RFBK26-35 VFM Boiler Replacement.pdf
PDF 1 MB Posted
- Attached to
- Volunteer Fireman's Museum: Boiler Replacement
- Solicitation number
- K26-35
- Issued by
- Ulster County, New York
About this file
This is a Request for Bids (RFB) document issued by the City of Kingston, Ulster County, New York, for the replacement of an existing heating boiler at the Wiltwyck Hose Company No. 1 Engine House/Volunteer Fireman's Museum located at 265 Fair Street in Kingston. The project involves disconnecting and removing the existing boiler (believed to be from 1972) and associated equipment, draining and removing two existing 275-gallon fuel-oil tanks, and furnishing and installing a new natural-gas-fired condensing hot-water boiler with all required controls, safety devices, circulators, expansion tank, valves, gauges, sensors, venting, combustion-air connections, and condensate treatment systems. The work includes converting the existing gravity hydronic system to a forced circulation system, installing gas piping and electrical connections with emergency shutdown and gas-solenoid interlocks, connecting the new equipment to existing heating piping and building services, relocating the existing water meter, providing backflow-prevention and makeup-water piping, flushing and cleaning the existing hydronic system, and providing startup, testing, demonstration, training, operating and maintenance materials, and warranties. Sealed bids were due on Friday, November 20, 2026, at 10:00 a.m. at the Planning Department, City Hall, 420 Broadway, Kingston, New York. A pre-bid meeting was held on Wednesday, November 4, 2026, at 10:00 a.m. at the museum site. The work must achieve substantial completion by Friday, January 15, 2027.
Bids are being accepted on a lump-sum basis with separate line items for base bid (excluding demolition and abatement), demolition and abatement of boiler and flange gaskets, and a 10 percent field changes allowance. The contract is subject to prevailing wage requirements as determined by the New York State Department of Labor, and the higher of Davis-Bacon wages and New York State prevailing wages must be paid. City of Kingston Resolution No. 179 of 2012 requires that contractors and subcontractors on this project have approved Apprenticeship Agreements pursuant to New York State Labor Law Section 816.b. The existing boiler gaskets are presumed to contain asbestos and must be abated per New York State Department of Labor Code Rule 56. Each bid must include bid security equal to five percent of the total bid amount in the form of cash, a certified check, or a bid bond. The successful bidder must furnish Performance and Payment Bonds equal to 100 percent of the contract price within ten days of the Notice of Award. Liquidated damages are assessed at $2,500 per calendar day for contracts between $0 and $2,000,000. The City of Kingston is tax-exempt and does not pay sales tax on materials incorporated into the project. All contractors and subcontractors are required to register with the New York State Department of Labor under Labor Law Section 220-i before submitting bids. No Minority and Women Owned Business Enterprise (M/WBE) utilization goal is established for this project, although M/WBE participation is encouraged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-22-26 - BOILER REPLACEMENT FOR KINGSTON FIREHOUSE (S_S FOR BID).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO. RFBK 26-35
265 Fair Street Wiltwyck Hose Co. No. 1 Engine House/ Volunteer Fireman’s
Museum :Boiler Replacement
FOR THE
CITY OF KINGSTON
ULSTER COUNTY, NEW YORK
STEVEN T. NOBLE, MAYOR
COMMON COUNCIL
ANDREA SHAUT, ALDERMAN-AT-LARGE
ALDERMEN
SARA PASTI, FIRST WARD
MICHAEL TIERNEY, SECOND WARD
MARISSA MARVELLI, THIRD WARD
BENJAMIN FALK, FOURTH WARD
TERYL MICKENS, FIFTH WARD
ROBERT DENNISON, SIXTH WARD
MICHAEL HAM, SEVENTH WARD
RUTH KATZ, EIGHTH WARD
MICHELE HIRSCH, NINTH WARD
October 28th, 2026
This page intentionally left blank
- i -
TABLE OF CONTENTS
Page Number Invitation for Bids 1 Instructions for Bidders 4 Bid Proposal Forms 11 Statement of Contractor’s Qualifications 16 Statement of Contractor’s Apprenticeship Program or Exemption from Compliance 17 Notice of Award 22 Notice to Proceed 24 Change Order 26 Certificate of Substantial Completion 28 Verified Statement of Prevailing Wages 30
Contractor’s Affidavit of payment of Debts and Claims Contractor’s Release of Liens and Warranty Consent of Surety to Final Payment General Conditions GC 1 - 25 New York State Minimum Wage Requirements PW200 NYS Prevailing Wage Rates
DRAWING LIST
BUILDING OVERVIEW:
Built in 1857, the Wiltwyck Hose Co. No. 1 Engine House is located at 265 Fair Street. From its construction until 1970, the building functioned as an active hose company building for the then Village of Kingston, and for a brief time functioned as Village and City Hall. Following its decommissioning in 1971, the City of Kingston’s Historic Landmarks Preservation Commission (HLPC) designated Wiltwyck Hose Co. No. 1 Engine House a local landmark, and in 1974, the building became part of the Kingston Stockade Local Landmark District. By 1975, the building was listed as a contributing resource to the Kingston Stockade State and National Historic District. The Volunteer Fireman’s Museum of Kingston has held a lease on the building, which it utilizes to store and operate an educational facility focused on preserving, interpreting, and promoting Kingston’s Firefighting History. The City of Kingston’s Planning Department serves as the local agency managing and coordinating maintenance and rehabilitation work to the municipally owned building.
PROJECT DESCRIPTION
The project consists of replacing the existing heating boiler at the 265 Fair Street (Wiltwyck Hose/Volunteer Fireman’s Museum), Kingston, New York, and connecting the new equipment to the existing hydronic heating system. The work includes providing all labor, materials, equipment, and subcontractor services needed for complete installation in accordance with the contract documents. The original boiler is believed to be from 1972 and is much past it’s useful life.
