PPPL_PQA_Supplier_Quality_Survey_R7.doc

DOC document 219 KB Posted

Attached to
Fabrication of Center Stack Casing for NSTX-U Project
Solicitation number
Not on record
Issued by

About this file

PPPL PQA Supplier Quaity Survey

View the file

Other files

File Type Posted
NSTX-U_Center_Stack_Casing_Specs_(draft).pdf PDF
CSCA_Drawings.zip ZIP file
NSTX-U_Center_Stack_Casing_Description.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRINCETON PLASMA PHYSICS LABORATORY

PQA Supplier Quality Survey This survey is to be completed by the head of your Quality Department and returned to PPPL.

Please attach your organization chart that includes the Quality function and your Quality Manual.

Distributors – Please include your Traceability/Material Identification Procedure and your Trouble Reporting/Customer Notification procedure.

Checklist Completed By
Date
Title
The survey need not be completed if you have completed one within the last 12 months and there have been no significant changes. If so, check here.
FORMCHECKBOX

Would you be receptive to a site survey visit?

If requested, would you be willing to supply specific quality procedures in the future?

GENERAL INFORMATION

Name of Facility
Years in Business under this Name
Division or subsidiary of:
Facility Address
City
State
Zip Code
-
Mailing Address
Phone
Zip Code
-
Principle Products/Services
Is this facility currently certified to any quality standards (ISO, ASME, etc.)? If so, please list them:

Identify the industry / national standard(s) that the quality system follows?

PERSONNEL

Head of Quality Dept.
Phone
e-mail
Reports to:
Production Manager
Phone
e-mail
Reports to:
Total No. of Personnel
Inspection/Test
Production
Administrative
QA/QC
Certified Welders

Capable of multiple shifts?

If YES, how many?
QUALITY SYSTEM
Yes
No
Comments

Is there a formal quality system in place?

Is there a written Quality Manual?

Are there regular, documented, Quality Program audits?

Is formal document control implemented for work instructions, procedures and drawings?

Is there a nonconformance system that includes identification, segregation, customer notification and concurrence, and action to prevent recurrence?

Is there a calibration program that requires national standards and includes tracking of status?

Are all measuring and test equipment used for final acceptance part of the calibration system?

What is the typical calibration period?

What is the longest calibration period?

Do all personnel receive quality program training?

Do Quality personnel review procurement documents?

Do Quality personnel witness inspections and tests?

Do Quality personnel witness special processes?

PURCHASED ITEMS
Yes
No
Comments

Are Quality personnel involved in contract review?

Is there a documented supplier qualification process?

Does supplier oversight include visits to supplier’s site?

Is there a rating system for supplier performance?

Are all incoming items/materials inspected?

Are incoming materials verified to be traceable to the associated certifications?

Is there a system of tagging or labeling material to maintain traceability?

Are receipt inspection results documented?

Are there controls to assure that unacceptable materials do not enter production?

Are materials controls in place to prevent damage/deterioration in storage?

Are age-sensitive items identified & controlled?

Please describe how counterfeit and mis-identified materials are kept out of your products. Items of particular interest are graded fasteners, refurbished electrical components (represented as new), and counterfeit semiconductors.
ENGINEERING/DESIGN
Yes
No
Comments

Is there a system for documenting designs and design changes?

Is there a system for reviewing of designs and related design items, such as calculations, and documenting the review?

Are drawing and specification and their revisions reviewed for conformity to customer’s specifications?

Is there a system to control the development of software and to validate the final software to be delivered?

PROCESS CONTROLS
Yes
No
Comments

Are plans such as manufacturing, inspection, and test plan normally used?

Is an in-process tracking and identification system such as routing cards or travelers used?
FORMCHECKBOX

Who does in-process inspection?

Are written procedures or checklists used for in-process and tests?

Are records kept showing the acceptance, rejection, or disposal of material?

Are written procedures used for special processes & NDT?

How is inspection and test status indicated?

Are there up-to-date Preventive Maintenance schedules for production equipment?

FINAL INSPECTION & TESTS
Yes
No
Comments

Are written procedures used for final inspections & tests?

Is acceptance based on 100% inspection/test?

If sampling is used, does the customer pre-approve the method used?

If there is a default sampling method, what is it?

Is the organization performing final inspection and tests separate from production?

Does the Quality organization review acceptance procedures to ensure purchase order compliance?

Are records of results maintained?

OTHER

Are there other aspects of your Quality System that we should consider in evaluating your program (Customer approval/awards, lean manufacturing, 6-Sigma and/or process improvement programs, etc.)?

