Sealift Vessel Phase 1 Ship Design Outline Specifications

This document is a comprehensive outline specification for the design and construction of a Ro/Con (Roll-On/Roll-Off Container) vessel prepared by Marine Design and Operations, Inc. for the Maritime Administration under Contract No. 6933A224D000001. The specifications establish both core requirements that must be met and optional parameters that may be preferred by the builder, with all deviations from non-core items subject to technical evaluation during bid review.

The vessel is specified as an ocean-going, single-screw, slow-speed diesel engine-driven cargo ship with a length overall not to exceed 228 meters, beam under 32.3 meters, and draft under 11 meters. Core requirements include a MAN 8S50ME-C10.7 main engine (15,200 kW MCR, 12,920 kW NCR), service speed of 19 knots at 85% MCR with 15% sea margin, and endurance of 12,000 nautical miles. The vessel must accommodate 15,000 square meters of Ro/Ro cargo capacity (16,000 MT deadweight), 488 TEU container capacity (320 TEU on deck, 168 TEU in hold), with minimum clear heights of 6.25 meters for heavy deck and 4.50 meters for medium deck. Required complement includes 48 personnel (16 officers, 20 crew, 12 special persons). Critical equipment comprises bow and stern thrusters (1,400 kW and 975 kW respectively), fixed quartering stern ramp (250 MT capacity, 9.4-meter clear width), one 10-person elevator, two 49-person lifeboats with davits, and comprehensive accommodations including officer and crew mess facilities, galley (84.1 m²), laundry facilities, sanitary systems, and air conditioning. The design incorporates over 40-year service life capability with double hull protection for all oil tanks, ABS classification under ACP NVIC 2-95 Change 3, and compliance with international maritime conventions including SOLAS, MARPOL, and U.S. Coast Guard regulations. Optional items include heavy weather mooring equipment rated for 130 mph sustained winds, advanced monitoring systems, and enhanced class notations.

View the file

Other files

File Type Posted
2217-100-001 Rev D General Arrangement ABS Stamp.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREPARED FOR:

Maritime Administration

U.S. Department of Transportation 1200 New Jersey Avenue

Washington, DC 20590-0001

Contract No. 6933A224D000001 Contract Holder: Marine Design and Operations, Inc.

PREPARED BY: REVIEWED BY:

Marine Design and Operations, Inc.

15 Prospect Lane, Suite 2AB Colonia, NJ 07067

Herbert Engineering Corp.

1040 Marina Village Parkway, Suite 200 Alameda, CA 94501

C 7/27/2026 Updated as per client comments JH AT RS B 7/17/2026 Updated as per client comments JH AT RS A 7/27/2026 Updated as per internal review JH AT RS

- 5/01/2026 Initial draft for review JH RS RS

Rev Date Description Originator Checked By Appvd By

TITLE:

Sealift Vessel Phase 1 Ship Design

Outline Specifications

DOCUMENT NO. 2217-100-051 Rev C

Release Date: 7/27/2026 Total Sheets: 77

Marine Design and Operations, Inc.

Sealift Vessel – Outline Specifications Document No. 2217-100-051 REV C

MDO& HEC 1 7/27/2026

1 SHIP GENERAL

1.1 General Clauses

1.2 Materials and Workmanship

1.3 Principal Dimensions

1.4 Displacement

1.5 Capacity

1.6 Main engine (CORE REQUIREMENT)

1.7 Speed (CORE REQUIREMENT)

1.8 Cruising range (CORE REQUIREMENT)

1.9 Fuel Oil Consumption of Main Engine

1.10 Complement (CORE REQUIREMENT)

1.11 Classification and Flag (CORE REQUIREMENT)

1.12 Rules and Regulations (CORE REQUIREMENT)

1.13 Certificates to be Provided at Vessel Delivery

1.14 Spare Parts

1.15 Drawings and Manuals

1.16 Model Test

2 HULL STRUCTURE

2.1 General

2.2 Materials and Scantlings

2.3 Stack loads and Cargo Space

2.4 Painting and Cathodic Protection

3 HULL OUTFITTING

3.1 General

3.2 Stern Ramp and Internal Ramp (CORE REQUIREMENT)

3.3 Container Securing System

3.4 Provisions and Engine Parts Handling Crane

3.5 Deck machinery

3.6 Maneuvering Equipment

3.7 Ladders

MDO& HEC 2 7/27/2026

3.8 Lifesaving Appliances

3.9 Firefighting System

3.10 Ventilation System for Cargo Holds

3.11 Hull Piping System

3.12 Accommodation

3.13 Air Conditioning System

3.14 Cold Provisions Stores

3.15 Dry Provisions Stores

4 MACHINERY

4.1 Propulsion & Steering

4.2 ER System Machinery

4.3 Hull system Machinery

4.4 Hull Outfitting System Machinery

4.5 Electrical

4.6 Accommodation System Machinery

4.7 Machinery Piping System

5 ELECTRICAL

5.1 General

5.2 Electric Cable and Cable Installation

5.3 Electric Power

5.4 Transformer

5.5 Switchboard

5.6 Power Equipment

5.7 Lighting Equipment

5.8 Interior Communication Equipment

5.9 Navigational Equipment

5.10 Radio Equipment (GMDSS A3)

5.11 Automation System

5.12 Ship’s LAN network

6 Optional Items

MDO& HEC 3 7/27/2026

6.1 Marine Machinery Condition Monitoring System

6.2 Optional Class Notations

6.3 Hull Outfitting

6.4 Heavy Weather Mooring Equipment

6.5 Rudder

1 SHIP GENERAL

1.1 General Clauses

The intent of these specifications is to solicit a technical and price proposal from the contractor/builder to enter into a contract to perform a full functional design including full Class approval of the Lead Vessel described herein as well as provide a cost to carry out fabrication design and construct the vessel(s). All items marked as a CORE REQUIREMENT are defined as requirements that must be met in the final design, while other parameters may be as per any standard design preferred by the builder.

For non-core items, any suggested deviations will undergo technical evaluation during the bid review process. Any non-core deviation from the specs must be highlighted with the appropriate comments and reasons thereof

The final design shall be as close to the preliminary design as possible. Any major deviations shall be kept to a minimum and shall not adversely affect the vessel’s capabilities.

The Specifications and the accompanying plan are intended to describe the details of technical matters in the Contract, i.e. design, performance, capacities, structure, equipment and materials required for the construction of a Ro/Con (hereinafter called "the Vessel").

The accompanying plans and makers list provided below shall form an integral part of the Specifications upon which the detailed design of the Vessel will be developed:

Details in design, construction, installation, inspection, test, workmanship, etc. not covered by the Specifications shall be in accordance with the Builder’s current standards and practices.

Contractor’s current practices and standards (approved by ABS) shall be submitted to the Buyer for approval. Any item/items which is/are not mentioned in the Specifications, but which is/are essential for the satisfactory working of the Vessel or required by any applicable Rules and Regulations as per the Specifications shall be furnished by the Contractor without any additional cost to the Buyer.

Should there be any discrepancy between the Contract and the Specifications, the Contract shall prevail. And should there be any discrepancy between the

MDO& HEC 4 7/27/2026

Specifications and the drawings, it shall be resolved by mutual discussions in a manner not to affect the CORE REQUIREMENTS of the vessel.

Wherever in the Specifications any terms are unclear, interpretation shall be by mutual discussion between the Contractor and the Buyer without sacrificing any of the Vessel’s CORE REQUIREMENTS and performance.

All plans for the final design shall be submitted for buyer’s approval.

MDO& HEC 5 7/27/2026

1.1.1 List of all applicable drawings

Drawing name Drawing number

General Arrangement 2217-100-001

Capacity Plan 2217-100-021

Stowage Plan 2217-100-002

Machinery Arrangement 2217-100-022

Midship Section

Scantling Plan

2217-100-023-1

2217-100-023-2

Ballast Water System Diagram 2217-100-031-1

Bilge and Waste Oil System Diagram 2217-100-031-2

Cargo Hold Bilge System Diagram 2217-100-031-3

Fire Main System Diagram 2217-100-031-4

Seawater Cooling System Diagram 2217-100-031-5

Fresh Water Cooling System Diagram 2217-100-031-6

Potable Water System Diagram 2217-100-031-7

Diesel Oil System Diagram 2217-100-031-8

Lube Oil System Diagram 2217-100-031-9

Black Water & Gray Water System Diagram

2217-100-031-10

Compressed Air System Diagram 2217-100-031-11

Exhaust Gas System Diagram 2217-100-031-12

EGR Water Handling System Diagram 2217-100-031-13

HVAC Hot Water Service System Diagram

2217-100-031-14

Cargo Hold Ventilation Schematic 2217-100-031-15

E/R Ventilation Diagram 2217-100-031-16

MDO& HEC 6 7/27/2026

Electrical One Line Diagram 2217-100-032

Hazardous Area Plan 2217-100-035

1.2 Materials and Workmanship

1.2.1 Materials

Materials supplied and used for the construction of the Vessel shall be of such quality as approved by the Classification Society where required.

Materials, apparatus and equipment shall be in accordance with the Japanese Industrial Standard (JIS) and/or the American Society for Testing and Materials (ASTM) and/or the contractors standards and/or the manufacturers standards (ISO and/or DIN standards), unless otherwise specifically described in the Specifications.

ASBESTOS, PCBs and CFCs material shall not be used.

1.2.2 Equipment

All equipment shall be of the latest models with service facilities based in the U.S. All things being equal US manufacturer sis preferred where applicable.”

1.2.3 Workmanship

The Vessel shall be built in accordance with the good shipbuilding standards and practices of the Contractor, which has been approved (as required) by The American Bureau of Shipping.

1.2.4 Quality Control

The building yard will have robust QA system that shall meet international standards and have ISO certification.

1.2.5 Measurement Units and Language

Metric systems shall be adopted for design and construction of hull, machinery and equipment, unless otherwise specified.

All figures given in the Specifications shall be understood as approximate ones and determined in accordance with the design development except those which are of

MDO& HEC 7 7/27/2026

countable nature, unless otherwise specifically described in the Specifications.

All documents and drawings for design and construction of the Vessel which shall be submitted to the Buyer shall be prepared in English.

All name plates and notices including those for main engine, auxiliaries, electrical equipment and necessary valves shall be described in English and in metric system.

1.2.6 General Description

The Vessel shall be an ocean-going single screw slow speed diesel engine driven commercially viable/militarily useful Ro/Con vessel suitable for carrying military and commercial vehicles as well as military/commercial containerized cargo. The vessel shall be designed for unrestricted worldwide service.

The Vessel shall have a raked stem with bulbous bow, a transom stern and one (1) continuous deck with forecastle as shown on the General Arrangement Plan.

The vessel shall be fitted with one starboard quarter ramp.

The engine room shall be located semi-aft as shown on the General Arrangement Plan.

The Vessel shall be outfitted with one (1) bow thruster and one (1) stern thruster

(CORE REQUIREMENT).

The Vessel shall be fitted with a non-continuous type bilge keel to be fitted on bilge strake port and starboard through about 1/4 of the length amidship of the vessel. Fore and aft ends of the bilge keel to be gradually tapered.

All tanks intended for carriage of oil or oily-water substances including the oily bilge tanks and the main engine sump shall be arranged with double hull protection.

Minimum clearance to outer shell shall be 760 mm for smaller tanks and 1.5m for tanks with volumes exceeding 300 m3. Intended cargo

Roll-On Roll-Off

15,000 m2/162,000 ft2) (CORE REQUIREMENT)

16,000 MT (15,750 LT)

Container

(CORE REQUIREMENT)

488 TEU (320TEU on Deck 4 & optional 168 TEU on Deck 1) Container area is for dual use - as Ro/RO space and container space.

Note: IMDG cargo; Dangerous goods in closed containers in accordance with SOLAS Regulation 19 of Chapter II-2 and the provisions mentioned in the Specifications.

Helicopter Capability

(CORE REQUIREMENT)

Helicopter winch only area on Deck 5, aft of accommodation deck house.

1.3 Principal Dimensions

MDO& HEC 8 7/27/2026

Length Overall (LOA) Approx. 212 m (Approx. 696 ft) Length Between Perpendiculars (LBP) 197.70 m (648.62 ft) Breadth (mld) not to exceed 32.26 m (105.84 ft) Depth (mld) Design/Summer Draft (mld) not to exceed Scantling Draft

14.14 m (46.39 ft)

8.5 m (27.89 ft)

8.5 m (27.89 ft)

Air Draft not to exceed 38 m (124.67 ft)

Note: all dimensions are approximate

CORE REQUIREMENTS:

Length Overall < 228 m (750 ft)

Beam < 32.3 m (106 ft)

Draft < 11 m (35 ft)

Design Transit Speed @ 85% MCR w/ 15% sea margin

< 20 kts

Design Loitering Speed @ 25% MCR w/ 15% sea margin n/a

Endurance @ Design Transit Speed < 12,000 nm

Air Draft < 38 m (125 ft)

1.4 Displacement

At Design Draft 35,039 MT Deadweight Lightship

19,869 MT (CORE REQUIREMENT)

15,170 MT

Note: all dimensions are approximate

1.5 Capacity

1.5.1 Tank Capacity

Tank Capacity

Sea Water Ballast 12,571 m3

MDO& HEC 9 7/27/2026

Lube Oil 106 m3

Misc. tanks (total) 381 m3

Fuel Oil Tanks (total) 2,957 m3

Fresh Water Tanks (total) 545 m3

Void 4,669 m3

Note: all dimensions are approximate

1.5.2 RO/RO Capacity (CORE REQUIREMENT)

RO/RO Capacity 15,000 m2 (162,000 ft2)

16,000 MT (15,750 LT)

Heavy Deck at 2.2 MT/m2 (450 psf)(70% capacity)

12,500 m2 (135,000 ft2)

Medium Deck at 1.22 MT/m2 (250 psf) (30% capacity)

2,500 m2 (27,000 ft2)

1.5.3 Minimum Clear Height Below Deck (CORE REQUIREMENT)

Heavy Deck 6.25 m (20.5 ft)

Medium Deck 4.50 m (14.75 ft)

Note: Deck 4 clear height in way of superstructure may be 5.5 m to meet air draught requirements.

