RFI Amendment 36C24425B0001 0001.docx

DOCX document 2 MB Posted

Attached to
Z1DA--460-24-008 | Boiler Plant Blowdown and Discharge Piping Replacement | NCO 4 Construction East
Solicitation number
36C24425B0001
Issued by

About this file

This is an amendment to solicitation 36C24425B0001 from the VA Network Contracting Office 4, providing responses to questions from a February 5, 2025 site visit regarding a Boiler Plant Blowdown and Discharge Piping Replacement project. The proposal due date remains February 28, 2025 at 3:00 PM.

The amendment clarifies technical requirements for work on all four boilers, including: replacement of main blowdown piping at the outlet of the first valve off each boiler; installation of double block and bleed systems; simplification of existing piping to eliminate obsolete components; use of stainless piping for the quench tank discharge; and approximately 15-20 feet of piping replacement on Boiler 4. The work can be completed during normal business hours while boilers are operational, with installations staged individually. Additional optional pricing is requested for upgrading the trench pump to provide automatic and manual functions. Two supporting document attachments were provided showing boiler layouts and condensation tank details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

460-24-008 00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24425B0001 02-19-2025

X

The purpose of this amendment is to:

1. Provide SOW supporting documentation (Att. 1&2) and responses to questions from the site visit held on February 5, 2025.

2. The proposal due date remains February 28, 2025 at 3:00p.m.

Cheryl A. Roberts Contracting Officer

Boiler Plant Blowdown and Discharge Piping Replacement Project # 460-24-008 Questions, Responses, Comments:

Q: The supporting documents referenced in item 2 of the specifics are not available on SAM. Please provide them.

VA Response: Provided attached (SOW Supporting Documentation, Attachment 1&2).

Q: Item 2 of the specifics references 3 boilers. Is this work intended to be performed on all 4 boilers?

VA Response: Yes

Q: Please clarify the connection points referenced in item 2 of the specifics. Is the connection point at Boilers 1, 2, and 3 for the main blowdown pipe at the existing valve or at the flange closest to the boiler? If the connection point is the flange on the boiler, are the main blowdown valves to be replaced and, further, to include a bleed between the valves?

VA Response:

a. The Connection points are at 1,2,3,and 4 for the main blowdown piping at the outlet of the first valve off of the boilers.

b. Include cost adder for replacing the first blow down valve off of each boiler.

c. Include a bleed between the 2 valves off of the boilers(Double Block and Bleed).

Q: For the continuous blowdown system on Boilers 1, 2, 3, is the connection point in near proximity to the discharge from the boiler? If so, should this piping be simplified to replace shutoff gate valves with new valves and, further, to eliminate the obsolete and now non-functional components in this line?

VA Response: For Boilers 1,2,3, and 4 simplify existing piping to eliminate obsolete and non-functioning components.

Q: For piping less than 2” in diameter are either butt welded and socket welded joints acceptable? Are socket weld fittings acceptable?

VA Response: Construct in accordance with VA til (33 63 00)specifications

Q: For the trench sump pump located near the north end of Boiler 3, please confirm that the VA desires this pump discharge into the sanitary sewer drain inlet located near the south end of Boiler 3.

VA Response: That is correct

Q: Please verify that the VA wants to reroute the quenching tank discharge at a level below the concrete floor, through the existing wall, and to the existing drain piping near boiler 3. Then restore any concrete floors/walls that have been demolished.

VA Response:

a) Correct

b) The existing trench may be utilized to eliminate the need for demo of any floors/walls

Q: If the VA desires the quench tank discharge to be buried below grade, is cast iron an acceptable material of construction for this piping? Would the VA elect to use stainless piping in this service for longer duration corrosion resistance?

VA Response: The VA would elect to use Stainless piping in this service for corrosion resistance.

Q: Please confirm that each of the boilers can be blown down, individually, and have the main (large-scale) blowdown and automated blowdown disabled for an 8 hour install period.

VA Response: Yes this is confirmed.

Q: Can the installation be staged for each boiler?

VA Response: Yes the installation can and will have to be staged.

Q: In a transition period of a few days, can the automated discharge be released into the trench?

VA Response: Yes it can be pumped out of the trench.

Q: Can this work be completed while the boilers are in operation? If not, will all 4 boilers be available at the same time?

VA Response: Yes this work can be completed while the boilers are in operation

Q: Does the VA desire the trench pump to be upgraded to provide an automatic and manual function? The automatic function would use a float switch to enable the trench sump pump in the presence of water within the trench.

VA Response:

c) Trench pump replacement is not in scope.

d) The VA would like for this to be priced as an additional option.

Q: Are we to use flanges in lieu of pie unions?

VA Response: Flanges are only to be used when connecting to the quench tank and the boilers.

Q: Is the existing drain into the pit behind the boilers to be replaced in kind?

VA Response: The piping in the pit behind the boilers is to be replaced in kind.

Q: Is any work on the blowdown tank and/or cooling water piping included in this project?

VA Response: No. That is not in scope.

Q: There was discussion of a “double block and bleed” to be installed at each boiler. Does the VA have a design for that?

VA Response: Utilize the American Petroleum Institute’s standard SPI 6D for Double Block and Bleed (DBB) Definition for the construction guide.

Q: Is the entire run to the blowdown tank to be in 1 ½” Schedule 80 black pipe?

VA Response: Construct in accordance with VA til (33 63 00) specifications.

Q: Will there be any need for off hours work to be performed (i.e. shutdowns, etc.)?

VA Response: Not required, Preference is normal business hours. No Shutdown required

Q: Is there any work to be performed on Boiler #4?

VA Response: Yes, Boiler 4 will have ~15-20ft of piping replaced.

Q: If welding is required, will X-Ray testing for the welding be required?

VA Response: Construct in accordance with VA til (33 63 00)specifications.

Attachment 1C1 Boiler 3

B1 Boiler 2

A1 Boiler 1

Attachment 2D1 Condensation tank inlet flange

End of Document image1.jpeg image2.jpeg