- Solicitation number
- RFI_FY27001
- Issued by
- Not on record
About this file
Statement of Work Summary
This Statement of Work (SOW) outlines professional relocation services for the United States Coast Guard Mission System Integration Lab (MSIL) located at Naval Air Station Patuxent River, Maryland. The contractor must provide comprehensive packing, rigging, loading, transportation, offloading, and unpacking of approximately 2,000 square feet of office equipment, electronic systems, servers, radios, flat-screen televisions, large mock-ups, office furniture, and heavy equipment weighing up to 2,000 pounds from a secure second-floor facility in Maryland to a destination facility in Elizabeth City, North Carolina, approximately 240 miles away. The work requires specialized equipment capable of accessing a removable exterior wall section measuring 79 inches by 46 inches to safely remove large and heavy items, as well as qualified personnel including riggers, lift operators, and signal persons. The contractor must provide all labor, materials, transportation vehicles, packing supplies, rigging equipment, lift equipment, tools, and supervision necessary to complete the relocation safely while protecting facility surfaces and maintaining chain-of-custody awareness for government property.
The contract will be awarded on a Firm Fixed Price basis with a performance period not to exceed 90 calendar days from the anticipated award date of March 1, 2027. The contractor must attend a Post Award Conference within 10 business days of award and submit a comprehensive move plan, rigging/lift plan, and weekly progress reports throughout performance. Key deliverables include a draft project plan due by March 12, 2027, a final project plan by March 26, 2027, inventory/labeling documentation, damage reports within 24 hours of occurrence, and a completion confirmation upon move completion. All wages and benefits must comply with the Service Contracting Act and Department of Labor wage rate determinations. The contractor must comply with Navy base security and access requirements, provide valid REAL-ID identification, undergo background checks as requested, and ensure all personnel are U.S. citizens fluent in English. The Contracting Officer is SKC Jennifer Sabatino, and the government reserves the right to cancel the solicitation if funding is not appropriated, with no legal liability to the government prior to notification of fund availability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| wage rates 15-4279.txt | TXT text file | |
| DEI_FAR_Clause.docx | DOCX document | |
| WAR_Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #:
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
USCG Mission System Integration Lab Packing, Rigging, Transportation, Offloading, and Unpacking of Office, Computers, Electronic Equipment, Heavy Equipment, and Mission System Assets
RFI_FY270001
1.0 GENERAL
1.1 BACKGROUND
The purpose of this Statement of Work is to obtain contractor support for the packing, rigging, loading, transportation, offloading, and unpacking of equipment, furnishings, and related assets from the USCG Mission System Integration Lab (MSIL) located in a secure facility at Naval Air Station Patuxent River located at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670 and move it to another designated facility approximately 240 miles away at 112 Corporate Dr. in Elizabeth City North Carolina 27909.
The MSIL occupies approximately 2000 square feet of office and equipment space on the second floor of a secure facility located Naval Air Station Patuxent River, MD. The space contains multiple equipment racks populated with electronic equipment, radios, servers, flat screen televisions, large mock-ups, office furniture, and heavy equipment or large assets weighing up to 2,000 pounds.
The Contracting Officer’s Representative (COR) requires professional relocation services to safely pack, protect, rig, remove, transport, offload, unpack, and place these items at a destination facility in North Carolina. Due to the location of the office space and the size and weight of certain items, the contractor must provide specialized equipment capable of reaching the second-floor access point and safely removing large and heavy equipment from the building.
The Contracting Officer intends to award a Firm Fixed Price contract for this effort.
1.2 SCOPE
The contractor must provide all labor, supervision, materials, tools, packing supplies, rigging equipment, lift equipment, vehicles, transportation, and incidentals necessary to complete the relocation. Provision and operation of special equipment necessary to reach the second-floor access point of the building. Access to the building for moving oversized items will be through a removable exterior wall section on the second floor, approximately 79 inches high by 46 inches wide. Certain large and heavy assets may require specialized hoisting equipment capable of operating on soft/uneven/unpaved ground able to access the second floor and remove the large/heavy items from the building.
Work includes, but is not limited to:
1. Pre-move coordination, site assessment, and planning.
2. Packing and protection of electronic equipment, radios, servers, televisions, office furniture, mock-ups, and related assets.