Work includes disconnecting, removing, and disposing of the existing boiler and associated equipment and piping shown for removal; draining and removing the two existing 275-gallon fuel-oil tanks; and furnishing and installing a new natural-gas-fired condensing hot-water boiler on a new concrete housekeeping pad in the basement boiler room. The new installation includes the boiler’s required controls and safety devices, boiler and system circulators, air separator, expansion tank, valves, gauges, sensors, venting and combustion-air connections, and condensate treatment and disposal. This will be a conversion of a gravity hydronic system to a forced circulation system. The work also includes the gas piping, electrical connections, emergency shutdown and gas-solenoid interlocks, and control wiring shown in the contract documents.
The contractor shall connect the new equipment to the existing heating supply and return piping and associated building services, relocate the existing water meter as shown, and provide the specified backflow-prevention and makeup-water piping. The existing hydronic system shall be flushed and cleaned, individual heating units flushed as needed, and the system refilled with corrosion inhibitor.
The contractor shall protect existing building systems, patch and restore openings or surfaces disturbed by the work, start up and test the completed installation, demonstrate its operation to City staff, and provide required training, operating and maintenance materials, warranties, and closeout documents.
The existing boiler gaskets are presumed to be asbestos containing and were not accessible for testing. The gasketing in the boiler and flanges shall be abated per NYS DOL Code Rule 56.
INVITATION FOR BIDS
The City of Kingston invites sealed bids for the replacement of the boiler and associated piping at the Volunteer Firemen’s Museum, 265 Fair Street, Kingston, New York. The work is more fully described in the bid documents.
Bid documents will be available through BidNet Direct at bidnetdirect.com.
A pre-bid meeting will be held at the Volunteer Firemen’s Museum, 265 Fair Street, Kingston, New York, on Wednesday, November 4, 2026, at 10:00 a.m.
Sealed bids, clearly marked “RFBK26-35 — Volunteer Firemen’s Museum Boiler Replacement,” must be received by the Planning Department, 420 Broadway, Kingston, New York, no later than 10:00 a.m. on Friday, November 20, 2026, at which time they will be publicly opened and read at the Planning Office.
Each bid must include bid security in the amount and form specified in the bid documents. The City reserves the right to reject any or all bids and to waive informalities as permitted by law.
Complete sets of the plans, specifications and bid forms may be obtained on or after October 28 th 2026 from the Empire State Purchasing Group website, http://www.bidnetdirect.com. Contract documents will ONLY be provided digitally. Hard copies and CD’s will NOT be distributed. Hard copies of the drawings and specifications may be examined at the City of Kingston Engineering Office, 420 Broadway, Kingston, New York.
Prospective bidders may request clarification of the Bid documents by contacting Brad Borquist at bborquist@kingston-ny.gov. All questions must be submitted via e-mail, no phone calls will be accepted.
All e-mails must have the subject line “VFM Boiler Replacement RFBK26-35”.
Each proposal must be accompanied by a certified check payable to The City of Kingston or by a Bid Bond for a sum equal to five percent (5%) of the bid, conditioned as set forth in the Instructions to Bidders. All bid security, except those of the three lowest bidders will be returned within four days after formal opening of bids. The bid security provided by the three lowest bidders will be returned after the execution of the Contract or until 60 days after the bid opening, whichever is longer.
A one hundred percent (100%) Payment Bond and a one hundred (100%) Performance Bond will be required of the successful bidders at the time of contract signing.
There is no Minority and Women Owned Business Enterprise (M/WBE) Utilization Goal for this project but MWBE participation is encouraged.
This is a public works project and the higher of Davis-Bacon wages and prevailing wages as determined by the New York State Department of Labor must be paid.
The City of Kingston Resolution # 179 of 2012 requires that for any general construction contract for $100,000 or more, or for any building trades contract for $350,000 or more, the Contractor and subcontractors must have approved Apprenticeship Agreements pursuant to NYS Labor Law 816.b.
The bidder, by signing his proposal, certifies that he is fully aware of State Laws requiring non-collusive bidding. No separate forms will be required, but the actual signing of the proposal includes such a statement and is included in the proposal.
Starting December 30th, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered under Article 8 of the Labor Law are required to register with the New York State Department of Labor, (NYSDOL) under Labor Law Section 220-i. A link below to the NYSDOL website is included below for your convenience.
Contractors are responsible for verifying that any subcontractors they contract with are registered. All Contractors and Subcontractors are required to register before submitting any bid. Provide certificate of registration with bid. Failure to do so will result in bid disqualification and bid rejection.
NYSDOL Contractor Registration
The City of Kingston expressly reserves the right to waive any informality in or to accept any bid, or to reject any and all bids, or to award on any or all items, as the interest of the City of Kingston may appear to require.
The City of Kingston is a tax-exempt organization under the Tax Laws and is exempt from payment of Sales and Compensating Use Taxes of the State of New York and Cities and Counties of the State of all materials which are to be incorporated into the project, pursuant to the provisions of the Contract. These taxes are not to be included in the Bid.
No bidder may withdraw his bid within 60 (sixty) days after the actual date of the opening thereof.
By order of the City of Kingston Common Council.
Steven T. Noble, Mayor October 28th 2026
INSTRUCTIONS FOR BIDDERS
Receipt and Opening of Bids
The City of Kingston, Ulster County, New York hereinafter called the Owner, invites bids on the forms attached hereto, all blanks in which must be appropriately filled in. Bids will be received by the Owner until 10:00 AM on Friday, November 20, 2026, at the Planning Department in City Hall, 420 Broadway, Kingston, New York. Bids will then be opened and publicly read aloud in the Planning Office on 10:00 AM on Friday, November 20, 2026.
