Summary of RFB954200-01 Bid Drawings
This is a set of bid drawings for a water mitigation project at the Iowa Medical and Classification Center Administration Building in Coralville, Iowa, prepared by the Iowa Department of Administrative Services. The project involves installation of storm sewer systems, foundation drainage improvements, site restoration, and related civil work at the facility located at 2839 Northgate Drive, Iowa City, Iowa 52245. The drawings include cover sheets, existing conditions plans, erosion and sediment control plans, site access and preparation plans, utility plans, construction details, site restoration plans, and grading plans. The project requires installation of approximately 12-inch storm sewer lines, 4-inch perforated drain tile, storm intake structures, and associated appurtenances. The drawings were issued for bid on November 18, 2026, with a project number of 9542.00. No specific contract award date, response deadline, or term length is indicated in the bid drawing documents themselves.
The drawings establish comprehensive requirements for contractor execution including site fencing, erosion and sediment control measures, utility coordination, excavation and backfill specifications, pavement and sidewalk restoration, and grading to finished elevations. The contractor bears responsibility for utility location verification through Iowa One Call at minimum 48 hours before excavation, compliance with all OSHA regulations, daily site cleanup, maintenance of emergency vehicle access, and protection of existing vegetation and structures. All excess excavated material must be disposed of at the owner's on-site dump site. The project requires phased construction to maintain site access and emergency egress, coordination with public safety and parking authorities, and restoration of all disturbed areas to match existing conditions. No specific pricing information, set-asides, incumbent contractor identification, or funding sources are documented in these bid drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB954200-01 - Notice to Bidders.pdf | ||
| RFB954200-01 - Project Manual.pdf | ||
| RFB954200-01 - Bid Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
C O
R
AL
R
ID
G E
AV
E
UNIVERSITYPARKWAY
IOWA MEDICAL AND
CLASSIFICATION
CENTER
OWNER'S ON-SITE
EXCESS SOIL
DUMP SITE.
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\G
0.
dw g
/1
4/
1:
:0
AM
G000
C O
VE
R
S H
EE
T
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
IMCC ADMIN BLDG WATER MITIGATION
CLIENT PROJECT #9542.00
CORALVILLE, IA
PROJECT LOCATION MAP
1. CONTRACTOR SHALL MINIMIZE THE DISRUPTION OF EMERGENCY
VEHICLE ACCESS THROUGH THE SECURITY GATE. BACKFILL
EXCAVATION AS SOON AS PRACTICAL. PROVIDE TEMPORARY FILL TO
MATCH ADJACENT PAVEMENT IF REPAVING IS NOT COMPLETED
IMMEDIATELY.
2. UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND OTHER
UTILITIES NOT SHOWN ON DRAWINGS MAY EXIST. CONTRACTOR
SHALL HAVE UTILITY LOCATIONS MARKED AND EXCAVATE WITH
CAUTION.
3. SURFACE RESTORATION: REPLACE TOPSOIL TO FINISHED GRADE.
PLACE SUFFICIENT MATERIAL ADJACENT TO BUILDING. PROVIDE
SEED MIX FOR INSTALLATION AND WATERING BY OWNER. OTHER
THAN SEEDING, RETURN DISTURBED AREAS TO CONDITIONS PRIOR
TO CONSTRUCTION, READY FOR SEEDING OR PLANTING BY OWNER.
4. SITE SAFETY AND PEDESTRIAN SAFETY IS OF EXTREME IMPORTANCE.
THE CONTRACTOR IS RESPONSIBLE FOR EXECUTING THE WORK IN A
SAFE MANNER.
5. CONTRACTOR TO COORDINATE WITH PUBLIC SAFETY AND PARKING
THROUGH THE OWNER'S REPRESENTATIVE.
6. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLIANCE WITH
ALL OSHA REGULATIONS, COMPLIANCE IS MANDATORY.
7. PERFORM SITE CLEANUP ON A DAILY BASIS AT A MINIMUM. KEEP ALL
SURFACES INCLUDING SIDEWALKS, PARKING LOTS, AND ROADWAYS
CLEAN AT ALL TIMES.
8. CONTRACTOR TO ERECT SITE FENCING AND RECEIVE APPROVAL BY
THE OWNER PRIOR TO THE COMMENCEMENT OF WORK.
9. IOWA UTILITIES INFORMATION REQUIRES VERBAL NOTICE TO IOWA
ONE CALL 1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE
EXCAVATING. UTILITY LOCATES SHALL BE KEPT CURRENT PER STATE
REQUIREMENTS.
10. VEHICULAR TRAFFIC OR PARKING OF CONSTRUCTION VEHICLES
UNDER THE DRIP LINES (IN OR OUT OF THE CONSTRUCTION LIMITS)
OF TREES IS STRICTLY PROHIBITED AND VEHICLES MAY BE TOWED.
11. UNFORESEEN CONDITIONS ARE INHERENT TO UNDERGROUND WORK
AND ARE TO BE EXPECTED WITH THIS PROJECT. UPON
ENCOUNTERING UNFORESEEN CONDITIONS, CONTACT OWNER AND
DESIGN PROFESSIONAL FOR DIRECTION ON HOW TO PROCCEED.
12. AT CONTRACTOR'S OPTION, PROVIDE AND PAY FOR STAKING.
STAKING TO BE PERFORMED BY A LICENSED LAND SURVEYOR.
GENERAL INFORMATION
G000 & C SHEETS
27651
Sheet List Table Sheet Number Sheet Title
G000 COVER SHEET
C001 EXISTING CONDITIONS PLAN
C101 EROSION AND SEDIMENT CONTROL PLAN
C201 SITE ACCESS PLAN
C301 SITE PREPARATION AND DEMOLITION PLAN
C401 SITE UTILITY PLAN
C501 CONSTRUCTION DETAILS
C601 SITE RESTORATION PLAN
C701 SITE GRADING PLAN
November 16, 2026November 18, 2026
X
X
X X
X X
X
CP 1
CP 2
CP 4
CP 6
R
AZO
R
W
IR
E
R
AZ
O R
W
IR
E
PCC
PCC
PCC
PC
C
PCC
PCC
PCC
PCC
PCC
PC
C
PC
C
PC
C
PCC
PCC
PCC
GRASS
GRASS
GRASS
GRAVEL
GRASS D
IR
T
GRASS
GRASS
GRASS
GRASS
GRASS
GRAVEL
GRAVEL
G R
AV
EL
GRAVEL
GRASS
E.
N
.F
E.
N
.F
E.N.F.
IMCC
ADMINISTRATION
BUILDING
GROUND ROD
COVERED SEATING AREA
ANTENNA
GROUND ROD
SANITARY MH
809.52 RIM
800.68 IE ±8" VCP (W)
799.22 IE ±10" (N)
799.10 IE ±10" (S)
GROUND ROD
GROUND ROD
2" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC COMING OUT OF WALL
1" CONDUIT COMING
OUT OF GROUND
FF THRESHOLD = 804.05
(METAL)
FF = 811.25
(TILE)
FF = 803.89
(CONCRETE)
FF = 811.24
(TILE)
GROUND
ROD
STONE
RETAINING WALL
STONE
RETAINING WALL
STONE RETAINING WALL
SPLIT HEAD
GALVANIZED PIPE
ON WALL
GUARD RAIL
STAIRS
CAMERA POLE AND
JUNCTION BOX.
POLE MOUNTED
MOTION SENSOR.
POLE MOUNTED
MOTION SENSOR.
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
6" S
T
" S
T
15" ST
8" ST
8" S
T
12" ST
" S
T
" S
T
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E R
AZ
O
R W
IR
E
PCC
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E
STORM INTAKE
800.09 RIM
797.94 IE 8" DIP (E)
797.79 IE (N)
STORM INTAKE
808.91 RIM
802.40 IE 12" RCP (S)
802.31 IE 12" RCP (N)
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE
6" ADS TILE
RUN ON TOP
OF GROUND
DIRECTING
ROOF DRAIN
DISCHARGE
STORM MH
806.64 RIM
799.10 IE 10" VCP (SW)
798.95 IE 12" RCP (W)
798.88 IE 18" RCP (N)
STRUCTURE INACCESSIBLE
UNDER RAZOR WIRE
803.32 IE 4" ADS (SW)
STORM MH
811.92 RIM
STORM INTAKE
801.64 RIM
799.57 IE 4" PVC (S) (PLUGGED WITH ROCK)
799.23 IE 12" VCP (NW)
STORM INTAKE
804.98 RIM
803.48 IE 6" ADS (N)
803.27 BOTTOM
STORM INTAKE
800.31 RIM
798.21 IE 8" DIP (W)
798.16 IE 8" DIP (N)
798.11 IE (E)
STORM MH
811.92 RIM
±804 IE 15" VCP (W)
6" (N)
804.19 BOTTOM
STANDING WATER IN STRUCTURE
803.92 IE 4" PVC (W)
803.90 IE 4" PVC (W)
803.93 IE 4" PVC (W)
SUMP PUMP DISCHARGE
INTO ADS TILE
ENF
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE809
POINT #
NORTHING
7956526.25
7956515.59
7956763.16
7956256.05
7956025.32
7956216.48
EASTING
20515354.42
20515516.07
20515516.05
20515410.91
20515506.33
20515515.13
ELEVATION
808.69
810.22
800.95
812.78
807.92
810.65
DESCRIPTION
BRASS MARKER
BRASS MARKER
BRASS MARKER
BRASS MARKER
BRASS MARKER
BRASS MARKER
CONTROL POINT TABLE
IOWA REGIONAL COORDINATE SYSTEM -ZONE 10
NAD83 (2011) NAVD88 GEOID18 US SURVEY FEET
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:4
AM
C001
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
EXISTING CONDITIONS PLAN
ABBREVIATIONS
RESTRAINED JOINT
DUCTILE IRON PIPE
NOTES
ASPHALTACC
ABAN
DIA
DIP
DW
FO
IE
LF
LPS
MH
ABANDONED
DIAMETER
DUCTILE IRON PIPE
DOMESTIC WATER
FIBER OPTIC
INVERT ELEVATION
LINEAR FEET
LOW PRESSURE STEAM
MANHOLE
OE
PCC
PVC
RCP
RE'D/REQ'D
RGS
RJ
DIP
SAN
SMH
ST
TELU
TEMP
UE
WAT/W
OVERHEAD ELECTRIC
PORTLAND CEMENT CONCRETE
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
REQUIRED
RIGID STEEL
SANITARY SEWER
SANITARY MANHOLE
STORM SEWER
TELECOMMUNICATIONS
TEMPORARY
UNDERGROUND ELECTRIC
WATER MAIN
PL PROPERTY LINE
1. UTILITIES SHOWN ARE BASED ON TOPOGRAPHICAL SURVEY COMPLETED
09-04-2026 BY SHIVE-HATTERY. SURVEY UTILITY INFORMATION IS PROVIDED BY
THE OPERATING AUTHORITY OF EACH UTILITY, SURFACE FEATURES, AND
AVAILABLE RECORD DRAWINGS. NO SUBSURFACE INVESTIGATION HAS BEEN MADE
TO DETERMINE ACCURACY OF THE INFORMATION. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF UNDERGROUND
UTILITIES. CALL IOWA ONE-CALL (1-800-292-8989) FOR UTILITY LOCATES PRIOR TO
CONSTRUCTION. UTILITY LOCATES SHALL BE KEPT CURRENT PER STATE
REQUIREMENTS.