3. Safe rigging, lifting, lowering, removal, and loading of large or heavy equipment weighing up to 2,000 pounds.
4. Movement of items from a second-floor office location within a secure facility.
5. Loading items onto contractor-provided transportation vehicles.
6. Transporting items approximately 240 miles to the destination facility in North Carolina in vehicles that are enclosed to protect and secure the contents from the elements and theft.
7. Offloading items at the destination facility.
8. Unpacking and placing items in designated locations as directed by the COR.
9. Removal and disposal of packing materials and debris generated by the contractor. Packing material and debris generated by contractor must be disposed of at an approved offsite location.
10. Submit a r to the COR for approval.
1.3 OBJECTIVE
The government is looking to obtain contractor support for the packing, rigging, loading, transportation, offloading, and unpacking of equipment, furnishings, and related assets from the USCG Mission System Integration Lab (MSIL) located in a secure facility at Naval Air Station Patuxent River located at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670 and move it to another designated facility approximately 240 miles away at 112 Corporate Dr. Elizabeth City North Carolin 27909. The period of performance is not to exceed 90 days from anticipated contract award date of 01 March, 2027.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. Pre-Move Coordination, Site Assessment, and Planning
The contractor must coordinate with the COR before the move to confirm requirements, schedule, access procedures, equipment needs, site constraints, second-floor access requirements, and heavy equipment removal requirements.
2.1.1 The contractor must participate in a pre-move planning meeting with the COR.
2.1.2 The contractor must review the types and approximate quantities of items to be moved.
2.1.3 The contractor must conduct or participate in a site assessment, if authorized by the COR, to determine access limitations, second-floor removal requirements, floor loading considerations, exterior access constraints, staging areas, and lift or rigging equipment requirements.
2.1.4 The contractor must identify required packing materials, lift equipment, rigging equipment, carts, dollies, pallets, crates, protective coverings, and vehicle requirements.
2.1.5 The contractor must identify specialized equipment required to reach the second-floor access point and remove large equipment weighing up to 2,000 pounds.
2.1.6 The contractor must identify staffing requirements, including qualified rigging, lift, or heavy equipment operators qualified and licensed in accordance with the state of performance.
2.1.7 The contractor must coordinate access requirements for both origin and destination facilities.
2.1.8 The contractor must identify any COR-furnished information or support needed to complete the work.
2.1.9 The contractor must submit a move plan for COR review and approval prior to work.
The move plan must include, at a minimum:
· Proposed move schedule.
· Staffing plan.
· Packing and protection approach.
· Rigging, lifting, hoisting, or heavy equipment removal approach.
· Description of specialized equipment to be used to reach the second-floor access point.
· Description of how equipment weighing up to 2,000 pounds will be safely removed, loaded, transported, and offloaded.
· Transportation approach.
· Equipment and vehicle types to be used.
· Risk mitigation measures for fragile, heavy, oversized, or sensitive equipment.
· Points of contact.
· Approach for protecting floors, walls, doorways, windows, elevators, stairwells, access points, exterior surfaces, and building infrastructure.
· Safety controls, exclusion zones, and communication methods during lifting or rigging activities.
· Any required permits, base coordination requirements, or equipment staging requirements.
2.2 TASK TWO. Packing and Protection
2.2.1 The contractor must professionally pack and protect all items identified by the COR for relocation.
Items may include, but are not limited to:
· Equipment racks populated with electronic equipment.
· Radios and communications equipment.
· Computers, servers and related electronic components.
· Large or heavy equipment weighing up to 2,000 pounds.
· Flat screen televisions.
· Office furniture.
· Desks, chairs, tables, cabinets, shelving, and related office items.
· Cables, accessories, and peripheral equipment as identified by the COR.
2.2.2 The contractor must provide appropriate packing and protection materials, including, as applicable but not limited to:
· Anti-static packaging for sensitive electronic components.
· Bubble wrap, foam, blankets, pads, and protective coverings.
· Moving boxes and labels.
· Crates or custom packaging for large, fragile, heavy, or irregularly shaped items.
· Pallets, shrink wrap, straps, and tie-down materials.
· Corner protectors and screen protection for flat screen televisions.
· Floor, wall, doorway, window, exterior access, elevator, and stairwell protection.
2.2.3 The contractor must ensure items are packed and protected to prevent damage during handling, rigging, lifting, loading, transit, offloading, and unpacking.