Please attach any supporting documentation helping to support the answers above. For example, certificates supporting certifications, a quality manual if available, special customer awards if appropriate.

IN HOUSE CAPABILITIES

Please complete this section to help us understand the capabilities of your organization. It is understood that not all organizations will have all (or most) of these capabilities and that they are not needed for many fabrications.

The comments section should be used to add specific information such as equipment, type, number, # of qualified operators etc. If you have “established” relationships with contractors who routinely perform these services for your business please note “Contracted” in the comments section.

MACHINING CAPABILITIES
Yes
No
Comments
CNC (Computer Numerical Control) - # of axis?
FORMCHECKBOX

FORMCHECKBOX

Waterjet Cutting
FORMCHECKBOX

FORMCHECKBOX

EDM (Electric Discharge Machining)/Plunge EDM
FORMCHECKBOX

FORMCHECKBOX

Laser Machining
FORMCHECKBOX

FORMCHECKBOX

Plasma Cutting
FORMCHECKBOX

FORMCHECKBOX

What are your size limitations on fabricated parts?

Other

METROLOGY CAPABILITIES)
Yes
No
Comments
Fixed Position CMM (Coordinate Measuring Machine)
FORMCHECKBOX

FORMCHECKBOX

Portable CMM (e.g. Romer or Faro Arm, Laser tracker)
FORMCHECKBOX

FORMCHECKBOX

Other

WELDING CAPABILITIES
Yes
No
# of certified welders
Arc Welding
FORMCHECKBOX

FORMCHECKBOX

MIG (Gas Metal Arc)
FORMCHECKBOX

FORMCHECKBOX

TIG (Tungsten Inert Gas)
FORMCHECKBOX

FORMCHECKBOX

Other (Friction Stir Welding, Laser, Electron Beam)
FORMCHECKBOX

FORMCHECKBOX

Experience Welding:

Stainless Steel FORMCHECKBOX Aluminum FORMCHECKBOX Inconel FORMCHECKBOX

Other Metals:

Other

BRAZING CAPABILITIES
Yes
No
Comments
Torch Brazing
FORMCHECKBOX

FORMCHECKBOX

Furnace Brazing (Note furnace size in comments)
FORMCHECKBOX

FORMCHECKBOX

Vacuum Brazing (Note vessel size in comments)
FORMCHECKBOX

FORMCHECKBOX

List typical materials brazed

Other

NON DESTRUCTIVE TESTING CAPABILITIES
Yes
No
Comments
Dye Penetrant Testing
FORMCHECKBOX

FORMCHECKBOX

Magnetic Particle Inspection
FORMCHECKBOX

FORMCHECKBOX

Ultrasonic Testing (note if phased array is included)
FORMCHECKBOX

FORMCHECKBOX

Eddy Current Testing
FORMCHECKBOX

FORMCHECKBOX

Radiographic Testing
FORMCHECKBOX

FORMCHECKBOX

Vibration Analysis
FORMCHECKBOX

FORMCHECKBOX

Infrared Thermography
FORMCHECKBOX

FORMCHECKBOX

Acoustic Emission Analysis
FORMCHECKBOX

FORMCHECKBOX

Other

HEAT TREATING CAPABILITIES
Yes
No
Comments
Temperature Range Capability (please define)
FORMCHECKBOX

FORMCHECKBOX

Capability to heat treat under vacuum
FORMCHECKBOX

FORMCHECKBOX

Size capacity for heat treating
FORMCHECKBOX

FORMCHECKBOX

Other

OPTICAL TESTING CAPABILITIES
Yes
No
Specify methodology
Transmission (within and outside band)
FORMCHECKBOX

FORMCHECKBOX

Reflection (within and outside band)
FORMCHECKBOX

FORMCHECKBOX

Scratch & Dig
FORMCHECKBOX

FORMCHECKBOX

Parallelism
FORMCHECKBOX

FORMCHECKBOX

Other

SPECIAL PROCESS / TESTING CAPABILITIES
Yes
No
Comments
Magnetic Permeability Testing
FORMCHECKBOX

FORMCHECKBOX

Helium Leak Testing (specify max. sensitivity)
FORMCHECKBOX

FORMCHECKBOX

Pressure Testing hydorstatic FORMCHECKBOX pneumatic FORMCHECKBOX

FORMCHECKBOX

FORMCHECKBOX

Vacuum Testing
FORMCHECKBOX

FORMCHECKBOX

Additional Comments or Capabilities

Laboratory Capabilities:

Revision 7 8/28/2018

File details come from the government source that posted it.