2. PLAN AND EXECUTE ALL NEW CONSTRUCTION THAT IS WITHIN CLOSE PROXIMITY
TO EXISTING OR NEW UTILITIES CAREFULLY SO THAT UTILITIES ARE NOT
DAMAGED. PHYSICALLY VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO
COMMENCING WORK. REPAIR ANY DAMAGES TO EXISTING OR NEW UTILITIES.
1. PROTECT STAKING CONTROL POINTS THROUGHOUT THE PROJECT.
2. STAKING AND LAYOUT FOR THIS PROJECT IS THE RESPONSIBILITY OF THE
CONTRACTOR.
3. NO STAKING COORDINATES WILL BE PROVIDED FOR THE WORK SHOWN ON THE
C-SERIES SHEETS. ELECTRONIC AUTOCAD FILES WILL BE PROVIDED AND IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE STAKING AND LAYOUT BASED ON
ELECTRONIC DRAWING DATA.
4. UNLESS OTHERWISE APPROVED, IT IS EXPECTED THE CONTRACTOR CAREFULLY
OBTAINS ELEVATIONS FROM THE PLANS, AND THAT UTILITIES WILL BE INSTALLED
AS CLOSE TO PRECISE PROFILE ELEVATIONS AS CONSTRUCTION METHODS WILL
REASONABLY ALLOW.
STAKING/LAYOUT NOTES
GENERAL SITE
EXISTING STRUCTURE
PLAN MARK DESCRIPTION
LEGEND
GUARD POST/ BOLLARD
SHRUB
DECIDUOUS TREE
CONIFEROUS TREE
SINGLE POLE SIGN
HANDHOLE
UTILITY POLE
LIGHT POST
FIRE HYDRANT
VALVE
UTILITY END CAP
CLEANOUT
DRAINAGE MANHOLE
ELECTRICAL MANHOLE
TELEPHONE PEDESTAL
SANITARY MANHOLE
TELEPHONE MANHOLE
INTAKE - CIRCLE
INTAKE - RECTANGLE
CHAIN LINK FENCE
620 MAJOR CONTOUR
MINOR CONTOUR
SURVEY CONTROL POINT
ELECTRIC OUTLET JUNCTION BOX
CP-1
RD BUILDING ROOF DRAIN
BUSH LIMITS
UTILITY LINES
LINE TYPE DESCRIPTION
OVERHEAD ELEC.
UNDERGROUND ELEC.
GAS MAIN
WATER MAIN
SANITARY SEWER
STORM SEWER
UNDERGROUND TELE.
UNDERGROUND
STEAM
DUCTBANK
FIBER OPTICS
SITE LIGHTING
LEGEND
X
X
X
X
X X
X
X X
X X
X
R
AZO
R
W
IR
E
R
AZ
O R
W
IR
E
PCC
PCC
PCC
PC
C
PCC
PCC
PCC
PCC
PCC
PC
C
PC
C
PC
C
PCC
PCC
PCC
GRASS
GRASS
GRASS
GRAVEL
GRASS D
IR
T
GRASS
GRASS
GRASS
GRASS
GRASS
GRAVEL
GRAVEL
G R
AV
EL
GRAVEL
GRASS
E.
N
.F
E.
N
.F
E.N.F.
IMCC
ADMINISTRATION
BUILDING
GROUND ROD
COVERED SEATING AREA
ANTENNA
GROUND ROD
GROUND ROD
GROUND ROD
2" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC COMING OUT OF WALL
1" CONDUIT COMING
OUT OF GROUND
FF THRESHOLD = 804.05
(METAL)
FF = 811.25
(TILE)
FF = 803.89
(CONCRETE)
FF = 811.24
(TILE)
GROUND
ROD
STONE
RETAINING WALL
STONE
RETAINING WALL
STONE RETAINING WALL
SPLIT HEAD
GALVANIZED PIPE
ON WALL
GUARD RAIL
STAIRS
CAMERA POLE AND
JUNCTION BOX.
POLE MOUNTED
MOTION SENSOR.
POLE MOUNTED
MOTION SENSOR.
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
6" S
T
" S
T
15" ST
8" ST
8" S
T
12" ST
" S
T
" S
T
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E R
AZ
O
R W
IR
E
PCC
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E
STORM INTAKE
800.09 RIM
797.94 IE 8" DIP (E)
797.79 IE (N)
STORM INTAKE
808.91 RIM
802.40 IE 12" RCP (S)
802.31 IE 12" RCP (N)
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE
6" ADS TILE
RUN ON TOP
OF GROUND
DIRECTING
ROOF DRAIN
DISCHARGE
STORM MH
806.64 RIM
799.10 IE 10" VCP (SW)
798.95 IE 12" RCP (W)
798.88 IE 18" RCP (N)
STRUCTURE INACCESSIBLE
UNDER RAZOR WIRE
803.32 IE 4" ADS (SW)
STORM MH
811.92 RIM
STORM INTAKE
801.64 RIM
799.57 IE 4" PVC (S) (PLUGGED WITH ROCK)
799.23 IE 12" VCP (NW)
STORM INTAKE
804.98 RIM
803.48 IE 6" ADS (N)
803.27 BOTTOM
STORM INTAKE
800.31 RIM
798.21 IE 8" DIP (W)
798.16 IE 8" DIP (N)
798.11 IE (E)
STORM MH
811.92 RIM
±804 IE 15" VCP (W)
6" (N)
804.19 BOTTOM
STANDING WATER IN STRUCTURE
803.92 IE 4" PVC (W)
803.90 IE 4" PVC (W)
803.93 IE 4" PVC (W)
SUMP PUMP DISCHARGE
INTO ADS TILE
ENF
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE80
EXISTING ACCESS ROAD, TYP
EXISTING GRADE CONTOUR, TYP
EXISTING STORM SEWER AND INTAKE, TYP
0.
0.
0.
0.
0.
2.
11.53%
CLEANUP OF DIRT AND DEBRIS IS REQUIRED.
CONTRACTOR SHALL USE ALL METHODS
NECESSARY TO PREVENT TRACKING OFF-SITE
AT ALL TIMES AND AS REQUIRED BY THE
OWNER. CONTRACTOR SHALL ANTICIPATE
THE USE OF DUST CONTROL MEASURES.
CONTRACTOR TO DETERMINE
PREFERRED LOCATION DURING EACH
PHASE OF CONSTRUCTION, TYP
ANTICIPATED CONTRACTOR STAGING AREA,
COORDINATE FINAL LOCATION WITH OWNER, TYP.
SURFACE APPLIED INTAKE PROTECTION, TYP
CLEANUP OF DIRT AND DEBRIS IS REQUIRED.
CONTRACTOR SHALL USE ALL METHODS
NECESSARY TO PREVENT TRACKING OFF-SITE
AT ALL TIMES AND AS REQUIRED BY THE
OWNER. CONTRACTOR SHALL ANTICIPATE
THE USE OF DUST CONTROL MEASURES.
MAINTAIN STABILIZED CONSTRUCTION
ENTRANCE/EXIT (SUDAS 9040.120). DRESS
WITH STONE AS REQUIRED TO PREVENT
TRACKING OFF-SITE. INSTALL GEOTEXTILE
FILTER FABRIC BELOW STONE.
X
X
X
X
X
X
R
AZO
R
W
IR
E
PCC
PCC
PCC
PC
C
PCC
PCC
PCC
PCC
PCC
PC
C
PC
C
PC
C
PCC
PCC
PCC
GRASS
GRASS
GRASS
GRAVEL
GRASS D
IR
T
GRASS
GRASS
GRASS
GRASS
GRASSGRAVEL
GRASS
E.
N
.F
E.
N
.F
E.N.F.
IMCC
ADMINISTRATION
BUILDING
GROUND ROD
COVERED SEATING AREA
ANTENNA
GROUND ROD
GROUND ROD
GROUND ROD
2" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC COMING OUT OF WALL
1" CONDUIT COMING
OUT OF GROUND
FF THRESHOLD = 804.05
(METAL)
FF = 811.25
(TILE)
FF = 803.89
(CONCRETE)
FF = 811.24
(TILE)
GROUND
ROD
STONE
RETAINING WALL
STONE
RETAINING WALL
STONE RETAINING WALL
SPLIT HEAD
GALVANIZED PIPE
ON WALL
GUARD RAIL
STAIRS
CAMERA POLE AND
JUNCTION BOX.
POLE MOUNTED
MOTION SENSOR.
POLE MOUNTED
MOTION SENSOR.
6" S
T
" S
T
15" ST
8" ST
12" ST
" S
T
" S
T
STORM MH
806.64 RIM
799.10 IE 10" VCP (SW)
798.95 IE 12" RCP (W)
798.88 IE 18" RCP (N)
STRUCTURE INACCESSIBLE
UNDER RAZOR WIRE
803.32 IE 4" ADS (SW)
STORM MH
811.92 RIM
STORM INTAKE
801.64 RIM
799.57 IE 4" PVC (S) (PLUGGED WITH ROCK)
799.23 IE 12" VCP (NW)
STORM INTAKE
804.98 RIM
803.48 IE 6" ADS (N)
803.27 BOTTOM
STORM INTAKE
800.31 RIM
798.21 IE 8" DIP (W)
798.16 IE 8" DIP (N)
798.11 IE (E)
STORM MH
811.92 RIM
±804 IE 15" VCP (W)
6" (N)
804.19 BOTTOM
STANDING WATER IN STRUCTURE
803.92 IE 4" PVC (W)
803.90 IE 4" PVC (W)
803.93 IE 4" PVC (W)
SUMP PUMP DISCHARGE
INTO ADS TILE
ENF
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE80
4" S
T 4"
S T
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
EXISTING ACCESS ROAD, TYP
EXISTING GRADE CONTOUR, TYP
ADDITIONAL SURFACE
APPLIED INTAKE PROTECTION.
THIS CONTROL TO REMAIN
UNTIL THE SITE HAS BEEN
STABILIZED AND APPROVED
BY THE OWNER'S
REPRESENTATIVE, TYP.
PROPOSED PAVEMENT, TYP
FINISHED GRADE CONTOUR, TYP
STORM SEWER AND INTAKE, TYP
PERFORATED DRAIN TILE, TYP
8" FILTER SOCK ALONG EDGE OF
PAVEMENT. THIS CONTROL TO
REMAIN UNTIL THE SITE HAS BEEN
STABILIZED AND APPROVED BY
THE OWNER'S REPRESENTATIVE.
ONCE REMOVED, 8" FILTER SOCK
TO BE DISCARDED AND
PERMANENT SEEDING, FERTILIZER
AND MULCHING TO BE APPLIED TO
THE BARE SPOT, TYP.
SURFACE APPLIED INTAKE PROTECTION
TO REMAIN UNTIL THE SITE HAS BEEN
STABILIZED AND APPROVED BY THE
OWNER'S REPRESENTATIVE, TYP
EXISTING STORM SEWER AND INTAKE, TYP
5.3 2%
8.22%
6.82%
8.20%
5.
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:5
AM
C101
ER
O
SI
O
N A
N D
SE
D
IM
EN
T C
O N
TR
O
L
PL
AN
C M
B
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
EROSION AND SEDIMENT CONTROL PLAN - PRE-DURING - CONSTRUCTION EROSION AND SEDIMENT CONTROL PLAN - POST - CONSTRUCTION
EROSION AND SEDIMENT CONTROL NOTES
CONTRACTOR STAGING AREA FOR
PORTABLE RESTROOM FACILITIES,
TEMPORARY FUEL TANKS, WASTE
CONTAINERS AND OTHER
HAZARDOUS CHEMICALS. RELOCATE
AS REQUIRED FOR CONSTRUCTION.
PROJECT SITE/DISTURBED AREA
LEGEND
SPILL KIT TO BE INSTALLED AND
RELOCATED AS REQUIRED FOR
CONSTRUCTION
CONCRETE, PAINT, AND GROUT
WASHOUT AREA PER SUDAS
SECT 11,050. CONTRACTOR TO
HAUL OFF WASTE MATERIAL.
SUGGESTED LOCATION.
RELOCATE AS REQUIRED FOR
CONSTRUCTION.
PORTABLE RESTROOM
FACILITY LOCATION
EXISTING/PROPOSED GRADE
DIRECTION OF DRAINAGE
4.0%
8" FILTER SOCK (SUDAS 9040.102).
SHALL HAVE 'J' HOOKS AT MAXIMUM
25' INCREMENTS.
1. EROSION/SEDIMENT CONTROL MEASURES SHOULD BE
INSTALLED BEFORE EARTH DISTURBING ACTIVITIES BEGIN AND
ARE REQUIRED REGARDLESS OF THE TIME OF YEAR. THIS
PLAN MUST BE IMPLEMENTED DURING WINTER MONTHS AS
WELL.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL
EROSION/SEDIMENT ON THE SITE AT ALL TIMES. THE CONTROL
MEASURES SHOWN ON THE PLAN ARE A MINIMUM. THE
CONTRACTOR SHALL PROVIDE ADDITIONAL
EROSION/SEDIMENT CONTROL MEASURES AS NECESSARY TO
FULFILL THIS REQUIREMENT. CONTRACTOR TO INCORPORATE
ALL TEMPORARY STABILIZING AND PERMANENT
EROSION/SEDIMENT CONTROL FEATURES AT THE EARLIEST
TIME PRACTICABLE.
3. THE CONTRACTOR IS REQUIRED TO USE STABILIZATION
CONTROLS ON ALL DISTURBED AREAS OF THE SITE
REGARDLESS OF THE TIME PERIOD BEFORE THEY WILL BE
DISTURBED AGAIN.
4. THE CONTRACTOR SHALL RESTORE DISTURBED AREAS AS
SOON AS WORK IS COMPLETED AS INDICATED ON THE PLANS.
5. THE CONTRACTOR SHALL USE CONTROL MEASURES AS
REQUIRED TO KEEP SOILS FROM LEAVING THE SITE.
6. CONTRACTOR SHALL IMPLEMENT SITE SPECIFIC BEST
MANAGEMENT PRACTICES (BMPS) AS SHOWN AND REQUIRED
BY THE EROSION AND SEDIMENT CONTROL PLAN. ADDITIONAL
BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED BY
THE CONTRACTOR AS DICTATED BY SITE CONDITIONS OR THE
PROJECT GOVERNING AUTHORITIES AT NO ADDITIONAL COST
TO THE OWNER THROUGHOUT ALL PHASES OF
CONSTRUCTION.
7. IF AFTER REPEATED FAILURE ON THE PART OF THE
CONTRACTOR TO PROPERLY CONTROL SOIL EROSION,
SEDIMENT AND/OR POLLUTION FROM THE PROJECT SITE, THE
GOVERNING AUTHORITIES RESERVE THE RIGHT TO EFFECT
NECESSARY CORRECTIVE MEASURES AND CHARGE ANY
COSTS TO THE CONTRACTOR.
8. ALL BMPS AND CONTROLS SHALL CONFORM TO THE
APPLICABLE FEDERAL OR STATE REQUIREMENTS, STANDARDS,
AND SPECIFICATIONS OR MANUAL OF PRACTICE.
9. IN THE EVENT THAT SOILS LEAVE THE SITE, CLEANUP OF ALL
SURROUNDING ROADS, DRIVES, AND PARKING LOTS SHALL BE
PERFORMED ON A DAILY BASIS AT A MINIMUM AND UPON
REQUEST BY OWNER'S REPRESENTATIVE AT NO ADDITIONAL
COST. PAVEMENT IS TO BE SCRAPED OF DEBRIS AND MUD AND
BROOMED CLEAN. MUD TRACKS ARE TO BE REMOVED AS THEY
ARE CREATED.
10. IF DURING CONSTRUCTION OPERATIONS ANY LOOSE
MATERIALS ARE DEPOSITED IN THE FLOW LINE OF GUTTERS,
DRAINAGE STRUCTURES, OR DITCHES SUCH THAT THE
NATURAL FLOW LINE OF WATER IS OBSTRUCTED, THIS LOOSE
MATERIAL SHALL BE REMOVED.
11. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY
EXISTING STORM DRAINAGE SYSTEMS BY THE USE OF INLET
PROTECTION OR OTHER APPROVED FUNCTIONAL METHODS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING
SEDIMENT RESULTING FROM CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS PROJECT.
12. CONSTRUCTION ACCESS POINTS TO THE SITE SHALL BE
PROTECTED IN SUCH A WAY AS TO PREVENT TRACKING OF
MUD OR SOIL ONTO PUBLIC THOROUGHFARES. ALL SEDIMENT
SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY BY THE
CONTRACTOR.
13. CLEAN SILT FROM FILTER SOCKS ON A REGULAR BASIS AS PER
THE STANDARD SPECIFICATIONS. FILTER SOCKS MUST BE
CLEANED OUT WHEN THEY ARE 33% FULL.
14. CONTRACTOR TO LOCATE/ RELOCATE FILTER SOCKS AS
NECESSARY THROUGHOUT THE PROJECT TO CONTROL
EROSION/SEDIMENT. FILTER SOCK INSTALLATION IS TO
FOLLOW SUDAS 9040.102.
15. REMOVE ALL TEMPORARY EROSION/SEDIMENT CONTROLS,
NOT CALLED OUT TO REMAIN, AFTER SITE HAS BEEN
STABILIZED AND APPROVED BY THE OWNER'S
REPRESENTATIVE.
16. WHERE WATER IS PUMPED FROM EXCAVATIONS ON SITE,
PROVISIONS SHALL BE MADE TO REMOVE SEDIMENT FROM
THE WATER BEFORE IT IS RELEASED. REFER TO SUDAS 3010
SECT 3.04 FOR DEWATERING GUIDANCE.
17. WHERE WATER IS RELEASED FROM A DEWATERING SYSTEM,
PRECAUTIONS SHALL BE TAKEN TO ENSURE THAT EROSION
GULLIES DO NOT FORM. WATER MUST BE FILTERED THROUGH
AN APPROPRIATE FILTER DEVICE BEFORE DISCHARGING.
18. THE CONTRACTOR IS REQUIRED TO INSTALL STABILIZATION
CONTROLS ON ALL DISTURBED AREAS OF THE SITE
IMMEDIATELY FOLLOWING COMPLETION OF GRADING
ACTIVITIES. REFER TO SUDAS 9040 FOR REQUIRED
STABILIZATION CONTROLS NOT SHOWN ON THIS PLAN.
19. ALL EXISTING AND PROPOSED STORM INTAKES, WITHIN AND
ADJACENT TO THE PROJECT AREA, MUST BE PROTECTED
THROUGHOUT THE DURATION OF THE PROJECT AS IDENTIFIED
ON THE DRAWINGS. INTAKES SHALL BE FREE OF DIRT, DEBRIS
AND ROCK AT COMPLETION OF WORK.
20. SANITARY WASTE DISPOSAL: ALL LOCATIONS OF PORTABLE
RESTROOM FACILITIES MUST BE IDENTIFIED ON THE PLAN. IN
THE EVENT THAT PORTABLE RESTROOM FACILITIES ARE USED
ON-SITE, THE CONTRACTOR IS REQUIRED TO INSTALL AN 8"
FILTER SOCK AROUND THE FACILITY TO MINIMIZE THE RADIUS
OF THE AFFECTED ZONE IN THE EVENT OF A SPILL. WASTES
SHALL BE COLLECTED AND DISPOSED OF IN COMPLETE
COMPLIANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. PORTABLE RESTROOM FACILITIES MUST NOT
BE LOCATED NEAR DRAINAGE WAYS. RELOCATE AS REQUIRED
FOR CONSTRUCTION.
