This is an Amendment to Questions and Answers document for a pre-solicitation process control system engineering opportunity issued by the Army DEVCOM Soldier Center. The document addresses 14 vendor inquiries regarding licensing requirements, contractor qualifications, system specifications, scope of work, and procurement procedures for troubleshooting a newly installed PLC and steam/water/air control system serving three hydraulic press systems with approximately 5-6 platen sets.
Key requirements clarified include: PE licensure or equivalent is preferred with specific expertise in high pressure steam systems and boiler certification; relevant Allen-Bradley PLC programming experience and steam plumbing/controls expertise are mandatory; small firms may partner with subcontractors provided letters of agreement are submitted; the existing system uses an Allen-Bradley Model L33ER PLC with custom-built logic and unknown firmware version; as-built drawings will be provided after award, with the initial task being verification against the installed system; hardware replacement and re-piping may be required and will be priced following system analysis; the contract will likely be fixed-price with separate deliverables for the initial system assessment and corrective modifications, with corrective action awards being optional pending findings and cost; US citizenship and background checks are required for on-site work; and the full system requirements list will be released with the RFP. Process system design expertise may be satisfied through a qualified subcontractor rather than the prime contractor. The original Sources Sought announcement requested responses by November 26, 2026 at 5pm EST to designated Army contacts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001 Questions and Answers:
1. When you say the vendor must be "licensed in process system design," what license are you looking for? A PE, something Massachusetts-specific, or is relevant experience enough?
PE license is preferred with specific experience with high pressure steam systems. Relevant licenses and certification for AB controls and plumbing licensing required. This is fed installation, so I don’t think mass certs are required, although will be considered.
2. Would you consider a small controls firm, with a chemical engineer on staff, that teams with a mechanical or plumbing partner for the physical piping work?
Would consider all firms and relevant subcontractors. Letters of agreement from subs are suggested in response to RFP. Steam plumbing and controls expertise is required for consideration.
3. Can you share which Allen-Bradley platform and software the system is running, and whether as-built drawings and the current PLC program would be available after award? A site visit before any RFP would also help if that's an option.
Model L33ER. I don’t know the firmware version. As-builts are available. Initial task is to verify as-built drawings against the installed system. They would be provided after award. I can suggest contracting offer site visits to sources sought respondents as part of RFP process.
4. Which PLC model, firmware, and programming software versions are installed, and will the source code and as-built drawings be provided?
Model L33ER. Firmware is unknown. Custom software can be requested from the original vendor. As-builts are available. As-builts review and comparison to actual system is part of the task.
5. Is valve replacement or re-piping expected to be within scope, and how will hardware be procured?
Hardware changes will be priced following the initial system analysis. If hardware needs to be changed, pricing can be negotiated based on findings. Hardware would be priced in the proposed system changes along with any software changes.
6. What is the preferred contract type and expected level of effort?
Contract will likely be fixed price. Pricing for hardware and coding will be negotiated following system analysis. Level of effort is to complete the system analysis using as-builts as basis, determine system remediation, identify required changes, installation of changes then system testing and validation.
7. How many press systems and platen sets are in the installation?
3 presses, ~5-6 platen sets.
8. What license (type and state) satisfies the process system design requirement?
PE or equivalent. Specific expertise in high pressure steam if possible. Boiler certification is also preferred.
9. What access, badging, or citizenship verification will be required for on-site work?
US citizens only + background check. Noted in solicitation.
10. Will the full system requirements list be released before a solicitation, or only with the RFP?
With RFP
11. Can the requirement for licensed process-system design expertise be satisfied through a qualified engineering subcontractor, or must the prime contractor hold the license?
Yes, your sub can hold the license or accreditation. Suggest getting an agreement letter from the company to submit with your full proposal, when that request is made.
12. What Allen-Bradley PLC model and programming software are currently installed?
Model L33ER. Logic for this system was custom built. Don’t know the software version.
13. Are the existing PLC/HMI source files, P&IDs, valve specifications, and as-built drawings available?
We do have copies of the submitted As-builts, however part of task to is go through those and identify differences between that copy and the system as part of the walk-down. The custom software would need to be downloaded from the system or requested from the original vendor. We have those contacts.
14. Does the Government anticipate separating the initial system assessment from the subsequent corrective modifications?
These would be separate deliverables. Pricing for corrective actions will be dependent on system analysis. Award for corrective actions is optional dependent on actual findings and total proposed cost.