1.5.4 Container Capacity (CORE REQUIREMENT)

Location Capacity Design Stack Weight

On deck (deck 4) 320 TEU 60 MT

In hold (deck 1) 168 TEU 60 MT

MDO& HEC 10 7/27/2026

Total 488 TEU

1.6 Main engine (CORE REQUIREMENT)

Model MAN 8S50ME-C10.7

Type Slow speed direct drive

Maximum cont. rating (MCR) 15,200 KW

Normal cont. rating (NCR) 12,920 KW

1.7 Speed (CORE REQUIREMENT)

Service speed at the design draft of 8.5M: 19 knots (at NCR (85% of MCR) of main engine with 15% sea margin.)

Loitering speed at the design draft of 8.5M: 12.9 knots (at 25% of MCR of main engine with 15% sea margin.)

1.8 Cruising range (CORE REQUIREMENT)

Approx. 12,000 nautical miles with Main engine running at NCR at design draft with cargo on board.

1.9 Fuel Oil Consumption of Main Engine

Daily fuel oil consumption at NCR of main engine:(12,920KW) - 51.6 MT based on marine gas oil of 42,700 kJ/kg) lower calorific value at shop test under ISO reference condition without considering SFOC allowance and at Nox tier III operation.

1.10 Complement (CORE REQUIREMENT)

Officers: 16

Crew: 20

Special Persons: 12

Total: 48

MDO& HEC 11 7/27/2026

1.11 Classification and Flag (CORE REQUIREMENT)

Classification ABS, ACP NVIC 2-95, Change 3 including U.S.

Supplement to International Conventions and Classification Society Rules for Ships Enrolled in the Alternate Compliance Program. Latest edition.

✠A1, Vehicle Carrier, Ⓔ, ✠ACCU, ✠AMS, ✠APS, BWT+, CPS-B, CR, CRC (SC,RMP), ENVIRO, ESA, HAB, HVSC (6600 V), IHM, MAN, NIBS, PMP+, RRDA, RW, SElev, TCM-

W, UWILD,

Flag USA

1.12 Rules and Regulations (CORE REQUIREMENT)

The rules and regulations and/or requirements are to include all compulsory amendments and additional rules or circulars which are enforced on the date of signing the Specifications.

National Maritime Regulation of Country of Registry.

International Convention on Load Lines, 1966 and Protocol 1988.

International Convention for Safety of Life at Sea, 1974 with Protocol 1978 including all latest amendments.

International Convention for the Prevention of Pollution from Ships, 1973 with

Protocol 1978 (MARPOL 73/78, Annex I, IV, V & VI) as amended.

Convention on the International Regulations for Preventing Collisions at Sea, 1972 including all amendments.

International Ship and Port facility Security code International Telecommunication Union Radio Regulation, 2001.

International Convention on Tonnage measurement of Ships, 1969.

Suez Canal Rules and Regulations including Tonnage measurement.

AMSA Marine Orders part 32 for hold ladders.

IEC Publication No.92 Electrical Installation in Ships (except where otherwise agreed in the Specification).

ILO MLC (Maritime Labor Convention) 2006, Part-A (Mandatory) of Title 3-

Accommodation and recreational facilities, food and catering.

IMO Resolution MSC.202(81) “Long range identification and tracking of ships” IMO resolution A468 (XII), Code on noise levels onboard ship 1981.

MDO& HEC 12 7/27/2026

ISO 6954-2000(E), Guideline for the measurement, reporting and evaluation of vibration with regard to habitability on passenger and merchant ships.

IMO Res. A.868 (20), Guidelines for the control and management of ship’s ballast water to minimize the transfer of harmful aquatic organisms and pathogens. -

IMO Resolution MEPC.107(49) “Revised guidelines and specifications for pollution prevention equipment for machinery space bilges of ships.

International Maritime Pilot’s Association regarding Pilot Boarding Arrangement.

MARPOL 73/78 Annex I, Reg.12A on Oil fuel tank protection.

IMO Resolution MSC.215 (82) Performance Standard for Protective Coatings for Dedicated Seawater Ballast Tanks in All Types of Ships and Double-Side Skin Spaces of Bulk Carriers.

SOLAS 2009 chapter II-1, Reg.3-4, Emergency Towing Arrangement for cargo ships.

CARB (California Air Resources Board) Regulations regarding Ship’s emissions.

US 40 CFR Part 1042: Control of Emission from Marine Compression Ignition Engines.

US Clean Water Act and National Pollution Discharge Elimination Systems

(NPDES).

United States Environmental Protection Agency (EPA).

1.13 Certificates to be Provided at Vessel Delivery

Classification certificate for Hull and Machinery Class Cargo Ship Safety Construction Certificate N.A.

Cargo Ship Safety Equipment Certificate Cargo Ship Safety Radio Telegraphy Certificate Certificate of compliance regarding special requirements for ships carrying dangerous goods according to SOLAS Reg. II-2/19 International Load Line Certificate International Tonnage Certificate International Oil Pollution Prevention (IOPP) Certificate (MARPOL Annex I) without Shipboard Oil Pollution Emergency Plan (SOPEP) which shall be prepared by the Buyer, but the Contractor will provide the available plans and information International Sewage Pollution Prevention (ISPP) Certificate (MARPOL Annex

IV)

International Air Pollution Prevention (IAPP) Certificate (MARPOL Annex VI)

MDO& HEC 13 7/27/2026

Crew Accommodation Certificate Corresponding to Maritime Labor Convention 2006, Title 3 Regulation 3.1 (except swimming pool)

Suez canal Tonnage Certificate Panama Canal Tonnage Certificate International Energy Efficiency (IEE) Certificate Class Declaration that the vessel is free of asbestos Builder's Certificate Deadweight Certificate Certificate of compass adjustment Builder USCG Certificate of Inspection USCG approved engine automation design verification procedure EIAPP Certificate for main and auxiliary engines Class Builder’s lien release and waiver

1.14 Spare Parts

Builder shall provide all makers and class mandated emergency spares and tools for all equipment and maker recommended consumable spare parts for one year suitable for one year of operation.

1.15 Drawings and Manuals

Builder shall provide three (3) copies of all drawings and manuals, both digital and hard copies.

1.16 Model Test

The hull model to be tested in a tank basin for the following items:

Resistance test at the ballast, design, EEDI draughts. (4 draughts) Self-propulsion test at the ballast, design, EEDI draughts with stock propeller

(4 draughts).

Self-propulsion test at the ballast, design, EEDI draughts with design propeller

(4 draughts). Trim optimization to be performed only at the design draft (5 Trims).

Measurement of axial wake distribution at the design draught at service speed.

Flow line paint test for bilge keel at design draft at service speed.

Propeller open water test with design propeller.

MDO& HEC 14 7/27/2026

Cavitation test at the design draught at service speed. The model scales to be approximately 1:31 for resistance and self-propulsion and approximately 1:55 for maneuvering test.

Model Test to include rudder bulb.

The test results are to be submitted to the Buyer for reference. Also, Buyer shall be given sufficient notice to attend the model testing.

2 HULL STRUCTURE

2.1 General

The vessel shall be all welded construction. It shall be constructed from a combination of ABS approved mild steel and high tensile steel. Steel shall be received in the construction yard pre primed with shop primer (or immediately shop primed upon receipt). Long-term storage shall be with care to prevent exposure to harsh weather and salt spray. If there is no additional expense, and if practical, it would be preferred that shop primer color for these ships be easily identifiable.

Welding to be executed in accordance with the Builders’ practice approved by the Classification Society.

Welding to be performed for the entire hull structure by manual, gravity, electro-slag or any other automatic welding including one-sided welding. All welding to be continuous except in dry space where intermittent welding is adopted.

Corrective measures for mis-cut holes, the lack of alignment of joints and excessive gaps between edge surfaces are to be subjected for approval by the Classification Society.

Excessive distortion of the hull structure after fabrication due to welding is to be corrected by means of line or spot heating and water cooling according to lACS 47 “Shipbuilding and repair quality standard for new construction” and/or as approved by the Owner's representative on site.

Loose mill scale and excessive rust is to be removed from the steel surface after welding

2.1.1 Service life (CORE REQUIREMENT)

The intended service life requirement for the Vessel shall be more than 40 years in unrestricted worldwide service, based on the design environmental conditions, operational profile, and loading assumptions defined in these Specifications and applicable Class Rules. The hull structure, including primary, secondary and tertiary members, local details, corrosion additions, and fatigue-sensitive connections, shall be

MDO& HEC 15 7/27/2026

designed and analyzed to achieve this service life with the understanding that around 20 years’ service life structural renewal may be required as per the ABS SLEP recommendations.

During the detailed design phase, the Contractor (or ABS) shall develop a complete three-dimensional finite element model of the Vessel’s hull structure. The model shall include sufficient structural detail to support global strength evaluation, local structural assessment, and future direct load analysis and spectral fatigue analysis. The final finite element model, associated input files, loading assumptions, boundary conditions, calculation documentation, and results shall be submitted to the Buyer in editable native and generally transferable formats. The model and supporting information shall also be submitted to ABS as required or directed by the Buyer to facilitate future structural and fatigue evaluations.

Design still water bending moment and shear forces for seagoing conditions shall be based on minimum ten (10) % margin over the maximum values calculated along the vessel length at actual seagoing conditions as per T&S booklet. The Class assigned allowable SWBM/SF should be no less than these design values.

The machinery arrangement, equipment foundations, access routes, and surrounding spaces shall support inspection, operation, maintenance, overhaul, removal, and replacement of equipment throughout the Vessel’s service life. Sufficient working space shall be provided around all equipment in accordance with manufacturers’ recommendations and applicable regulatory and Class requirements.

Adequate vertical and horizontal clearances shall be provided for equipment disassembly and component removal. Permanent padeyes, lifting lugs, overhead rails, monorails, beams, hooks, or other approved lifting arrangements shall be provided where necessary for the maintenance, overhaul, and replacement of major machinery and equipment. Equipment removal routes shall be identified and shall include adequately sized doors, hatches, soft patches, and access openings, as applicable.

The Contractor shall provide spare parts for one year of operation as required by ABS and manufacturers requirements. Buyer will have the right to ask for additional spare parts at the contract negotiation stage and the final price of the vessel will include any such request

2.2 Materials and Scantlings

All structural design and scantling shall be done in accordance with the requirements of the Classification Society and Contractors’ practice. Additionally, all hull structure materials shall meet worldwide climatic conditions.

Steels for hull construction shall be of normal quality mild steel (grade A) and high tensile steel (grade AH36) approved by the Classification Society.

Longitudinal stiffeners and transverse frames shall be of rolled sections, built-up sections and/or flat bars.

MDO& HEC 16 7/27/2026

Copper-Nickel (Cu-Ni 90-10) piping shall be used in the SW service, distilling plant SW feed supply, and as an optional alternative to carbon steel piping in the bilge, ballast, fire main, water mist firefighting system, exterior deck drains/scupper, vents & overflows, sounding for ballast tanks, and void spaces. Special consideration for flow rates to be given when designing Copper-Nickel piping. Sacrificial anodes shall be provided wherever there is a bridge between Copper-Nickel and CS piping to prevent rapid corrosion of the carbon steel material.

2.3 Stack loads and Cargo Space

Cargo holds shall be constructed with double bottom, passageway and side ballast tanks as shown on the General Arrangement Plan.

Bulwark and “snow shield” shall be provided as shown on the General Arrangement Plan

Design loads of containers for local structural reinforcement (CORE REQUIREMENT) In accordance with Section 1.5.4

2.4 Painting and Cathodic Protection

2.4.1 Painting Scheme

Area System No. of Coat

DFT in Total (microns)

Note No.

Bottom Epoxy

Epoxy Tie

Self-Polishing AF

2/3

See note

Top Side Epoxy

Polyurethane

MDO& HEC 17 7/27/2026

Exposed Deck Epoxy

Polyurethane

Exposed Deck House Epoxy

Polyurethane

Ro-Ro Deck and Ramp Epoxy

Nonskid

2 250 -

Seawater Ballast Tanks Epoxy 2 320 2

Freshwater Ballast Tanks Epoxy 2 250 -

Fresh Water Tank Pure Epoxy 3 300 -

F.O. and L.O. Tank Rust Prevent Oil - - -

Void Tanks Epoxy 2 250 3

Engine Room and Machinery Space, Bilge Area, Bilge Wells, and Bilge Tank

Epoxy 2 250 3

Notes:

1. The DFT and number of coats to be based on maker’s recommendation for 60 months life and suitable for maker guarantee of life.

2. Water Ballast Tank coating shall meet the requirements of PSPC.

3. Stripe Coats to be applied as follows:

a. Seawater Ballast Tanks: 2 stripe coats

b. FW Tanks and FW Ballast Tanks: 2 stripe coats

c. Void/Cofferdam: 1 stripe coat

d. Bilge Tank: 1 stripe coat

e. ER Bilge Well: 1 stripe coat

4. The sharp edges of structural members and holes (slots, scallops, air and drain holes, etc.) shall be removed as follows:

a. 2 pass grinding: water ballast tanks, freshwater tanks, house exposed deck edge

b. 1 pass grinding: voids, sea chest

MDO& HEC 18 7/27/2026

5. Paint scheme above is for the owner and contractor to specify and review for the hull and tanks.

6. Non-skid coating shall be applied on exposed decks in areas which are actively navigated by the crew and on Ro/Ro decks and ramps.

7. All erection seams in immersion areas such as ballast tanks, gray water tanks, black water tanks, and shell plating should be abrasive blasted to minimum Sa-

2.0 standard after hull erection and testing.

2.4.2 Cathodic Protection

Aluminum anodes shall be fitted inside of the bow and stern thruster tunnels and sea chests according to the following condition:

Lifetime Five (5) years

Mean Current Density 25 mA/m2

The following cathodic protection of bolted type aluminum anode shall be provided to water ballast tanks:

Lifetime Five (5) years

Mean Current Density 5 mA/m2

Ballast ratio 50%

Impressed current cathodic protection system shall be provided for the protection of underwater hull:

Mean Current Density 35 mA/m2 for underwater hull

600 mA/m2 for propeller

3 HULL OUTFITTING

3.1 General

3.1.1 Provision/Engine spare Parts Handling Crane

One set of stores and mechanical equipment davit of 10-ton S. W. L. capacity to be provided on starboard side of deck 5 aft of the deck house.

MDO& HEC 19 7/27/2026

3.1.2 Hose Handling/Miscellaneous Davit

One set of hose handling/miscellaneous davit of 2-ton S. W. L. capacity to be provided at deck 7 on each side of the vessel for handling of fuel oil bunkering hoses.

3.2 Stern Ramp and Internal Ramp (CORE REQUIREMENT)

The vessel shall be outfitted with a fixed quartering starboard side ramp with a capacity of 250 MT (246 LT) for shore side use. Clear width of ramp for vehicle traffic shall be 9400 mm.

All the internal ramps width > 5m (16ft)

3.3 Container Securing System

On deck Securing by fixed fittings and container loose fittings.

Loose lashing gear and cargo securing manual shall be furnished.

Ro/Ro Loose Lashing Gear

MDO& HEC 20 7/27/2026

3.4 Provisions and Engine Parts Handling Crane

3.4.1 Engine Overhaul Crane

One (1), 4.0 MT SWL, twin rail crane w/ 2.8M jib reach & 10.5M hoisting height

3.5 Deck machinery

3.5.1 Windlass Combined with Mooring Winch

Type Electric motor driven, open gear for chain wheel part and closed gear with auto-tension device for hawser drum part

Number of Set Two (2)

Capacity As per rule requirement

3.5.2 Mooring Winch

Type Electric motor driven, closed gear with auto tension device for hawser drum part

Number of Set Four (4)

Capacity As per rule requirement

3.5.3 Anchoring and Mooring Equipment

Anchor Two (2) stockless type

One (1) spare anchor

Anchor Chain Cable Grade 3, size as per rule requirement

Chain Stopper Two (2) roller bar type

Mooring Rope Twelve (12) Samson Amsteel Blue Mooring ropes other than those required by rule

3.6 Maneuvering Equipment

MDO& HEC 21 7/27/2026

3.6.1 Bow Thruster (CORE REQUIREMENT)

Number of Set One (1)

Type Electric motor driven, tunnel type

Capacity 1,400 kW

Description Controlled pitch prop. With VFD

Note: two (2) spare blades are to be included

3.6.2 Stern Thruster (CORE REQUIREMENT)

Number of Set One (1)

Type Electric motor driven, tunnel type

Capacity 975 kw

Description Controlled pitch prop. With VFD

Note: two (2) spare blades are to be included

3.6.3 Steering Gear

Number of sets One

Type Electro-hydraulic rotary vane type with two (2) pumps of 100 % capacity each.

3.6.4 Stern Frame and Rudder (CORE REQUIREMENT)

Item Description

Stern frame Cast steel and fabricated steel

MDO& HEC 22 7/27/2026

Rudder KSR®-supported twisted-leading-edge high-efficiency rudder with bulb and conical connection.

The rudder to be of welded steel construction, located aft of the propeller.

Rudder arrangement to be designed for maximum propulsive efficiency and minimum drag fulfilling the requested steering performance requirements.

The rudder bearing to be of synthetic polymer material or equivalent and no special lubricating device for rudder bearing to be provided in accordance with the maker's standard.

Mechanical stopper to be provided to limit possible upward motion of the rudder which would result in damage to the steering gear.

The material and construction to be in accordance with the maker's standard and the requirements of the Classification Society.

3.6.5 Stern Tube Seal and Bearing (CORE REQUIREMENT)

The stern tube and bearing shall be Seawater circulation type; acc. to the manufacturer’s standards.

3.7 Ladders

3.7.1 Accommodation Ladder

Two (2) aluminum alloy vertical stowage type, telescoping, electric motor driven.

International standards ISO 7061 & 5488.

3.7.2 Pilot Ladder

Two (2) manual type 8m pilot rope ladders on both sides. SOLAS regulation V/23 and follow ISO 799 standards.

3.8 Lifesaving Appliances.

MDO& HEC 23 7/27/2026

Item Description

Lifeboat 2 x 49-person lifeboats, one per side;

One (1) lifeboat to be commonly used as a rescue boat

Rescue boat 1x6-person rescue boat with davit, largest size available

Lifeboat davit Two (2) of hinged gravity type, electric motor driven

Life raft 4 x 25-person life rafts, 2 per side, 2x 6-person life raft forward, 1 per side. Life rafts are thrown overboard type, self-righting, USCG-approved

Others As per the Rule requirement and equipment with USCG approval type

3.9 Firefighting System

Item/Location Equipment

Engine room Fixed low pressure CO2 system and sea water system

Fixed local fire extinguishing system

Water based fixed local fire extinguishing for main engine, generator engines, boiler front and purifiers

Cargo hold Fixed low pressure CO2 system and smoke detecting system

Paint store Fixed sea water spray system

Emergency fire pump One (1) set, electric motor driven centrifugal, self-priming type

Main fire pump/Bilge/General Service

Two (2) set, electric motor driven centrifugal, self-priming type

Others

Pipe

As per the Rule requirement

Fire main: ASTM A53 Gr. A, Sch. 80, galvanized

Water mist: ASTM A312 Type 316L, Sch. 40

*90-10 Cu-Ni Sch.40 pipe to be considered as an option instead of Galv. Steel Sch.80 pipe.

MDO& HEC 24 7/27/2026

3.10 Ventilation System for Cargo Holds

3.10.1 General

The vessel has three (3) enclosed cargo decks. Decks No.1 & No.2 are open to each other. Deck No.3 is a separate watertight zone. Each deck has its own set of supply/exhaust fans and ducts. All fans are located on Deck No. 4 in the weather.

An air change rate of 10 air changes per hour ACR (m3/hr) required in Navigation condition and 20 air changes per hour ACR (m3/hr) in loading/unloading condition.

Additional exhaust capacity is provided to achieve negative pressure inside the cargo hold to help prevent gases from spreading to adjacent spaces. This extra capacity is provided by an extra fan for each cargo Deck group. The extra fans are reversible type to provide redundancy in case of failure of any one of the supply or exhaust fans.

3.10.2 Cargo Holds Deck 1 & 2

System Mechanical supply and exhaust fans with damper control

Type Electric motor driven, single speed type

Note: Reversible exhaust fans to be explosion proof.

3.10.3 Cargo Hold Deck No. 3

System Mechanical supply and exhaust fans with damper control

Type Electric motor driven, single speed type

Note: Reversible exhaust fans to be explosion proof.

3.11 Hull Piping System

3.11.1 Ballast System

Piping system Ring main line system

Ballast pump Two (2) x 600 m3/h x 30 MTh

MDO& HEC 25 7/27/2026

(2640 GPM x 98 ftTH)

Electric motor driven, centrifugal self-priming type

Ballast Stripping Eductor

1 - 80 m3/h x 10 MTH

(350 GPM x 33 ftTH)

MOTIVE WATER

FROM BILGE/FIRE/GS

PUMPS VIA BWTS FILTER

Pipe ASTM A53, GR A, SCH 80, ERW Galvanized (in Engine Room).

(in Pipe Tunnel & tanks) ASTM A53, GR A, 12.7 mm, ERW Galvanized

SHIP SIDE CONNECTION PIPE - II ≥ 10"

ASTM A53, GR A, ERW

THICKNESS ACCORDING

TO RULES

REQUIREMENT

- ACID PICKLED

+ PAINTED FLANGE

SLIP ON ANSI

CLASS 150

NONASBESTOS

*90-10 Cu-Ni Sch.40/Sch.STD pipe to be considered as an option instead of Galv. Steel Sch.80/Sch.XS pipe in the engine room

Valve Wafer type butterfly valves. Valves shall be controlled remotely from the control, alarm, &

MDO& HEC 26 7/27/2026

Monitoring system (CAMS)

Ballast Water Treatment System

FULL BALLAST

FLOW, NON-CHEMICAL USE TYPE, UV TYPE

1200 m3/h (5280 GPM)

IMO/USCG APPROVED

3.11.2 Bilge System for Cargo Hold

Piping system One (1) main 8-inch line with 4-inch suction branch to each cargo hold bilge well.

Pipe CS 6.0" ASTM A53, gr a, SCH.80, g Cond.

ERW - Work'g Cond. Galvanized

≥ 8.0" ASTM A53, GR A,

SCH.XS (12.7mm), ERW Work’g Cond. Galvanized

*90-10 Cu-Ni Sch.40/Sch.STD pipe to be considered as an option instead of Galv. Steel Sch.120/Sch.80/Sch.XS pipe.

Cargo Hold Bilge Pump Air driven diaphragm pump 25 m3/hr, 4.0 bar (110 gpm, 134 ft)

Bilge eductor for IMDG cargo holds

Two, (2) of sea water driven type, 25 m3/h

1- Bow thruster rm

Bilge, 10 m3/hr

1- Bosun store/chain

Locker bilge, 5m3/hr

Shipside connection ALL ASTM A53, GR A, SCH.160, ERW – NDT

GALVANIZED

MDO& HEC 27 7/27/2026

Oil discharge monitoring equipment (ODME) for cargo hold bilge

USCG APPROVED & COMPLIES WITH IMO

RESOLUTION MEPC.107(49)

15 PPM, WITH GPS LOCATION RECORDING

FUNCTION

3.11.3 Anti-Heeling System

Anti-heeling pump One (1) Electric motor driven , located in cargo hold beneath ramp. Reversible Propeller Pump

600 m3/h x 15 MTH

(2640 GPM x 49 ftTH)

Control Main control by anti-heeling system maker

Remote control by CAMS

3.11.4 Valve Control System

Type Electro-hydraulic type

Remote controlled valves

Ballast valves in cargo hold area Essential ballast valves in engine room Bilge suction valves in cargo hold area D.O. main valves in cargo hold area D.O. fuel lines

Control Controlled by remote control system in ship’s office

Other Manual operation

3.11.5 Ullage System

Type Electric pressure transmitter type with level gauge and remote readout in deck & ship’s office.

MDO& HEC 28 7/27/2026

Application Ballast tank(level indication)

Fuel oil tank(level indication and high level alarm)

Draft(level indication)

Bilge (high level alarm)

Gray water (level indication and high level alarm)

Sewage (level indication and high level alarm)

Fresh Water (level indication and high level alarm)

L.O. (level indication and high level alarm)

Waste Oil (level indication and high level alarm)

Overflow (level indication and high level alarm)

3.12 Accommodation

3.12.1 Staterooms/Cabins (CORE REQUIREMENT)

Grade No. of person

Private room

Owner VIP 1 P Day room, bedroom and private unit lavatory

Senior officer class 4 P Day room, bedroom and private unit lavatory

Licensed officers including 2-Cadet

11 P Single berth cabin and private unit lavatory

Pilot cabin 1 P Single berth cabin and private unit lavatory

Crew (unlicensed) 18 P Single berth cabin and private unit lavatory

ATFP Embark Team

12 P 6-Cabin with (2) * two tier beds and private shower/ lavatory

Note: The clear height in the living quarters to be about 2100 mm, but sanitary space may be about 1970 mm from the top of floor covering to the bottom of overhead deck or ceiling in accordance with Regulatory Bodies. However, the protruding part such as ceiling lamp, ventilating louver and unavoidable corner bracket, etc. to be excluded from the measurement.

MDO& HEC 29 7/27/2026

(CORE REQUIREMENT)

Minimum sizes of galley, food service area and mess rooms (CORE REQUIREMENT):

Area: Area and Complement:

Officer Mess 16 persons seating, 52.3 m2

Main Galley 84.1 m2

Unlicensed Crew Mess 24 persons seating, 52.3 m2

Scullery Inside Galley

Service Areas Food serving line: 39.8 m2 adjacent to the galley space

3.12.2 Joiner Panel System

Joiner construction shall be Method IC in accordance with SOLAS. Joiner material shall be USCG or MED approved where required in accordance with structural fire protection regulations.

Item Description Thickness

Partition bulkhead Mineral wool board with PVC film on both sides

50 mm

Lining panel Mineral wool board with PVC film on visible sides

25 mm

Ceiling panel Mineral wool board with baked enamel paint

25 mm

3.12.3 Application of Panel System

Compartment Bulkhead Deck head

MDO& HEC 30 7/27/2026

Private space

Public space

Office space

Catering space

Navigation & control spaces

Passage space

Lining and/or partition wall panel

Ceiling panel

Private lavatory or bath room

(prefabricated unit type)

15 mm thick lining panel

15 mm thick ceiling panel

Dry provisions store Sanitary space except private lavatory and hospital lavatory

Nil (but the insulated wall shall be finished with colored steel sheet)

Colored steel sheet

Sundry space Machinery space

Nil Nil

3.12.4 Deck Covering

Type Application Thickness

Underlay

(Latex composition)

The space for carpet or vinyl sheet finished floor

8 mm

Carpet Captain and Senior officer class cabins

7 mm

Vinyl Sheet or Tile Other living spaces, other public spaces, mess room, hospital and passage spaces

2 mm

Stud Type Rubber Tile Wheelhouse, machinery control room, and passageways

3.5 mm

Non-slip Tile Toilets 5 mm

MDO& HEC 31 7/27/2026

Cement & Non-Slip Quarry Tile

Galley, pantry, laundries, drying room, ECR toilet

7 mm

Rubber Mat, linked Bridge wings 14 mm

Rubber Insulating Mat In way of the electrical switchboards, front and rear

3 mm

3.12.5 Window

Item Application

Material Steel window frame with toughened safety glass

Minimum Size 1,500 mm x 1,100 mm for wheelhouse

1,000 mm x 800 mm for recreation rooms, mess rooms, ship’s office, highest officer day rooms

450 x 600 for cabins and other public spaces

1000 x 700 for engine control room

Other equipment 5- window wipers for wheelhouse

2- clear view screens for wheelhouse

3.12.6 Doors

Item Application

General All doors in accommodation spaces to be in accordance with SOLAS rules and to meet structural fire protection regulations

Height Height from the finished deck surface to the top of the door opening to be 2000 mm

Clear Width of Door Openings

Accommodation spaces

Private toilets

Gymnasium – two doors

750 mm

600 mm

1300 mm

MDO& HEC 32 7/27/2026

Weather Deck Entrance

Emergency Generator

Treatment Rooms & adjacent exterior

Dry provision rooms

Wheelhouse exterior doors

Workshop

900 mm

900 mm

900 mm

750 mm

900 mm

900 mm

Numerical Code Locks Bridge access doors

Engine room casing doors

Door to stairwell casing

Elevator door at the Main Deck

Bunkering Stations/Pilot ladders to accommodation

Internal & exterior

Internal & exterior

Internal

Internal exterior

3.12.7 Furniture

Furniture requirements are governed, largely by contracts with the various sea-going unions and the Contractor shall develop a preliminary arrangement based on the Owner’s input for the living, public and office spaces, as well as details of the build-out as part of the contract package.

Furniture In general, the furniture shall be constructed of low-pressure melamine sheet.

Top surfaces of desks, tables, chest of drawers, sideboards and countertop of medicine locker shall be covered with high pressure melamine sheet.

Upholstery for Sofas & Chairs

Woven fabric

Vinyl leather

Jr., Sr., & Highest Officer cabins, Officer recreation room

Crew rooms, control rooms and other public spaces

MDO& HEC 33 7/27/2026

Accommodation spaces

Wall Mounted Fans

Note: All furniture should be well constructed and suitable for hard use. All furniture is to be appropriately sized for an average sized westerner, following US furniture sizing standards.

Furniture is to be appropriate for safe use on ships.

3.12.8 Galley

Galley equipment and installation shall be in accordance with CDC US Public Health Department requirements. The minimum area of the galley should be no less than 45 m2. All galley equipment shall be sized for catering 55 persons (CORE

REQUIREMENT).

Galley equipment cooking range with oven baking/roasting 2-oven deep fat fryer with firefighting system range grill freezer ice making machine refrigerator tilting frying pan garbage disposer meat slicer mixer dish washer biodigester additional equipment as needed per galley arrangement

MDO& HEC 34 7/27/2026

Pantry equipment for serving space refrigerator serving window with vertical roll up door tray rack tray and cutlery dispenser bowl and plate dispenser ice cube machine dish dispenser cup rack hot food bar salad bar desert bar

Each Mess Space (2) coffee machine

4 slice toaster microwave electric hot plate refrigerator twin tank drink dispenser water fountain with glass filler electric kettle

Grease Trap (1) With level alarm and sight glass

Note: All metal parts to be stainless steel

3.12.9 Laundry Equipment

Item Description Qty

MDO& HEC 35 7/27/2026

Ship’s Laundry Washing machines (12 kg marine type)

Dry tumbling machines (8 kg marine type)

Hand iron

Metal sink

Soap cabinet

Officer’s Laundry Washing machines (12 kg marine type)

Dry tumbling machines (8 kg marine type)

Hand iron

Metal sink

Soap cabinet

Washing machines shall be 110 V single phase type to be suitable for future replacement by US standard machines.

Dryers shall be 220 V single phase type to be suitable for future replacement by US standard machines. Dryers shall be vented to outside.

Galley and Laundry equipment shall be certified to US standards in accordance with regulations.

3.12.10 Sanitary System

Item Description Qty (if applicable)

Fresh Water Common supply for drinking, cooking, toilet flushing and washing

Equip. for water supply (for accommodation)

HW Circulating pumps, 1.0 M3/HR @ 5M

(4.4 GPM @ 16.4 FT)

Potable water hydrophore tank with 2 pumps, M3/HR, 60M (22 GPM, 196.9 FT) sterilizer, ultra violet type 5 M3/HR (22 GPM) 1

MDO& HEC 36 7/27/2026

hot water calorifier, Electric 0.4 M3, 1.0 M3/HR (106 GAL, 4.4 GPM) Heating from

10°C TO 70°C

hot water calorifier, Electric 0.4 M3, 1.0 M3/HR (106 GAL, 4.4 GPM) Heating from

10°C TO 70°C

POTABLE FW MINERALIZER 1 DOLOMITE

5 M3/HR (22 GPM)

Drinking fountains; two to have an additional spout/ dispenser and control for the wheelhouse and engine control room.

Toilets Vacuum type

Sewage treatment Biological sewage treatment plant for 48 persons

Gray Water Biological gray water treatment system, Separate from sewage

3.12.11 Elevator (CORE REQUIREMENT)

One (1) 10-person elevator rated for 1000 kg SWL to operate from the engine room upper platform (Deck 2) / control room level to the Masters’ day room / office deck level (Deck 6) with a 45 m/min hoisting speed.

3.12.12 Public / Control Spaces

Officer’s Mess Room (seats 16)

Crew’s Mess Room (seats 24)

Officer’s Lounge Room

Crew’s Lounge Room

Conference Room (seats 10)

Gymnasium

Wheelhouse with radio space

Machinery Control Room in ER

MDO& HEC 37 7/27/2026

Fire Control Station

3.12.13 Other Spaces

Armory

Ships Hospital

Ambulatory Room w/ Bath

Galley

Service Area (for Cafeteria type service)

Officer & Crew Laundry

Public Toilets

Dry Provision Storerooms (60-day food supply for 49 people)

Refrigerated Provision Storerooms

Storeroom

Stores/Lockers

Linen Locker

Electrical Storeroom

Emergency Generator Room

AC Mechanical Room

Battery Room

Damage Control Lockers (2)

Incinerator Room

Decontamination Station

Garbage Holding Storeroom

Note: Free height approx. 2,100 mm in general except unit lavatory

MDO& HEC 38 7/27/2026

3.12.14 Insulation

Heat and Sound insulation shall be installed where appropriate for air-conditioned spaces recognizing expected ship operations in tropical zones, and in accordance with Regulatory requirements. Insulation material shall be USCG or MED approved where required by regulations

3.13 Air Conditioning System

3.13.1 General

Living, public, office and control room spaces are to be heated and air conditioned and the system capable of operating while on AMP.

General High pressure, single duct air conditioning system with a central air-handling unit

Fresh air ratio About 50% of total air volume

Refrigerant R-404a

Heating medium Electric and Hot Water

Humidifying According to Builder’s practice

Air change rate According to the Builder’s practice

Air handling unit Two (2) sets, each 60% capacity, single speed

Condensing unit Two (2) sets, each 60% capacity

Separate Air Con & Heating Unit package type units

1 – Machinery Control Room

1 – Engine Workshop

1 – Galley

1 – Wheelhouse

1 – Amp Transformer Room

MDO& HEC 39 7/27/2026

3.13.2 Design Condition

Outside air Inside air

Temp.

Relative Humidity

Temp.

Relative Humidity

Cooling (Summer) +35°C +24°C 50%

Heating (Winter) -20°C +21°C

3.14 Cold Provisions Stores

Chamber Area (m2) Temperature Cooling system

Meat/Fish room 18.3 - 25°C Unit cooler

Dairy room 18.3 + 4°C Unit cooler

Vegetable room 15.5 + 4°C Unit cooler

Lobby 6.3 + 8°C

Total 116.8

Note: Areas are approximate.

Two (2) R404A direct expansion reciprocating compressors with two (2) condensers.

One compressor is to be working at full load no more than 14 hours per day. For "cooling down" both units in parallel operation.

3.15 Dry Provisions Stores

Dry Provisions Store is to be 52 m2 in area.

MDO& HEC 40 7/27/2026

4 MACHINERY

4.1 Propulsion & Steering

Machinery Q'ty Type and Particulars Capacity (each) Remarks

Propeller 1 Keyless, fixed pitch; nickel aluminum bronze;

manufacturing tolerance:

Class I of ISO 484/1; surface finish: Class S of ISO 484/1

Sufficient for M/E MCR operation;

optimized at M/E NCR operation;

light running margin of 5%

Propeller shaft 1 Forged steel; fwd shaft flange with hydraulic tightening bolt coupling

Intermediate shaft 2 Forged steel; shaft flanges with hydraulic tightening bolt coupling; with shaft earthing device of silver alloy type, including milli-voltmeter and shaft power meter

Stern tube seal & bearing

1 Seawater circulation type;

acc. to the manufacturer’s standards

Including necessary provisions for the extended shaft removal interval

Intermediate shaft bearing

2 Self-lubricated, fresh water cooled; white metal lining at lower half

Steering gear 1 Electro-hydraulic, rotary vane or ram type

Performance criteria to meet SOLAS II-1 Regulation 29

MDO& HEC 41 7/27/2026

Rudder 1 KSR®-supported twisted-leading-edge high-efficiency rudder with bulb and conical connection

Working angle of 60 degree on each side

Bow thruster 1 Controlled pitch propeller with

VFD

1,400 kW

Stern thruster 1 Controlled pitch propeller with

VFD

975 kW

Impressed current cathodic protection system (ICCP)

1 Underwater hull protection, including rudder, propeller and thrusters

Mean current density: 35 mA/m2 Anode lifetime: 30 years

MDO& HEC 42 7/27/2026

4.2 ER System Machinery

Machinery Q'ty Type and Particulars Capacity (each) Remarks

Main Engine (M/E) 1 8S50ME-C10.7-EcoEGR, EPA Tier 3 / IMO Tier III with Exhaust Gas Recirculation (EGR)

MCR: 15,200 kW x 125.0 rpm; NCR:

12,920 kW x 118.4 rpm; NCR = 85%

MCR

Optimized at NCR

Ship Service Diesel Generator (SSDG) Engine Set

3 (with possiblity of 4)

4-stroke, in-line, trunk piston, EPA Tier 3 / IMO Tier III

Engine: 1,320 bkW x 900 rpm;

Generator: 1,255 ekW

Resilient mounting;

4th SSDG optional for future installation

Emergency Diesel Generator (EDG) set

1 4-stroke, in-line, trunk piston, radiator cooled genset

350 ekW x 1,800 rpm Capacity as required based on ELA

External water treatment system for M/E Exhaust Gas Recirculation (EGR)

1 Centrifugal separating, approved type of M/E licensor

As per M/E manufacturer’s standards, including: water treatment unit (WTU); feed pump for EGR WTU; supply unit with buffer tank;

NaOH dosing pump

SSDG SCR 3 or 4 Selective catalytic reactor and urea dosing type, acc.

to SSDG & SCR manufacturer’s standards

For each SSDG: 1 SCR unit, 1 urea dosing unit, 1 urea injection pipe, 1 urea mixing pipe, 1 NOx sensor; for all SSDGs: 1 urea supply unit

Applies if selected SSDG requires SCR

Fuel transfer pump 2 MD, screw or gear, with magnetic coupling

25 m3/h x 3 bar g.

M/E fuel supply pump

2 MD, screw or gear, with magnetic coupling

100% as per M/E manufacturer’s standards; 4.1 m3/h x 4 bar g.

M/E fuel circulating

2 MD, screw or gear, with magnetic coupling

100% as per M/E manufacturer’s standards; 7 m3/h x 6 bar g.

MDO& HEC 43 7/27/2026

M/E fuel auto filter 1 Auto back flushing, with a manual bypass filter

Acc. to M/E manufacturer’s standard;

fineness: abs. 10 microns for auto filter, abs. 25 microns for by-pass filter

Auto and bypass filters to be provided as single skid, incorporating 3-way inlet/outlet valves

M/E fuel inlet fine filter

1 Manual duplex Acc. to M/E manufacturer’s standard;

fineness: abs. 50 microns

M/E fuel flow meter 1 Coriolis

SSDG fuel supply

2 MD, screw or gear, with magnetic coupling

100% of SSDG manufacturer’s standard

SSDG emergency fuel pump

1 Air driven, positive displacement

Acc. to SSDG manufacturer’s standard

SSDG fuel auto filter 1 Auto back flushing, with a manual bypass filter

Acc. to SSDG manufacturer’s standard; fineness as per SSDG manufacturer’s recommendation

Auto and bypass filters to be provided as single skid, with 3-way valves on inlet/outlet sides

SSDG fuel flow meter

2 Coriolis 1 for supply and 1 for return

Fuel purifier 2 Automatic, self-clean, non-gravity disc

7,600 l/h based on CFR, 100% for M/E and SSDG operation acc. to purifier manufacturer’s recommendation

Capacity to be based on specific gravity of diesel fuel: 0.86

Fuel purifier feed pump

2 MD, screw or gear, with

7.6 m3/h x 2.5 bar g.

M/E fuel cooler 1 SUS316 plate, FW cooled 2.5 cSt at M/E inlet

SSDG fuel cooler 1 SUS316 plate, FW cooled 2.5 cSt at SSDG inlet

MDO& HEC 44 7/27/2026

Clean fuel drain tank pump

2 MD, screw or gear, with

5 m3/h x 2.5 bar g.

Clean fuel drain flow meter

2 Positive displacement or Coriolis

1 for supply to each Fuel Settling Tk

Incinerator fuel service pump

1 MD, screw or gear, with magnetic coupling

According to incinerator manufacturer’s standard

L.O. transfer pump 1 MD, screw 5 m3/h x 3 bar g.

M/E L.O. pump 2 MD, deepwell-centrifugal 100% as per M/E manufacturer’s standards;…

This is the start of the file's text. The full file is on GovTribe.