21. POLLUTION AND SPILL PREVENTION PLANNING: POTENTIALLY
HAZARDOUS MATERIALS ON THE CONSTRUCTION SITE
INCLUDE FUEL, LUBRICANTS, CURING COMPOUNDS,
FERTILIZERS, GREASE AND CLEANING SOLVENTS. THE
CONTRACTOR STAGING AREA FOR PORTABLE RESTROOM
FACILITIES, TEMPORARY FUEL TANKS, WASTE CONTAINERS
AND OTHER HAZARDOUS CHEMICALS MUST BE PROTECTED BY
AN 8" FILTER SOCK AT ALL TIMES. ALL REASONABLE
PRECAUTIONS WILL BE TAKEN TO PREVENT SPILLS. ANY
SPILLED MATERIAL WILL IMMEDIATELY BE DIRECTED AWAY
FROM STORMWATER INTAKES, DETENTION BASINS, OR
DRAINAGE WAYS. SPILLED MATERIALS WILL BE CLEANED AND,
IF NECESSARY, SOIL REMEDIATION PRACTICES WILL BE USED.
A RECORD OF SPILLS WILL BE MAINTAINED BY THE PRIME
CONTRACTOR. RELOCATE AS REQUIRED FOR CONSTRUCTION.
22. CONCRETE, PAINT AND GROUT WASHOUT AREA: THE
WASHOUT AREA SHOULD BE AN APPROVED CONCRETE
WASHOUT CONTAINER, COLLECTION BAG, OR WASHOUT BOX
PER SUDAS 11,050. PROTECT WITH AN EROSION CONTROL
DEVICE (IF USING FILTER SOCKS, STACK TWO (2) TALL).
CONTRACTOR TO HAUL OFF ALL WASTE MATERIAL. ALL
LOCATIONS OF CONCRETE, PAINT AND GROUT WASHOUT
AREAS MUST BE PROVIDED BY THE CONTRACTOR AND
IDENTIFIED ON THE PLAN (RELOCATE AS REQUIRED FOR
CONSTRUCTION). THE CONTRACTOR IS REQUIRED TO INSTALL
A SIGN THAT DESIGNATES THE WASHOUT AREA.
23. CONCRETE SLURRY AND DUST FROM SAWCUTTING ACTIVITIES
IS PROHIBITED FROM ENTERING THE STORM SEWER SYSTEM.
ALL STORM INTAKES LOCATED NEAR SAWCUTTING ACTIVITIES
ARE REQUIRED TO BE PROTECTED. SAWCUT SLURRY AND
DUST MUST BE CONTAINED, CLEANED UP, AND DISPOSED OF
OFF-SITE.
24. SPILL KIT: THE LOCATION OF THE SPILL KIT MUST BE
IDENTIFIED ON THE PLAN. THE SPILL KIT SHALL CONTAIN, BUT
NOT BE LIMITED TO THE FOLLOWING ITEMS: A GARBAGE CAN,
GLOVES, SAFETY GOGGLES, BROOM AND DUST PAN AND OIL
ABSORBENT CLAY CHIPS OR PADS. THE SPILL KIT SHALL BE
RESTOCKED AS SUPPLIES ARE USED. THE CONTRACTOR
SHALL INSTALL A SIGN THAT DESIGNATES THE SPILL KIT.
RELOCATE AS REQUIRED FOR CONSTRUCTION. THE SPILL KIT
SHOULD BE DESIGNED TO DEAL WITH ANY HAZARDOUS
MATERIALS ON-SITE.
25. DUST CONTROL: THE CONTRACTOR SHALL IMPLEMENT DUST
CONTROL MEASURES WHERE DUST IS GENERATED. FREQUENT
WATERING OF THE SITE, SPRINKLED, VEGETATIVE COVER,
MULCH, WINDBREAKS, TILLAGE, STONE AND SPRAY-ON
CHEMICAL SOIL TREATMENTS (PALLIATIVES) ARE POSSIBLE
DUST CONTROL MEASURES. IF THE DUST CONTROL IS NOT
ACCEPTABLE IT SHALL BE CHANGED AS DIRECTED BY THE
OWNER'S REPRESENTATIVE.
26. STOCKPILED MATERIALS: CONTRACTOR TO IDENTIFY ALL
LOCATIONS OF STOCKPILED MATERIALS ON THE STORMWATER
POLLUTION PREVENTION PLAN. CONTRACTOR SHALL PROVIDE
ALL EROSION/SEDIMENT CONTROLS AS REQUIRED TO CONTAIN
MATERIALS ON-SITE. AT A MINIMUM, THE CONTRACTOR IS
REQUIRED TO PROVIDE SILT FENCE/FILTER SOCKS AROUND
STOCKPILED SOILS BEFORE STOCKPILE IS RE-SPREAD.
27. THE CONTRACTOR SHALL AMEND THE EROSION AND
SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN
DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE OF A
STORMWATER BMP.
SEQUENCING AND PHASING NOTES
PROPOSED PAVEMENT. SEE SHEET
C601 FOR MORE INFORMATION.
SURFACE APPLIED INTAKE
PROTECTION (NOTE: FILTER
SOCKS ARE NOT AN ALLOWABLE
INTAKE PROTECTION DEVICE).
SEE SUDAS 9040 SECT 2.19.
1. THIS PROJECT MAY BE CONSTRUCTED OVER
SEVERAL PHASES. EROSION/SEDIMENT CONTROL
DEVICES IDENTIFIED ON THE PLAN WILL BE
IMPLEMENTED ON A PER PHASE BASIS.
2. INSTALL INTAKE PROTECTION AND DOWN SLOPE
AND SIDE SLOPE PERIMETER CONTROLS BEFORE
LAND DISTURBING ACTIVITY OCCURS.
3. STRIP TOPSOIL TO A DEPTH OF 6" AND STOCKPILE.
DO NOT MIX TOPSOIL WITH SUBSOIL.
4. GRADE SUBSOIL TO CONFORM WITH THE GRADES,
CONTOURS AND LEVELS IDENTIFIED ON THE
DRAWINGS.
5. ROUGH GRADE FOR ROADWAY, WALKS, CURBS,
GUTTERS, AND LANDSCAPED AREAS.
6. COVER OR STABILIZE DISTURBED AREAS AS SOON
AS POSSIBLE.
7. SCARIFY AREAS TO RECEIVE TOPSOIL TO A DEPTH
OF 4". REMOVE ALL STONES, WOOD AND OTHER
DEBRIS LARGER THAN 1" FROM AREAS TO RECEIVE
TOPSOIL. DO NOT COMPACT TOPSOIL.
8. REFER TO SHEET C601 FOR SITE RESTORATION
INFORMATION.
9. UPON COMPLETION OF EACH PHASE AND APPROVAL
BY THE OWNER'S REPRESENTATIVE,
EROSION/SEDIMENT CONTROL DEVICES MAY BE
REMOVED/RELOCATED.
C O
R
AL
R
ID
G E
AV
E
IOWA MEDICAL AND
CLASSIFICATION
CENTER
UNIVERSITY
PKWY
CONTRACTOR ACCESS ROUTE.
MAINTAIN ACCESS TO EASTERN
LOADING DOCK DOOR DURING
CONSTRUCTION, TYP.
MATERIALS AND EQUIPMENT SHALL
BE SECURED AT THE END OF EACH
DAY. REFER TO OWNER'S PROJECT
REQUIREMENTS FOR SECURITY
STANDARDS, TYP.
CONTRACTOR WORK AREA.
MAINTAIN ACCESS TO
EGRESS DOOR AND FIRE
DEPARTMENT CONNECTION.
SECURED ACCESS GATE.
COORDINATE WITH
OWNER FOR ACCESS.
SITE ACCESS
GATE, TYP.
COORDINATE WITH OWNER 1-WEEK
PRIOR TO LOADING DOCK CLOSURE
SO OWNER CAN REVISE DELIVERY
SCHEDULE. CONTRACTOR MAY BEGIN
WORK AFTER THE DELIVERY IS
COMPLETED ON MONDAY MORNING
AND LOADING DOCK MUST BE OPENED
PRIOR TO THE FOLLOWING MONDAY.
COORDINATE WITH OWNER FOR
REMOVAL OF PORTION OF EXTERIOR
PERIMETER FENCE AND INSTALLATION
OF SECURE ACCESS GATE TO INSTALL
BARRIER CURB. REMOVAL OF FENCE
AND INSTALLATION OF SECURE GATE
TO BE BY OWNER. SEE PHOTO 1/C201.
5'-6" WIDE X 8'-0" TALL ACCESS GATE FOR
WORK IN BETWEEN PERIMETER FENCES.
COORDINATE WITH OWNER FOR ACCESS
THROUGH SECURE GATES, TYP.
CONSTRUCTION AREA
ROADWAY VEHICLE TRAFFIC FLOW ARROW
PEDESTRIAN ROUTE
CHAIN LINK CONSTRUCTION FENCE
CONTRACTOR ACCESS ROUTE
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:0
AM
C201
SI
TE
A C
C
ES
S
PL
AN
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
SITE ACCESS PLAN
PHASING/TRAFFIC CONTROL NOTES
1. PHASING DRAWINGS ARE PROVIDED TO DESCRIBE THE REQUIRED SCHEDULING OF THE WORK IN THIS PROJECT TO
ACCOMMODATE VEHICLE AND PEDESTRIAN ACCESS ON SITE.
2. SITE PHASING DRAWINGS DO NOT SHOW THE FULL EXTENT OF WORK IN EACH PHASE, BUT RATHER A GENERAL WORK AREA
AND SITE ACCESS REQUIREMENTS. REFER TO OTHER DRAWINGS FOR FULL SCOPE OF WORK.
3. CONTRACTOR MAY SUBMIT ALTERNATE TRAFFIC CONTROL AND PHASING OPTIONS FOR OWNER APPROVAL PRIOR TO
CONSTRUCTION.
4. NO CONTRACTOR VEHICLE PARKING WILL BE ALLOWED ON SIDEWALKS, DRIVES, GRASS, OR STREETS OUTSIDE OF CONSTRUCTION LIMITS. VEHICLES PARKED OUTSIDE CONSTRUCTION LIMITS WILL BE TOWED AT THE EXPENSE OF THE VEHICLE OWNER. SEE OWNER'S PROJECT REQUIREMENTS FOR ADDITIONAL INFORMATION ON PARKING AND SITE ACCESS.
5. FENCING SHOWN ON THE PLANS IS A MINIMUM. CONTRACTOR IS RESPONSIBLE FOR PROVIDING FENCING TO MAINTAIN A SECURE SITE AT ALL TIMES, AND TO ACCOMMODATE ACTUAL WORK LIMITS AND PHASING LIMITS. PROVIDE CONSTRUCTION
FENCE FOR ALL WORK EXTENDING BEYOND MAIN SITE FENCE.
6. REPAIR OR REPLACE DAMAGED CONSTRUCTION FENCE ON THE SAME DAY AS IT IS DAMAGED, MAINTAINING A SECURE SITE AT
ALL TIMES. REPAIR OR PATCH ANY DISTURBED AREAS DUE TO FENCING INSTALLATION.
7. PROVIDE PERMANENT OR TEMPORARY PEDESTRIAN DETOUR ROUTES TO MEET SITE ACCESS AND CURRENT ADA STANDARDS FOR ACCESSIBLE DESIGN. COORDINATE LOCATIONS WITH THE OWNER'S REPRESENTATIVE. PLAN AND COORDINATE
TEMPORARY WALKS FOR SITE ACCESS WITH CONSTRUCTION ACTIVITIES.
8. NO ROAD OR LANE CLOSURES PERMITTED FOR STAGING OF DELIVERY TRUCKS.
9. FURNISH, ERECT, AND MAINTAIN ALL SIGNAGE DURING THE PROJECT. REMOVE ALL DEVICES AT THE END OF THE PROJECT.
10. PROVIDE AND INSTALL TEMPORARY CONSTRUCTION PROJECT SIGNAGE AND MAINTAIN SIGNAGE THROUGHOUT CONSTRUCTION. SIGNS MAY BE INSTALLED ON THE PROJECT FENCING OR SUPPORTED INDEPENDENTLY DEPENDING ON SITE
CONDITIONS.
11. ALL VEHICULAR AND PEDESTRIAN CONTROL SIGNAGE SHALL CONFORM TO THE STANDARDS IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST EDITION. SIDEWALK CLOSURES AND DETOURS SHALL BE IOWA DOT TYPE II BARRICADES AND SHALL BE WHITE WITH BLACK LETTERING, EXCEPT THE S1-1 AND R1-6A SIGNS. TRAFFIC CONTROL AND TRAFFIC DETOUR SIGNAGE SHALL BE ORANGE WITH BLACK LETTERING. ALL SIGNAGE SHOULD BE COORDINATED WITH ALL
OTHER TRAFFIC CONTROL PLANS IN THE AREA.
12. RESTORE ACCESS TO SIDEWALKS AND BUILDING ENTRANCES AS SOON AS POSSIBLE.
BARRIER CURB WORK AREA1
LEGEND
OWNER TO REMOVE PORTION OF EXTERIOR
PERIMETER FENCE AND INSTALL 7'-6" WIDE X 7'-10"
TALL ACCESS GATE. CONTRACTOR TO COORDINATE
WITH OWNER FOR TIMING OF GATE INSTALLATION
FOR ACCESS TO INSTALL BARRIER CURB.
X
X X
X X
X
R
AZO
R
W
IR
E
R
AZ
O R
W
IR
E
PCC
PCC
PCC
PC
C
PCC
PCC
PCC
PCC
PCC
PC
C
PC
C
PC
C
PCC
PCC
PCC
GRASS
GRASS
GRASS
GRAVEL
GRASS D
IR
T
GRASS
GRASS
GRASS
GRASS
GRASS
GRAVEL
GRAVEL
G R
AV
EL
GRAVEL
GRASS
E.
N
.F
E.
N
.F
E.N.F.
IMCC
ADMINISTRATION
BUILDING
GROUND ROD
COVERED SEATING AREA
ANTENNA
GROUND ROD
SANITARY MH
809.52 RIM
800.68 IE ±8" VCP (W)
799.22 IE ±10" (N)
799.10 IE ±10" (S)
GROUND ROD
GROUND ROD
2" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC COMING OUT OF WALL
1" CONDUIT COMING
OUT OF GROUND
FF THRESHOLD = 804.05
(METAL)
FF = 811.25
(TILE)
FF = 803.89
(CONCRETE)
FF = 811.24
(TILE)
GROUND
ROD
STONE
RETAINING WALL
STONE
RETAINING WALL
STONE RETAINING WALL
SPLIT HEAD
GALVANIZED PIPE
ON WALL
GUARD RAIL
STAIRS
CAMERA POLE AND
JUNCTION BOX.
POLE MOUNTED
MOTION SENSOR.
POLE MOUNTED
MOTION SENSOR.
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
6" S
T
" S
T
15" ST
8" ST
8" S
T
12" ST
" S
T
" S
T
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E R
AZ
O
R W
IR
E
PCC
R
AZ
O R
W
IR
E
R
AZ
O R
W
IR
E
STORM INTAKE
800.09 RIM
797.94 IE 8" DIP (E)
797.79 IE (N)
STORM INTAKE
808.91 RIM
802.40 IE 12" RCP (S)
802.31 IE 12" RCP (N)
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE
6" ADS TILE
RUN ON TOP
OF GROUND
DIRECTING
ROOF DRAIN
DISCHARGE
STORM MH
806.64 RIM
799.10 IE 10" VCP (SW)
798.95 IE 12" RCP (W)
798.88 IE 18" RCP (N)
STRUCTURE INACCESSIBLE
UNDER RAZOR WIRE
803.32 IE 4" ADS (SW)
STORM MH
811.92 RIM
STORM INTAKE
801.64 RIM
799.57 IE 4" PVC (S) (PLUGGED WITH ROCK)
799.23 IE 12" VCP (NW)
STORM INTAKE
804.98 RIM
803.48 IE 6" ADS (N)
803.27 BOTTOM
STORM INTAKE
800.31 RIM
798.21 IE 8" DIP (W)
798.16 IE 8" DIP (N)
798.11 IE (E)
STORM MH
811.92 RIM
±804 IE 15" VCP (W)
6" (N)
804.19 BOTTOM
STANDING WATER IN STRUCTURE
803.92 IE 4" PVC (W)
803.90 IE 4" PVC (W)
803.93 IE 4" PVC (W)
SUMP PUMP DISCHARGE
INTO ADS TILE
ENF
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE
.2
12'
REMOVE PAVEMENT.
REMOVE STORM INTAKE.
CONTRACTOR TO REMOVE AND
DISPOSE OF GROUND LEVEL RAZOR
WIRE STACKED IN 3-2-1 CONFIGURATION
AS REQUIRED TO INSTALL STORM
SEWER, TYP. SEE PHOTOS 1 AND 2/C301.
REMOVE PAVEMENT AS
REQUIRED TO REMOVE
EXISTING STORM
INTAKE AND INSTALL
NEW STORM SEWER.
REMOVE STORM INTAKE.
EXCAVATE AND EXPOSE NORTHERN
WALL FACE AND ABANDONED STORM
SEWER ON NORTH END OF TUNNEL.
FILL STORM SEWER TO THE NORTH
AND SOUTH WITH LOW STRENGTH
FLOWABLE FILL AND CAP, TYP.
REMOVE STORM SEWER AS
REQUIRED FOR NEW FOUNDATION
DRAIN TILE CONNECTION, TYP.
REMOVE ABANDONED
CONCRETE FENCE
FOOTING.
REMOVE ABANDONED
CONCRETE FENCE FOOTING
AS REQUIRED FOR
EXPLORATORY EXCAVATION
TO LOCATE STORM SEWER
AND INSTALL LIQUID
APPLIED WATERPROOFING
ON BUILDING FACE. REMOVE DAMAGED PCC CONCRETE.
PROTECT ADJACENT FENCE POSTS.
REMOVE STORM SEWER. REMOVE AND STORE ABOVE
GRADE DRAIN TILE FOR
REINSTALLATION, TYP.
REMOVE AND STORE ABOVE
GRADE DRAIN TILE FOR
REINSTALLATION, TYP.
2'
STRIP, SALVAGE, AND STORE
GRAVEL SURFACING AS
REQUIRED FOR STORM SEWER
INSTALLATION, TYP.
REMOVE PCC PAVEMENT
REMOVE SURFACE FEATURE
REMOVE AND DISPOSE OF UTILITY
PRESSURE GROUT AND ABANDON UTILITY
LEGEND
STRIP, SALVAGE, AND STORE GRAVEL
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:0
AM
C301
SI
TE
PR
EP
AR
AT
IO
N
AN
D
D
EM
O
LI
TI
O
N
PL
AN
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
SITE PREPARATION AND DEMOLITION PLAN
SITE PREPARATION AND DEMOLITION NOTES
1. CONSTRUCTION FENCE IS REQUIRED AROUND CONSTRUCTION AREAS AND ALL UNATTENDED OPEN EXCAVATIONS. CONSTRUCT FENCE AS SHOWN ON THE
PLAN AND MAINTAIN IN AN UPRIGHT POSITION AT ALL TIMES. PROVIDE ORANGE CONSTRUCTION FENCE TO SECURE ALL WORK OUTSIDE OF THE CHAIN LINK
FENCE. SEE DETAIL 1/C501.
2. USE CAUTION WHILE INSTALLING FENCE NOT TO DAMAGE UNDERGROUND UTILITIES.
3. FENCING, BARRICADES AND SIGNAGE MUST BE USED TO DIVERT TRAFFIC AROUND THE CONSTRUCTION ACTIVITY.
4. SEE SITE ACCESS PLAN FOR ADDITIONAL CONSTRUCTION FENCE LOCATIONS.
5. KEEP ALL DRIVES OPEN AT ALL TIMES EXCEPT FOR THOSE INDICATED. PERFORM THE WORK IN A MANNER THAT WILL MAINTAIN UNINTERRUPTED VEHICULAR
AND PEDESTRIAN TRAFFIC. MAINTAIN ROADS FREE OF RUTS.
6. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE DURATION OF THE PROJECT.
