RFl Announcement_OTA_Sentinel Infrastructure_MAFB.pdf
PDF 125 KB Posted
- Solicitation number
- W912DW26S1CE0
About this file
This is a Request for Information (RFI) issued by the U.S. Army Corps of Engineers, Seattle District, for market intelligence regarding a potential standalone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a for the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base, Great Falls, Montana. The project involves construction of a comprehensive utilities distribution system serving the Ground Based Strategic Deterrent (GBSD) Complex, including electrical distribution systems, water distribution, wastewater collection, natural gas service, and telecommunications backbone connectivity. The estimated project magnitude is $160 million to $200 million with an anticipated period of performance of approximately 1,278 calendar days. Design is near 100 percent completion by Jacobs Engineering, which will remain the Designer of Record.
The Government is evaluating a Construction Management at Risk (CM@Risk) delivery approach structured in two phases: Phase 1 (Preconstruction/Collaborative Services) where a constructor is selected on qualifications, past performance, approach, and price to provide constructability reviews and collaborate on establishing a Guaranteed Maximum Price (GMP); and Phase 2 (Construction Execution At-Risk) where the contractor assumes construction risk and is responsible for delivery within agreed price ceiling, schedule, and performance requirements. This RFI is issued solely for market intelligence and acquisition planning purposes and does not constitute a formal solicitation; no contract will be awarded as a result of this RFI, and responses will not be reimbursed. Interested parties must submit responses via an online questionnaire at https://forms.osi.apps.mil/r/7Pna1mrz1x by 10:00 AM PDT on 28 August 2026, with optional supplemental capability statements (not exceeding 5 pages) submitted via email to Kyla Couch, Contract Specialist, at kyla.m.couch@usace.army.mil. The NAICS code identified is 237130 (Power and Communication Line and Related Structures Construction, Size Standard: $45 Million).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Corps of Engineers – Seattle District | Sentinel Program – Market Intelligence
RFI – OTA | Sentinel Utility Infrastructure | Malmstrom AFB | Page 1 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SEATTLE DISTRICT
REQUEST FOR INFORMATION (RFI)
ADVANCE NOTICE TO
INDUSTRY: Potential Use of Other Transaction Authority (OTA)
Construction Management at Risk (CM@Risk) for the Sentinel Utility Infrastructure Project
Malmstrom Air Force Base, Great Falls, Montana
Notice Type Request for Information / Market Intelligence (Special Notice) Authority 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) Potential Delivery Method
Construction Management at Risk (CM@Risk) via Other Transaction Authority (OTA)
NAICS Code 237130 – Power and Communication Line and Related Structures Construction (Size Standard: $45 Million)
Place of Performance Malmstrom Air Force Base, Great Falls, Montana Estimated Magnitude $160,000,000 – $200,000,000 Industry Day TBD (details will be announced separately if held) Response Link https://forms.osi.apps.mil/r/7Pna1mrz1x
Response Deadline 10:00 AM PDT on 28 August 2026 Point of Contact Kyla Couch, Contract Specialist | kyla.m.couch@usace.army.mil
1. NOTICE AND DISCLAIMER
This is a Request for Information (RFI) issued solely for market intelligence and acquisition planning purposes. This announcement does not constitute a Solicitation, Request for Proposal (RFP), Request for Qualifications (RFQ), or invitation for bid. No solicitation is currently available. Participation is strictly voluntary. The Government will not award any agreement or contract as a result of this RFI, nor will it reimburse respondents for any costs incurred in preparing or submitting a response. Submission of a response does not obligate the Government in any way and will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.
While Other Transaction Authority is not subject to the Federal Acquisition Regulation (FAR) or FAR-based small-business set-aside rules, the NAICS code above is provided for market-intelligence purposes to help the Government understand the size and demographics of the interested industrial base.
2. PURPOSE
The U.S. Army Corps of Engineers (USACE), Seattle District, is conducting market intelligence to assess industry capability, capacity, interest, and feedback regarding the potential use of Other Transaction Authority (OTA) under 10 U.S.C. § 2808a to deliver the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base (MAFB). Responses will inform the District’s acquisition strategy, https://forms.osi.apps.mil/r/7Pna1mrz1x
RFI – OTA | Sentinel Utility Infrastructure | Malmstrom AFB | Page 2 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION solicitation approach, agreement structure, evaluation criteria, and risk-allocation framework for a standalone OT agreement covering this critical enabling project.
3. PROJECT BACKGROUND
The Sentinel (Ground Based Strategic Deterrent) program is modernizing the Nation’s land-based intercontinental ballistic missile force. At Malmstrom AFB, the Air Force is constructing a suite of new facilities collectively referred to as the Operations and Maintenance Complex (OMC), together with associated support facilities. The Utility Infrastructure Project is the critical enabling backbone that must be in place before the remaining Sentinel facilities can be constructed and made operational.
Scope of the Utility Infrastructure Project includes construction of a comprehensive utilities distribution system serving the entire Sentinel GBSD Complex at Malmstrom AFB. Primary elements include:
• Electrical distribution systems, including connection to / expansion of electrical substation capacity as required to serve the new campus.
• Water distribution and related appurtenances.
• Wastewater collection and connection to treatment systems.
• Natural gas service to the campus.
• Telecommunications backbone connectivity, including fiber services to Information Transfer
Nodes (ITNs), electrical substation, water pump stations, and related Base utility facilities.
• Associated site work: clearing, grubbing, grading, minor demolition, drainage, utility and communications connections, access paving, parking, and walkways as applicable.
Individual OMC facility projects (Integrated Command Center, Integrated Training Center, Missile Handling Complex, Consolidated Maintenance Facility, and Operations Group Facility) will connect their building utilities to the systems provided under this project at the project boundary. Coordination with Base Communications for Government Furnished / Government Installed (GFGI) equipment in ITNs will affect service delivery timelines.
Design for the Utility Infrastructure Project is mature (near 100 percent) and is being performed by Jacobs Engineering under an existing design contract. Jacobs will remain the Designer of Record. The estimated construction magnitude is between $160 million and $200 million. The anticipated period of performance is approximately 1,278 calendar days. This project is on the critical path for the overall Sentinel beddown at Malmstrom AFB; any schedule slip cascades into every subsequent facility.
4. POTENTIAL ACQUISITION STRATEGY
The Seattle District is evaluating execution of a standalone Other Transaction Agreement under 10 U.S.C. § 2808a using a Construction Management at Risk (CM@Risk) delivery approach for the Utility Infrastructure Project.
Because design is already advanced, the anticipated CM@Risk model is expected to operate as follows:
Phase 1 – Preconstruction / Collaborative Services
• Constructor is selected primarily on qualifications, past performance, proposed approach, commercial terms and price.
• Selected constructor joins the Project Delivery Team as a collaborative advisor while design is finalized .
• Constructor provides constructability reviews, value-engineering input, long-lead item identification, supply-chain risk assessment, and open-book cost development.
• Government and constructor work collaboratively to establish a Guaranteed Maximum Price (GMP) or equivalent commercial ceiling validated against the Independent Government Estimate (IGE).
RFI – OTA | Sentinel Utility Infrastructure | Malmstrom AFB | Page 3 of 3 | FOR OFFICIAL USE / INDUSTRY DISTRIBUTION
Phase 2 – Construction Execution (At-Risk)
• Upon successful negotiation of the GMP (or equivalent), the OT Agreement is modified to authorize construction.
• Constructor assumes construction risk and is responsible for delivery within the agreed price ceiling, schedule, and performance requirements.
• Designer of Record (Jacobs) retains design liability; constructor is accountable for constructability, coordination, and execution decisions made during Phase 1.
The agreement is anticipated to be structured with flexibility for incremental funding, differing site conditions, environmental contingencies, and coordination with concurrent Sentinel facility construction.
The Government anticipates that this standalone Infrastructure OT will be awarded and executed on a timeline that supports the overall program critical path.
5. RESPONSE INSTRUCTIONS
Interested parties are requested to submit responses by completing the online questionnaire at:
https://forms.osi.apps.mil/r/7Pna1mrz1x The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices.
If necessary, interested parties may also submit a brief capabilities statement containing relevant information not otherwise addressed in the questionnaire. Capability statements shall not exceed 5 pages in length. The Government requests that firms avoid duplicating information already provided through the questionnaire.
Supplemental capability statements are requested to be submitted via email to the individual(s) listed below no later than 10:00 AM Pacific Time on 28 August 2026. Late responses may still be considered at the Government’s discretion but are not guaranteed review prior to strategy finalization.
Kyla Couch, Contract Specialist Military/Environmental/Interagency & International Services (IIS) Branch Contracting Division, Seattle District, Northwestern Division Email: kyla.m.couch@usace.army.mil Subject line: “RFI Response – Sentinel Utility Infrastructure OTA CM@Risk – [Firm Name]”
The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a.
Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates.
https://forms.osi.apps.mil/r/7Pna1mrz1x
| 1. NOTICE AND DISCLAIMER |
| 2. PURPOSE |
| 3. PROJECT BACKGROUND |
| 4. POTENTIAL ACQUISITION STRATEGY |
| 5. RESPONSE INSTRUCTIONS |
File details come from the government source that posted it. Updated .