Draft_BHMT-M_CDRLs_-20130827.pdf
PDF 800 KB Posted
- Attached to
- Foreign Military Sales (FMS) Case TW-B-YZC Taiwan Army UH-60M Black Hawk Maintenance Trainer
- Solicitation number
- RFI-ID04130185R
About this file
Draft CDRL's
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_Attachment_001_Configuration_Matrix.xlsx | XLSX spreadsheet | |
| Draft_-_Attachment_003_BHMT-M_System_Specification.pdf | ||
| Draft_-_Attachment_005_MIL_STD_31000A_BHMT-M_20130424.pdf | ||
| Draft_Attachment_006-GFE_List.xlsx | XLSX spreadsheet | |
| Draft_-_Attachment_004_CDRL_Matrix_Taiwan_BHMT_20130529.xlsx | XLSX spreadsheet | |
| Draft_PWS_-BHMT-M.pdf | ||
| Draft_Attachment_002_TA_BHMT-M_DSL_20130529.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL DECK 20130827
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Integrated Program Management Report Integrated Master Schedule
Baseline
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861 SOW Para 3.1.4 SFAE-AV-UH-T
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION IN
LT
MTHLY 30 DACA
b. COPIES
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
A
N/A SEE BLK 16
Reg
Repr
16. REMARKS:
BLOCK 8 The COR will review and approve or disapprove initial baseline submittal with comments
NLT thirty (30) days after initial submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) days after receipt of comments. The COR will review and approve or disapprove IMS baseline revision submittals with comments NLT seven (7) days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT seven (7) days after receipt of comments.
BLOCK 9 Distribution D. See Enclosure 1.
BLOCK 10, 13 The Contractor shall not re-baseline any IMS activities without concurrence from the
COR. As required, the Contractor shall deliver revised IMS baseline data anytime the data is revised
NLT 30 days of revisions for COR approval. The Contractor shall deliver status against the approved
IMS baseline monthly. Revisions shall be identified in each submittal by use of “Change Bars” in
MS office, or by similar means to make revisions easily identifiable.
BLOCK 14 The Contractor shall electronically deliver the data to the COR via COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil
<https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be transmitted electronically shall be mailed to the following address:
Prototype Integration Facility ATTN: UH Data Manager
5405 Fowler Road
Mark For: FMS Case TW-B-YZC Redstone Arsenal, AL 35898-5000
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 reference)).”
SEE BLK 16
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
https://safe.amrdec.army.mil/
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Technical Report-Study/Services IMS Baseline Change Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.1.4.1 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SEE BLK 16 SEE BLK 16
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
N/A
BLOCK 10, 12, 13 The Contractor shall deliver an IMS Baseline Change Report any time revisions to the baseline are made. The Contractor shall deliver IMS
Baseline Change Reports NLT seven (7) days prior to IMS baseline revision submittal (A001).
BLOCK 14 The Contractor shall electronically deliver the data to the COR via
COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC
SAFE (https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be transmitted electronically shall be mailed to the following address:
5405 Fowler Road
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the
Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A003 Data Accession List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81453A SOW Para 3.1.5 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SEE BLK 16 30 DACA
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
16. REMARKS
BLOCK 10, 13 After first submission, review, and re-submission: the contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions.
Revisions shall be identified in each submittal by use of “Change Bars” in MS office, or by similar means to make revisions easily identifiable.
BLOCK 14 The Contractor shall electronically deliver the data to the COR via
COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC
SAFE (https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be transmitted electronically shall be mailed to the following address:
5405 Fowler Road
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the
Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A004 Technical Report-Study/Services Data Delivery from the DAL
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.1.5 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall deliver data within 30 days of
Procuring Contracting Officer (PCO) request.
BLOCK 14 The Contractor shall electronically deliver the data to the
COR via COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil
<https://safe.amrdec.army.mil/> ) concurrent with the notification letter to
COR. Files that cannot be transmitted electronically shall be mailed to the following address:
Prototype Integration Facility ATTN: UH Data Manager 5405 Fowler Road Mark For: FMS Case TW-B-YZC Redstone Arsenal, AL 35898-5000
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 reference)).”