7. INSTALL EROSION CONTROL MEASURES ON SITE PRIOR TO PERFORMING SOIL DISTURBING ACTIVITIES.
8. THIS PROJECT DISTURBS LESS THAN ONE ACRE AND DOES NOT REQUIRE A SWPPP. HOWEVER, THE CONTRACTOR IS STILL REQUIRED TO CONTROL SEDIMENT
AND PREVENT IT FROM LEAVING THE SITE OR ENTERING DRAINAGE SYSTEMS.
9. CONTACT THE OWNER IMMEDIATELY AND SUSPEND WORK IF SUSPECT CONTAMINATED SOIL IS ENCOUNTERED.
10. CONTACT THE OWNER'S REPRESENTATIVE TO COORDINATE ANY TREE PRUNING REQUIRED FOR WORK. ALL PRUNING OF TREES SHOWN TO REMAIN SHALL BE
COMPLETED BY OWNER. USE CAUTION NOT TO DAMAGE TREES NOT SHOWN TO BE REMOVED.
11. STRIP TOPSOIL WITHIN DISTURBED AREA. ALL EXISTING TOPSOIL THAT IS ACCEPTABLE TO THE OWNER MAY BE REUSED. ALL OTHER TOPSOIL SHALL BE
DISPOSED OF AT OWNER'S ON-SITE DUMP SITE.
12. DISPOSE OF ALL EXCESS EXCAVATED MATERIAL THAT WILL NOT BE USED ON SITE AT OWNER'S ON-SITE DUMP SITE OR STOCKPILED OFF SITE AT LOCATION(S)
SECURED BY THE CONTRACTOR.
13. IMMEDIATELY PROVIDE A TEMPORARY SPLICE IN THE EVENT THAT LIGHTING CIRCUITS ARE DISRUPTED INTENTIONALLY OR UNINTENTIONALLY TO REESTABLISH THE CIRCUIT. CONTACT THE OWNER'S REPRESENTATIVE PRIOR TO MAKING ANY PERMANENT ELECTRICAL CONNECTIONS. PROVIDE PERMANENT
CONNECTIONS AT NO ADDITIONAL COST TO THE OWNER.
14. REMOVE EXISTING PAVEMENT IN FULL PANELS OR AS NOTED ON DRAWINGS. DOUBLE SAW CUTTING SHALL BE AT THE CONTRACTOR'S DISCRETION. IF THE EDGES OF EXISTING PANELS ARE DAMAGED DURING CONSTRUCTION, REPLACE THOSE PANELS AT NO ADDITIONAL COST TO THE OWNER.
15. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL PAVEMENT REMOVAL LIMITS AND ACCOUNT FOR THOSE IN THE BID PRICE. NO ADDITIONAL COMPENSATION WILL BE GIVEN FOR PAVEMENT REMOVAL IN ADDITION TO WHAT IS SHOWN IN THE DRAWINGS. THE LIMITS OF ROADWAY AND
SIDEWALK REMOVAL SHOWN ARE A MINIMUM.
16. REPLACE AT NO COST TO THE OWNER ALL DAMAGED STREET SIGNS, PAVEMENT MARKINGS, SIDEWALK LAMPS, SIDEWALKS, STEPS, LANDSCAPE STRUCTURES, CURB AND GUTTER, STREETS, DRIVES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE REMOVED DURING THE COURSE OF THE WORK.
17. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR REGISTERED TO
PRACTICE IN THE STATE OF IOWA.
18. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER, OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, REMOVE AND REPLACE THE ENTIRE SECTION AT NO COST TO THE OWNER. REMOVE PAVEMENT, CURBS, GUTTERS, AND SIDEWALKS TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. DOCUMENT (OR PHOTO) ALL CRACKED PCC PAVEMENT OR DAMAGED ASPHALT PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR ASPHALT PAVEMENT IS DAMAGED DUE TO CONSTRUCTION TRAFFIC (EXTENDS BEYOND
CONSTRUCTION LIMITS), REPLACE DAMAGED AREA AT NO ADDITIONAL COST TO THE OWNER.
19. REMOVE AND REPLACE ALL LANDSCAPING INCLUDING TREES, SHRUBS, BUSHES AND GRASS OR TURF NOT CALLED OUT TO BE REMOVED ON THE DRAWINGS WHERE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WHERE TREES, BUSHES AND SHRUBS CANNOT BE OR ARE NOT PROTECTED, OR ARE OTHERWISE DESTROYED OR DAMAGED BY CONTRACTOR, REPLACE THE TREES, BUSHES AND SHRUBS WITH NEW PLANTS OF THE SAME VARIETY AND SIZE AS THE PLANT DAMAGED OR DESTROYED. RESTORE GRASS OR TURF WHERE DESTROYED OR DAMAGED DURING CONSTRUCTION, TO THE CONDITION THAT
EXISTED PRIOR TO CONSTRUCTION.
20. TREAT THE ON SITE SOILS AND PROVIDE ROCK SURFACING AS NEEDED TO MAINTAIN A SUITABLE WORKING SURFACE DURING CONSTRUCTION.
UTILITY DEMOLITION NOTES
1. CAREFULLY COORDINATE ALL UTILITY DEMOLITION WITH PHASING REQUIREMENTS OF THE PROJECT.
2. PLUG ALL PREVIOUSLY ABANDONED UTILITY LINES DISCOVERED DURING CONSTRUCTION THAT ARE CUT DURING EXCAVATION WITH 3' OF CONCRETE AND WITNESSED BY OWNER OR OWNER'S THIRD PARTY INSPECTOR. VERIFY WITH OWNER THAT LINES ARE ABANDONED PRIOR TO PLUGGING.
3. PRESSURE GROUT AND CAP ALL UTILITIES TO BE ABANDONED IN PLACE.
4. CONTACT THE OWNER OF EACH UTILITY PRIOR TO DEMOLITION OR ABANDONMENT TO VERIFY THAT UTILITY HAS BEEN ABANDONED.
5. DISPOSE OF ALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND NOT RETAINED BY THE OWNER OFF-SITE BY IN ACCORDANCE WITH ALL APPLICABLE STATE
AND LOCAL LAWS AND REGULATIONS.
COILED RAZOR WIRE REMOVAL (SOUTH)1
CONTRACTOR TO REMOVE AND
DISPOSE OF GROUND LEVEL RAZOR
WIRE STACKED IN 3-2-1 CONFIGURATION
AS REQUIRED TO INSTALL STORM
SEWER, TYP. SEE PHOTOS 1 AND 2/C301.
PROTECT CAMERA POLE AND
JUNCTION BOX DURING STORM
SEWER INSTALLATION.
PROTECT POLE MOUNTED
MOTION SENSOR DURING
STORM SEWER INSTALLATION.
COILED RAZOR WIRE REMOVAL (NORTH)2
CONTRACTOR TO REMOVE AND
DISPOSE OF GROUND LEVEL RAZOR
WIRE STACKED IN 3-2-1 CONFIGURATION
AS REQUIRED TO INSTALL STORM
SEWER, TYP. SEE PHOTOS 1 AND 2/C301.
R
AZO
R
W
IR
E
PCC
PCC
PCC
PC
C
PCC
PCC
PCC
PCC
PCC
PC
C
PC
C
PC
C
PCC
PCC
PCC
GRASS
GRASS
GRASS
GRAVEL
GRASS D
IR
T
GRASS
GRASS
GRASS
GRASS
GRASSGRAVEL
GRASS
E.
N
.F
E.
N
.F
E.N.F.
IMCC
ADMINISTRATION
BUILDING
GROUND ROD
COVERED SEATING AREA
ANTENNA
GROUND ROD
SANITARY MH
809.52 RIM
800.68 IE ±8" VCP (W)
799.22 IE ±10" (N)
799.10 IE ±10" (S)
GROUND ROD
GROUND ROD
2" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC SUMP PUMP
DISCHARGE INTO ADS TILE.
3" PVC COMING OUT OF WALL
1" CONDUIT COMING
OUT OF GROUND
FF THRESHOLD = 804.05
(METAL)
FF = 811.25
(TILE)
FF = 803.89
(CONCRETE)
FF = 811.24
(TILE)
GROUND
ROD
STONE
RETAINING WALL
STONE
RETAINING WALL
STONE RETAINING WALL
SPLIT HEAD
GALVANIZED PIPE
ON WALL
GUARD RAIL
STAIRS
CAMERA POLE AND
JUNCTION BOX.
POLE MOUNTED
MOTION SENSOR.
POLE MOUNTED
MOTION SENSOR.
6" S
T
" S
T
15" ST
8" ST
12" ST
" S
T
" S
T
STORM MH
806.64 RIM
799.10 IE 10" VCP (SW)
798.95 IE 12" RCP (W)
798.88 IE 18" RCP (N)
STRUCTURE INACCESSIBLE
UNDER RAZOR WIRE
803.32 IE 4" ADS (SW)
STORM MH
811.92 RIM
STORM INTAKE
801.64 RIM
799.57 IE 4" PVC (S) (PLUGGED WITH ROCK)
799.23 IE 12" VCP (NW)
STORM INTAKE
804.98 RIM
803.48 IE 6" ADS (N)
803.27 BOTTOM
STORM INTAKE
800.31 RIM
798.21 IE 8" DIP (W)
798.16 IE 8" DIP (N)
798.11 IE (E)
STORM MH
811.92 RIM
±804 IE 15" VCP (W)
6" (N)
804.19 BOTTOM
STANDING WATER IN STRUCTURE
803.92 IE 4" PVC (W)
803.90 IE 4" PVC (W)
803.93 IE 4" PVC (W)
SUMP PUMP DISCHARGE
INTO ADS TILE
ENF
6" ADS TILE RUN ON TOP OF
GROUND DIRECTING ROOF
DRAIN DISCHARGE
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
4" S
T
+0
+0
+2
15"ST
4" S
T
+0
+0
+0
+4
" S
T
STORM INT 1.0
SW-401 (48") WITH TYPE 4B GRATE
STORM INT 3.0
SW-401 (48") WITH TYPE 4B GRATE
INSTALL STORM SEWER MANHOLE
AND CONNECT TO EXISTING PIPES.
VERIFY PIPE SIZES AND IE'S PRIOR
TO ORDERING STRUCTURE.
CONNECT TO EXISTING STORM
SEWER PIPING WITH WYE OR
INSERT-A-TEE CONNECTION.
CLEANOUT, TYP.
SEE DETAIL 8/C501.
INSTALL STORM SEWER
MANHOLE OVER EXISTING
STORM SEWER AND CONNECT
TO EXISTING PIPES. VERIFY
PIPE SIZES AND IE'S PRIOR TO
ORDERING STRUCTURE, TYP.
STORM INT 1.1
SW-401 (48")
WITH TYPE 3B GRATE
INSTALL 4"
PERFORATED
DRAIN TILE. SEE
DETAIL 5/C501.
INSTALL NEW 12"
STORM SEWER.
INSTALL 4" PERFORATED DRAIN
TILE AND CONNECT TO EXISTING
DRAIN TILE WITH WYE
CONNECTION AND REINSTALL
CLEANOUT, SEE DETAIL 5/C501.
INSTALL NEW 12"
STORM SEWER.
STORM INT 2.0
SW-401 (48")
WITH TYPE 3B GRATE
" S
T
CONNECT NEW 12" STORM SEWER
TO EXISTING STORM MANHOLE.
INSTALL 4" PERFORATED
DRAIN TILE. SEE DETAIL 5/C501.
INSTALL LIQUID APPLIED WATER PROOFING ON
EXPOSED PORTIONS OF BELOW GRADE STRUCTURE
EXTERIOR WALL PER MANUFACTURER'S
INSTRUCTIONS. BACKFILL WITH 12" OF BENTONITE
MIXED SOIL AGAINST BUILDING, TYP.
ANTICIPATED SHORING LIMITS.
CONTRACTOR SHALL UTILIZE
STABILIZATION METHODS TO
PROTECT FROM UNDERMINING
EXISTING FENCE FOOTINGS
AND ANTENNA TOWER, TYP.
INSTALL 4" PERFORATED DRAIN TILE AS FAR
NORTH AS POSSIBLE USING NARROW EXCAVATION
METHODS SUCH AS HYDRO EXCAVATION NORTH
OF ANTENNA STRUCTURE DUE TO RESTRICTED
WORKING AREA. APPLY AS MUCH LIQUID APPLIED
WATER PROOFING ON EXPOSED PORTIONS OF
BELOW GRADE STRUCTURE EXTERIOR WALL PER
MANUFACTURER'S INSTRUCTIONS AS FEASIBLE.
PROTECT EXISTING SIDEWALK AND
FENCE FOUNDATIONS DURING STORM
SEWER INSTALLATION.
10+00
0.
0.
0.
0.
11+00
9.
11+20
9.
1 PROFILE - STORM SEWER - SOUTH
EXISTING
GRADE, TYP.
EXISTING
GRADE, TYP.
12"ST @ 0.5%
ST
O
R M
IN
T
1.
R
IM
SE
E G
R
AD
IN
G
P
LA
N
2.
IE
2"
N
2.
IE
5"
E)
2.
IE
5"
W
EXISTING BUILDING.
ST
O
R M
IN
T
1.
R
IM
SE
E G
R
AD
IN
G
P
LA
N
2.
IE
2"
S)
2.
IE
N
INSTALL LIQUID WATER PROOFING ON
EXPOSED PORTIONS OF BELOW GRADE
STRUCTURE EXTERIOR WALL PER
MANUFACTURER'S INSTRUCTIONS.
BACKFILL WITH 12" OF BENTONITE
MIXED SOIL AGAINST BUILDING, TYP.
(E
XI
ST
PROPOSED
GRADE, TYP.
9.
9.
9.
9.
9.
PROPOSED
GRADE, TYP.
(E
XI
ST
(N
EW
20+00
0.
0.
0.
21+00
0.
0.
9.
8.
22+00
7.
6.
22+40
4.
12"ST @ 0.5%
2 PROFILE - STORM SEWER - NORTH
EXISTING
GRADE, TYP.
EXISTING
GRADE, TYP.
INSTALL LIQUID WATER PROOFING ON
EXPOSED PORTIONS OF BELOW GRADE
STRUCTURE EXTERIOR WALL PER
MANUFACTURER'S INSTRUCTIONS.
BACKFILL WITH 12" OF BENTONITE
MIXED SOIL AGAINST BUILDING, TYP.
EX
IS
TI
N
G M
AN
H
O
LE
R
IM
SE
E G
R
AD
IN
G
P
LA
N
1.
IE
2"
S)
9.
IE
0"
SW
8.
IE
2"
W
8.
IE
8"
N E)
ST
O
R M
IN
T
2.
R
IM
SE
E G
R
AD
IN
G
P
LA
N
2.
IE
(S
2.
IE
2"
N
(E
XI
ST
PROPOSED
GRADE, TYP.
PROPOSED
GRADE, TYP.
0.
0.
0.
0.
0.
9.
8.
7.
6.
(N
EW
(E
XI
ST
(E
XI
ST
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:4
AM
C401
SI
TE
U
TI
LI
TY
PL
AN
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
SITE UTILITY PLAN
UTILITY CONSTRUCTION NOTES
1. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR HAS A
CONTRACTUAL OBLIGATION TO COMPLY WITH ALL APPLICABLE LAWS AND REGULATIONS INCLUDING THOSE OF OSHA. AT NO TIME WILL EITHER THE OWNER OR THE ENGINEER TAKE RESPONSIBILITY FOR EITHER THE MEANS OF THE WORK OR THE SAFETY OF THE CONTRACTOR'S EMPLOYEES.
2. FIELD-VERIFY THE INVERT ELEVATIONS AT ALL TIE-IN LOCATIONS PRIOR TO THE START OF GRAVITY SEWER LINE INSTALLATION. REPORT ANY DISCREPANCIES BETWEEN THE VERIFIED ELEVATIONS AND THE PLAN ELEVATIONS TO THE ENGINEER IMMEDIATELY. NO GRAVITY SEWER LINE INSTALLATION SHALL PROCEED UNTIL VERIFICATION IS
COMPLETE AND ANY NECESSARY ADJUSTMENTS ARE APPROVED.
3. FOR THE PURPOSES OF GENERAL SAFETY, CONSTRUCT FENCE AROUND CONSTRUCTION AREAS AT ALL UNATTENDED OPEN EXCAVATIONS. SEE SHEET C501 FOR FENCE TYPE
AND DETAIL. MAINTAIN ALL FENCES IN AN UPRIGHT POSITION AT ALL TIMES.
4. LOCATION, SIZE, AND DEPTH OF BURIED UTILITIES ARE ILLUSTRATED BASED ON AVAILABLE RECORDS FROM THE UTILITY OPERATING AUTHORITY. RECORD LOCATIONS ARE FIELD VERIFIED BASED ON OBSERVABLE SURFACE FEATURES SUCH AS MANHOLES, VALVE BOXES, EVIDENCE OF TRENCHES, ETC. OR FIELD MARKING BY THE OPERATING AUTHORITY WHEREVER POSSIBLE. EXCAVATIONS HAVE NOT BEEN MADE TO VERIFY LOCATIONS OR DEPTH OF BURIED UTILITIES. EXACT LOCATION AND ELEVATION OF ALL
UTILITIES MUST BE DETERMINED BY THE CONTRACTOR.
5. CONTACT EACH UTILITY'S OPERATING AUTHORITY AND SCHEDULE JOINT MEET LOCATES. VERIFY WITH EACH UTILITY'S OPERATING AUTHORITY THAT LOCATES HAVE BEEN PERFORMED. IOWA ONE CALL SYSTEM: 1-800-292-8989. IT IS THE ESSENCE OF THIS CONTRACT TO PROTECT ALL EXISTING UTILITIES. WORK TO EXPLORE AND VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIES AT LEAST 100 FEET IN ADVANCE OF THE EXCAVATION WORK. IN THE EVENT THAT A UTILITY IS DISCOVERED THAT WAS NOT SHOWN ON THE DRAWINGS OR A SUBSTANTIAL DEVIATION IN LOCATION OR ELEVATION OF A KNOWN UTILITY EXISTS, REPORT IT TO THE OWNER'S REPRESENTATIVE AS SOON AS
DISCOVERED.
6. PROTECT ALL UTILITIES AND VAULTS FROM DAMAGE DUE TO OPERATION OF HEAVY EQUIPMENT. HAND EXCAVATION WILL BE REQUIRED WHEN EXPOSING EXISTING UTILITIES.
7. USE EXTREME CAUTION WHILE EXCAVATING AND WORKING OVER EXISTING TUNNELS AND UNDERGROUND VAULTS TO PROTECT STRUCTURE AND WATERPROOFING SYSTEM.
HAND EXCAVATION WILL BE REQUIRED. IF WATERPROOFING SYSTEM IS DAMAGED, CONTACT THE OWNER FOR REPAIR INSTRUCTION.
8. SHORE/SUPPORT ALL UTILITIES CROSSING THROUGH EXCAVATION TRENCH TO PROTECT THE UTILITY. SOME NON-REINFORCED DUCTBANKS MAY EXIST ON SITE THAT WILL REQUIRE SPECIAL SUPPORT/SHORING. ALL SHORING/SUPPORT SYSTEMS ARE SUBJECT TO APPROVAL BY THE OWNER. REPAIR ALL DAMAGE TO UTILITIES CAUSED BY
CONSTRUCTION ACTIVITIES AT NO COST TO THE OWNER.
9. UNDERGROUND TUNNELS AND VAULTS ARE PRESENT ON SITE. SHORE/SUPPORT EXISTING UNDERGROUND TUNNELS AND VAULTS TO SUPPORT CONSTRUCTION ACTIVITIES THAT ARE CROSSING OR ADJACENT TO EXISTING STRUCTURES PRIOR TO COMMENCING WORK. SUBMIT METHOD OF SHORING TO OWNER AND DESIGN PROFESSIONAL FOR REVIEW PRIOR TO INSTALLATION. NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR SHORING. DURING THE CONSTRUCTION PROCESS, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND PROTECT IT FROM DAMAGE.
10. SHORING OF EXISTING OR NEW UTILITIES AND OTHER SITE FEATURES IS NOT NECESSARILY SHOWN ON THE PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN IF SHORING IS NEEDED IN ADDITION TO WHAT IS SHOWN ON THE DRAWINGS BASED ON THE OWNER'S REQUIREMENTS FOR VEGETATION/STRUCTURE/PAVING PROTECTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PLAN AND DESIGN ALL SHORING. SHORING DESIGN TO BE PERFORMED BY A LICENSED ENGINEER LICENSED TO PERFORM WORK IN THE STATE OF IOWA. SUBMIT DESIGN OF SHORING TO OWNER AND DESIGN PROFESSIONAL FOR REVIEW PRIOR TO INSTALLATION. NO ADDITIONAL COMPENSATION WILL BE
PROVIDED FOR SHORING.
11. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION OPERATIONS, STOP WORK IN THAT AREA AND CONTACT THE OWNER FOR DIRECTION. DO NOT REMOVE CONTAMINATED MATERIALS FROM THE SITE UNTIL RECEIVING DISPOSAL DIRECTION FROM THE OWNER. REFER TO SPECIFICATION FOR INSTRUCTIONS. COMPLY WITH APPLICABLE REGULATIONS, LAWS AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION
12. PHASE WORK TO MEET UTILITY OUTAGE AND PROJECT SCHEDULE REQUIREMENTS.
13. STAGING AREAS ARE LIMITED. IT IS ANTICIPATED THAT SOME AREAS WILL REQUIRE THAT ALL EXCAVATED MATERIALS WILL BE HAULED TO OWNER'S ON-SITE DUMP SITE AND NEW BACKFILL MATERIALS HAULED IN. HAUL OFF AND IMPORT OF MATERIALS SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
14. UTILITIES AND OTHER SITE FEATURES SCHEDULED FOR DEMOLITION ARE NOT SHOWN ON THE SITE UTILITY PLAN. REFER TO THE UTILITY DEMOLITION PLAN ON SHEET C301.
15. COORDINATE ALL UTILITY OUTAGES WITH COMPANY OF UTILITY.
16. THE OWNER SHALL OPERATE ALL VALVES AND HYDRANTS.
17. ALL UTILITY SHUT DOWNS REQUIRE WRITTEN NOTIFICATION TO THE OWNER A MINIMUM OF 1 WEEK IN ADVANCE. SHUT DOWN MAY HAVE A DURATION NO MORE THAN 8 HOURS.
18. THE ALIGNMENT OF UTILITIES AND OTHER WORK IN THIS CONTRACT HAS BEEN CAREFULLY LAID OUT. THE CONTRACTOR IS NOT PERMITTED TO INSTALL UTILITIES AT SIGNIFICANT DEVIATION FROM ALIGNMENT AND PROFILES PROVIDED WITHOUT FIRST RECEIVING APPROVAL FROM THE OWNER'S REPRESENTATIVE AND DESIGN
PROFESSIONAL.
19. TEMPORARILY CAP ALL PIPES OVERNIGHT WITH WATER TIGHT FITTINGS AND PRIOR TO LEAVING SITE.
20. SEE SHEETS C501 FOR TYPICAL UTILITY TRENCH AND EMBEDMENT DETAILS.
21. BACKFILL THE TRENCH WITH SUITABLE MATERIALS THAT MEET COMPACTION REQUIREMENTS. THE COST TO HAUL OUT EXISTING MATERIALS AND BRING IN NEW MATERIALS IS INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COSTS TO THE OWNER. THE COST TO HAUL IN ADDITIONAL MATERIAL WHEN NATIVE MATERIAL IS BEING COMPACTED TIGHTER THAN THE IN-SITU CONDITION IS INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COSTS TO THE OWNER.
22. DEWATERING IS INCIDENTAL TO THE PROJECT. THE USE OF DEWATERING EQUIPMENT WILL BE DONE AT THE CONTRACTOR'S OPTION.
23. IF WET SOILS ARE ENCOUNTERED, THE CONTRACTOR IS NOT REQUIRED TO INSTALL WELL POINTS TO DEWATER AREAS IN ADVANCE OF EXCAVATING THE TRENCH. EXCAVATE THE TRENCH, REMOVE UNSUITABLE MATERIAL AS REQUIRED, AND KEEP THE TRENCH DEWATERED AS REQUIRED TO INSTALL THE PIPE.
24. IF UNSUITABLE SOILS FOR UTILITY BEDDING ARE ENCOUNTERED, CONTACT THE OWNER. REPLACE ALL UNSUITABLE SOILS WITH SPECIFIED COMPACTED BACKFILL AT THE OWNER'S APPROVAL. INSTALL GEOTEXTILE FABRIC WHEN SUBBASE CAN NOT BE STABILIZED WITH ROCK ALONE. INSTALL GEOTEXTILE FABRIC AS PER MANUFACTURER'S
RECOMMENDATION AND AT THE OWNER'S APPROVAL.
25. INSTALL NEW ROADWAY SUBDRAIN WHEN EXCAVATING THROUGH STREETS FOR UTILITY INSTALLATION. CONNECT NEW SUBDRAIN TO EXISTING SUBDRAIN.
26. REPLACE ALL DISRUPTED LIGHT CIRCUITS COMPLETELY FROM THE NEAREST HANDHOLE OR SOURCE NOT DISTURBED.
27. THE CONTRACTOR IS REQUIRED TO KEEP ACCURATE CONSTRUCTION RECORD DOCUMENTS INCLUDING ELEVATIONS FOR UTILITIES AT EACH CHANGE IN PROFILE OR ALIGNMENT. CONTRACTOR TO UTILIZE GPS EQUIPMENT TO OBTAIN AS-BUILT COORDINATES PRIOR TO BACKFILL.
28. ADJUST ALL NEW AND EXISTING CASTINGS TO MATCH THE FINISHED ELEVATIONS INDICATED ON THE PLANS. ADJUST ALL RIM ELEVATIONS WITHIN PAVED SURFACES TO MATCH
FINISHED PAVING. ALL ADJUSTMENT RINGS FOR MANHOLES OR INTAKES SHALL BE CONCRETE.
N O
R
TH
G
AT
E D
R
IV
E
IO
W A
C
IT
Y, IO
W A
9.
4.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
1.
dw g
/1
4/
1:
:5
AM
C501
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
AS
R
KM
B
BI
D
/1
8/
80 --- C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
2.
IM
C
C A
D M
IN
B
LD
G
W
AT
ER
M
IT
IG
AT
IO
N
IO
W
A D
EP
AR
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
C O
R
AL
VI
LL
E, IA
6' -0
MOVEABLE CHAINLINK FENCE SHALL BE INSTALLED AROUND CONSTRUCTION
SITE PERIMETER.
NOTES:
GRADE
MOVEABLE PANELS SHALL BE SECURELY FASTENED DOWN TO PREVENT
MOVEMENT, OVERTURNING, OR WIND PROBLEMS.
TEMPORARY CHAIN LINK CONSTRUCTION FENCE 1
1.
2.
MOVEABLE GALVANIZED STEEL
CHAIN LINK FENCING, POSTS & RAILS
BASE PLATE WITH SAND BAGS
TO PREVENT OVERTURNING
PROVIDE BEIGE PVC PRIVACY SLATS WITH BOTTOM LOCK SLAT ON FENCE EXCEPT
AT CONSTRUCTION GATES AND TO ALLOW FOR SITE DISTANCE AT DRIVE
ENTRANCES.
3.
DT
2 PIPE EXCAVATION & BEDDING FOR STORM SEWERS
NOTE:
SUBGRADE SHALL BE EXCAVATED OR OVEREXCAVATED, IF
NECESSARY, SO A UNIFORM FOUNDATION FREE OF
PROTRUDING ROCKS MAY BE PROVIDED.
PROVIDE TOPSOIL OR PAVING AS PER
PLANS AND SPECIFICATIONS.
ACTUAL TRENCH SIDE SLOPE TO BE
DETERMINED BY CONTRACTOR IN
ACCORDANCE WITH OSHA STANDARDS
IN LANDSCAPE AREAS, BACKFILL SHALL BE
SUITABLE NATIVE OR IMPORTED SUITABLE FILL
COMPACTED TO 95% STANDARD PROCTOR
DENSITY. IN PAVED AREAS, BACKFILL SHALL BE
IOWA DOT GRADATION 11 CLASS 'A' ROADSTONE
COMPACTED TO 98% STANDARD PROCTOR
DENSITY.
HAND TAMPED BACKFILL SEE NOTE
FOR MATERIAL
D/4, 4" MIN
12" MIN
PIPING SHALL HAVE SUDAS
CLASS 1 (IOWA DOT GRAD. 3)
BEDDING AND ENVELOPE
UNDISTURBED SOIL
2.0'
WARNING TAPE 12"-18"
ABOVE UTILITY
PCC PAVEMENT4
NOTES:
1. ALL NEW PAVEMENT SHALL BE DOWELED INTO EXISTING.
2. ALL PAVEMENT SHALL BE JOINTED TO MEET IOWA DOT STANDARD ROAD PLAN PV-101
AND ACCORDING TO SUDAS SECTION 5G
FINISH PER
SPECIFICATIONS.
SEE GRADING PLAN
FOR CROSS-SLOPES,
TYP.
PROVIDE 6" OF IOWA DOT GRADATION 14 SUBBASE. SEE
SPECIFICATION FOR COMPACTION REQUIREMENTS
SUBGRADE TO BE SCARIFIED TO A DEPTH OF 12" AND RECOMPACTED
TO 98% STANDARD PROCTOR DENSITY
PCC PAVEMENT. SEE PLAN FOR
LOCATION AND THICKNESS.
EXPANSION JOINT6
SLOPE
1"
1/
2"
3/4" BUILDING OR STRUCTURE FACE, 1/2" ELSEWHERE
BUILDING FACE OR ABUTTING PAVEMENT
JOINT SEALANT
CLOSED CELL POLYETHYLENE FOAM BACKER ROD
EXPANSION JT. MATERIAL
ABUTTING PAVEMENT
7 GRAVEL SURFACE SECTION
6"
SUBGRADE TO BE
SCARIFIED TO A
DEPTH OF 12" AND
RECOMPACTED TO
98% STANDARD
PROCTOR DENSITY.
2" NOMINAL DIAMETER
ROCK SURFACING.
WEED BARRIER
PCC SIDEWALK3
NOTES:
1. SPACE 1/2" EXPANSION JOINTS AT MAX 100' INTERVALS.
2. PROVIDE MEDIUM BROOM FINISH PERPENDICULAR TO THE DIRECTION OF TRAVEL.
SEE GRADING PLAN FOR
CROSS-SLOPE, TYP.
EXISTING SIDEWALK
PROVIDE 4" OF IOWA DOT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .