RFI Responses _ Dickman Rd Perimeter Fence _ 1.pdf
PDF 120 KB Posted
- Attached to
- Dickman Rd. Perimeter Fence W50S84-20-B-0001 Federal contract opportunity
- Solicitation number
- RFI_01
- Issued by
- Department of the Army National Guard
About this file
This document contains responses to requests for information (RFI) related to a federal contract opportunity for perimeter fencing work at Battle Creek Air National Guard Base in Michigan. The RFI responses clarify that the perimeter fencing must meet a minimum K4 crash rating standard as defined in UFC 4-020-02. For a decorative gate requirement, the contractor is to follow the specifications in section 323119.53 of the contract documents rather than differing details shown on a drawing. As most of the new fencing will be inside the existing perimeter, the contractor is not required to provide a badged gate guard for all fence work areas. The related federal contract opportunity is issued by the Department of the Army National Guard for project Dickman Rd. Perimeter Fence W50S84-20-B-0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Minutes _ Dickman Rd Fence.pdf | ||
| W50S84-20-B-0001 Dickman Rd Sign in Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions / Responses ‐#1
Project Title: Dickman Rd Perimeter Fence Location: Battle Creek ANGB, MI.
Solicitation Number: W50S84‐20‐B‐0001
RFI: Crash Rating Question: “Is there a certified crash rating for the perimeter fence? “
Answer: “The anticipated impact force established by the threat parameters defined in UFC 4‐ 022‐02 require a minimum K4 rating for the fence.”
RFI: Decorative Gate Question: “The decorative gate requirement differs between detail and spec. Please verify or provide basis of design.”
Answer: “Contractor is to follow guidance provided in Specification Section 323119.53 Decorative Metal Security Fence and Gates. Drawing F‐510 lists note “Fence Fabric not shown for clarity”, as details shown provide clarity of the reinforcement, not the fence fabric.”
Site Visit Clarification:
As the majority of the new fence will be constructed inside the existing perimeter fence, the contractor is not required to provide a badged gate guard at all areas of the fence work (G‐081 ”Base Security”)
Bid Opening Location: Selfridge ANGB, MI (See Documents)