annotated Code) and that it will take such action as, from time to time hereafter, may be necessary to remain so qualified.

B. It is not in arrears with respect to the payment of any moneys due and owing the State of Maryland, or any department or unit thereof, including but not limited to the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of this Contract.

C. It shall comply with all federal, State, and local laws, regulations, and ordinances applicable to its activities and obligations under this Contract, including but not necessarily limited to:

Maryland Building Codes, Americans with Disabilities Act, and the Maryland Occupational Safety and Health Act and related regulations.

D. It shall obtain, at its expense, all licenses, permits, insurance and governmental approvals, if any, necessary to the performance of its obligations under this Contract.

A3-3. CONFIDENTIALITY; DISSEMINATION OF INFORMATION

Contractor shall not release any information related to services or performance of the services under this Contract, nor publish any final reports or documents without the prior written approval of the University. Contractor shall indemnify and hold harmless the State and the University, its officers, agents and employees from all harm which may be incurred by reason of dissemination, publication, distribution or circulation, in any manner whatsoever, of any information, data, documents, or materials pertaining in any way to this Contract by Contractor, its agents or employees.

A3-4. CONFLICTING TERMS AND ORDER OF PRECEDENCE

Any proposal for terms in addition to or different from those set forth in the Solicitation or Contract or any attempt by the Contractor to vary any of the terms of this offer by Contractor's acceptance shall not operate as a rejection of this offer, unless such variance is in the terms of the description, quantity, price or delivery schedule, but shall be deemed a material alteration thereof, and this offer shall be deemed acceptable by the Contractor without the additional or different terms. If this Solicitation or Contract is an acceptance of a prior offer by the Contractor, the acceptance is expressly conditioned upon Contractor's assent to any additional or different terms contained herein. The Contractor understands and agrees that the terms and conditions of this Solicitation or Contract may not be waived.

In the event of a conflict, the University of Maryland's Terms and Conditions shall take precedence over any terms specifically identified in Contractor's proposal or any other forms or documents provided by Contractor. The University is not, and shall not be, bound by any other terms in or referenced by Contractor's proposal, invoices, form(s), or online terms and conditions unless such terms are specifically incorporated herein.

University of Maryland College Park RFP Appendix 3 3 of 11

A3-5. CONTRACTOR'S INVOICES

Contractor shall include the Purchase Order Number and its Taxpayer Identification Number on the face of each invoice billed to the University. Failure to provide this information on invoicing may result in delayed payment.

A3-6. DELAYS AND EXTENSION OF TIME

A. The Contractor agrees to perform the work continuously and diligently and no charges or claims for damages shall be made by it for any delays or hindrances from any cause whatsoever during the progress of any portion of the work specified in this Contract.

B. Time extensions will be granted only for excusable delays that arise from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, acts of the public enemy, acts of the State in either its sovereign or contractual capacity, acts of another Contractor in the performance of a contract with the State, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of either the Contractor or the subcontractors or suppliers.

A3-7. DELIVERY AND ACCEPTANCE

A. Delivery shall be made in accordance with the specifications in the Solicitation and Contract.

The University, in its sole discretion, may extend the time of performance for excusable delays due to unforeseeable causes beyond the Contractor's control. The University unilaterally may order in writing the suspension, delay, or interruption of performance hereunder.

B. The University reserves the right to test any materials, equipment, supplies, or services delivered to determine if the specifications have been met. Only when the items or equipment, have been fully installed, implemented, tested and is successfully in operation is the item/equipment considered to have been accepted. For contract services-only upon final acceptance of all defined deliverables is a service considered to have been fully accepted. Phased payments for projects or capital equipment purchases do not constitute acceptance.

C. Materials shall be delivered FOB to the point or points specified in the bid or proposal, on the date either agreed to in advance or specified in the bid or proposal.

D. Any material or product that is defective, or fails to meet the terms of the specifications, may be rejected. Rejected materials shall be promptly replaced.

E. If Contractor fails to promptly replace rejected materials, or product, the University reserves the right to purchase replacement materials in the open market.

F. Contractor shall be liable for costs to replace materials, or product, incurred by the University which exceed the bid proposal or Contract price, including expenses such as, but not necessarily limited to, shipping and delivery, if any.

A3-8. DISPUTES

Pending resolution of a claim, the Contractor shall proceed diligently with the performance of the Contract in accordance with the Procurement Officer's decision.

University of Maryland College Park RFP Appendix 3 4 of 11

A3-9. DRUG AND ALCOHOL-FREE WORKPLACE

The Contractor warrants that the Contractor shall comply with COMAR 21.11.08 (Drug and Alcohol Free Workplace), and that the Contractor shall remain in compliance throughout the term of this Contract.