The envelopes containing the bids must be sealed and addressed to the City of Kingston, New York and designated as a Bid for CONTRACT No. RFBK26-35, - VFM Boiler Replacement.
The Owner may consider as informal any bid not prepared and submitted in accordance with the provisions hereof. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof.
Preparation of Proposal
All bids must be submitted in sealed envelopes, bearing on the outside, the name of the bidder, his or her address, and the name of the project for which the bid is submitted. (If forwarded by mail, the sealed envelopes containing the proposal, and marked as directed above, must be enclosed in another envelope, addressed as specified in the Proposal Form; preferably by Registered Mail).
The work shall be bid as one Prime Contract for Electrical and site civil and plumbing work incidental.
Each bidder must bid on all items of the work.
Table of Bidding Schedule Listed below are specific and estimated dates and times of actions related to this request for bids (RFB).
Task Dates RFB Advertised Wednesday, October 28, 2026 First Addendum Issued (if any) November 6th, 2026 Deadline for RFB question submissions November 12th 2026 4:00 PM Final Addendum Issued (if any) Friday, November 13th 2026 Final Bids due Friday, November 20, 2026, at 10:00 a.m.
Anticipated Notice To Proceed November 25th, 2026, Non-Collusion and Bid Certification
The bidder, by signing his proposal, certifies that he is fully aware of the State Laws regarding the non-collusion bidding certification. No separate forms will be required, but the actual signing of the proposal includes such a statement and is included in the proposal.
NYS DOL Contractor Registration Starting December 30th, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered under Article 8 of the Labor Law are required to register with the New York State Department of Labor, (NYSDOL) under Labor Law Section 220-i. A link below to the NYSDOL website is included for your convenience. Contractors are responsible for verifying that any subcontractors they contract with are registered. All Contractors and Subcontractors are required to register before submitting any bid. Provide certificate of registration with bid. Failure to do so will result in bid disqualification and bid rejection.
NYSDOL Contractor Registration
Qualifications of Bidder
The Owner may make such investigation as he deems necessary to determine the ability of the bidder to perform the work and the bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request.
The Owner reserves the right to reject any bid if the evidence submitted by, or investigations of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligation of the contract and to complete the work contemplated therein. Conditional bids will not be accepted.
City of Kingston Requirement for Apprenticeship Program
Attention is also directed to the fact that the Contractor will be governed by the Labor Standards provisions, which are made part of this specification and contract. The City of Kingston Resolution #179 of 2012 requires that for any City construction contract for $100,000 or more, or for any building trades contract for $350,000 or more, the Contractor and subcontractors must have Apprenticeship Agreements appropriate for the type and scope of work to be performed, registered with and approved by the Commissioner pursuant to NYS Labor Law 816.b. The Bidder shall furnish a completed Statement of Contractor’s Apprenticeship Program Compliance Form with his Bid.
“STATEMENT OF CONTACTOR’S APPRENTICESHIP PROGRAM COMPLIANCE” shall be added to and made part of the Contract Documents. This Statement must be attached to the Bid Proposal Form.
This form can be found on Page 22 of these specifications.
Bid Security
Each bid must be accompanied by cash, by a certified check of the bidder payable to the order of the City of Kingston or by a bid bond, duly exercised by the bidder as Principal, and having as surety thereon a surety company licensed to do business in the State of New York, approved by the Owner in the amount of five percent (5%) of the total Proposal submitted. Bid security shall be returned to all except the three lowest bidders within four (4) days after the formal opening of bids. The remaining Bid Security will be returned to the three lowest Bidders within forty-eight (48) hours after the Owner and the accepted Bidder have executed a Contract and the executed Performance Bond and Payment Bonds have been approved by the Owner. If the required contract and bonds have not been executed within sixty (60) days after the date of opening of Bids, then the Bid Security of any Bidder will be returned upon his request, provided he has not been notified of the acceptance of his Bid prior to the date of such request.
Liquidated Damages(Bid)
The Owner shall be entitled to receive as liquidated damages the face amount of the certified check or bid bond deposited with the bid if the successful bidder fails to or refuses to execute and deliver the contract and bond required within ten (10) days after he has received notice of the acceptance of his bid.
Conditions of Work
Each bidder must inform himself fully of the conditions relating to the construction and labor under which the work is now or will be performed; failure to do so will not relieve a successful bidder of his obligation to furnish all materials and labor necessary to carry out the provisions of the contract documents and to complete the contemplated work for the consideration set forth in his bid.
Notice of Special Conditions
Attention is particularly called to those parts of the contract documents and specifications which deal with the following:
a. Inspection and testing of materials.
b. Insurance requirements.
c. Wage rates.
d. Time of completion and liquidated damages.
e. Building Permit
Addenda and Interpretations
No interpretation of the meaning of the plans, specifications, or other contract documents will be made to any bidder orally. Every request for such interpretation should be in writing and addressed to the Project Manager at the Engineering Office in the City of Kingston , 420 Broadway, Kingston, New York 12401 or emailed to bborquist@kingston-ny.gov. Any and all such interpretations and any supplemental instructions will be in the form of a written addenda to the project documents which, if issued, will be posted to all prospective bidders (at the respective addresses furnished for such purposes) via Empire State Purchasing Group (BidNet direct). Failure of any bidder to receive any such addendum or interpretation shall not relieve the bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the contract documents.
Construction Terms and Conditions
The bidder is warned that the construction terms and conditions hereinafter fully set forth in the form of Contract will be rigidly enforced.
Security for Faithful Performance
Simultaneously with his delivery of the executed contract, the successful bidder must deliver to the Owner, executed bonds in the amount of one hundred per centum (100%) of the total amount bid as security for the faithful performance of his contract. He shall also provide a separate bond for payment not less than one hundred per centum (100%) of the contract price. These bonds shall be prepared on forms supplied by the Surety Company or companies, licensed to do business in the State of New York, and currently issued by the American Institute of Architects.
