This Request for Information (RFI) from the US Agency for International Development (USAID) Zambia solicits feedback on a draft Statement of Objective (SOO) for the USAID Zambia Business Enabling Project. The purpose of the project is to catalyze greater gender equality and inclusive private sector investment and trade in rural Zambia by strengthening select government and civil society organizations to implement improved policies and processes that support economically viable and gender-balanced rural enterprises. The project also aims to create an enabling environment incentivizing productive investments in agriculture, trade, energy, eco-tourism and sustainable natural resource management. USAID Zambia anticipates awarding a five-year, $14-18 million contract subject to funding availability. Respondents are asked to provide comments on the draft SOO and respond to questions on potential deliverables, risks, success metrics, lessons learned and effective approaches for engaging the Government of Zambia to advance regulatory reform supporting policy sectors like agriculture and trade. Responses are due February 17, 2021 and must follow the specified format and page limits. USAID may publish anonymized responses on SAM.gov and issuing this RFI does not obligate USAID to release a subsequent solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. AGENCY FOR INTERNATIONAL DEVELOPMENT
Subdivision 694/Stand 100 Ibex Hill Road
PO Box 320373
Lusaka, Zambia – 10101 infozambia@usaid.gov
USAID.gov
TO: All Prospective Offerors
ISSUANCE DATE: Monday, February 1, 2021
REQUEST FOR INFORMATION (RFI) #: 72061121C0000BEP
SUBJECT: Draft Section C - USAID Zambia Business Enabling Project
DUE DATE: February 17, 2020, at 2:00 pm Lusaka Time
Dear Prospective Offerors:
The United States Government, represented by the U.S. Agency for International Development
(USAID), is seeking input from interested Offerors who may provide comments, opinions, and recommendations in response to the proposed activity approach in the subject draft Statement of
Objective (SOO) under RFI # 72061121C0000BEP. USAID/Zambia anticipates that the subsequent
Request for Proposal (RFP) will serve as the basis for a five-year, $14 to $18 million contract, subject to the availability of funds.
The purpose of this RFI is to solicit feedback on the draft SOO to help ensure clarity and purpose.
While we welcome all comments, we particularly request Offerors to respond to the questions in
Attachment II below. Please note that responding to this RFI will not give any advantage to or preclude any organization or individual from any RFP that may be subsequently issued as any/all comments received will be strictly for information gathering purposes only. RFI Responses must be submitted electronically in Microsoft Word format to OAA Solicitations Lusaka AID (oaa-solicit-lusaka@usaid.gov) to the attention of Ms. Elizabeth Chisala and Mr. Mohib Ahmed under the title: RFI #
72061121C0000BEP USAID BEP. See Attachment 1 for detailed RFI Response Requirements.
USAID/Zambia may choose to publish responses to the RFI submissions in an anonymized format through https://beta.sam.gov/. The release of this RFI in no way obligates the United States Government or USAID to release a solicitation for this proposed activity, nor are either responsible for any costs incurred in preparing responses to this RFI.
Thank you for your interest in the subject request for information.
Sincerely, Mohib Ahmed
Supervisory Contracting Officer
Director, Office of Acquisition and Assistance
Attachment I: RFI Response Requirements
Attachment II: RFI Questions
Attachment III: Draft Statement of Objective mailto:infozambia@usaid.gov mailto:oaa-solicit-lusaka@usaid.gov https://beta.sam.gov/
RFI #: 72061121C0000BEP
Draft Statement of Objective for the
USAID Zambia Business Enabling Project
ATTACHMENT I – RFI RESPONSE REQUIREMENTS
Responses should include the following:
1. Cover page, not to exceed one (1) page, that includes:
a. Organization name and address
b. Point of contact name and contact information
c. A brief statement of interest that indicates the organization’s interest in applying as a prime or subcontractor. If a team or consortium is envisioned, please provide the names of the potential partner organizations, if possible.
2. Comments and questions on the draft Statement of Objective. Submissions must not exceed six
(6) pages, excluding annexes/attachments that may be relevant. Please reference Page and
Section Title for each question to ensure USAID is able to fully understand the question/comment.
No other documents or information are requested at this time. USAID asks respondents to not send any additional information other than what is requested above and to adhere to the page limits mentioned.
ATTACHMENT II – RFI QUESTIONS
1. What are some of the "low hanging fruits" that could be identified for deliverables in each sector? What are some of the more longer-term (3-5 years) issues that should be prioritized?
2. What are the key risks, challenges, and/or gaps with the stated objectives? Are there alternatives that would mitigate or alleviate these risks and challenges?
3. Please help to suggest how success could be measured with realistic targets, while indicating the current metrics for each indicator.
4. What lessons learned, if any, could you share with USAID that would help inform the design of this project?
5. Given the social and economic situation in Zambia, how could USAID support the government
(Central, Provincial and Local), quasi-government institutions like ZESCO and ERB, civil society, and the private sector to effectively improve the business environment while also reducing poverty? What would be the most effective way to engage with the GRZ to advance policy/regulatory reform?
6. What unique challenges should USAID be aware of for any of the proposed policy sectors?
Please provide any suggestions for sector-specific approaches.
7. Any general feedback and/or comments?
ATTACHMENT III – DRAFT STATEMENT OF OBJECTIVE
SECTION C: DESCRIPTION/STATEMENT OF OBJECTIVES
C.1 TITLE
The title is USAID Zambia Business Enabling Project
C.2 PURPOSE
The purpose of the USAID Zambia Business Enabling Project is to catalyze greater gender equality and inclusive private sector investment and trade in rural areas by strengthening select Zambian government and civil society organizations to implement improved and streamlined policies and processes for economically viable and gender balanced rural enterprises. The project will also support the creation of an enabling environment that incentivizes productive investments in trade, agriculture, energy, eco-tourism and sustainable natural resource management.
C.3 BACKGROUND
The Government of the Republic of Zambia (GRZ) is responsible for providing a supportive macro- and micro-level enabling environment for the economy. The Government has adopted an integrated approach to sectoral development as outlined in its Seventh National Development Plan (7NDP)1 of
2017-2021. This is to ensure that sector interventions are coherent and support the attainment of prioritized national policy objectives. To this end, sectoral clusters2 have been established to promote multi-sectoral planning, implementation and monitoring impact and results. Trade, agriculture, energy, tourism and sustainable natural resource management are part of pillar 1 whose focus is on economic diversification and job creation. Therefore, interventions in these sectors are expected to be coordinated for meaningful results and impact.
Although the GRZ has made strides, in principle, toward introducing transparent policies to foster competition, complaints arise from time to time. The government continues to use the Regulatory
Impact Assessment (RIA)3 as part of its policy and legislative making process, creating a platform for public-private dialogue and healthy debate on economic development laws and policies, and ultimately, improving the quality of regulation. Under the Business Regulatory Act No. 34 of 2014, the law requires that regulators consider alternatives to proposed regulations; the RIA informs those discussions.
Proposed laws and other statutory instruments are, however, often insufficiently vetted with interest groups, or are not released in draft form for public comment and need to be improved.
Through the Zambia Development Agency (ZDA), the Government continues to undertake a number of activities to promote investment through provision of fiscal and non-fiscal incentives, establishment of
Multi-Facility Economic Zones (MFEZs), the development of SMEs, as well as the promotion of skills development, productive investment, and increased trade. The Zambian Business Regulatory Review
Agency (BRRA5) has responsibility for Regulatory Services Centers (RSCs) that serve as a one-stop shop for investors. RSCs provide for an efficient regulatory clearance system by streamlining business
1 Seventh National Development Plan 2017-2021, © 2017, Ministry of National Development Planning 2 Summary Report of the National Development Coordinating Committee (NDCC) Meeting 19th to 20th December, 2018. Ministry of National Development Planning, © January 2019.
3 http://www.brra.org.zm/ 4 http://www.parliament.gov.zm/node/4781 5 The Zambian Business Regulatory Review Agency - info@brra.org.zm http://www.brra.org.zm/ http://www.parliament.gov.zm/node/4781 registration processes; providing a single licensing system; reducing the procedures and time it takes to complete the registration process; and increasing accessibility of business registration institutions by placing them under one roof. The Government established RSCs in Lusaka, Livingstone, Kitwe, and
Chipata, and will need support to establish additional RSCs so that there is at least one in each of the country’s 10 provinces.
With respect to Agriculture, the Second National Agriculture Policy (SNAP)6 provides a policy framework to ensure development of a competitive and diversified agriculture sector in the country.
Policy challenges in the agricultural sector are highlighted by unbalanced agriculture policies favoring maize production thereby disadvantaging the production of other crops7; poor financing towards
Research and Development (R&D), low mechanization and information communication technologies
(ICTs) to increase yields; and limited food commodity storage, and insufficient irrigation and related infrastructure challenges. Although women play a critical role in sustaining a productive agricultural sector, mostly through provision of labor, they have limited access and control over productive resources for equal participation in economic activities. There is need therefore for deliberate policies that empower women with technology, access to finance and skills to bring gender equity and social inclusion.
With regards trade, a National Trade Policy8 supported by a National Export Strategy9, among other strategic documents, was adopted in 2019 as part of the national development agenda of maintaining an open trading system that supports national development efforts. However, there are a number of GRZ policies and/or procedures that still impede trade and business growth that are aggravated by onerous and challenging documentation and permitting processes. Although Zambia is signatory to a range of international treaties that govern international investment and has signed several Bilateral Investment
Treaties (BITs), it still lacks harmonized legislation for investment built on a national investment policy.
While the Government has made gains in improving the business and operating environment for companies, especially for foreign investors, weaknesses in the regulatory framework remain apparent.
Although Zambia is a member of several regional trading bodies, much work remains to develop implementation protocols and mechanisms across Africa.
Energy is another area of focus and priority for economic diversification and job creation. GRZ seems to prioritize initiatives aimed at expanding access to electricity for households and businesses and improving electricity reliability and diversification of electricity generation sources. There are significant gender differences in access, use and effects of different energy sources. For instance, biomass accounts for 77 percent of the total primary energy use, and is typically inefficiently produced and utilized, resulting in a negative health impact on the rural women who use it. Currently, around 31.4 percent of the country’s total population has access to electricity, with rural households accounting for only 4.4 percent (National Energy Policy, 2019).10 Besides the low electricity access rate, parallel efforts need to be directed towards improving electricity reliability, including the diversification of Zambia’s electricity generation sources. Energy consumers, both individually and through representative entities (that include civil society) have increasingly voiced their concerns on energy services such as electricity particularly with regard to pricing e.g. the 113% tariff increment in 2019 and reliability of supply.
In the tourism sector, forests and wildlife areas provide a significant opportunity for rural communities to benefit economically. Through wildlife-based tourism, GRZ has an ambitious goal of creating one million jobs by 2030 and increasing the contribution of wildlife and forests to the country’s economic
6 Republic of Zambia Second National Agricultural Policy, Ministry of Agriculture and Ministry of Fisheries and
Livestock. February 2016 7 http://www.iapri.org.zm/ 8 National Trade Policy 2018, Ministry of Commerce and Trade.
9 The National Export Strategy 2018, Ministry of Commerce and Trade.
10 The National Energy Policy 2019, Ministry of Energy growth through tourism and sustainable timber harvesting. However, this goal is confronted by a number of challenges, which include limitations in policy enforcement, and illegal demands on natural resources, such as bush meat, charcoal, timber, among others. Part of the solution to these challenges rests on catalyzing greater involvement of the private sector in order to create opportunities for increased investment, trade and economic benefits from wildlife, forests and ecotourism.
Efforts by various Zambian think-tanks including the USAID-funded Indaba Agricultural Policy Research
Institute (IAPRI) and the Policy Monitoring and Research Centre (PMRC), as well as civil-society organizations such as the Zambia National Farmers Union (ZNFU,) have made laudable efforts but have had little success in fostering GRZ policy and regulatory reforms that would lead to a more conducive private-enterprise enabling environment. This limited success is partly due to the tendency of these organizations to work in silos, as opposed to coordinating their efforts.
C.4 OBJECTIVES
In order to reach the purpose of this Project, there are two mutually reinforcing objectives:
1. Streamline and improve processes and policies that catalyze gender-equitable private sector investment in agriculture, trade, energy and natural resources/eco-tourism.
2. Strengthen informed decision-making for Zambian Government policy implementation and formulation through linkages with strengthened civil society organizations and the private sector, where women’s interests are equally represented.
C.5 SUCCESS
Success of the Business Enabling Project will be measured by:
1. Improvements in select indicators that are used to compute “Ease of Doing Business Index,” and the “Enabling the Business of Agriculture (EBA).” In collaboration with the private sector and other stakeholders, the key specific performance business indicators that go into these three indices will be developed. The Ease of Doing Business rank of Zambia improved to 85 in 2019 from 87 in 2018.11 The EBA has eight quantitative indicators which include; supplying seed, registering fertilizer, securing water, registering machinery, sustaining livestock, protecting plant health, trading food, and accessing finance. The 2019 EBA report shows that Zambia scored
63.7% and is ranked top third in Africa.12 Zambia scored well in five indicators including the availability of seed, access to fertilizer, availability of water resources, plant protection and access to finance. The EBA should be improved from 63.7% to 70% by 2025.
2. Increased value of investments in the agriculture, energy, eco-tourism and sustainable natural resource management industries, including for women-owned businesses.
3. Increase in the volume and value of domestic and internationally traded agricultural goods and services due to improved trade policies and processes.
C.6 KEY STAKEHOLDERS
The following list provides key stakeholders and their envisioned respective roles and responsibilities within the USAID Business Enabling Project. Collaboration with these stakeholders will include coordination to avoid duplication and maximize impact, joint learning that benefits the Zambian business environment, strengthening goals and efforts to advance an effective partnership with the Government of Zambia.
11 source: World Bank
12 https://eba.worldbank.org/ https://www.worldbank.org/ https://eba.worldbank.org/
STAKEHOLDER ROLES
GRZ Propose and implement laws and other statutory instruments to improve the business enabling environment.
CIVIL SOCIETY Strengthen decision-making for Zambian Government policy implementation and formulation through advocacy, providing evidence and vetting.
PRIVATE SECTOR Strengthen decision-making for Zambian Government policy implementation and formulation through advocacy/lobbying, providing evidence and vetting.
USAID Oversight of the performance of the Contract.
Cooperating Partners To coordinate interventions in related activities as planned or managed by other cooperating partners.
C.7 LINKAGES TO MISSION OBJECTIVES AND OTHER USG PROGRAMS
Through co-design and partnerships with GRZ, private sector, think-tanks, non-governmental organizations (advocacy groups, etc.) and local communities, this project will contribute to Development
Objective (DO) 2 (“Rural Poverty Reduced through Enterprise-Driven Inclusive Economic Growth”) of
USAID/Zambia’s 2019-2024 Country Development Cooperation Strategy (CDCS). USAID is working with host country governments and our partners to achieve locally sustained results, helping countries mobilize public and private revenues, strengthening local capacities, and accelerating enterprise-driven development. An important enabler of this are citizens themselves, along with private-sector stakeholders, who have a strong interest in improving conditions so their communities and markets can thrive. The Business Enabling Project seeks to unlock the enabling power of civil society and the private sector to help the Government of Zambia advance its development goals and boost inclusive economic opportunity, especially in rural areas. Specifically, the project will address DO2’s Intermediate Result
(IR)2.1 (“Rural business enabling environment improved”) and address Sub-IR 2.1.1 (“Economic and natural resource policies improved and implemented”) and Sub-IR 2.1.2 (“Markets strengthened and expanded”) - see table 1. In addition, this will also contribute to IR 2.2 (“Rural enterprises strengthened”) and IR 2.3
(“Natural resources more sustainably managed”) by addressing critical enablers of economic growth. To address this challenge, the project will coordinate closely with the Democracy, Rights and Governance
Office (DRG), which manages DO1 (“Citizen and National Self-Reliance Advanced by More Effective, Accountable Governance”), to strengthen citizen-responsive transparency initiatives around government revenue, budgeting, expenditure and policy implementation.
Table 1: USAID/Zambia CDCS DO2 Results Framework
DO 2: Rural Poverty Reduced through
Enterprise-Driven Inclusive Economic Growth
IR 2.1:
Rural business enabling environment improved
IR 2.2:
Rural enterprises strengthened
IR 2.3:
Natural resources more sustainably managed
Sub-IR 2.1.1
Economic and natural resource policies improved and implemented
Sub-IR 2.2.1:
Investment in rural enterprises increased, including for female-led enterprises
Sub-IR 2.3.1:
Income from sustainable livelihoods increased
Sub-IR 2.1.2:
Markets strengthened and expanded
Sub-IR 2.2.2:
Access to electricity and digital technology in rural areas increased
Sub-IR 2.3.2:
Natural resource management and governance improved
Sub-IR 2.2.3: Employment, income and entrepreneurship in rural areas increased, particularly among youth
Sub-IR 2.3.3: Conservation of natural resources improved
Numerous USG programs have invested or are currently investing in Zambia to improve food security and nutrition (PROFIT+, Mawa, COMACO, Partnering for Innovation, EDGE, Emerging Farmers
Partnership, SUNTA, etc.), governance (Local Impact Governance project, Revenue Mobilization for
Equity and Growth, and Integrated Land and Resource Governance), natural resource management
(Alternatives to Charcoal, Community Forest Program, North Luangwa Ecosystem Project, Community
Wildlife Protection), ecotourism (Wildlife Crime Prevention Program), energy (the Zambia Energy
Regulatory Partnership), and trade (Southern Africa Trade and Investment Hub). The Offeror will be expected to build upon these past programs and leverage existing programs, where appropriate, to maximize the impact of the Business Enabling Project. In particular, this project is expected to collaborate strongly with the Health, Ecosystems and Agriculture for Resilient Thriving Societies
(HEARTH) which aims to scale up public-private partnerships to implement integrated solutions that increase rural incomes through improved natural resource management, intensified agricultural production and diversified farm and off-farm incomes. The project will also coordinate, with the Local
Impact Governance which will help Zambia build up a sub-national system of governance for devolved service delivery more responsive to citizen needs. Where appropriate, the project will collaborate with other relevant USAID partnership programs and other donor supported initiatives that complement
Business Enabling Project objectives and are in line with national policies or priorities to improve trade and investment opportunities within Zambia to spur more inclusive, market-driven rural economic growth.
C.8 STRATEGIC ALIGNMENT WITH GRZ GOVERNMENT PRIORITIES
This project aligns with the GRZ’s 7NDP on the development outcomes: creating a diversified and export-oriented agricultural sector through improved trade policies; improved access to domestic, regional and international markets; improved energy production and distribution for sustainable development; creating a diversified tourism sector; and enhancing job opportunities in the economy. The project will address policy and regulatory constraints and assist GRZ in achieving these development objectives.
C.9 ASSUMPTIONS
USAID/Zambia believes that through this project the results will be achieved in five years given the following assumptions:
● USAID interventions demonstrate and prove win-win outcomes that positively influence government decision makers to facilitate increased private-sector engagement in economic development.
● Addressing Zambia’s ability to become economically independent and self-reliant remains a USG policy priority, with commensurate levels of resources available to USAID/Zambia across the sector foci in this project.
C.10 THE DEVELOPMENT HYPOTHESIS
If the Government creates an enabling environment for business which is informed regularly with input from key stakeholders, then private sector companies will be supported to grow their businesses, expand trade and attract increased investment in agriculture, energy, eco-tourism and natural resource management, resulting in broad-based gender-equitable economic growth that transforms rural areas and pulls people out of poverty.
C.11 SCOPE
The focus of this project is to improve the policy Institutional Architecture (IA) needed to stimulate the transformation of agriculture, trade, energy, and natural resources/tourism sectors. IA refers to the entities and processes for policy formulation and implementation. Specifically, this project will strengthen/streamline agriculture, trade, energy and natural resources/tourism policies, laws, and regulations and administrative procedures that impede trade and investment. The following are some of the areas with policy misalignment that require interventions:
● Lack of coordination among/between sectors in identifying policy objectives and implementation strategies.
● Lack of integrated approach to policy planning and implementation, e.g., does the energy policy address challenges in other sectors (i.e. energy supply capacity to respond to production constraints), does the agriculture policy address challenges in other sectors (i.e. production to meet demand, agriculture measures not to create trade constraints);
● Commercialization of agriculture - has this policy translated into specific interventions and what are the challenges?
● Availability of credible data to support policy interventions and how this affects investment decision (in sectors) consistent with priorities.
● Complementary support to facilitate private sector involvement: finance, capacity, etc.
● Monitoring and evaluation frameworks - how effective are these?
● Uncoordinated response/interventions by cooperating partners in the design and provision of support to sectoral processes and initiatives.
The project will also include activities that create incentives to unleash the private-sector resources needed to advance the country’s journey to self-reliance. For example, advocating for zero tax ratings on special capital investments for SMEs. This project will also support scaling up and effectiveness of economic growth development outcomes of other USG funded activities including the Enterprise
Development and Growth Enhanced (EDGE), and Healthy Ecosystems and Agriculture for Resilient, Thriving Societies (HEARTH), Revenue Mobilization for Equity and Growth, and the Local Impact
Governance activities. The project will be expected to collaborate with these other USAID funded activities to leverage resources and improve development outcomes. To achieve this, the Business
Enabling Project will facilitate and strengthen linkages between key actors in all target sectors to advance their specific policy and advocacy issues. The project will also work with GRZ line ministries at both national and sub-national levels to address policy/administrative issues, or other constraints that impede private sector investments and engagement of women and youth. Although the mid-term review (MTR) of the 7NDP noted that structures were functional both at national and sub-national levels, much work remains to be done especially at ward level. The MTR noted that full adoption of this approach was hampered by the slow pace of actualization of the integrated budgeting system based on the outcome areas of the 7NDP. The current budgeting process is still predominantly sector based. The MTR, therefore, recommended that the Government should: (i) strengthen the cluster approach across all the dimensions of 7NDP management including resource planning, programme implementation, monitoring, evaluation and reporting; (ii) strengthen vertical linkages between national and sub-national levels and streamline reporting formats; (iii) establish effective feedback mechanisms between national and sub-national levels; (iv) allocate adequate resources to support coordination mechanisms, meetings, monitoring and reporting processes; (v) restructure the national budgeting system to entrench integrated and results-based budgeting for the clusters; and (vi) finalize legal frameworks that are supportive of the integrated approach, for instance the National Planning and Budgeting Bill.
The contractor must consider using a blended approach of capacity building activities focused on organizational strengthening and relationship-building between institutions to hold each other accountable and build common agendas. The contractor must provide more of an oversight role to ensure that support to Ministries, regulatory agencies and civil society organizations is coordinated, standardized and effected with an overarching goal of improving the rural business enabling environment.
The core of this project will be strengthening the institutional architecture of GRZ and civil society to solicit and respond to private sector and community needs:
● Within the GRZ, ministries should improve their feedback and learning systems to be responsive to stakeholders’ needs and identify issues affecting their ability to invest/expand their businesses.
● This project will consider the interests of various stakeholders and address them accordingly:
invest resources into developing a better understanding of specific “issue networks” in order to frame who the critical actors are and whose voices are currently excluded;
● Facilitate problem solving and local solutions by bearing the transaction costs to encourage actors to come together to find more sustainable solutions to the problems they face.
● Support coalitions of interests or webs of alliances in which a range of actors work for similar types of changes through addressing issues of immediate interest to them; work with like-minded actors on the state side of the equation and opportunities to ‘work with the grain’ in order to build critical mass;
● Provide sufficient upfront support to avoid privileging organizations that are better placed to produce well written proposals, but are less likely to have the most influence or represent the interests of those most affected; and
● Amplify the voice of local organizations and constituency-based groups and reinforce it with the credibility of expert analysis, including from international partners.
C.12 INCEPTION PHASE
The USAID Business Enabling Project is trying to break through blockages or bottlenecks in the economic system. The project will begin with a six-month inception phase to gather data and refine the approach to ensure that interventions are based on the best possible understanding of the local context and evidence of what is likely to work within these conditions as well as the differential impact on men and women. During this phase the contractor will engage in collaborative planning and field consultations with USAID and key stakeholders including GRZ, civil society and the private sector to understand political economy and system dynamics, organizational capacity and skill constraints, risks, the nature of the problem and where and how the project will intervene to achieve its objectives.
This effort will identify and assess existing institutions – public, private, informal, traditional, U.S.
Government (USG) supported and non-USG programs – that could be engaged or assisted to achieve the project’s purposes. Possible benchmarks for GRZ involvement and ownership will be explored. The assessment also will examine consequential cultural and political factors as well as the underlying social networks that shape ground-level decisions. Power discrepancies including gender and partisan divides among Zambian citizens, private business, subnational officials, and local ministerial representatives underscore the importance of broad stakeholder engagement to achieve inclusive systemic change. The applied learning component will use data and consultation to challenge assumptions, assess organization capacity, implementation risks, and systems dynamics to refine the proposed technical approach. This should be revisited annually as part of the learning agenda.
These are among the questions that USAID and the contractor will probe during the inception phase:
1. Which constraints are most consequential, including those for women specifically? Which catalysts deserve the most attention?
2. What are low, medium and high potential interventions for implementation?
3. What is the best strategic approach for implementation?
4. What would incentivize the Government to advance reforms beneficial to the private sector for rural investment?
Through its inception phase work plan development, the contractor will construct an adaptive roadmap for program implementation. The roadmap may face challenges like the two big context issues of the moment: 1) the economic crisis - recession, debt and impact on rural jobs and incomes - and 2) the
Covid-19 disruption. The contractor will establish specific adaptive management steps for implementation to address the above challenges.
C.13 COLLABORATING LEARNING AND ADAPTING (CLA)
Development work presents many opportunities to collaborate and engage with a broad set of stakeholders, to learn from both evidence and experience and to adapt iteratively to unexpected results or changes in context. Therefore, USAID places “Collaborating, Learning and Adapting,” or CLA, at the center of its Program Cycle, both as a connector between, and an integrated part of the components.
USAID/Zambia will employ a rigorous framework for ensuring that all partners are instituting robust and meaningful CLA practices and behaviors across their activities and feeding into the greater USAID
Mission and GRZ priorities. The USAID/Zambia Economic Development office is finalizing a CLA Action
Plan that the contractor will be expected to participate in and follow for their contribution to Mission objectives.
COLLABORATING
Collaboration enables cross-sector integration, convergence, and effective interventions to maximize development resources and enhance development results. The Contractor will collaborate with
USAID-supported and other development partners (e.g., multilateral, other donors, host government) activities in common areas of operation and engage with stakeholders (defined collaboratively with
USAID COR) to deliver integrated services to target populations.
LEARNING
Learning should be intentional, systematic, and resourced. Sources for learning include data from monitoring, pause and reflect workshops, portfolio reviews, findings of research, evaluations, analyses conducted by USAID or third parties, knowledge gained from experience, stocktaking exercises, and other sources. Those documents produced by USAID will be shared with the Contractor by the COR for consideration in the learning phase of CLA.
These sources will be used to develop and implement plans, manage adaptively, and contribute to the
USAID/Zambia knowledge base in order to improve development outcomes. A collaborating, learning, and adapting focus helps to ensure that programming is coordinated, grounded in evidence, and adjusted as necessary to remain relevant and effective throughout implementation.
Knowledge generated by learning shall be applied throughout programming to implementation approaches, processes, and stakeholder engagement. Knowledge generated by learning should also be disseminated to stakeholders, partners, and collaborators in an appropriate forum and format so that it may be translated into decisions and actions that enhance the success of approaches and interventions designed to achieve common intermediate results.
The Contractor will share information and knowledge generated by monitoring data, portfolio review results, research findings, evaluations, analyses, and experiences with other USAID implementing partners. The Contractor will apply actionable information and knowledge gained from collaborating partners to implementation in order to improve results. USAID implementing partners and other development partners’ staff, as relevant, shall convene on a periodic basis to reflect on actions taken, exchange analysis, and propose decisions that affect implementation.
ADAPTING
The Contractor will demonstrate adaptability that is informed by knowledge gained through learning and recognize behaviors and incentives necessary to create change. Knowledge gained through learning shall influence decision making, resource allocation, and adaptation to contextual shifts. Application of new knowledge to implementation decisions shall be reflected in the Annual Work Plan and Monitoring, Evaluation, and Learning Plan (AMELP). Decisions to adapt may be based on, but not limited to the following:
● Extraneous changes in the operating environment (i.e. emergency or natural disaster; national policy changes)
● Financial and human resource constraints
● Evidence that signals targets are unmet
● Emerging evidence that interventions are not working or could work better if adapted
Any changes to the scope of the contract must be approved by the Cognizant Contracting Officer in a modification to the contract. Changes in technical approach may be approved by the Contracting
Officer’s Representative (COR) by way of the COR’s authority to provide technical direction and approve Annual Work Plans.
C.14 ENVIRONMENTAL COMPLIANCE
The Foreign Assistance Act of 1961, as amended, Section 117 requires that the impact of USAID’s activities on the environment be considered and that USAID include environmental sustainability as a central consideration in designing and carrying out its development programs. ADS Parts 201.5 and 204
(http://www.usaid.gov/policy/ADS/200/) in part, require that the potential environmental impacts of
USAID-financed activities be identified prior to a final decision to proceed and that appropriate environmental safeguards are adopted for all activities.
Additionally, the Business Enabling Project must comply with host country environmental regulations unless otherwise directed in writing by USAID. In case of conflict between host country and USAID regulations, the latter or more stringent of the two shall govern. None of the activities under the
Business Enabling Project will be implemented unless an environmental threshold determination, as defined by 22 CFR 216, has been reached as documented in the FTF/WASH IEE duly signed by the
Bureau Environmental Officer.
As part of the initial Work Plan and all annual work plans thereafter, the Business Enabling Project, in collaboration with the COR and the MEO will review all ongoing and planned activities to determine if they are within the scope of the approved IEE. If any of the planned activities are outside the scope of the approved IEE, an amendment must be prepared for USAID review and approval. No such new activities shall be undertaken prior to receiving written USAID approval of environmental documentation amendments. Any ongoing activities found outside the scope of the approved Regulation
216 environmental documentation will be halted until an amendment to the documentation is submitted and written approval is received from USAID.
A negative determination with conditions has been reached for this project which means that if these activities are implemented subject to specified conditions, they are expected to have no significant adverse effect on the environment. The Contractor should therefore include potential impacts that are likely to result from this and develop an approach to achieving environmental compliance and management, including developing and implementing an Environmental Mitigation and Monitoring Plan
(EMMP) and an illustrative budget for implementing environmental compliance activities.
C.15 SELF RELIANCE AND SUSTAINABILITY
This project exemplifies USAID’s priority goal of advancing Zambia’s self-reliance through the strengthening of local government and civil society and the inclusion of the private sector. The decision on interventions will be primarily driven by the end goal of sustainable rural economic growth with poverty reduction through private sector investment and trade. This project will build sustainability into existing government and regulatory structures that will persist beyond the project’s life. The Business
Enabling Project will collaborate extensively with the Government of Zambia, private sector and associated civil society institutions by strengthening the capacity of the national and sub-national stakeholders to effectively collaborate to improve service delivery. This ecosystem of government, civil society and the private sector will sustain and expand the model that the Business Enabling Project will build to widen the ownership base for development and achieve more robust and lasting development outcomes.
C.16 GENDER AND YOUTH CONSIDERATIONS
Inclusive development is smart development, as no country can realize its full potential without supporting all people to contribute to and benefit from the development of their countries. Gender roles in the Zambian society result in a general imbalance in women’s economic participation. The
Business Enabling Project’s technical approach must strive to institute policies, practices and behaviors that have the potential for transformative change to reduce gender-based barriers to economic development. Moreover, the project will identify approaches making headway in Zambia that can be leveraged to promote greater citizen engagement, especially for its underutilized and underrepresented women. USAID strives to promote gender equality, in which both women and men have equal opportunity to benefit from and contribute to economic, social and cultural development. This project’s approach will identify those areas where strategic engagement on gender issues could substantively and significantly unlock women as drivers of increased economic growth and investment. Planned activities will need to be carefully tailored to ensure that clear, realistic, and equitable strategies are implemented with the ultimate aim of reducing gender disparities in access to, control over and benefit from socioeconomic opportunities and services at the local level.
This project is rooted in a Positive Youth Development (PYD) approach, which is based on the belief that, “given guidance and support from caring adults, all youths (ages 10-29) can grow up healthy and productive, making positive contributions to their families, schools, and communities.” PYD programs encourage youth leadership and experiential learning, as well as adult approachability and champions.
https://www.usaid.gov/documents/1865/environmental-mitigation-and-monitoring-plan-emmp
Services and opportunities are designed to support young people in developing a sense of competence, usefulness, belonging and empowerment. The contractor will include concrete and practical approaches that will not only address the challenges that youth face to accomplish the results but will also involve and support young people in decision-making, management and leadership.
C.17 CLIMATE CHANGE INTEGRATION
Climate risk management (CRM) is required for all USAID-supported activities. ADS 201 stipulates that all USAID projects and activities comply with climate risk management requirements. Climate risks must be assessed, and risk management measures determined during design to ensure that results are incorporated and budgeted for. Climate risk is the potential for negative consequences on objectives and/or outcomes due to changing climatic conditions and can be manifested through potentially severe adverse consequences for development programs resulting from the interaction of climate-related hazards with the vulnerability of societies and systems. A climate risk may arise when an element, target, or beneficiary is exposed to a climate hazard such as higher temperatures, flooding or drought.
Per USAID policy, moderate and high climate risks must be addressed in the design and during implementation. The CRM process may identify potential development opportunities associated with current and expected climatic and meteorological changes, including chances to achieve additional development objectives.
The Contractor must describe their approach to climate risk assessment and how the assessment will inform implementation and adaptive management. In addition, given the challenges posed by climate change, the Contractor will need to articulate practices and interventions that can enable climate resilient approaches to succeed and support the sustainability of the investments made under this project. The identified risks and mitigation measures will be added to the EMMP.
C.18 SCIENCE, TECHNOLOGY, INNOVATION AND PARTNERSHIP (STIP)
USAID/Zambia is one of 20 Missions recognized as a “Lead Mission” in applying Science, Technology, Innovation and Partnership (STIP) to enhance its development impact. The Contractor must describe their approach and use of cost-effective methods to reach many beneficiaries and accelerate the timeline for obtaining results, and/or bringing ground-breaking innovations to scale.
https://www.climatelinks.org/climate-risk-management
ATTACHMENTS J.1- REFERENCES
1. Seventh National Development Plan 2017-2021, © 2017, Ministry of National Development
Planning
2. Summary Report of the National Development Coordinating Committee (NDCC) Meeting
19th to 20th December 2018. Ministry of National Development Planning, © January 2019.
3. http://www.brra.org.zm/
4. http://www.parliament.gov.zm/node/4781
5. The Zambian Business Regulatory Review Agency - info@brra.org.zm
6. Republic of Zambia Second National Agricultural Policy, Ministry of Agriculture and Ministry of
Fisheries and Livestock. February 2016
7. http://www.iapri.org.zm/
8. National Trade Policy 2018, Ministry of Commerce and Trade.
9. The National Export Strategy 2018, Ministry of Commerce and Trade.
10. The National Energy Policy 2019, Ministry of Energy
11. source: World Bank
12. https://eba.worldbank.org/ http://www.brra.org.zm/ http://www.parliament.gov.zm/node/4781 http://www.iapri.org.zm/ https://www.worldbank.org/ https://eba.worldbank.org/
File details come from the government source that posted it. Updated .