2.2.4 The contractor must not disconnect, disassemble, reconnect, configure, power on, test, repair, or modify electronic equipment unless specifically authorized in writing by the COR.
2.3 TASK THREE. Inventory and Labeling
2.3.1 The contractor must work with the COR to label and track items being moved.
2.3.2 The contractor must label boxes, furniture, equipment, and other move items as directed by the COR.
2.3.3 The contractor must prepare or support preparation of a move inventory.
2.3.4 The contractor must identify items requiring special handling, including fragile electronics, oversized mock-ups, and heavy equipment weighing up to 2,000 pounds.
2.3.5 The contractor must note visible pre-existing damage, if any, before packing, rigging, or loading.
2.3.6 The contractor must maintain chain-of-custody awareness for COR property during the move.
The COR may provide an existing inventory. If provided, the contractor must use the COR inventory as the baseline for the move.
2.4 TASK FOUR. Rigging, Lifting, and Removal of Heavy or Oversized Equipment
2.4.1 The contractor must provide all specialized equipment, qualified personnel, rigging, lift devices, tools, and safety controls necessary to safely access the second floor and remove large or heavy equipment weighing up to 2,000 pounds.
2.4.2 The contractor must Provide specialized equipment capable of reaching the second-floor access point of the building.
2.4.3 The contractor must provide and operate lift, hoisting, rigging, crane, forklift, telehandler, platform lift, gantry, or other suitable equipment as required to safely remove large or heavy items.
2.4.4 The contractor must verify that proposed equipment is appropriate for the item size, weight, lift height, access point, site conditions, and required movement path.
2.4.5 The contractor must use qualified personnel for rigging, lifting, hoisting, signaling, spotting, and operating special equipment.
2.4.6 The contractor must establish and maintain appropriate safety zones during rigging and lifting operations.
2.4.7 The contractor must protect facility surfaces, second-floor access points, exterior walls, windows, doors, floors, grounds, and other infrastructure.
2.4.8 The contractor must secure heavy or oversized items before lifting, lowering, or moving.
2.4.9 The contractor must coordinate all rigging and lift operations with the COR and comply with base and facility requirements.
2.4.10 The contractor must ensure heavy or oversized items are safely lowered, staged, and loaded for transportation.
2.4.11 The contractor must stop work and notify the COR immediately if unsafe conditions are identified.
2.4.12 The contractor must be solely responsible for determining the appropriate rigging, lift, hoisting, and removal methods necessary to safely perform the work, subject to COR review for coordination and access purposes.
2.5 TASK FIVE. Loading at Origin Facility
The contractor must move packed items from the second-floor office space to the contractor’s transportation vehicle or vehicles.
2.5.1 The contractor must provide all labor and moving equipment necessary to safely move items from the office space.
2.5.2 The contractor must provide special equipment necessary to reach the second-floor access point and remove large or heavy equipment.
2.5.3 The contractor must protect building surfaces, including floors, walls, doorways, windows, elevators, stairwells, exterior access areas, and loading areas.
2.5.4 The contractor must coordinate use of elevators, stairwells, loading docks, exterior access points, staging areas, or other access routes with the COR.
2.5.5 The contractor must safely handle heavy, fragile, irregular, or sensitive items.
2.5.6 The contractor must load and secure all items to prevent shifting or damage during transport.
2.5.7 The contractor’s vehicles will be enclosed and secured to protect items from weather, damage and tampering.
2.5.8 The contractor must comply with all facility, base, safety, and access requirements.
2.5.9 The contractor must be responsible for determining the appropriate number and type of vehicles and specialized equipment required to complete the move.
2.6 TASK SIX. Transportation
2.6.1 The contractor must transport all packed items from the origin facility to the destination facility approximately 240 miles away in North Carolina.
2.6.2 The contractor must provide properly licensed, insured, and suitable vehicles capable of safely transporting heavy, oversized, fragile, and sensitive equipment.
2.6.3 The contractor must secure items during transit to prevent loss, movement, tipping, vibration damage, or other damage.
2.6.4 The contractor must comply with all applicable federal, state, local, installation, and transportation requirements.
2.6.5 The contractor must maintain communication with the COR regarding departure, estimated arrival, and any delays.
2.6.6 The contractor must ensure property is not left unattended in an unsecured manner at any time during the move.
2.6.7 The contractor must notify the COR immediately of any accident, loss, delay, damage, or other incident affecting the move.
2.7 TASK SEVEN. Offloading at Destination Facility
2.7.1 The contractor must offload all items at the destination facility and move them to designated locations as directed by the COR.
2.7.2 The contractor must coordinate arrival and access with the COR.
2.7.3 The contractor must provide any lift, rigging, or handling equipment required to offload heavy or oversized items.
2.7.4 The contractor must protect building surfaces at the destination facility.
2.7.5 The contractor must offload all items safely.
2.7.6 The contractor must move items to designated rooms or placement areas.
2.7.7 The contractor must identify any damage or missing items during offload.
2.7.8 The contractor must maintain accountability of items through completion of offload.
2.8 TASK EIGHT. Unpacking and Placement
2.8.1 The contractor must unpack all items at the destination facility as directed by the COR.
2.8.2 The contractor must unpack boxes, equipment, furniture, televisions, and other items identified by the COR.
2.8.3 The contractor must place items in designated areas.
2.8.4 The contractor must reassemble standard office furniture that was disassembled by the contractor for movement, if applicable.
2.8.5 The contractor must remove all contractor-generated packing materials, boxes, shrink wrap, debris, and waste from the destination facility and dispose of them at an approved offsite location.
2.8.6 The contractor must leave work areas in a neat and orderly condition.
2.8.7 The contractor must not install, configure, connect, test, or operate electronic systems unless specifically authorized in writing by the COR.
2.9 TASK NINE. Damage Reporting and Final Walkthrough
2.9.1 The contractor must participate in a final walkthrough with the COR at both origin and destination, as applicable.
2.9.2 The contractor must document any observed damage to property or facilities.
2.9.3 The contractor must report missing, damaged, or potentially damaged items immediately.
2.9.4 The contractor must provide written incident reports for any damage, loss, accident, equipment failure, safety issue, or rigging/lifting incident.
2.9.5 The contractor must support COR review of move completion.
2.9.6 The contractor must correct contractor-caused deficiencies as directed by the Contracting Officer or authorized COR representative.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The contractor must provide trained and qualified personnel experienced in commercial or Government relocation services, including handling of electronic equipment, office furniture, heavy or oversized equipment, and fragile or irregularly shaped items.
The contracting personnel must be US citizens and english speaking to facilitate access to the base and facility.
The contractor must designate a single on-site supervisor or move lead who will serve as the primary contractor point of contact during performance.
The contractor must provide qualified riggers, lift operators, signal persons, spotters, and other specialized personnel necessary to safely remove large or heavy equipment from the second floor.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
3.3 KEY PERSONNEL
Project Manager:
The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be US citizens and able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.
The Project Manager must be available to the COR via telephone between the hours of 0800 and 1700 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 02 hours of notification.
Quality Control Manager:
• Ensures packing, crating, and shipping operations comply with contract standards.
• Conducts regular inspections of packing materials and cargo handling.
• Investigates discrepancies, damaged shipments, or service complaints to execute corrective actions.
Site Manager/ Lead Logistics Coordinator:
Directly manages day-to-day operations, receipt of goods, inventory control, and dispatching.
• Coordinates with carriers and manages scheduling for packing teams .
• Handles logistics paperwork, customs documentation, and dangerous goods declarations.
Packing Team Leader/Supervisor:
Onsite supervisor for packaging, crating, and loading operations.
· Acts as the primary field liaison with the customer and the agency's shipping representatives.
· Directly supervises packing crews to ensure items are secured, weighed, cubed, and marked correctly.
Before replacing any individual designated as Key by the Government, the Contractor must notify the Contracting Officer no less than 10 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes must possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor must not replace Key Contractor personnel without approval from the Contracting Officer. Contractor Key personnel must not be assigned by the Contractor to more than one key position for this requirement. The following Contractor personnel are designated as Key for this requirement. Note: The Government may designate additional Contractor personnel as Key at the time of award.
3.5 EMPLOYEE IDENTIFICATION
3.5.1 Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.6 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
4.1 SECURITY AND ACCESS REQUIREMENTS
The origin facility is located on a Navy base and is a secure facility. The contractor must comply with all applicable base, facility, security, escort, identification, badging, vehicle access, inspection, and entry requirements.
The contractor must:
1. Provide required personnel, vehicle, and specialized equipment information in advance, as requested by the COR.
2. Ensure contractor personnel carry valid REAL-ID compliant identification and comply with background checks as requested by the COR.
3. Comply with all escort and access control procedures.
4. Follow all COR instructions regarding restricted areas.
5. Ensure contractor personnel do not access areas outside the authorized work area.
6. Ensure contractor personnel do not photograph, record, copy, remove, or disclose COR information or facility information unless expressly authorized.
7. Immediately report any access, security, or safety incident to the COR.
8. Coordinate in advance any specialized equipment entering the Navy base, including cranes, forklifts, telehandlers, platform lifts, or other heavy equipment.
Contractor personnel, vehicles, or specialized equipment may be denied access if they fail to meet facility or base access requirements. Denial of access due to contractor failure to comply with requirements shall not excuse contractor performance obligations.
4.2 PERIOD OF PERFORMANCE
The period of performance for this contract must not exceed 90 calendar days from the date of award.
4.3 PLACE OF PERFORMANCE
4.3.1 ORIGIN LOCATION
The origin location is a secure facility located on a Navy base at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670. The office space is approximately 2000 square feet and is located on the second floor. Certain large and heavy assets may require specialized lift, rigging, hoisting, crane, forklift, telehandler, platform lift, or other contractor-provided equipment to access the second floor and remove the items from the building.
Exact dimensions, access routes, second-floor access point details, and access instructions will be provided to the awardee or during an authorized site visit to be designated by the COR.
4.3.2 Destination Location
The destination facility is located at 112 Corporate Dr. in Elizabeth City North Carolina approximately 240 miles from the origin location.
Access instructions, loading dock information, access route information, and receiving location details will be provided by the COR as well as a time and date for a site visit.
4.4 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0800 and 1700 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.5 TRAVEL
Contractor travel must be required to support this requirement. All travel required by the Government outside the local commuting area(s) will be reimbursed to the Contractor in accordance with FAR 31.205-46, Travel Costs. The Contractor must be responsible for obtaining COR approval (electronic mail is acceptable) for all reimbursable travel in advance of each travel event.
4.6 POST AWARD CONFERENCE
The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 10 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility, located at 48192 Switzer Road, BLDG 2191, Patuxent River, MD 20670 or via teleconference.
4.7 PROJECT PLAN
The Contractor must provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, must include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 10 business days after the Post Award Conference.
4.9 PROGRESS REPORTS
The Project Manager must provide a weekly progress report to the Contracting Officer and COR via electronic mail. This report must include a summary of all Contractor work performed, including a breakdown of labor hours by labor category, all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.
4.10 PROGRESS MEETINGS
The Project Manager must be available to meet with the COR upon request to present deliverables, discuss progress, exchange information and resolve emergent technical problems and issues. These meetings must take place either at the Government's facilities, via telephone or via teleconference.
4.11 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
4.12 Deliverables
| Deliverable |
| Description |
| Due Date |
| Move Plan |
| Schedule, staffing, packing approach, transportation plan, risk mitigation, heavy equipment removal approach, special equipment description, and access coordination details |
| Within [10] business days after award or before move date |
| Rigging/Lift Plan |
| Plan describing equipment, personnel, safety controls, lift approach, access route, staging area, and method for removing large equipment weighing up to 2,000 pounds from the second floor |
| Within [10] business days after award and before rigging/lift operations |
| Inventory/Labeling Support |
| Contractor-supported inventory or labeling record of items moved |
| Before loading and updated at delivery |
| Damage/Incident Reports |
| Written report for any damage, loss, delay, accident, rigging/lift incident, equipment failure, or security/access issue |
| Within 24 hours of occurrence |
| Completion Confirmation |
| Confirmation that packing, rigging, transport, offload, unpacking, debris removal, and walkthrough are complete |
| At completion of move |
4.13 COR-Furnished Information and Support
The COR will provide:
1. Access coordination information for the origin and destination facilities.
2. COR points of contact.
3. Identification of items to be moved.
4. Designated placement locations at the destination facility.
5. Available information regarding building access, loading areas, elevators, stairwells, second-floor access points, staging areas, and site restrictions.
6. Escort support, if required by facility or base procedures.
7. Existing inventory information, if available.
The COR will not provide contractor labor, vehicles, packing materials, rigging equipment, lift equipment, heavy equipment operators, or moving equipment unless otherwise stated in the contract.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide:
1. Access coordination information for the origin and destination facilities.
2. COR points of contact.
3. Identification of items to be moved.
4. Designated placement locations at the destination facility.
5. Available information regarding building access, loading areas, elevators, stairwells, second-floor access points, staging areas, and site restrictions.
6. Escort support, if required by facility or base procedures.
7. Existing inventory information, if available.
The Government will not provide contractor labor, vehicles, packing materials, rigging equipment, lift equipment, heavy equipment operators, or moving equipment unless otherwise stated in the contract.
6.0 CONTRACTOR FURNISHED MATERIALS
The contractor must provide all materials and equipment necessary to perform the work, including but not limited to:
· Moving trucks or other suitable vehicles.
· Vehicles suitable for heavy, oversized, fragile, and sensitive equipment.
· Packing boxes and containers.
· Anti-static and protective packaging.
· Moving blankets and pads.
· Crates or custom protection for fragile, large, heavy, or irregular items.
· Dollies, carts, hand trucks, pallet jacks, ramps, lift gates, and other moving equipment.
· Crane, forklift, telehandler, platform lift, gantry, hoist, rigging, or other specialized equipment necessary to reach the second-floor access point and remove equipment weighing up to 2,000 pounds.
· Straps, tie-downs, shrink wrap, and labels.
· Floor, wall, door, window, exterior access, elevator, and stairwell protection.
· Personal protective equipment.
· Tools needed for contractor-performed disassembly or reassembly of furniture.
7.0 SECURITY AND ACCESS REQUIREMENT
The origin facility is located on a Navy base and is a secure facility. The contractor must comply with all applicable base, facility, security, escort, identification, badging, vehicle access, inspection, and entry requirements.
The contractor must:
1. Provide required personnel, vehicle, and specialized equipment information in advance, as requested by the COR.
2. Ensure contractor personnel carry valid REAL-ID compliant identification and comply with background checks requested by the COR.
3. Comply with all escort and access control procedures.
4. Follow all COR instructions regarding restricted areas.
5. Ensure contractor personnel do not access areas outside the authorized work area.
6. Ensure contractor personnel do not photograph, record, copy, remove, or disclose COR information or facility information unless expressly authorized.
7. Immediately report any access, security, or safety incident to the COR.
8. Coordinate in advance any specialized equipment entering the Navy base, including cranes, forklifts, telehandlers, platform lifts, or other heavy equipment.
Contractor personnel, vehicles, or specialized equipment may be denied access if they fail to meet facility or base access requirements. Denial of access due to contractor failure to comply with requirements shall not excuse contractor performance obligations.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
The COR will consider the work complete when:
1. All designated items have been packed, rigged as required, loaded, transported, offloaded, and unpacked.
2. Heavy or oversized items weighing up to 2,000 pounds have been safely removed from the second floor and delivered to the destination facility.
3. Items have been placed in designated destination locations.
4. Contractor-generated packing debris has been removed.
5. The contractor has provided required deliverables.
6. The COR has completed a final walkthrough.
7. Any apparent damage, loss, or discrepancy has been documented.
8. The Contracting Officer or authorized representative has accepted the work.
8.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
8.2 The COR will have 5 business days to review deliverables and make comments. The Contractor must have 5 business days to make corrections and redeliver.
8.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.
9.0 SITE VISIT
The COR may conduct a site visit before quote submission and a time and date will be designated for each site. Offerors are strongly encouraged to attend if offered, as the site visit may provide information regarding access, dimensions, second-floor access points, exterior access routes, elevators, stairwells, loading areas, parking, staging areas, packing requirements, heavy equipment removal requirements, and movement constraints.US Offerors are responsible for making their own assessment of labor, equipment, vehicle, packing, rigging, lifting, transportation, and access requirements needed to perform the work at the quoted Firm Fixed Price.
10.0 DELIVERABLES
The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.
| ITEM |
| SOW REFERENCE |
| DELIVERABLE / EVENT |
| DUE BY |
DISTRIBUTION
| 1 |
| 4.6 |
| Post Award Conference |
| 12 March, 2027 |
N/A
| 2 |
| 4.6, 4.7 |
| Draft Contractor Project Plan |
| 12 March, 2027 |
COR, Contracting Officer
| 3 |
| 4.7 |
| Final Contractor Project Plan |
| 26 March, 2027 |
| COR, Contracting Officer |
| 4 |
| 4.8 |
| Progress Reports |
| Weekly |
| COR, Contracting Officer |
11.0 ASSUMPTIONS AND CONSTRAINTS
For quote purposes, offerors should assume the following unless revised by the COR:
1. The origin office space is approximately 2000 square feet.
2. The origin space is located on the second floor.
3. The origin facility is located on a Navy base and requires controlled access.
4. The move distance is approximately 240 miles.
5. Items include multiple populated equipment racks, electronic equipment, radios, servers, large mock-ups, flat screen televisions, office furniture, and large or heavy equipment weighing up to 2,000 pounds.
6. Contractor shall provide all packing materials, moving equipment, rigging equipment, lift equipment, labor, vehicles, and supervision.
7. Contractor shall provide special equipment capable of reaching the second-floor access point and safely removing large or heavy equipment.
8. Contractor shall comply with all applicable access, safety, base, and security requirements.
9. Contractor shall not perform technical disconnection, reconnection, configuration, or testing of electronic systems unless expressly authorized in writing.
10. Contractor is responsible for determining the appropriate specialized equipment and methods required for heavy equipment removal and movement.
12.0 QUOTE INSTRUCTIONS
Offerors shall provide a Firm Fixed Price quote that includes all labor, materials, equipment, vehicles, specialized lift or rigging equipment, transportation, supervision, packing, loading, offloading, unpacking, debris removal, and incidentals necessary to complete the work.
Quotes should include, at a minimum:
1. Total Firm Fixed Price.
2. Proposed move schedule.
3. Number and type of personnel.
4. Number and type of vehicles.
5. Type of specialized equipment proposed to reach the second floor and remove large or heavy equipment.
6. Description of packing and protection approach.
7. Description of rigging, lifting, hoisting, and heavy equipment removal approach.
8. Description of experience moving electronic equipment, servers, racks, televisions, mock-ups, heavy equipment weighing up to 2,000 pounds, and office furniture.
9. Confirmation of ability to meet base and secure facility access requirements.
10. Any assumptions, exclusions, or required COR support.
11. Proof of applicable licenses, certifications, and insurance, if requested by the COR.
12. Identification of subcontractors, if any.
13. Documentation of past performance.
13.0 Evaluation Considerations
The COR may evaluate quotes based on factors such as:
1. Price.
2. Understanding of the requirement.
3. Proposed move approach.
4. Proposed heavy equipment rigging, lift, and removal approach.
5. Experience with similar moves.
6. Ability to protect sensitive, fragile, heavy, oversized, or high-value items.
7. Ability to meet schedule and access requirements.
8. Completeness and reasonableness of quote.
9. Documentation of past performance.
14.0 INVOICING
The contractor must be registered in SAM, System for Award Management, in order to do business with the federal government. Information on how to register your entity can be found at https://sam.gov/ The contractor must submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site. The contractor must invoice in accordance with contract terms after completion and COR acceptance of the work, unless otherwise specified in the contract.
15.0 POINTS OF CONTACT
Contracting Officer: [SKC Jennifer Sabatino, Email: jennifer.m.sabatino@uscg.mil, Phone: 571-608-8642]
Contracting Officer’s Representative: [TBD]
Technical Point of Contact: [CWO Tom Rapp, Email: Thomas.e.rapp@usc.mil, Phone: 301-757-4858]
Origin Facility Point of Contact: [Mr. Tracy Nixon, Email: Tracy.j.nixon@uscg.mil, Phone: 571-608-2558]
Destination Facility Point of Contact: [Ms. Amy Bailey, Email: Amy.h.bailey2@uscg.mil, Phone: 571-610-0845]
16.0 Special Notes
1. The contractor must not remove any item from the origin facility unless it has been identified by the COR for relocation.
2. The contractor must not dispose of property unless expressly authorized in writing.
3. The contractor must not access, view, copy, photograph, or disclose Government information encountered during performance.
4. The contractor must immediately notify the COR of any suspected damage, loss, access issue, safety incident, rigging/lifting incident, equipment failure, or schedule delay.
5. The contractor must ensure all personnel conduct themselves professionally while on Government or military installation property.
6. The contractor must be responsible for ensuring specialized equipment used for second-floor access and heavy equipment removal is suitable, properly maintained, properly operated, and authorized for use at the site.
LAST UPDATED: 11/12/2026 PAGE 8/17
File details come from the government source that posted it. Updated .