101718_JPL_condensed_SOW-RFI_MC-2662-977944.pdf

PDF 114 KB Posted

Attached to
JPL Design-Build Energy Management and Control System (EMCS) Upgrade Request for Information
Solicitation number
RFI_MC_2662_977944
Issued by

About this file

Condensed Statement of Work

View the file

Other files

File Type Posted
jpl_exhibit_A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e 1 | 2

Solicitation No. MC-2662-977944

DESIGN-BUILD ENERGY MANAGEMENT AND CONTROL SYSTEM

(EMCS) UPGRADE REQUEST FOR INFORMATION (RFI)

Condensed Statement of Work (SOW) October 17, 2018

SUMMARY DESCRIPTION

This task is to upgrade the existing Energy Management and Control System (herein after referred to as “EMCS”) in buildings on a 177-acre site at the JPL campus located in Pasadena, CA.

Wage Determination

General Wage Determinations Issued Under the Davis-Bacon and Related Acts Volume VII, U.S. Department of Labor, Employment Standards Administration Wage and Hour Division, as applicable to Los Angeles County applies to this Project.

Objectives

Provide an upgrade of building and HVAC control systems to a centralized Niagara4 based EMCS utilizing Vykon JACEs and Distech controllers, including custom Graphical User Interfaces and Energy Dashboards for all buildings. The Proposed system and new equipment must comply with the JPL Facility Design Standards (FDS) which will be provided at the issuance of the Request for Proposal.

Analyze current HVAC control systems and recommend potential upgrades and Niagara4 integration scenarios for optimizing short and long-term goals that could include future growth of the Niagara Framework to additional building systems.

Controls shall be linked between buildings via Ethernet using a JPL furnished, configured, and maintained Ethernet zone/segment within the JPL network infrastructure. The Control Network/

Fieldbus within buildings between controllers and devices shall be ASHRAE SSPC 135, BACnet. Where existing and/or no other means are available wireless, LON or Modbus may be used after written approval by JPL.

Integrate building level energy metering and sub-metering including Water, Gas, Electric and

BTU meters into the existing Niagara4 Supervisor and existing Niagara Analytics including energy usage reporting graphics, fault detection diagnostics, reporting, and dashboards for all buildings listed in Exhibit A.

Energy Management and Analysis software and configuration for consideration shall include

HVAC control algorithms to optimize energy savings and operational efficiency, i.e., optimized start/stop for chillers, boilers, air handling equipment and all associated equipment, and Feed-

Forward controls based on predicted weather patterns.

P a g e 2 | 2

The proposed system shall include measuring of key points in building systems to monitor part-load operation and adjust system set points to match system capacity to load demands.

Provide the capability for Maintenance and Operations and Building Staff to measure energy consumption and monitor performance critical to overall system well-being. Electrical values such as volts, amperage, watts, KVA, KVAR, kWh, kVArh, frequency, power factor, and %THD;

Natural Gas consumption in ft³; and water in gallons consumed should all be considered for measured values. Current (Live) watts, kWh, gas, and water consumptions at a minimum shall be reported for each building.

Provide energy management measurements in instantaneous, totalized, and interval-based samples for chillers, boilers, air-handling units, pumps, and other HVAC equipment. Provide the ability to convert the collected data to standard database and spreadsheet format and transmit to a designated PC. Energy points are those points that are monitored to ensure compliance with ASHRAE Standard 90.1.

File details come from the government source that posted it.