REQUEST FOR INFORMATION
Depot Aircraft Maintenance Dock Expansion Phase II For Hill AFB, UT
** RESPONSES DUE Tuesday, 22 February 2022, 4:00 PM MST **
| Synopsis Number: | Notice Type: | |
| FA8224-22-R-Dock_Expansion | REQUEST FOR INFORMATION |
Synopsis:
NOTICE: This Request for Information (RFI) is issued for information and planning purposes only. This is not a Request for Proposal (RFP). It is not to be construed as a commitment by the Government to issue a solicitation or ultimately award a contract. Responses will not be considered as proposals nor will any award be made as a result of this RFI. The Air Force WILL NOT be responsible for any costs incurred by interested parties in responding to this RFI. This notice is an announcement seeking market research information on industry capabilities as described herein. The information requested by this RFI will be used within the Air Force to facilitate decision making and will not be disclosed outside the agency. However, respondents submitting business information pursuant to this RFI should consult 41C.F.R. part 105-60 and other implementing regulations concerning the release of such information to third parties under the Freedom of Information Act. All information submitted by respondents that they consider confidential and not releasable to third parties outside of the Air Force, and its employees agents, consultants, and representatives must be clearly and conspicuously so marked.
The Magnitude of this project is projected to be between $8,000,000 and $25,000,000.
PROGRAM OVERVIEW
The Air Force Materiel Command (AFMC) Ogden Air Logistics Complex (OO-ALC) performs depot repair for aircraft and is converting maintenance docks from one aircraft to another. This effort will require the design, purchase, and installation of major pieces of equipment as well as some building repair. The Government’s initial focus is to identify interested companies who possess the capability, experience, and capacity to design and install an aircraft electronics (avionics) cooling air system to supply cooling air to the aircraft. The cooling air will be supplied through Operator Control Consoles (OCCs – similar or the same as the OCCs we already have) between every other dock. Raising an equipment shelter outside of the building to shelter the air handling units will also be required. The Government is seeking capable companies that are interested in working as a prime contractor or as a subcontractor on this effort. The other requirements of this effort include the following:
· Removal of two C-130 Maintenance Stands, wrapping them for storage, and moving them to a storage site.
· Preparation of the area for installation of up to ten F-35 aircraft maintenance docks
· Evaluating, expanding, and/or tying into the central hydraulics system to supply hydraulic oil to the aircraft through the same OCCs as the avionics cooling air system
· Acquiring, assembling, and installing additional specified Aerospace Ground Equipment (AGE) electrical panels and shop air reservoirs between every other dock including all associated transformers, electrical buses, etc. to ensure adequate power to the docks
· Acquiring and installing specified or equivalent aircraft electrical equipment and cord reels between every other dock
· Removing a sunshade from the building (if necessary) to allow for bridge crane installation
· Designing and installing two large bridge cranes (including footings) to cover the entire area (roughly 48,400 square feet)
· Frosting the windows in the hangar doors
· Enclosing the roughly 48,400 square feet area with a fence and covering the fence with a known black fabric and implementing other security measures such as metal doors with closures and latches, vindicators, grating, etc.
· Installing one to four office insert buildings in the area
· Removing unused equipment, piping, etc. and filling in trenches in the area with fill and concrete
· Repairing and leveling the floor, refinishing the floors with epoxy, and striping docks, walkways, tow lines, etc.
· Ensuring adequate fire suppression, lighting, and heating in the area including acquiring, assembling, installing any required equipment that require upgrade
· De-conflicting currently installed utilities (pipes, ducts, conduit, etc.) for installation of the equipment above
· Installing and/or updating at least one and up to three communication rooms
This will be a competitive acquisition. The Government will evaluate responses to this RFI to help determine the best acquisition strategy and evaluation methodology. The contract to be awarded is anticipated to have a 1-1/2 to 2 year period of performance.
INDUSTRY DAY/SITE VISIT
The Government anticipates holding an Industry Day/Site Visit to discuss the objectives/requirements of the program and to answer questions. As dates, times, and details are confirmed they will be posted to https://sam.gov/. Please check the web site often for updates.
DRAFT RFP
The Government anticipates releasing a Draft Request for Proposal (RFP) Spring 2022. Please check the web site listed above for an electronic copy of the solicitation.
RFI QUESTIONS
The Depot Aircraft Maintenance Dock Expansion Phase II Integrated Products Team (IPT) has developed a list of questions to facilitate discussion and influence the final version of the RFP. We intend to use your answers to refine the RFP and enhance selection criteria that assure open competition while supplying the best combination of military, government and commercial practices to our effort. To ensure that your answers have the opportunity to influence this acquisition, please submit your responses no later than 22 February 2022. In addition to your responses to the RFI questions, feel free to include any suggestions, recommendations, questions, or concerns regarding this effort. The team intends to address identified concerns/suggestions at the industry day during the Q&A session.
1) General Business Information
a) Do you see yourself as a Prime or Subcontractor and why?
i) Please estimate the percentage of the work you feel you would contribute to this effort and the types of capabilities you offer with regard to the requirements above.
ii) Would you be willing to work as a subcontractor on this effort?
b) Have you ever been awarded a Government contract for the design and installation of an aircraft electronics (avionics) cooling system and/or a high pressure hydraulics system? Please provide contract numbers.
2) Program Requirements
a) What experience do you have designing/installing an Aircraft Avionics Cooling System and/or a high pressure hydraulics system?
b) What is your experience related to design and installation of large bridge cranes?
3) Pricing
a) The government prefers this to be Firm Fixed Price (FFP) contract. Do you see any issues with this type of contract, and if so, what type of contract would you suggest? Please explain the rationale.
4) Risks
a) What do you see as the risk areas associated with this effort?
5) Miscellaneous
a) Please provide any additional feedback you feel is relevant.
SUMMARY
To recap, interested offerors should send a response to the RFI questions listed above to Bradley Tobler at bradley.tobler.2@us.af.mil. Responses to the questions should be submitted by 4:00 pm mountain time, 22 February 2021.