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Contractor's Configuration Management Plan FMS Configuration
Management Plan (CMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80858B SOW Para 3.1.6 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 8 The COR will review and approve or disapprove with comments NLT thirty
(30) days after submittal. If disapproved the contractor shall revise IAW comments and resubmit NLT thirty (30) days after receipt of COR comments.
BLOCK 9 See Enclosure 1.
BLOCK 10, 12, 13 The Contractor shall deliver the initial submittal NLT 14 days prior to
SRR. The contractor shall deliver an updated list anytime the data is revised NLT 14 days from date of revision not to exceed a bi-weekly submittal. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions easily identifiable.
BLOCK 14 The Contractor shall electronically deliver the data to the COR via COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC SAFE
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be transmitted electronically shall be mailed to the following address:
5405 Fowler Road
“WARNING – This document contains technical data whose export is restricted by the
Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 reference)).”
15. TOTAL
0 1 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A006 As Built Configuration List (ABCL)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-81516 SOW Para 3.1.7 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10,12,13 The contractor shall deliver one ABCL NLT 30 days after final delivery (DD250).
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Technical Reports – Study/Services Program Risk Management
Assessment Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.1.8 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit data NLT 14 Days prior to: Systems
Requirements Review (SRR), Preliminary Design Review (PDR), Critical Design Review
(CDR), Test Readiness Review (TRR), and Pre-Shipment Readiness Review (PSRR).
Revisions shall be identified in each submittal by use of “Change Bars” in MS office, or by similar means to make revisions easily identifiable.
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A008 Briefing Material SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81605 SOW Para 3.1.9, 3.2.5.2, 3.3.4.2, 3.4.1.2, 3.5.12.2, 3.5.14.2
SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
N/A SEE BLK 16 SEE BLK 16
BLOCK 3
A008-001 Program Management Review (PMR) Program Status Briefing Material A008-002 System Requirement Review (SRR) Briefing Material
A008-003 Preliminary Design Review (PDR) Briefing Material
A008-004 Critical Design Review (CDR) Briefing Material A008-005 Test Readiness Review (TRR) Briefing Material
A008-006 Pre-Shipment Readiness Review (PSRR) Briefing Material
BLOCK 8 The COR will review and approve or disapprove with comments NLT seven (7) days after submittal. If disapproved the contractor shall revise IAW comments and resubmit NLT fourteen
(14) days following receipt of comments.
BLOCK 10, 12, 13 The Contractor shall deliver briefing material through the IPT process NLT 14 days prior to the corresponding event. COR comments on the briefing package content will be made through the IPT within 7 days of receipt. The Contractor shall deliver the final presentation updated
IAW the review event NLT 14 days after the conclusion of the event.
<https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be
5405 Fowler Road amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A009 System Safety Program Plan (SSPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-81626A SOW Para 3.1.10 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 8 The COR will review and approve or disapprove with comments NLT thirty (30) days after submittal. If disapproved the contractor shall revise IAW comments and resubmit NLT thirty (30) days after receipt of COR comments.
BLOCK 10, 12, 13 The Contractor shall deliver baseline plan NLT 30 days prior to Preliminary Design Review (PDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions easily identifiable.
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A010 Software Development Plan (SDP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81427A SOW Para 3.2.1 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit initial document NLT 30 days prior to
Preliminary Design Review (PDR). The Contractor shall deliver final documentation
NLT 30 days prior to Critical Design Review (CDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
1 1 0
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A011 Software Requirements Specification (SRS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81433A SOW Para 3.2.2 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 4 Contractor format is acceptable.
NLT 30 days prior to Critical Design Review (CDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBHT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A012 Software Product Specifications (SPS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81441A SOW Para 3.2.3 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
NLT 30 days prior to Critical Design Review (CDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBHT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A013 Technical Reports – Study/Services Requirements Traceability
Matrix (RTM)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.2.4 SFAE-AV-UH-T
7. DD250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit initial document NLT 14 days prior to
System Requirements Review (SRR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions easily identifiable.
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A014 Software Design Description (SDD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81435A SOW Para 3.3.1 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
NLT 30 days prior to Critical Design Review (CDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A015 Interface Design Description (IDD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81436A SOW Para 3.3.2 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
NLT 30 days prior to Critical Design Review (CDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A016 Product Drawings/Models and Associated Lists Engineering and Installation
Drawings
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81000E SOW Para 3.3.3 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 8 The COR will review and approve or disapprove with comments NLT thirty (30) days after submittal. If disapproved the contractor shall revise IAW comments and resubmit NLT thirty
(30) days after receipt of COR comments.
BLOCK 10, 12, 13 Thirty percent (30%) of engineering drawings and associated lists shall be released and delivered NLT 30 days prior to PDR. Ninety percent (90%) of engineering drawings and associated lists shall be released and delivered NLT 30 days prior to the Critical Design Review
(CDR). Remaining drawing releases and revised drawings shall be delivered NLT 30 days prior to
Test Readiness Review (TRR). Any time a drawing is revised, the Contractor shall submit the revised drawing within 14 days thereafter. Revisions shall be identified in the drawing change block or by similar means to make changes easily identifiable.
<https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be
5405 Fowler Road amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance Trainer
(BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017 Product Drawings/Models and Associated Lists Drawing Tree
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81000E SOW Para 3.3.3 SFAE-AV-UH-T
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 8 The COR will review and approve or disapprove with comments NLT thirty (30) days after submittal.
If disapproved the contractor shall revise IAW comments and resubmit NLT thirty (30) days after receipt of COR comments.
BLOCK 10, 12, 13 Thirty percent (30%) of drawing tree shall be released and delivered NLT 30 days prior to PDR. Ninety percent (90%) of drawing tree shall be released and delivered NLT 30 days prior to the Critical
Design Review (CDR). Remaining drawing tree shall be delivered NLT 30 days prior to Test Readiness Review
(TRR). Any time a drawing is revised, the Contractor shall submit the revised drawing tree within 14 days thereafter. Revisions shall be identified in the drawing tree change block or by similar means to make changes easily identifiable.
BLOCK 14 The Contractor shall electronically deliver the data to the COR via COR supplied e-mail address. Files over 5MB shall be delivered via AMRDEC SAFE (https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the notification letter to COR. Files that cannot be transmitted electronically shall be mailed to the following address:
5405 Fowler Road
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act
(Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 reference)).”
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A018 Technical Reports – Study/Services R&M Prediction Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.5.3 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall deliver initial data NLT 30 days prior to
Preliminary Design Review (PDR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A019 Test and Evaluation Program Plan (TEPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-81284 SOW Para 3.5.6 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall deliver draft baseline plan NLT 30 days prior to
Critical Design Review (CDR). The Contractor shall deliver final plan NLT 30 days prior to Test Readiness Review (TRR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A020 Test Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80603A SOW Para 3.5.8 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit document NLT 30 days prior to Test
Readiness Review (TRR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions easily identifiable.
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A021 Technical Report-Study/Services Acceptance Test Procedure
List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.5.9 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit document NLT 30 days prior to Test
Readiness Review (TRR). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each submittal by use of either, “Changes Bars” in MS Office, or by similar means to make revisions easily identifiable.
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the COR Issuing Contracting Officer for Contract/PR
No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
UH-60M Black Hawk Maintenance
Trainer (BHMT-M)
FMS CASE TW-B-YZC
W58RGZ-12-C-0008
Logistics Services
International, Inc.
A022 Technical Report-Study/Services Deficiency Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW Para 3.5.10 SFAE-AV-UH-T
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10, 12, 13 The Contractor shall submit document NLT 15 days following
Contractor Preliminary Inspection (CPI). The Contractor shall deliver revised data anytime the data is revised NLT 30 days of revisions. Revisions shall be identified in each
(https://safe.amrdec.army.mil <https://safe.amrdec.army.mil/> ) concurrent with the
5405 Fowler Road
Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .