PWS Abiomed Perfusion Pump Maintenance.docx

DOCX document 59 KB Posted

Attached to
RFI - Impella Perfusion Pump Maintenance for NMC Portsmouth, Portsmouth, VA
Solicitation number
RFI0ImpellaPerfusionPump
Issued by

About this file

This is a Performance Work Statement (PWS) for Abiomed Impella perfusion pump maintenance services at Naval Medical Center (NMC) Portsmouth, Virginia, issued by the Defense Health Agency. The contractor shall provide preventive maintenance, corrective maintenance, calibration support, and all associated labor, equipment, supplies, tools, and transportation necessary to maintain the Abiomed Impella perfusion pumps and their components. The base period of performance runs from October 1, 2026, through September 30, 2027, with four optional one-year renewal periods extending through September 30, 2031.

The contractor must be an Original Equipment Manufacturer (OEM) authorized dealer, distributor, or reseller with current OEM certification (within two years) and must maintain qualified personnel and facilities throughout the contract period. Preventive maintenance shall be performed annually prior to March 15th in accordance with OEM recommendations, with depot-level work conducted at the contractor's facility and on-site scheduled maintenance at NMC Portsmouth. The contractor must provide a loaner unit during service periods and submit detailed Field Service Reports within two days of service completion. All replacement parts must be new OEM-certified parts (rebuilt parts allowed with equivalent warranties), with the contractor responsible for parts, labor, shipping, and disposal costs. The contractor shall provide 24/7 telephonic technical support with a four-hour callback commitment during normal business hours and must provide software updates and critical FDA safety-related modifications at no additional cost. Operations are limited to Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Defense Defense Health Agency Performance Work Statement

Abiomed perfusion pump maintenance

6/03/2026

Naval Medical Readiness and Training Command, Portsmouth

1.0 GENERAL INFORMATION

1.1 This is a non-personal services contract to provide Abiomed perfusion pump preventative and corrective maintenance.

1.1.1 Description of services/introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform preventative and corrective maintenance as defined in this Performance Work Statement (PWS).

1.1.2 Background: The Cardiology department of Naval Medical Readiness Training Command Portsmouth in Portsmouth, VA. has a requirement for a service and maintenance plan for the Abiomed Impella perfusion pumps listed in 1.1.3A and their components. These units were acquired in 2014. Units have been historically under contract due to preventative and corrective maintenance only being able to be done by the Original Equipment Manufacturer (OEM)

1.1.3 Scope: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide calibration support for the items listed in Section 1.1.3A and all support items / components as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.1.3A

1.1.4 Period of Performance (PoP):

Base Year: 01-Oct-2026- 30-Sep-2027 Option Year 1: 01-Oct-2027- 30-Sep-2028 Option Year 2: 01-Oct-2028- 30-Sep-2029 Option Year 3: 01-Oct-2029- 30-Sep-2030 Option Year 4: 01-Oct-2030- 30-Sep-2031

1.2 Administrative specifications

1.2.1 Place of performance: All depot-level maintenance and corrective repair services shall be performed at the contractor's (Abiomed) depot-level repair facility. Scheduled Preventive Maintenance (PM) services shall be executed on-site at Naval Medical Center (NMC) Portsmouth.

1.2.2 Recognized Federal holidays: Is not required to perform services on holidays.

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Juneteenth DayChristmas Day

Independence Day

1.2.3 Hours of operation: The contractor is responsible for conducting business Monday through Friday between 8:00 A.M. to 4:30 P.M except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. The contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

1.2.4 Emergency Services: Not Applicable

1.3 Contractor Identification

1.3.1 Contractor personnel performing services in a contractor capacity in a government facility are required to possess and wear an identification badge that displays his or her name and the name of their company. Ensure all those with whom the person interacts in any face-to-face dealings while supporting the Government understand that the person is contractor support personnel.

2.0 SPECIFIC TASKS

2.1. Service Agreement for Annual Preventative Maintenance and Corrective Maintenance

2.1.1. Preventive maintenance. Shall be performed once a year prior to the 15th of March in accordance with the Original Equipment Manufacturers (OEM) recommendations. The contractor shall be qualified / authorized by the OEM (IE: Certified Agent of the OEM) in the repair of all equipment listed within this contract. Certification of the OEM must always be current (within 2 years) prior to contract award and throughout contract period. Contractor and its employees shall maintain qualifications throughout entire contract period. In the event that a sub-contractor is used for this requirement, the sub-contractor must be a Certified Agent of the OEM. Qualification includes but is not limited to the certification of all repair persons and repair facilities by the OEM as being trained / qualified to perform required repairs. The Government shall maintain the right to seek proof of qualification prior to award and anytime during contract period of performance. The contractor shall be an OEM authorized dealer, authorized distributor, or authorized reseller for the proposed equipment/system such that OEM warranty and service are provided and maintained by the OEM. The vendor shall be required to provide documentation from the manufacturer stating the vendor is an authorized service provider on the required equipment/system. All software licensing, warranty, and service associated with the equipment/system shall be in accordance with the OEM terms and conditions. Additionally, contractors must have ready access to parts inventory of OEM replacement parts. The Government shall provide electricity, O2, medical air, suction, and water to the contractor. The Government will not provide any materials in support of the contractor.

2.1.2. This contract shall provide annual preventative maintenance services which includes depot level preventative maintenance and calibration in accordance with the Original Manufacturers Equipment (OEM) requirements. The contractor shall provide a loaner unit to the facility to use as services are being done. It shall include all systems, subsystem components, and assemblies, (i.e.: contractor responsible for total maintenance of entire system). All maintenance provisions shall apply to hardware, firmware, and software, as appropriate, unless otherwise stated. Preventative maintenance and corrective repairs, if needed, shall be done prior to the 15th of March each fiscal year to all equipment listed under section 1.1.3 and any subcomponents.

2.1.3 The contractor shall provide Biomedical Engineering (BME) a Field Service Report (FSR) within two (2) days after completion of all service performed. The service report shall include, but not be limited to: contract number, equipment description (model, serial number, equipment control number) contractor’s log number, detailed description of the service(s) performed, replacement part(s) information (part number, par value, nomenclature, unit price, manufacturer, if not OEM, and whether the part is new/reconditioned), the completion date and time, man-hours expended, model and serial numbers, and the name of the FSE performing the service. In the event that agents/sub-contractors are used in the performance of repairs, said agent shall be identified on the service report by company name and contact information (i.e., telephone number). Additionally, contractors will be required to affix a tag on equipment upon the completion of a preventative maintenance inspection. Tag may either be a “sticker” or “hanging tag”. As a minimum the tag shall contain: the name of the contractor, technician performing inspection and date of inspection legibly printed. FSR will be emailed to BME distribution email at usn.hampton-roads.nmrtc-portsmouth-va.list.nmcp-dfabiomed@health.mil.

2.1.4 All test equipment used in the performance of this contract must be calibrated (if required / as required by manufacture of test equipment) and shall be in compliance with Joint Commission (JC) Original Equipment Manufacturer (OEM) and Federal Drug Administration (FDA) standards as required.

2.1.5 The contractor shall provide trained, experienced, English-speaking personnel, labor, tools, diagnostic equipment, software, test phantoms, material, supplies, transportation, parts and equipment necessary to perform Preventive Maintenance (PM), Calibration (CAL), Safety testing (ST) and corrective maintenance. If one is available in the geographic area.

2.1.6 The contractor shall provide telephonic communications with the Government to discuss technical matters relating to the performance of this contract. A systems operator will be made available to answer technical questions regarding system operations and applications. The contractor points of contact (POC) TBD. Service calls shall be placed 24 hours a day, 7 days a week by calling a vendor supplied toll free response center. Qualified service reps are required to make a “best effort” to call back within 4-hours during normal business hours (8am – 5pm EST Monday – Friday excluding Federal Holidays) to schedule service visit.

2.2 Corrective Maintenance. The contractor shall provide depo level corrective maintenance and calibration in accordance with the Original Manufacturers Equipment (OEM) requirements. A loaner shall be provided and sent to Naval Medical Center Portsmouth for the duration of the corrective maintenance.

2.2.1 In the event that emergency services outside the normal working hours are required by the Government, additional work shall be billable to the Government at published commercial rates then NMCP will have to complete a new purchase order via a government purchase card order or a new purchase order to authorize. Government request for corrective maintenance will be placed by BME, to the contractor’s POC. Corrective Maintenance shall be completed during the hours specified in the contract.

2.3 The contractor representative(s) at each site is encouraged to request a pre-maintenance inspection prior to the onset of the contract. As all apparent discrepancies must be identified upon submittal of quote, all claims must be received within 30 days of contract award or prior to contract start whichever occurs first. All non-apparent / hidden discrepancies must be identified no later than the first scheduled preventative maintenance. Any claims resulting from hidden defects must be received within 30 days of first scheduled preventative maintenance. Any equipment found to be inoperable during this pre-maintenance inspection would be repaired using a separate purchase order. The cost of repairs shall not exceed contractor’s normal retail rate for required repairs. The government certifies that the equipment to be maintained under this contract will be in good operating condition on the effective date of this contract. For the purpose of this contract, the clause, “good operating condition” means the conditions necessary for the equipment to function as intended without corrective maintenance. The contractor agrees to leave the equipment in good operating condition at the expiration of this contract. During the final week of this contract, the Government will make final inspection of the equipment. Any correction of deficiencies noted during this inspection shall be resolved prior to contract end. The Government reserves the right to request the repair (at no additional cost to the Government) of items identified with latten defects after contract termination, when it has been determined that defects are either a result of contractor’s performance or should have been discovered during normal performance of work under this contract.

2.3.1 The Government will not be responsible for the damage or loss due to fire, theft, accident, or other disaster of contractor supplies, materials, or for the personal belongings brought onto Government property by contractor’s personnel.

2.4 Replacement Parts: The contractor shall have ready access to unique and/or high mortality replacement parts. All parts supplied shall be compatible with the existing system. In the event that replacements parts are required to be shipped. Shipping shall be performed in the fastest reasonable means possible (i.e., next day airing) at no additional cost to the Government. All replacement parts shall be new and certified as OEM replacement parts. In the event that new parts are not available, rebuilt parts and sub-assemblies are allowed provided that they are warranted to be free of defects for a period that meets or exceeds warranties of similar replacement parts. The contractor shall at their expense, replace all worn or defective parts necessary to restore the equipment to 100% operational condition as specified by the OEM. Vendor is not responsible for consumable items. The contractor shall specifically annotate on the final Field Service report the use and identification of rebuilt parts and the period of warranty. When discrepancies occur, the Government will make the final determination on whether a replacement part is of equal or better quality. Replacement parts must maintain the integrity of system / equipment certification to include compliance with any UL, AMA, Joint Commission (JC), manufacturer’s certifications or any other certifications as they apply.

2.4.1 The contractor shall at their expense replace all worn or defective parts necessary to restore the equipment to 100% operational condition as specified by the OEM. Vendor is not responsible for consumable items.

2.4.2 Contractor installed replacement parts shall become the property of the Government, and the replaced malfunctioning part shall become the property of the contractor. Replaced items shall be properly disposed of at no additional cost to the Government (contractor to pay all “environmental fees” where required).

2.4.3 Contractor’s pricing shall be inclusive of all costs including parts, labor, travel and shipping, unless otherwise indicated.

2.4.4 Freight, postage, and storage charges associated with shipment and receipt of replacement parts, and the return of parts shall be the responsibility of the contractor.

2.5 Software: The contractor must include software revisions and updates (field service changes), which are required due to the Food and Drug Administration (FDA), or manufacturer announced safety-hazard recall, to include FDA Year 2000 Compliance Directive, as part of the contract at no additional cost to the Government. Updates shall be performed as soon as possible after release, but no later than the first scheduled Preventative Maintenance Inspection after release. For any updates that have been identified as critical or required for the proper operation of equipment by the OEM, contractor shall provide installation within 30 days of release regardless of preventative maintenance schedules.

2.6 Removal of Government Property: Whenever the repair of equipment cannot be performed at the Government site as determined by the contractor, the contractor shall notify BME who will make arrangements for the contractor to remove the item to the contractor’s designated site. The contractor may be required to sign a government form accepting responsibility for the Government equipment. The contractor shall provide a detailed description of removed items. For associated items / accessories, contractors provide a detailed description and quantities of items to be removed. Description to include as a minimum manufacturers serial numbers and equipment control number (ECN) of all equipment / items removed. In the event that items / sub-assemblies / accessories are repaired via “Repair by Replacement” a detailed description of replaced items is to be included upon return of repaired components.

2.6.1 All charges resulting from a contractor’s determined requirement to transport Government owned property, covered by this contract, to and from an alternate repair location shall be the responsibility of the contractor.

2.7 Equipment Modification Upgrades: The contractor shall only incorporate OEM specified modifications, alterations and upgrades. Approval shall be obtained from BME prior to the contractor installation of any modification, alteration, or upgrades.

2.7.1 The contractor shall maintain contact with the OEM to determine the requirement for field modifications and to ensure accomplishment of these modifications in accordance with the time schedule set forth by the OEM.

2.7.2 The Government shall not alter the system without prior notification to the contractor.

2.7.3 The contractor at no additional cost shall provide software updates to the Government. Installation of updates will be left to the discretion of the Government. All supplied software is to be warranted current and free of defects such as viruses.

2.8 Service beyond the Scope of the Contract: The contractor shall immediately, but not later than 24 consecutive hours after discovery, notify BME, in writing, of the existence or the development of any defects in, or repair required to the scheduled equipment, which the contractor considers they are not responsible for under the terms of this contract.

2.8.1 At the same time of the notification, the contractor shall furnish BME with written estimate of the cost to make the necessary repairs. Repairs considered by the Contracting Officer (CO) to be outside the scope of this contract shall not be covered under this contract but shall be ordered under a separate purchase order.

2.9 Special Qualifications: The Contractor must be an OEM-certified service provider. Contractors must verify that an individual whom they plan to employ or continue to employ in the performance of this contract is authorized to accept employment in the United States. Individuals such as those who have been admitted as permanent residents, granted asylum or refugee status, or admitted in work-related nonimmigrant classifications may have employment authorization as a direct result of their immigration status

2.9.1 When using education/certification in conjunction with labor categories, the COR in coordination with the CO must establish a review process of contractor personnel to ensure labor category requirements are met.

3.0 Qualifications/Considerations

3.1 Special Qualifications/Considerations: The contractor shall be an Original Equipment Manufacturer (OEM) authorized dealer, authorized distributor, or authorized reseller for the proposed equipment/system such that OEM warranty and service are provided and maintained by the OEM. All software licensing, warranty, and service associated with the equipment/system shall be in accordance with the OEM terms and conditions.

DHA PWS Template Under SAT August 2022 Rev. 1 image1.png image2.emf

File details come from the government source that posted it. Updated .