RFI FRC Work Staging_ZWV_Figure 1 - General Layout of Warehouse Bay.docx
DOCX document 52 KB Posted
- Solicitation number
- 70Z04026RFI62204Y00
About this file
This document is an RFI (Request for Information) image depicting a general layout of a warehouse bay for the US Coast Guard. The image (Figure 1) shows a schematic design of a warehouse space, which corresponds to the Coast Guard's RFI for constructing semi-permanent working platforms at the Coast Guard Yard in Baltimore, MD. The platforms will be used for blasting, painting, and welding operations on sea-going vessels up to 154' long, positioned in two adjacent warehouse bays. The work platform solution must be movable by industrial equipment and serve as a walkway with vessel access points. The Coast Guard is seeking potential vendors to provide design, construction, and delivery of these specialized work platforms, with interested parties invited to an industry day and required to participate in a future site visit.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1 General Layout of Warehouse Bay image1.png
File details come from the government source that posted it. Updated .