Lowest Responsible Bidder
The comparison of bids on this Contract will be made by comparing the total sums as submitted by each separate contractor. The lowest responsible bidder shall be considered as being the successful bidder for the contract. The contract award will be made to the successful bidder as described above if the project in total is acceptable to the Owner.
Time of Completion and Liquidated Damages
Due to the urgency of the work, the proposed improvements must be Substantially Complete by Friday, January 15th , 2027.
The date of substantial completion shall be the date when the work has been substantially completed to such an extent that the City may fully open the facility to the public for use for its intended purpose. This should be before the Final Completion date. Minor items which are not completed but which do not interfere with operations or the use of the site by the Owner will not be deemed as a failure to comply with the requirements of the time of completion of the work.
Liquidated damages may be assessed for each and every calendar day that the work is not in substantial completion, after the above stated time at the daily rate as indicated in the table below;
SCHEDULE OF LIQUIDATED DAMAGES
Original Total Contract Bid Price Liquidated Damages per Calendar Day From More Than To and Including $0 $2,000,000 $2,500 $2,000,000 $5,000,000 $3,250 $5,000,000 $10,000,000 $4,000 $10,000,000 $20,000,000 $6,500 $20,000,000 - $11,000
Obligation of Bidder
At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Plans and Contract Documents (including all addenda). The failure of any bidder to receive or examine the site or any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his bid.
Tax Exemption
The City of Kingston is an exempt organization under the Tax Law and is exempt from payment of Sales and Compensating Use Taxes of the State of New York and cities and counties of the State on all materials which are to be incorporated into the project, pursuant to the provisions of the contract. Tax exempt certificates will be provided by the Owner for use by the successful bidders. These taxes are not to be included in the bid.
Local and State Laws
The Contractor shall abide by all local and State laws or ordinances to the extent that such requirements do not conflict with Federal laws or regulations.
Labor, Safety and Health Regulations
The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction.
Safety Standards and Accident Prevention
With respect to all work performed under this contract, the Contractor shall:
a. Comply with the latest safety standards provisions of applicable laws, building and construction codes and the "Manual of Accident Prevention in Construction" published by the Associated General Contractors of America, the requirements of the Occupational Safety and Health Act of 1970 (Public Law 91-956) and the requirements of Title 29 of the Code of Federal Regulations, Section 1518 as published in the “Federal Register”, Volume 36, No. 75, Saturday, April 17, 1971.
b. Exercise every precaution at all times for the prevention of accidents and the protection of persons (including employees) and property.
c. Maintain at his/her office or other well known place at the job site, all articles necessary for giving first aid to the injured, and shall make standing arrangements for the immediate removal to a hospital or a doctor's care of persons (including employees), who may be injured on the job site.
In no case shall employees be permitted to work at a job site before the employer has made a standing arrangement for removal of injured persons to a hospital or a doctor's care.
Experience Clauses
These specifications do have requirements that material installers have specific experience, the Owner or Engineer will require appropriate documentation, and reserves the right to reject any installer or subcontractor who, in the opinion of the Owner, lacks the required experience.
Performance and Payment Bond Requirements
The bidder to whom the municipality proposes to award the contract shall, as soon as possible, but not later than ten (10) days from the date of the Notice of Award furnish to the municipality bonds equal to one hundred percent of the amount of the contract, conditioned for the faithful performance of all terms, covenants and conditions of same, with a surety company authorized to do business in the State of New York, as surety. If the bidder fails to furnish said Bonds within ten (10) days of the Notice of Award, said Owner will be entitled to consider all rights arising out of the Owner's acceptance of Bid as abandoned and as a forfeiture of Bid Bond. The Owner will be entitled to such other rights as may be granted by law.
The performance bond shall be maintained in the amount of 100% of the contract price in full force for a period of twelve months after date of final certificate as a guarantee that the Contractor will make good any faults or defects in the work arising from improper or defective workmanship or materials which may appear during that period.
A separate payment bond will be supplied in the amount of 100% of the contract price and shall be kept in force for a period of 12 months after the date of final certificate.
Certificate of Insurance
A certificate of insurance will be required at the time of contract signing, naming the Owner, (the City of Kingston) as additionally insured.
Insurance Requirements
The CONTRACTOR shall purchase and maintain such insurance as will protect him from claims set forth below which may arise out of or result from the CONTRACTOR'S execution of the WORK, whether such execution be by himself or by any SUBCONTRACTOR or by anyone directly or indirectly employed by any of them or by anyone whose acts of them may be liable.
Claims under workmen's compensation, disability benefit and other similar employee benefit acts;
Claims for damages because of bodily injury, occupational sickness, or disease or death of his employees;
Claims for damages because of bodily injury, sickness, or disease or death of any person other than his employees.
Claims for damages insured by usual personal injury liability coverage which are sustained (1) by any person as a result of an offense directly or indirectly related to the employment of such person by the CONTRACTOR, or (2) by any other persons and Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom.
Certificates of Insurance acceptable to the OWNER shall be filed with the OWNER prior to commencement of the WORK. These Certificates shall contain a provision that coverages afforded under the policies will not be cancelled unless at least fifteen (15) days prior WRITTEN NOTICE has been given to the OWNER.
The CONTRACTOR shall procure and maintain, at his expense, during the CONTRACT TIME, liability insurance as specified within the General Conditions.
Contract Security
The CONTRACTOR shall within ten (10) days after the receipt of the NOTICE OF AWARD furnish the OWNER with a PERFORMANCE BOND and a PAYMENT BOND in penal sums equal to the amount of the CONTRACT PRICE conditioned upon the performance of the CONTRACTOR of all undertakings, covenants, terms, conditions and agreements of the CONTRACT DOCUMENTS, and upon the prompt payment by the CONTRACTOR to all persons supplying labor and materials in the prosecution of the WORK provided by the CONTRACT DOCUMENTS. Such BONDS shall be executed by the CONTRACTOR and a corporate bonding company licensed to transact such business in the state in which the WORK is to be performed. The expense of these BONDS shall be borne by the CONTRACTOR. If at any time a Surety on any such BOND is declared a bankrupt or loses its right to do business in the state in which the WORK is to be performed or is removed from the list of Surety Companies accepted on Federal BONDS, CONTRACTOR shall within ten (10) days after notice from the OWNER to do so substitute an acceptable BOND (or BONDS) in such form and sum and signed by such other Surety or Sureties as may be satisfactory to the OWNER. The premiums on such BOND shall be paid by the CONTRACTOR. No further payments shall be deemed due not shall be made until the new Surety or Sureties shall have furnished an acceptable BOND to the OWNER.
Intent to Bid Submission Form
PLEASE COMPLETE AND RETURN THIS CONFIRMATION FORM WITHIN 5 WORKING DAYS
OF RECEIVING THIS RFB TO:
Brad Borquist Engineering Aide City of Kingston
420 Broadway Kingston, NY 12401 bborquist@kingston-ny.gov Phone: (845) 334-3966
Company Name/Contact Person: ____________________________________________
Address: _______________________________________________________________
City: ______________________________ State: ________________ Zip Code: ______
Telephone Number: ____________________ EXT:_________ Fax Number: _____________
Email: _________________________________________________________________
I have received a copy of the above noted RFB Specification. Mark one choice below.
_____ We will be submitting a BID
_____ We will NOT be submitting a BID – (please indicate reason)
Signature: _________________________________________________
Title: _____________________________________________________
BID PROPOSAL FORM – Boiler Replacement
CONTRACT NO. RFBK26-35
VFM BOILER REPLACEMENT
CONTRACTOR'S NAME AND ADDRESS:
TELEPHONE NO.:
E-MAIL ADDRESS:
FEDERAL I.D./S.S. #:
TO: Planning Department City of Kingston
City Hall, 420 Broadway
Kingston, New York 12401
Gentlemen:
I hereby submit my Bid for: Contract RFBK26-35, VFM Boiler Replacement
1. LUMP SUM BASIS:
Having carefully examined:
a. The Advertisement for Bids, Instructions to Bidders, Bid Form, General Conditions, Specifications, Contract Drawings and Prevailing Wage Rates.
b. The Drawings titled and dated: Contract RFBK26-35, VFM Boiler Replacement October 28th 2026
c. All addenda issued by the Project Manager and received by the Undersigned prior to the date of opening of bids, and having visited the site, examined all conditions affecting the work, the Undersigned proposes to furnish all labor, materials and equipment necessary and required by said documents for General Construction Work, as per the Proposal.
d. The undersigned agrees to start work at the site at the date to be specified on a written notice from the Owner to do so but, in no case, later than ten (10) days after the signing of the Notice to Proceed and that the work will be substantially completed by January 15th, 2027.
265 Fair Street (Wiltwyck Hose Co. No. 1 Engine House/ Volunteer Fireman’s Museum)
Base Bid Breakdown
The Contractor, offers to furnish all labor at prevailing wage rates, materials, supplies, equipment and other facilities and materials necessary or proper for, or incidental to perform the work.
Base Bid less demolition & abatement1,2 $
Demolition & Abatement of Boiler & Flange gaskets3 $
Field Changes (10%):4 $
TOTAL CONTRACT PRICE-BASE BID PLUS Boiler & Flange Gasket Abatement PLUS Field Changes5
TOTAL BID AMOUNT WRITTEN IN WORDS:
1. Base bid is all contractual service and material obligations of the bid drawings and bid document without the abatement and demolition pricing.
2. Outline oil tank demolition. Do not count any demolition services twice.
3. Demolition and Abatement is anticipated to be a subcontractor certified for asbestos abatement. Their contract price should be written here. Outline if oil tank will be demolished in this contract.
4. An allowance of ten percent (10%) of the Base Bid is to be added to the Base Bid amount stated above to arrive at the TOTAL BID AMOUNT. The Allowance will not be used unless a Change Order, approved and signed by the Owner, is issued by the Project Manager. The unused portion of the Allowance will be returned to the Owner at the completion of the work.
5. The total contract price and base bid will be inclusive of all demolition, abatement and installation work. Do not count any demolition pricing twice.
2. BONDS:
The undersigned agrees, if awarded the Contract, to deliver to the Owner simultaneously with the executed Contract an executed Performance Bond and a Labor and Material Payment Bond both of a corporate surety licensed to do business in the State of New York, in the amount of one hundred percent of the accepted contract sum. This shall guarantee the prompt payment of all indebtedness, incurred by the Contractor, or any subcontractor for supplies, materials or labor furnished, used or consumed directly in furtherance of such construction. The form of both the Performance Bond and the Labor and Material Payment Bond shall be that currently issued by the American Institute of Architects.
Surety Company shall be as approved by the Owner, the Contractor shall pay the premium for such Bonds.
3. INSURANCE:
Two copies of a Certificate of Insurance shall be provided at the contract signing, naming the
Owner (City of Kingston) and the State of New York as additional insureds.
4. NON-COLLUSIVE BIDDING CERTIFICATE:
By submission of this Bid, the Bidder certifies that: (a) this Bid has been independently arrived at without collusion with any other Bidder or with any Competitor or Potential Competitor; (b) this Bid has not been knowingly disclosed prior to submission or opening of Bids for this project, to any other Bidder, Competitor or Potential Competitor; (c) no attempt has been or will be made to induce any other person, partnership or corporation to submit or not to submit a Bid; (d) the person signing this Bid certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the Bidder as well as to the person signing in its behalf; (3) that attached hereto (if a corporate Bidder) is a certified copy of resolution authorizing the execution of this certificate by the signator of this Bid in behalf of the corporate Bidder.
5. ADDENDA:
Receipt of the following Addenda(if applicable) is hereby acknowledged:
DATE SIGNATURE
ADDENDUM NO. 1 _____ ___________
ADDENDUM NO. 2 _____ ___________
DATE: SIGNED:
(Name of Firm)
BY:
(Designate Officer)
6. I understand that the Owner reserves the right to reject this bid, but that this bid shall remain open and not be withdrawn for a period of sixty (60) days from the date prescribed for its opening.
7. Notice of acceptance, or request for additional information, may be addressed to the undersigned at the address set forth below.
8. The names of all persons interested in the foregoing bid as principals are:
(IMPORTANT NOTICE: If bidder or other interested person is a corporation, give legal name of corporation, state where incorporated, and names of president and secretary; if a partnership, give name of firm and names of all individual co-partners composing the firm; if bidder or other interested person is an individual, give first and last name in full)
SIGN HERE: _______________________________________________
SIGNATURE OF BIDDER: _______________________________________________
NOTE: If bidder is a corporation, set forth the legal name of the corporation together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation. If bidder is a partnership, set forth the name of the firm together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership.
Business Address: _________________________________
Telephone Number: _________________________________
Email address: _________________________________
Date of Proposal: _____________________________
TO BE SUBMITTED WITH BID PROPOSAL
“STATEMENT OF CONTRACTOR'S QUALIFICATIONS”
This statement must be submitted by the Contractor with his proposal. All questions must be answered and the data given must be clear and comprehensive.
1. Name of Bidder
PHONE NUMBER
2. Permanent main office address
3. When organized or began business
4. If a corporation, where incorporated
5. How many years have you been engaged in the contracting business under your present firm name?
6. Have you ever failed to complete any work awarded to you?
7. Will you, upon request, submit a detailed financial statement and furnish the following information that may be required by the Owner?
- Contracts on hand: (Indicate location, client gross amount of each contract, approximate anticipated dates of completion, A/E name, address and contact person.
- List of contracts of a similar nature performed within the past two years with location, client, gross amount, date of completion, A/E name, address and contact person.
- List of major equipment owned and available within 10 days of award of this contract.
- Background and experience of the principal members of your personnel, including the officers.
- Credit available (written evidence).
- Such statements, if required, shall be notarized and delivered to the Owner within three (3) days of written or verbal request. (Contractor may, at his discretion, elect to submit information as delineated under No. 7 with his Bid Proposal).
8. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner in certification of the recitals comprising this Statement of Contractor's Qualifications.
Dated at this day of , 20 .
Name of CONTRACTOR
BY
TITLE
TO BE SUBMITTED WITH BID PROPOSAL
“STATEMENT OF CONTRACTOR'S APPRENTICESHIP PROGRAM COMPLIANCE
OR EXEMPTION FROM COMPLIANCE”
This statement must be submitted by the Contractor with his proposal. All questions must be answered.
1. Name of Bidder
2. Phone Number
3. Permanent main office address
4. When organized or began business
5. If a corporation, where incorporated
6. How many years have you been in business under your present firm name?
7. Have you ever failed to complete any work awarded to you?
8. Applicability of Apprenticeship program (by City, check one):
This contract consists of general construction and a threshold value of $100,000.00 applies
This contract consists of building trades and a threshold value of $350,000.00 applies
9. The undersigned hereby affirms that he/she understands the requirements set forth under Resolution 179 of 2012 wherein the City of Kingston adopted the requirement that contractors and subcontractors on construction contracts exceeding certain values have approved apprenticeship agreements pursuant to NYS Labor Law Section 816-b, and shall comply fully. Select one:
The highest bid price under this proposal (base bid or alternates) is at or above the threshold value above and my firm has a compliant apprenticeship program.
The highest bid price under this proposal (base bid or alternates) is below the threshold value above and no apprenticeship program requirements apply.
Dated at this day of , 20 .
Name of CONTRACTOR
BY / TITLE
AGREEMENT
A STANDARD AGREEMENT TEMPLATE WILL BE ATTACHED SEPARATELY TO BE
COMPLETED BY THE OWNER UPON AWARD.
NOTICE OF AWARD
TO:
PROJECT Description: Contract RFBK26-35, VFM Boiler Replacement.
[HVAC], [Plumbing], [Electrical]
The OWNER has considered the BID PROPOSAL submitted by you for the above described WORK in response to its Advertisement for Bids dated October 28th 2026 and Invitation to Bidders.
You are hereby notified that your BID has been accepted for the LUMP SUM BID amount of
You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR'S Performance BOND, Payment BOND and Certificates of Insurance within ten (10) calendar days from the date of this Notice to you.
If you fail to execute said Agreement and to furnish said BONDS within ten (10) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your BID as abandoned and as a forfeiture of your BID RIGHTS. The OWNER will be entitled to such other rights as may be granted by law.
You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER;
dated this day of , 2026.
City of Kingston Owner
Signature
Printed Name Stephen T. Noble
Title Mayor
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF AWARD is hereby acknowledged By this the day of , 2026.
Signature
Printed Name
Title
NOTICE TO PROCEED
TO:
FED I.D. #:
DATE:
Project : Contract RFBK26-35, VFM Boiler Replacement.
You are hereby notified to commence WORK in accordance with the Agreement dated , 2026, on or before , 2026, and you are to be substantially complete by January 15th _______, 2027.
City of Kingston Owner
By
Mayor
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged by this day of , 2026.
CHANGE ORDER
CHANGE ORDER NO. DATE:
CONTRACT NO. RFBK26-35 SHEET 1 OF ____
PROJECT: VFM Boiler Replacement.
OWNER: City of Kingston
OWNER'S ADDRESS: City Hall
420 Broadway
Kingston, NY 12401
OWNER'S PHONE NUMBER: (845) 331-0080
CONTRACTOR:
CONTRACTOR'S ADDRESS:
CONTRACTOR'S PHONE NUMBER:
DESCRIPTION OF CONTRACT MODIFICATIONS:
REASON FOR CONTRACT MODIFICATIONS OR NEED FOR EXTRA WORK:
TIME EXTENSION REQUIRED FOR THIS CHANGE ORDER:
ITEMIZATION OF CONTRACTOR'S PROPOSAL FOR THIS WORK:
AUTHORIZATIONS:
OWNER: CONTRACTOR:
By: By:
Title: Title:
Date: Date:
CERTIFICATE OF SUBSTANTIAL COMPLETION
PROJECT: VFM Boiler Replacement.
OWNER: City of Kingston
OWNER'S ADDRESS: City Hall
420 Broadway
Kingston, NY 12401
OWNER'S PHONE NUMBER: (845) 331-0080
CONTRACTOR'S ADDRESS:
CONTRACTOR'S PHONE NUMBER:
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof:
The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ARCHITECT/ENGINEER, and that work is hereby declared to be substantially complete in accordance with the Contract Documents on
Date of Substantial Completion
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. When this Certificate applies to a specified part of the Work the items in the tentative list shall be completed or corrected by the CONTRACTOR within 10 days of the above date of Substantial Completion.
The date of Substantial Completion is the date upon which all guarantees and warranties begin, except as follows:
The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities and insurance shall be as follows:
RESPONSIBILITIES:
OWNER:
The following documents are attached to and made a part of this Certificate:
Executed by ARCHITECT/ENGINEER on , 202_
ARCHITECT/ENGINEER
The CONTRACTOR accepts this Certificate of Substantial Completion on ,202_
CONTRACTOR
The OWNER accepts this Certificate of Substantial Completion on ,202_
OWNER
VERIFIED STATEMENT OF PAYMENT OF PREVAILING WAGES
PRC ULSTER COUNTY
Date to
BID or QUOTE # RFBK26-35
1.
(Name of person making statement), (Owner or if Corporation, the title of such officer) of
(Full name of Corporation) file this Verified Statement pursuant to Section 220-a of the Labor Law.
2. This Verified Statement involves VFM Boiler Replacement
3. Except as stated herein, there are not amounts due and owing to or on behalf of workers employed on the project by the Contractor. (Set forth any unpaid wages and supplements, and if necessary, attach additional sheets. If none, so state).
4. The Contractor hereby files every verified statement required to be obtained by the
Contractor from the subcontractor and the same are attached hereto.
5. Upon information and belief, except as stated herein, all workers of subcontractor
(exclusive of executive or supervisory employees) employed on the project have been paid the prevailing wages and supplements for their services through , the last day worked on the project by their subcontractor:
(Set forth any unpaid wages and supplements, and if necessary, attach additional sheets.)
(If none, so state and utilize clause 5A).
(NAME) (AMOUNT)
5A. The Contractor has no knowledge of amounts owing to or on behalf of any workers.
6. In the event it is determined by the Commissioner of Labor that the wages or supplements or both of any such subcontractors have not been paid or provided pursuant to the appropriate schedule of wages and supplements, then the Contractor acknowledges that it shall be responsible for payment of which wages and supplements pursuant to the provision of Section 223 of the Labor Law.
The CONTRACTOR attests to this statement on ,202___
Authorized signature CONTRACTOR
Name and Title
GC - 1
GENERAL CONDITIONS
1. Definitions
2. Additional Instructions and Detail Drawings
3. Schedules, Reports and Records
4. Drawings and Specifications
5. Shop Drawings
6. Materials, Services and Facilities
7. Inspection and Testing
8. Substitutions
9. Patents
10. Surveys, Permits, Regulations
11. Protection of Work, Property, Persons
12. Supervision by Contractor
13. Changes in the Work
14. Changes in Contract Price
15. Time for Completion and Liquidated Damages
16. Correction of Work
17. Subsurface Conditions
18. Suspension of Work Termination and Delays
19. Payments to the Contractor
20. Acceptance of Final Payment as Release
21. Insurance
22. Contract Security
23. Assignments
24. Indemnification
25. Separate Contracts
26. Subcontracting
27. ARCHITECT/ENGINEER/PROJECT MANAGER's Authority
28. Land and Rights-of-Way
29. Guaranty
30. Claims and Disputes
31. Wages
32. Tax Exempt Status
33. Labor Standards
The City Standard Agreement attached hereto shall supersede the insurance requirements below.
GC - 2
1. DEFINITIONS
1.1 Wherever used in the CONTRACT DOCUMENTS, the following terms shall have the meanings indicated which shall be applicable to both the singular and plural thereof:
1.2 ADDENDA - Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the CONTRACT DOCUMENTS, DRAWINGS and SPECIFICATIONS, by additions, deletions, clarifications or corrections.
1.3 BID - The offer or proposal of the BIDDER submitted on the prescribed form setting forth the prices for the WORK to be performed.
1.4 BIDDER - Any person, firm or corporation submitting a BID for the WORK.
1.5 BONDS - Bid, Performance and Payment Bonds and other instruments of security furnished by the CONTRACTOR and his surety in accordance with the CONTRACT DOCUMENTS.
1.6 CHANGE ORDER - A written order to the CONTRACTOR authorizing an addition, deletion or revision in the WORK within the general scope of the CONTRACT DOCUMENTS, or authorizing adjustment in the CONTRACT PRICE or CONTRACT TIME.
1.7 CONTRACT DOCUMENTS - The contract, including Advertisement for Bids, Information for Bidders, BID, Bid Bond, Agreement, Payment Bond, Performance Bond, NOTICE OF AWARD, NOTICE TO PROCEED, CHANGE ORDER, DRAWINGS, SPECIFICATIONS, and
ADDENDA.
1.8 CONTRACT PRICE - The total monies payable to the CONTRACTOR under the terms and conditions of the CONTRACT DOCUMENTS.
1.9 CONTRACT TIME - The number of calendar days in the CONTRACT DOCUMENTS for the completion of the WORK from the Notice to Proceed.
1.10 CONTRACTOR - The person, firm or corporation with whom the OWNER has executed the Agreement.
1.11 DRAWINGS - The part of the CONTRACT DOCUMENTS which show the characteristics and scope of the WORK to be performed and which have been prepared by the
ARCHITECT/ENGINEER.
1.12 ARCHITECT/ENGINEER - The person, firm or corporation named as such in the
CONTRACT DOCUMENTS.
1.13 FIELD ORDER - A written order effecting a change in the WORK, not involving an adjustment in the CONTRACT PRICE, or an extension of the CONTRACT TIME, issued by the
GC - 3
ARCHITECT/ENGINEER/PROJECT MANAGER to the CONTRACTOR during construction.
1.14 NOTICE OF AWARD - The written notice of the acceptance of the BID from the OWNER to the successful BIDDER.
1.15 NOTICE TO PROCEED - Written communication issued by the OWNER to the CONTRACTOR authorizing him to proceed with the WORK and establishing the date of commencement of the WORK.
1.16 OWNER - A public or quasi-public body or authority, corporation, association, partnership, or individual for whom the WORK is to be performed.
1.17 PROJECT - The undertaking to be performed as provided in the CONTRACT
DOCUMENTS.
1.18 PROJECT MANAGER/RESIDENT PROJECT REPRESENTATIVE - The authorized representative of the OWNER who is assigned to the PROJECT site or any part thereof.
1.19 SHOP DRAWINGS - All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the CONTRACTOR, a SUBCONTRACTOR, manufacturer, SUPPLIER, or distributor, which illustrate how specific portion of the WORK shall be fabricated or installed.
1.20 SPECIFICATIONS - A part of the CONTRACT DOCUMENTS consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.
1.21 SUBCONTRACTOR - An individual, firm, or corporation having a direct contract with the CONTRACTOR or with any other SUBCONTRACTOR for the performance of a part of the WORK at the site.
1.22 SUBSTANTIAL COMPLETION - That date as certified by the ENGINEER when the construction of the PROJECT or a specified part thereof is sufficiently completed, in accordance with the CONTRACT DOCUMENTS, so that the PROJECT or specified part can be utilized for the purpose for which it is intended.
1.23 SUPPLEMENTAL GENERAL CONDITIONS - Modifications to General Conditions required by special conditions of the Owner or other agencies that have special requirements.
1.24 SUPPLIER - Any person or organization who supplies materials or equipment for the WORK, including that fabricated to a special design, but who does not perform labor at the site.
1.25 WORK - All labor necessary to produce the construction required by the CONTRACT DOCUMENTS, and all materials and equipment incorporated or to be incorporated in the
PROJECT.
GC - 4
1.26 WRITTEN NOTICE - Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the WORK.
2. ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS
2.1 The CONTRACTOR may be furnished additional instructions and detail drawings, by the ARCHITECT/ENGINEER/PROJECT MANAGER, as necessary to carry out the WORK required by the CONTRACT DOCUMENTS.
2.2 The additional drawings and instruction thus supplied will become a part of the CONTRACT DOCUMENTS. The CONTRACTOR shall carry out the WORK in accordance with the additional detail drawings and instructions.
3. SCHEDULES, REPORTS AND RECORDS
3.1 The CONTRACTOR shall submit to the OWNER such schedule of quantities and costs, progress schedules, payrolls, reports, estimates, records and other data where applicable for the WORK to be performed.
3.2 Prior to the first partial payment estimate, the CONTRACTOR shall submit construction progress schedules showing the order in which he proposes to carry on the WORK, including dates at which he will start the various parts of the WORK, estimated date of completion of each part and, as applicable:
3.2.1. The dates at which special detail drawings will be required; and
3.2.2. Respective dates for submission of SHOP DRAWINGS, the beginning of manufacture, the testing and the installation of materials, supplies and equipment.
3.3 The CONTRACTOR shall also submit a schedule of payments that he anticipates he will earn during the course of the WORK.
4. DRAWINGS AND SPECIFICATIONS
4.1 The intent of the DRAWINGS and SPECIFICATIONS is that the CONTRACTOR shall furnish all, labor, materials, tools, equipment, and transportation necessary for the proper execution of the WORK in accordance with the CONTRACT DOCUMENTS and all incidental work necessary to complete the PROJECT in an acceptable manner, ready for use, occupancy or operation by the OWNER.
4.2 In case of conflict between the DRAWINGS and SPECIFICATIONS, the SPECIFICATIONS shall govern. Written dimensions on DRAWINGS shall govern over scaled dimensions, and
GC - 5
detailed DRAWINGS shall govern over general DRAWINGS.
4.3 Any discrepancies found between the DRAWINGS and SPECIFICATIONS and site conditions or any inconsistencies or ambiguities shall be brought to the attention of the OWNER immediately. Any work done that is subject to such a discrepancy prior to clarifications being provided by the OWNER is at the CONTRACTOR'S risk, and shall be removed and replaced by the CONTRACTOR at no cost to the OWNER when so directed.
5. SHOP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .