RFI DMP.pdf
PDF 73 KB Posted
- Solicitation number
- W56HZV-21-R-L024
About this file
This document contains a request for information (RFI) from the Department of the Army Materiel Command regarding the procurement of a direct metal printing laser powder bed fusion equipment. The RFI seeks responses to questions about whether potential offerors' equipment meets requirements such as a 500W fiber laser, self-cleaning filtration system requiring replacement every 1,500 hours, built-in uninterruptible power supply, glass scale on the Z axis, capability to operate in both nitrogen and argon environments, NRTL approval, compliance with laser safety regulations, inclusion of starter kits and licenses for specific materials, and a build volume of 275 x 275 x 420 mm. Responses to the questions and any additional comments must be submitted by March 2, 2021 to an individual at the provided email address. The overall goal is to procure this direct metal printing equipment for the Ground Vehicle Systems Center's Materials Directorate Additive Manufacturing Team on a firm-fixed-price basis within 12 months of order receipt at Detroit Arsenal, Michigan.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
On behalf of the Ground Vehicle Systems Center’s Materials Directorate – Additive Manufacturing Team (GVSC MD AM), ACC-DTA is conducting market research to understand capabilities related to the below requirement:
Scope:
This supplies Performance Work Statement (PWS) establishes the requirements for one Direct Metal Printing (DMP) Laser Powder Bed Fusion (L-PBF) Equipment for the GVSC MD AM Team. This requirement is to provide one DMP L-PBF Equipment that meets the below listed dimensions and requirements.
Product Office: Combat Capabilities Command Ground Vehicle Systems Center’s (CCDC GVSC) Materials Directorate Additive Manufacturing (AM) team
NAICS: 333249, Other Industrial Machinery Manufacturing Period of Performance: 12 months after receipt of order Type: Firm Fixed Price (FFP) Set-Aside: TBD Extent of Competition: TBD
REQUEST FOR INFORMATION
Please review the above and previous contract and respond to the following questions (Negative responses are requested):
1. Is your equipment designed for 400V, three-phase power supply?
2. Does your equipment have a 500W Fiber Laser?
3. Does the equipment have a self-cleaning filtration system requiring replacement at no less than 1,500 hours?
4. Does the equipment include a built in Uninterruptible Power Supply (UPS)?
5. Does the equipment have a Z Axis glass scale?
6. Is the equipment capable of operating in dual modes of both nitrogen and argon?
7. Is the equipment NRTL approved?
8. Can the contractor certify the equipment is compliant with all Class I laser system requirements of 21 CFR 1040.10?
9. Does the equipment have a Material Starter Kit and license for LaserForm®Ni718 (A).?
10. Does the equipment have a Material Starter Kit and license for LaserForm®316L (A)?
11. Does the equipment have the 3DXpert Ultimate license?
12. Does the equipment have an extraction arm?
13. Does the equipment have the build volume dimensions of 275 x 275 x 420 mm?
14. Can the contractor guarantee delivery within 12 months after receipt of order (ARO) to Detroit
Arsenal, MI?
* NOTE: Additionally, please provide a detailed description of previous experience your company has performing similar efforts as well as comments on any concerns your company may have supporting the requirement.
Please submit your responses to the questions above and any and all comments/questions prior to 5:00 PM EDT on 02 March 2021: Conner Fowler, email: jason.c.fowler8.civ@mail.mil
File details come from the government source that posted it. Updated .