U.S. Department of Transportation Federal Aviation Administration

Request for Offers (RFO) Cover Letter

Solicitation Package

Project Name: Control Room Ramp Railings Replacement Project

Location: Auburn, Washington

Solicitation No.: 697DCK-23-R-00388

Issue Date: April 19, 2023

Submit Offers to: cindi.tjelde@faa.gov

Submit Offers by: Friday, June 9, 2023, 5:00 PM (Pacific time)

Special Instructions:

1) Insurance is required (See Contract Clause 3.4.1-12 Insurance (Jul 1996) for required coverage limits).

2) Payment and Performance Bonds are required. NOT REQUIRED

3) Set Aside: This procurement is being set aside for a small business under NAICS Code 236220 Commercial and Institutional Building Construction, which has a small business size standard of $45.0 Million.

4) Site Visit: A site visit for this project will be held on Wednesday, May 10, 2023, at 10:00 a.m. The site visit is not mandatory, but highly encouraged, so that the offeror and potential subcontractors can verify existing conditions, quantities of materials, and amount of work required. The contractor is responsible for ensuring that their offer reflects all work and time required to accomplish this project. The dimensions, measurements, and quantities of materials listed in the Statement of Work are estimated and are presented to give the contractor an idea of the total scope of work.

Please RSVP for the site visit by contacting Jon Orr at jon.orr@faa.gov or (206) 919- 6374 by 3:00pm on Friday, May 5, 2023.

5) Solicitation Questions/RFIs: See Section L, Clause Number L003, for the deadline date for questions and the process for submitting questions. No questions will be answered at the Site Visit, but must be submitted in writing and incorporated into the solicitation via amendment.

mailto:cindi.tjelde@faa.gov

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

WS-23-01011

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

cindi.tjelde@faa.gov

Cynthia Tjelde 206-231-3026 x

04/19/2023 48

PURCHASE REQUEST NO.

697DCK-23-R-00388

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Control Room Ramp Railings Replacement Project at FAA's Seattle Air Route Traffic

Control Center (ARTCC) located at 3101 Auburn Way S, Auburn, Washington 98092.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

5 14 calendar days and complete it within ________________ ________________ calendar days after receiving

06/09/2023 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

Cynthia A. Tjelde

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight cindi tjelde Highlight

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 48

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

697DCK-23-R-00388

(A) (B) (C) (D) (E) (F)

Delivery: 14 Days After Notice to Proceed

Delivery Location Code: S690EC4M

S690EC4M

690EC4 DOT FAA AJW 2W12E__NM8072

ENGR SERVICES ENROUTE FSS ENGR CTR

3101 AUBURN WAY SOUTH

AUBURN WA 98092 US

FOB: Destination

00001 Replace aluminum handrails on control room ramps for facility accessibility (ADA improvements) at

Seattle ARTCC, 3101 Auburn Way South, Auburn, WA

98092 in accordance with attached project specifications and drawings.

Attn: Cindi Tjelde.

Mark for Information:

Chris Winn

253-351-3772

Seattle, ARTCC

Electronic & IT: 03

Section A - Solicitation/Contract Form

A001 SOLICITATION INDEX

The Federal Aviation Administration (FAA) is soliciting competitive proposals through the use of this Request for Offers (RFO) for the award of a firm, fixed price construction contract.

This RFO consists of the following Parts / Sections:

Part I – The Schedule Section A: Solicitation / Contract Form Section B: Supplies or Services / Prices Section C: Descriptions / Specifications Section D: Packaging and Marking Section E: Inspection and Acceptance Section F: Deliveries or Performance Section G: Contract Administration Data Section H: Special Contract Requirements

Part II – Contract Clauses Section I: Contract Clauses

Part III – List of Documents, Exhibits, and Other Attachments Section J: List of Documents, Exhibits, and Other Attachments

Part IV – Representations and Instructions Section K: Representations, Certifications, and Other Statements of Bidders Section L: Instructions, Conditions, and Notice to Bidders Section M: Evaluation Factors for Award

End of Clause

Section B - Supplies or Services/Prices Section B - Schedule

Clause List

B001 PRICE / COST

The Contractor is required to furnish all labor, tools, materials, services, equipment, transportation, insurance, bonds, security notifications, submittals, supervision, licenses, permits, state sales taxes and fees in accordance with applicable federal, state, and local regulatory requirements, for the replacement of the control room ramp railings at the Seattle Air Route Traffic Control Center (ARTCC) located at 3101 Auburn Way S, Auburn, Washington 98092, in accordance with the Statement of Work, contract clauses, and applicable wage rates.

CONTRACT LINE ITEM DESCRIPTION TOTAL

0001 Lump Sum Price $_____________________

The offered price must include all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, transportation, inspections, testing, operation and maintenance manuals, warranties, etc., (b) federal, state, and local taxes, (c) all applicable fees, permits, licenses, and (d) any miscellaneous charges.

Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the new FAA Acquisition Management System (AMS). The 1996 DOT Appropriation Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are four of these laws.

(End of clause)

B002 PERIOD OF PERFORMANCE

From contract award, the FAA estimates the following timelines:

4 weeks for submittals, including submission, review, and approval

2 weeks for onsite physical work, any required punchlist items, and cleanup

4 weeks for all required closeout documents

Total contract timeframe expected is approximately ten (10) weeks.

(End of Clause)

B003 ESTIMATED SIZE OF CONSTRUCTION PROJECT

ESTIMATED PRICE RANGE FOR THIS PROJECT IS: UNDER $100,000.

(End of Clause)

B004 BUY AMERICAN GUIDANCE

FAA’s acquisitions are subject to the requirements of both the Buy American Act (41 U.S.C. 8301-8305)(BAA) and the FAA’s Buy American Preference (49 U.S.C. 50101)(BAP). The BAA applies across the Federal Government, while the BAP is specific to the FAA. The BAA and BAP have overlapping statutory authority in that both cover the acquisition of manufactured goods, but each subjects the acquisition to different rules and requirements. When determining whether to apply BAA or BAP to a given acquisition, the FAA looks at (1) what is being acquired, and

(2) how the acquisition is being funded and the purpose of the acquisition. Most FAA procurements fall under the authority of the BAP, unless specifically exempted.

This contract is subject to FAA’s Buy American Preference (49 U.S.C. 50101)(BAP), which is specific to the FAA and has different requirements than the Buy American Act (41 U.S.C. 8301-8305)(BAA), which does not apply to this contract. Please review contract clause 3.6.4-5 FAA Buy American Preference – Steel and Manufactured Goods, located in Section I - Contract Clauses, to ensure that you (the offeror) and your subcontractors and/or suppliers and manufacturers understand BAP requirements. Should any end product be of foreign origin, the Contractor must identify, in writing, such goods and country of origin to the Contracting Officer prior to contract award.

(End of Clause)

B005 SECURITY CONSIDERATIONS

This air traffic facility is a secured facility that requires daily entry through security. Entrance into the facility requires all unbadged individuals to go through the security building and obtain a visitor pass for that day. This process may take anywhere from 15 to 30 minutes depending on the number of workers requiring entry.

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

Clause List

C001 SCOPE OF WORK

See Attachment 1 - Specifications, and Attachment 1(a) Drawings (as an attachment to the Specifications).

Section D - Packaging and Marking Clause List

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

Section F - Deliveries or Performance Clause List

F001 FEDERAL HOLIDAYS OBSERVED / HOLIDAY MORATORIUMS

The following federal holidays are observed by the Federal Aviation Administration. No work will take place on holidays.

-New Year’s Day -Martin Luther King, Jr.’s Birthday -Washington’s Birthday -Memorial Day -Juneteenth -Independence Day -Labor Day -Columbus Day -Veterans Day -Thanksgiving Week -Christmas Week

If a federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the federal holiday falls on a Sunday, the holiday is observed on the following Monday.

(End of Clause)

Section G - Contract Administration Data Clause List

Section H - Special Contract Requirements Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019)

(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.

(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor must notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and must submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.

(c) No diversion will be made by the Contractor without the written consent of the Contracting Officer.

(d) The key personnel and/or facilities under this contract are:

Project Manager [ ] Superintendent [ ]

(List key personnel and/or facilities)

(End of clause)

H001 APPLICABLE MINIMUM HOURLY WAGE RATES

The wage determination decision of the Secretary of Labor in this contract specifies the minimum hourly rate of wages which must be paid to the laborers and mechanics employed or work at the job site. The rates have been determined by the Secretary of Labor in accordance with the provisions of the Davis Bacon Act, as amended, to be prevailing rates for the corresponding classes of laborers employed on contracts of a similar character in the locality where the work is performed.

While the wage rates given in the decision are the MINIMUM rates required to be paid during the life of the contract, it is the responsibility of offerors to inform themselves as to local labor conditions, such as the prevailing wage rates, the length of the work day and work week, overtime compensation, fringe benefits payments, available labor supply, and prospective changes or adjustments to wage rates. The contractor must abide by and conform to all applicable laws, Executive Orders, and rules, regulations, and orders of the Secretary of Labor. No increase in contract price will be allowed or authorized for the payment of wage rates in excess of those listed in the contract wage determination decision.

The wage determination decision of the Secretary of Labor in this contract is solely for the purpose of setting for the minimum hourly wage rates required to be paid during the life of the contract and is not to be accepted as a guarantee, warranty, or representation of the wage rates indicated.

NOTE: THE DAVIS BACON ACT IS APPLICABLE (SEE CONTRACT CLAUSES). REFERENCE THE

ATTACHED GENERAL WAGE DECISION NO. WA20230011, dated 02/03/2023, FOR THE STATE OF

WASHINGTON (SEE SECTION “J”). THE WAGE DETERMINATION IS HEREBY INCORPORATED INTO

THIS REQUEST FOR OFFERS (RFO) AND WILL BE PART OF ANY RESULTANT CONTRACT.

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)

3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)

3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)

3.2.2.3-48 OTHER CONTRACTS (MAR 2009)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2004)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2004)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)

3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)

3.2.2.3-58 LAYOUT OF WORK (MAR 2009)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)

3.2.2.3-66 CONTRACTOR'S DAILY LOG (OCT 2014)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (OCT 2021)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 2021)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)

3.2.5-4 CONTINGENT FEES (OCT 1996)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)

3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (JUL 2018)

3.3.1-40 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (APR 2022)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)

3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME

COMPENSATION (OCT 2018)

3.6.2-2 CONVICT LABOR (APR 1996)

3.6.2-9 EQUAL OPPORTUNITY (JUL 2020)

3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)

3.6.2-18 DAVIS BACON ACT (OCT 2018)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)

3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JAN 2019)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JAN 2019)

3.6.2-23 CERTIFICATION OF ELIGIBILITY (JAN 2019)

3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (OCT 2018)

3.6.2-39 TRAFFICKING IN PERSONS (APR 2019)

3.6.2-46 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)

3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)

3.6.3-25 AEROSOLS (OCT 2016)

3.6.3-26 FOAMS (OCT 2016)

3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR

2022)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.4-23 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (APR 2022)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (APR 2022)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (JAN 2023)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.2-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (JAN 2019)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)

3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (APR 2022)

3.14-3 FOREIGN NATIONALS AS CONTRACTOR EMPLOYEES (OCT 2022)

3.14-4 ACCESS TO FAA FACILITIES, SYSTEMS, GOVERNMENT PROPERTY, AND SENSITIVE

UNCLASSIFIED INFORMATION (OCT 2021)

3.14-5 SENSITIVE UNCLASSIFIED INFORMATION (SUI) (JAN 2022)

3.2.2.3-41 PERFORMING WORK (JUL 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 15 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

(End of clause)

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (APR 2022)

(a) Definitions. As used in this clause

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the Unique Entity Identifier (UEI) or the Electronic Funds Transfer indicator, into the SAM database.

"System for Award Management (SAM) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Unique Entity Identifier (UEI)" (also known as the Unique Entity ID) means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

"Electronic Funds Transfer indicator" means a 4-character suffix to the Unique Entity Identifier. This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer. The UEI will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a UEI, it should contact www.sam.gov directly to obtain one.

The offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company Physical Street Address, City, State, and ZIP Code.

(4) Company Mailing Address, City, State and ZIP Code (if different from physical street address).

(5) Company Telephone Number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company Headquarters name and address (reporting relationship within your entity).

(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.

(e) Processing time should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document. If registered in SAM as a Service-Disabled Veteran-Owned Small Business (SDVOSB), by submission of an offer, the offeror acknowledges that they are designated as a SDVOSB by the Department of Veterans Affairs, and this designation appears as such on the Veteran Affairs website, https://vetbiz.va.gov/vip//.

(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in AMS Procurement Guidance, the Contractor must provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to:

(A) Change the name in the SAM database;

(B) Comply with the requirements of AMS regarding novation and change-of-name agreements; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide the Contracting Officer with the notification, sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor must not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims. Assignees must be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.

(End of Clause)

3.3.1-41 ELECTRONIC INVOICING - REPRESENTATION (JAN 2021)

(a) The FAA intends to use electronic invoicing as per AMS clause 3.3.1-40 "Electronic Submission of Payment Requests" for this contract when it is awarded. Offerors must indicate whether they are currently using this form of electronic invoicing on other contract(s), or can easily adapt to it upon award of the contract. [ ] Yes [ ] No

(b) If an offeror indicates "No" the offeror must explain in this space why a waiver of this requirement should be approved in the event they were awarded the contract.

(c) Waiver requests will be handled per (f) of clause 3.3.1-40.

3.3.2-1 FAA COST PRINCIPLES (OCT 2019)

(a) Federal Aviation Administration (FAA) "Contract Cost Principles" must be used for:

(1) The pricing of contracts, subcontracts, and modifications to contracts and subcontracts whenever cost analysis is performed; and

(2) The determination, negotiation, or allowance of costs when required by a contract clause.

(b) The Contracting Officer will incorporate the FAA cost principles and procedures in contracts with commercial organizations as the basis for:

(1) Determining reimbursable costs under

(i) Cost-reimbursement contracts and cost-reimbursement subcontracts under these contracts performed by commercial organizations and

(ii) The cost-reimbursement portion of time-and-materials contracts except when material is priced on a basis other than at cost;

(2) Negotiating indirect cost rates, when:

(i) FAA has division or corporate contract administration responsibilities;

(ii) Quick Close-out procedures are used; or

(iii) Indirect rate caps are negotiated in the contract.

(3) Proposing, negotiating, or determining costs under terminated contracts;

(4) Price revision of fixed-price incentive contracts;

(5) Price redetermination of price redetermination contracts; and

(6) Pricing changes and other contract modifications.

(c) When division or corporate contract administration responsibilities rest with another Government agency, the FAA will apply the cost principles of the administering agency for the determination or negotiation of indirect rates not covered by (2)(ii) or (2)(iii) above.

(d) Upon request, the Contracting Officer will provide a copy of the FAA "Contract Cost Principles."

(End of clause)

3.6.2-24 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (JAN

2019)

(a) Definitions.

(1) "Employer identification number," as used in this clause, means the last four digits of the Federal Social Security number used on the employer's quarterly federal tax return, U.S. Treasury Department Form 941.

(2) "Minority," as used in this clause, means

(i) Black (all persons having origins in any of the black African racial groups not of Hispanic origin);

(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race);

(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(iv) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

(b) If the Contractor, or a subcontractor at any tier, subcontracts a portion of the work involving any construction trade, each such subcontract in excess of $10,000 must include this clause, including the goals for minority and female participation stated herein.

(c) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate work force in each trade on all construction work in the covered area, are as follows:

Goals for minority participation: 7.2% Goals for female participation: 6.9% (Contracting Officer insert goals)

Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor must provide written notification to the Office of Federal Contract Compliance Programs (OFCCP) area office within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this screening information request. The notification must list the:

(1) Name, address, and telephone number of the subcontractor,

(2) Employer identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) The Contractor must implement the affirmative action procedures in subparagraphs (f)(1) through (7) of this clause. The goals stated in this contract are expressed as percentages of the total hours of employment and training of minority and female utilization that the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it must apply the goals established for the geographical area where that work is actually performed. The Contractor is expected to make substantially uniform progress toward its goals in each craft.

(f) The contractor must take affirmative action steps at least as extensive as the following:

(1) Ensure a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities where the Contractor's employees are assigned to work. The Contractor, if possible, will assign two or more women to each construction project. The Contractor must ensure foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at these sites or facilities.

(2) Immediately notify the OFCCP area office when the union or unions, with which the Contractor has a collective bargaining agreement, has not referred back to the Contractor a minority or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations.

(3) Develop on-the-job training opportunities and/or participate in training programs for the area that expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor must provide notice of these programs to the sources compiled under subparagraph (f)(2) above.

(4) Review, at least annually, the Contractor's equal employment policy and affirmative action obligations with all employees having responsibility for hiring, assignment, layoff, termination, or other employment decisions. Conduct reviews of this policy with all on-site supervision, personnel prior to initiation of construction work at a job site. A written record must be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.

(5) Disseminate the Contractor's equal employment policy externally by including it in any advertising in the news media, specifically including minority and female news media. Provide written notification to, and discuss this policy with, other Contractors and subcontractors with which the Contractor does or anticipates doing business.

(6) Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities. Encourage these employees to seek or to prepare for, through appropriate training, etc., opportunities for promotion.

(7) Maintain a record of solicitations for subcontracts for minority and female construction contractors and suppliers, including circulation of solicitations to minority and -female contractor associations and other business associations.

(g) The Contractor is encouraged to participate in voluntary associations that may assist in fulfilling one or more of the affirmative action obligations contained in subparagraphs (f)(1) through (7). The efforts of a contractor association, joint contractor-union, contractor-community, or similar group of which the contractor is a member and participant, may be useful in achieving one or more of its obligations under subparagraphs (f)(1) through (7).

(h) A single goal for minorities and a separate single goal for women must be established. The Contractor is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of Executive Order 11246, as amended, if a particular group is employed in a substantially disparate manner.

(i) The contractor must not use goals or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.

(j) The Contractor must not enter into any subcontract with any person or firm debarred from Government contracts under Executive Order 11246, as amended.

(k) The Contractor must carry out such sanctions and penalties for violation of this clause and of the Nondiscrimination and Affirmative Action clause, including suspension, termination, and cancellation of existing subcontracts, as may be imposed or ordered under Executive Order 11246, as amended, and its implementing regulations, by the OFCCP. Any failure to carry out these sanctions and penalties as ordered must be a violation of this clause and Executive Order 11246, as amended.

(l) Nothing contained herein must not be construed as a limitation upon the application of other laws that establish different standards of compliance.

(End of clause)

3.6.3-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (OCT

2016)

(a) Hazardous material, as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.

Material (If none, insert None): __________________________________ Identification No.: __________________________________

(c) The apparently successful offeror, by acceptance of the contract, certifies that the list in paragraph (b) of this clause is complete. This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Safety Data Sheet prior to award may result in the apparently successful offeror being considered non-responsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause or the certification submitted under paragraph (c) of this clause, the Contractor shall promptly notify the Contracting Officer (CO) and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to:

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material;

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(i) Except as provided in paragraph (i)(2) the Contractor shall prepare and submit a sufficient number of Safety Data Sheets, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous materials identified in paragraph (b) of this clause.

(1) For items shipped to consignees, the Contractor shall include a copy of the Safety Data Sheets with the packing list or other suitable shipping document which accompanies each shipment. Alternatively, the Contractor is permitted to transmit Safety Data Sheets to consignees in advance of receipt of shipments by consignees, if authorized in writing by the CO.

(2) For items shipped to consignees identified by mailing address as agency depots, distribution centers or customer supply centers, the Contractor shall provide one copy of the Safety Data Sheets in or on each shipping container. If affixed to the outside of each container, the Safety Data Sheets must be placed in a weather resistant envelope.

(End of clause)

3.6.3-12 ASBESTOS - FREE CONSTRUCTION (APR 2017)

(a) In performing this contract, the Contractor must not use asbestos or asbestos-containing building materials during construction, renovation, and/or modernization of this facility.

(b) The Contractor must provide to the Contracting Officer (CO) a signed statement with their final pay application indicating that no asbestos or asbestos-containing building materials were used during construction, renovation, and/or modernization of this facility. The Contractor's certification under this clause is considered to be a material requirement of the contract and the FAA may withhold payment pending submittal and receipt of an acceptable certification.

(c) The FAA retains the right to conduct sampling of contractor building materials used during construction, renovation, and/or modernization of this facility to verify that they are asbestos-free. If asbestos-containing material is found, the Contractor must bear the expense of the sampling conducted by the FAA, remove and replace the asbestos-containing material and decontaminate the site of asbestos contamination caused by the Contractor at no additional cost to the Government. In addition, the Contractor must bear the expense of all testing (bulk sampling and air sampling conducted by the contactor and the FAA) to determine that the asbestos removal and site decontamination are satisfactorily completed. The Contractor must follow all applicable federal, state, and local asbestos regulatory requirements as well as applicable FAA Orders with respect to asbestos abatement when the Contractor is required to remove asbestos materials they have installed.

(End of clause)

3.10.1-19 MODIFICATION COST PROPOSAL - PRICE BREAKDOWN (CONSTRUCTION) (JUL

1996)

(a) The contractor, in connection with any proposal it makes for a contract modification, shall furnish a price breakdown, itemized as required by the Contracting Officer. The breakdown shall be in enough detail to permit an analysis of all material, labor, equipment, subcontract, and overhead costs, as well as profit, and shall cover all work involved in the modification, whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by similar price breakdowns from those subcontractors.

(b) In addition, if the proposal includes a time extension, a justification thereof shall also be furnished.

Notwithstanding any other provisions of this contract, it is mutually understood that the time extension for changes in the work will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of work. The contract completion dates will be extended only for those specific elements so delayed and the remaining contract completion dates for all other portions of the work will not be altered.

(c) The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by the Contracting Officer.

(End of clause)

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 5 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

3.13-16 RECORDS MANAGEMENT (JAN 2020)

(a) Definitions.

Federal record as defined in 44 U.S.C. § 3301, means all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. The term Federal record:

(1) Includes all FAA records.

(2) Does not include personal materials.

(3) Applies to records…