A3-10. EXPORT CONTROL

This Contract is subject to US export control regulations including, when applicable, the Export Administration Regulations (EAR), the International Traffic in Arms Regulations (ITAR), and the Office of Foreign Asset Control sanctions programs. Each party is responsible for compliance with applicable export and import regulations, and associated embargo and sanction regulations. If any of the materials or information to be furnished under this Contract is a controlled technology on the US Munitions List of the ITAR, Contractor must contact and receive written approval from the UMD Export Compliance Office (export@umd.edu) prior to acceptance of this Contract.

A3-11. FERPA (FAMILY EDUCATION RIGHTS AND PRIVACY ACT) (applicable if Contractor will have access to, or be responsible for the storage, maintenance and security of, student personal identifiable information protected under FERPA. See, also, UMD SENSITIVE DATA ADDENDA)

The Parties agree to maintain the privacy and security of personally identifiable educational records and health information and to prevent disclosure in compliance with Federal laws.

A3-12. GRAMM-LEACH BLILEY ACT OF 1999 (applicable if Contract pertains to financial services, banking, student loans or financial aid, or debt collection. See, also, UMD SENSITIVE DATA

ADDENDA)

The Contractor agrees that in performing its obligations under this Contract, the Contractor shall comply with all requirements of a non-affiliated third-party who receive a financial institution’s consumer or customer information, under the Gramm-Leach-Bliley Act of 1999 and applicable regulations thereto (the “GLB Act”), and other applicable federal and state consumer privacy acts, rules and regulations. Nonpublic personal information shall have the same meaning as that term is defined in the GLB Act.

The Contractor agrees to disclose such nonpublic personal information for the sole purpose of facilitating the Contractor’s performance of it duties and obligations under this Contract and will not disclose such nonpublic personal information to any other party unless such disclosure is (i) allowed by the GLB Act and consented to by the Customer, or (ii) compelled by law, in which case the Contractor will provide notice of such disclosure to the Costumer.

The Contractor represents and warrants that it will, for so long as it retains nonpublic personal information, implement and maintain in place the necessary information security policies and procedures for (i) protecting the confidentiality of such nonpublic person information, (ii) protecting against any anticipated threats or hazards to the security or integrity of such nonpublic personal information, and (iii) protecting against the unauthorized access to or use of such nonpublic personal information. These terms apply to all subcontractors employed by the Contractor who perform work under the scope of this agreement.

University of Maryland College Park RFP Appendix 3 5 of 11

A3-13. INDEMNIFICATION

The University shall not assume any obligation to indemnify, hold harmless, or pay attorneys' fees that may arise from or in any way be associated with the performance or operation of this agreement.

A3-14. INSURANCE REQUIREMENTS (for all work performed on University premises, or using equipment or facilities owned, occupied or used by the University, or as otherwise required by the University). See INSURANCE ADDENDUM for details on limits.

A. The Contractor shall secure, pay the premiums for, and keep in force until the expirations of this Contract, and any renewal thereof, appropriate insurance for the goods and services provided. The amount of such coverages shall meet or exceed the minimum coverage specified by law, regulation, industry standard, or the Procurement Officer, whichever is greater.

B. All required insurance coverages must be acquired from insurers allowed to do business in the State of Maryland and acceptable to the University. The insurers must have a policyholders’ rating of “A-” or better, and a financial size of “Class VII” or better in the latest edition of Best’s Insurance Reports.

C. Policies must name the University of Maryland College Park and the University System of Maryland and their Board of Regents/Trustees, officers, employees, agents and volunteers as “Additional Insureds” on general liability and other policies and this must be reflected on the certificate of insurance, along with the Contract or Purchase Order number.

D. Contractor must provide a certificate of insurance which clearly states the types of coverage and limits prior to performing the work.

A3-15. INTELLECTUAL PROPERTY

Contractor agrees to indemnify and save harmless the University, its officers, agents and employees with respect to any claim, action, costs or judgment for patent infringement, or trademark or copyright violation arising out of purchase or use of materials, supplies, equipment or services covered by this Contract.

A3-16. INVESTMENT ACTIVITIES IN IRAN.

Contractor, by accepting this order, certifies that it is not on the list of entities ineligible for award per Board of Public Works Advisory 2013-001, the full text of which is available at:https://bpw.maryland.gov/Pages/adv-2013-1.aspx. Written certification shall be furnished to the Procurement Officer on demand.

University of Maryland College Park RFP Appendix 3 6 of 11

A3-17. MANDATORY REPORTING OF SUSPECTED CHILD ABUSE AND NEGLECT

Maryland law contains mandatory reporting requirements for all individuals who suspect child abuse or neglect. Contractors performing work on campus also must comply with USM Board of Regents (BOR) VI-1.50 – Policy on the Reporting of Suspected Child Abuse & Neglect, as well as the University Procedures for Reporting Suspected Child Abuse and Neglect. The above-referenced USM/University Policy and Procedures are available at the following link:

https://www.usmd.edu/regents/bylaws/SectionVI/ and are incorporated herein. The University reserves the right to terminate the Contract if Contractor fails to comply with the above-referenced policy or procedures, or if, in the judgment of the University, termination is necessary to protect the safety and welfare of children who come into contact with the University community.

A3-18. MARYLAND LAW PREVAILS

This Contract shall be construed, interpreted and enforced according to the laws of the State of Maryland, without reference to its conflicts of law principles.

A3-19. MODIFICATIONS AND AMENDMENTS

This Contract may be amended with the consent of both parties. Amendments may not significantly change the scope of the Contract. Changes to these terms and conditions may only be made by an authorized Procurement Officer in the Department of Procurement and Business Services.

A3-20. MULTI-YEAR CONTRACTS CONTINGENT UPON APPROPRIATIONS

A. If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of this Contract succeeding the first fiscal period, this Contract shall be canceled automatically as of the beginning of the fiscal year for which funds were not appropriated or otherwise made available;

provided, however, that this will not affect either the University's rights or the Contractor's rights under any termination provision in this Contract.

B. The effect of termination of the Contract hereunder will be to discharge both the Contractor and the University from future performance of the Contract, but not from their rights and obligations existing at the time of termination.

C. The Contractor shall be reimbursed for the reasonable value of any non-recurring costs incurred but not amortized in the price of the Contract.

D. The University shall notify the Contractor as soon as it has knowledge that funds may not be available for the continuation of this Contract for each succeeding fiscal period beyond the first.

A3-21. CONTRACTS CONTINGENT UPON FEDERAL FUNDING (placeholder for situations when the Federal government exercises its termination for convenience or reduces the amount of funding associated with a contract, grant or cooperative agreement)

University of Maryland College Park RFP Appendix 3 7 of 11

A3-22. NON-DISCRIMINATION IN EMPLOYMENT

Contractor agrees to (a) not to discriminate in any manner against any employee or applicant for employment because of race, color, religion, creed, age, sex, sexual orientation, general identification, marital status, national origin, ancestry, genetic information or any otherwise unlawful use of characteristics, or disability of a qualified individual with a disability unrelated in nature and extent so as to reasonably preclude the performance of the employment, or the individual’s refusal to submit to a genetic test or make available the results of a genetic test; (b) to include a provision similar to that contained in subsection (a) above in any underlying subcontract except a subcontract for standard commercial supplies or raw materials; and (c) to post and cause subcontractor to pose in conspicuous places available to employees and applicants for employment, notices setting forth the substance of this clause.

A3-23. NON-HIRING OF OFFICIALS AND EMPLOYEES

No official or employee of the State of Maryland, as defined under General Provisions Article §5- 502 whose duties as such official or employee include matters relating to or affecting the subject matter of this Contract shall, during the pendency or term of this Contract and while serving as an official or employee of the State, become or be an employee of the Contractor or any entity that is a subcontractor on this Contract.

A3-24. NON-VISUAL ACCESS CLAUSE (See, also, UMD ACCESSIBILITY ADDENDUM)

Contractor warrants that the information technology offered hereunder:

A. Provides equivalent access for effective use by both visual and nonvisual means B. Will present information, including prompts used for interactive communications, in formats intended for both visual and nonvisual use C. If intended for use in a network, can be integrated into networks for obtaining, retrieving, and disseminating information used by individuals who are not blind or visually impaired and is available, whenever possible, without modification for compatibility with software and hardware for nonvisual access.

D. Contractor further warrants that the costs, if any, of modifying the information technology for compatibility with software and hardware used for nonvisual access will not increase the cost of the information technology by more than 5 percent.

E. For purposes of this section, the phrase “equivalent access” means that the ability to receive, use and manipulate information and operate controls necessary to access and use information technology by nonvisual means. Examples of equivalent access include keyboard controls used for input and synthesized speech, Braille, or other audible or tactile means used for output.

University of Maryland College Park RFP Appendix 3 8 of 11

A3-25. OWNERSHIP OF DOCUMENTS AND MATERIALS

Unless explicitly provided otherwise by UMD in the Contract, the Contractor agrees that all documents and materials including, but not limited to, reports, drawings, studies, specifications, estimates, maps, photographs, designs, graphics, mechanical, artwork, and computations prepared by or for it under the terms of the Contract shall at any time during the performance of the services be made available to the University upon request by the University and shall become and remain the exclusive property of the University upon termination or completion of the services. The University shall have the right to use same without restriction or limitation and without compensation to the Contractor other than that provided by the Contract. The University shall be the owner for purposes of copyright, patent or trademark registration.

A3-26. PARKING

If at any time Contractor shall be on the premises of the University of Maryland, then Contractor is responsible for acquiring a valid University of Maryland parking permit, obeying all parking regulations, and paying all fines assessed for violations of parking regulations. Contractor is responsible for ensuring this clause is included in Contractor’s agreements with subcontractors.

A3-27. PAYMENT OF STATE OBLIGATIONS

A. Unless a payment is unauthorized, deferred, delayed, or set-off under COMAR 21.02.07, Payments to the Contractor pursuant to this Contract shall be made no later than 30 days after the University’s receipt of a proper invoice from the Contractor.

The Contractor may be eligible to receive late payment interest at a rate of 9% per annum if:

• Contractor submits an invoice for the late payment interest within thirty days after the date of the State’s (or University’s) payment of the amount on which the interest accrued; and

• A contract claim has not been filed under State Finance and Procurement Article, Title 15, Subtitle 2, Annotated Code of Maryland.

B. The University is not liable for interest accruing more than one year after the 31st days after the agency receives the proper invoice; or on any amount representing unpaid interest.

C. Charges for late payment of invoices are authorized only as prescribed by Title 15, Subtitle 1, of the State Finance and Procurement Article, Annotate Code of Maryland or by the Public Service Commission of Maryland with respect to regulated public utilities, as applicable.

University of Maryland College Park RFP Appendix 3 9 of 11

A3-28. POLITICAL CONTRIBUTION DISCLOSURE

The Contractor shall comply with Election Law Article Title 14 Annotated Code of Maryland, which requires that every person that enters into a procurement contract with the State, a county or a municipal corporation or other political subdivision of the State, during a calendar year in which the person receives a contract with a governmental entity in the amount of $200,000 or more, shall file with the State Board of Elections statements disclosing (a) any contributions made during the reporting period to a candidate for elective office in any primary or general election; and (b) the name of each candidate to whom one or more contribution in a cumulative amount of $500 or more were made during the reporting period. The statement shall be filed with the State Board of Elections (a) before execution of a contract by the State (or University), a county, a municipal corporation or other political subdivision of the State, and shall cover the 24 months prior to when a contract was awarded; and (b) if the contribution is made after the execution of a contract, then twice a year, throughout the contract term, on or before (i) May 31, to cover the six (6) month period ending April 30; and (ii) November 30 to cover the six (6) month period ending October 31. Additional information is available on the State Board of Elections website:

http://www.elections.state.md.us/campaign_finance/index.html

A3-29. PUBLIC INFORMATION ACT NOTICE

The University is subject to the Maryland Public Information Act, General Provisions Article, Title 4 of the Annotated Code of Maryland. Contractors should give specific attention to the identification of those portions of their offer, Contract, and/or related documentation that they deem to be confidential, proprietary information or trade secrets. Contractor may be required to provide justification why such materials, upon request, should not be disclosed by the University.

A3-30. RESPONSIBILITY FOR CLAIMS AND LIABILITY

The Contractor shall be responsible for all damage to life and property due to its activities or those of its agents or employees, in connection with the services required under the Contract.

Further, it is expressly understood that the Contractor shall indemnify and save harmless the University, its officers, agents, and employees from and against all claims, suits, judgements, expenses, actions, damages and costs of every name and description, including reasonable attorney’s fees and litigation expenses arising out of or resulting from the negligent performance of the services of the Contractor under the Contract.

A3-31. RETENTION OF RECORDS

The Contractor shall retain and maintain all records and documents relating to this Contract for three years after final payment by the State hereunder or any applicable statute of limitations, whichever is longer, and shall make them available for inspection and audit by authorized representatives of the State, including the procurement officer or designee, at all reasonable times.

University of Maryland College Park RFP Appendix 3 10 of 11

A3-32. SPECIFICATIONS

All materials, equipment, supplies or services shall conform to federal and State laws and regulations and to the specifications.

A3-33. SOFTWARE CONTRACTS (See, also, UMD ACCESSIBILITY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .