RFI FRC Work Staging_ZWV_Figure 1 - General Layout of Warehouse Bay.docx

DOCX document 52 KB Posted

Attached to
Work Platforms for Blasting, Painting, and Welding
Solicitation number
70Z04026RFI62204Y00
Issued by

About this file

This document is an RFI (Request for Information) image depicting a general layout of a warehouse bay for the US Coast Guard. The image (Figure 1) shows a schematic design of a warehouse space, which corresponds to the Coast Guard's RFI for constructing semi-permanent working platforms at the Coast Guard Yard in Baltimore, MD. The platforms will be used for blasting, painting, and welding operations on sea-going vessels up to 154' long, positioned in two adjacent warehouse bays. The work platform solution must be movable by industrial equipment and serve as a walkway with vessel access points. The Coast Guard is seeking potential vendors to provide design, construction, and delivery of these specialized work platforms, with interested parties invited to an industry day and required to participate in a future site visit.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Figure 1 General Layout of Warehouse Bay image1.png

File details come from the government source that posted it. Updated .