About this file

This is a set of architectural drawings prepared by CMBA Architects for the Iowa Department of Administrative Services (DAS) regarding roof replacement work at the Fort Dodge Correctional Facility located at 1550 L Street, Fort Dodge, Iowa 50501. The project involves removal of existing ballast and roofing materials and installation of a new EPDM roof system on Buildings A, B, and G at the facility. The drawings include site plans, demolition plans, roof plans, and detailed specifications for roof assemblies, flashing, gutters, and penetrations. The existing roof assembly consists of loose-laid ballast, 60-mil EPDM membrane, 4.5 inches of XPS insulation in two layers, 0.5-inch gypsum substrate, and a sloped concrete deck. The new roof system requires fully adhered installation of the membrane and cover board with R-30 minimum insulation and includes provisions for approximately 1/4-inch per 1-foot slope for drainage. The project requires coordination with facility staff for gate access, background checks and PREA training for all personnel, daily tool inventory management, and maintenance of weather-tight conditions throughout construction.

The project specifications require contractors to remove and reinstall existing roof-mounted equipment including lightning protection cables and rods, roof vents, exhaust fans, and supply air intakes. Contractors must remove aggregate ballast and dispose of it offsite, remove and reinstall lightning cables with new clips (recertification not required), and coordinate with the owner regarding roof tie-off anchor removal to prevent materials from falling inside the building. All construction equipment must be removed from the site daily to a designated staging area in the parking lot, except for a secured job box that may remain on the roof. The contractor is responsible for protecting underground utility lines, covering open areas to prevent materials from falling below, cleaning work areas thoroughly at day's end, and maintaining the existing roof curbs, downspouts, roof hatches, and roof access doors. The drawings note that MEP item quantities, sizes, and locations are approximate and require field verification, and that final roof layout, tapered insulation design, and expansion joint locations must be coordinated with the roofing manufacturer to ensure warranty compliance.

View the file

Other files

File Type Posted
RFB950800-01 - Project Manual.pdf PDF
RFB950800-01 - Notice to Bidders.pdf PDF
RFB950800-01 - Addendum #1.pdf PDF
RFB950800-01 - Bid Form.pdf PDF
1380388-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

AB AIR BARRIER

AFF ABOVE FINISH FLOOR

ACT ACOUSTICAL CEILING TILE

ALT. ALTERNATE

ALUM. ALUMINUM

APPROX. APPROXIMATE

ARCH. ARCHITECT (URAL)

AVB AIR AND VAPOR BARRIER

BD. BOARD

BES BUILDING ENVELOPE SEALANT

BG BUMPER GUARD

BGW BELOW GRADE WATERPROOFING

MEMBRANE

B.O. BOTTOM OF

BRG. BEARING

CC CUBICLE CURTAIN

CFCI CONTRACTOR FURNISHED-CONTRACTOR

INSTALLED

CG CORNER GUARD

CJ CONTROL JOINT

CL CENTERLINE

CLG. CEILING

CMU CONCRETE MASONRY UNIT

COL. COLUMN

CONC. CONCRETE

CONST. CONSTRUCTION

CONT. CONTINUOUS

CORR. CORRIDOR

CPT. CARPET

CR CHAIR RAIL

CT CERAMIC TILE

DIA. DIAMETER

DIM. DIMENSION

DN. DOWN

DS DOWNSPOUT

DTL. DETAIL

DVB DECK VAPOR BARRIER

DWG. DRAWING

EA. EACH

EG END GUARD

EJ EXPANSION JOINT

ELEC. ELECTRICAL

ELEV. ELEVATOR

EPT EPOXY PAINT

EQ. EQUAL

EQUIP. EQUIPMENT

EW EACH WAY

EXIST. EXISTING

EXP. EXPOSED

EXT. EXTERIOR

FAF FLUID APPLIED FLOORING

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN. FINISH (ED)

FLR. FLOOR

FND. FOUNDATION

FRP FIBERGLASS REINFORCED PANEL

FRT FIRE RETARDANT TREATED

FTG. FOOTING

FV FIELD VERIFY

GA. GAUGE

GALV. GALVANIZED

GC GENERAL CONTRACTOR

GFRG GLASS FIBER REINFORCED GYPSUM

GL GLASS

GYP. GYPSUM

GWB GYPSUM WALL BOARD

HM HOLLOW METAL

HORIZ. HORIZONTAL

HR HANDRAIL

HVAC HEATING, VENTILATING, AIR CONDITIONING

INT. INTERIOR

JST. JOIST

JT. JOINT

KIT. KITCHEN

LAV. LAVATORY

MAX. MAXIMUM

MB MARKER BOARD

MDF MEDIUM DENSITY FIBERBOARD

MECH. MECHANICAL

MFR. MANUFACTURER

MIN. MINIMUM

MISC. MISCELLANEOUS

MTL. METAL

NIC NOT IN CONTRACT

NOM. NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OFOI OWNER FURNISHED-OWNER INSTALLED

OFCI OWNER FURNISHED-CONTRACTOR

INSTALLED

ORD OVERFLOW ROOF DRAIN

PL PLASTIC LAMINATE

PNL PANEL

PT. PAINT

R / RAD. RADIUS

RAF RAISED ACCESS FLOOR

RD ROOF DRAIN

REF. REFERENCE, REFER TO

REFR. REFRIGERATOR

REINF. REINFORCE (D) (ING)

REQ. REQUIRED

REV. REVISION (S), REVISED

RF RESILIENT FLOORING

RM. ROOM

RO ROUGH OPENING

RP RESIN PANEL

RTU ROOF TOP UNIT

SAB SOUND ATTENUATING BATTS

SCHED. SCHEDULE

SF SQUARE FEET

SIM. SIMILAR

SPEC SPECIFICATION

SS SOLID SURFACE

STD. STANDARD

STL. STEEL

SSTL STAINLESS STEEL

STOR. STORAGE

STRUCT. STRUCTURAL

SUSP. SUSPENDED

TB TACK BOARD

TERR. TERRAZZO

T.O. TOP OF

T.O.B. TOP OF BEAM

T.O.C. TOP OF CONCRETE

T.O.F. TOP OF FOOTING

T.O.W. TOP OF WALL

TWP THROUGH-WALL PENETRATION

TYP. TYPICAL

UVB UNDER-SLAB VAPOR BARRIER

VAR. VARIES

VB VAPOR BARRIER

VERT. VERTICAL

WB WALL BASE

WC WALLCOVERING

WD WOOD

WDF WOOD FLOORING

WDB WOOD BASE

WP WALL PROTECTION

WT WINDOW TREATMENT

CODE SUMMARY

EARTH

SITE SPOT ELEVATION

NEW FINISH

SPOT GRADE

NEW / EXISTING WALL CONSTRUCTION COLUMN GRID LINE

NEW AND EXISTING

FINISH SPOT

GRADE

TOP OF CURB

BOT. OF CURB

7.3

N:

7.3

E:

4.8

TC:

7.3

BC:

4.8

EXISTING CONTOUR LINE

NEW CONTOUR LINE

APPROX. TEST BORING LOCATION

PROPERTY LINE

CENTER LINES/ PROJECTED LINES

MATCH LINE

LEVEL LINE

MAIN FLOOR

ELEV. 110'- 0"

ROOM NAME AND NUMBER

DOOR NUMBER

ROOM NUMBER

ALPHABET CHARACTERS USED TO

DISTINGUISH BETWEEN MULTIPLE

DOORS THAT ARE ASSOCIATED WITH

PARTICULAR ROOMS

WINDOW TYPE

KEY NOTES

INDICATES A NOTE FOR A SPECIFIC ITEM

ALL KEY NOTES ARE COMPILED UNDER THE TITLE

BAR "KEY NOTES".

BUILDING SECTION / WALL SECTION

SECTION DIRECTION

DETAIL NUMBER

SHEET NUMBER

DETAILS

DETAIL NUMBER

SHEET NUMBER

EXTERIOR ELEVATION

REVISION MARKER

SHEET NUMBER

ELEVATION NUMBER

ELEVATION DIRECTION

NEW

EXISTING

(SCREENED)

A1.01 1

XX

A

A

A1.01

SIM

NEW

EXISTING

(SCREENED)

OR

INTERIOR ELEVATION

A1.01 1

GRAPHIC SYMBOLS

MATERIAL INDICATIONS

NEW EXISTING

A

A1.01

SIM

SHEET NUMBER

ELEVATION NUMBER

ROOM NAME

150 SF

101 ROOM NUMBER

ROOM SQUARE FOOTAGE

SPOT ELEVATION

8'-0"

TOILET ACCESSORIES TAG

A

WALL TAG ASSEMBLY TYPE TAG

METAL STUDS

METAL SECTION

CMU (STD. WT.)

WOOD STUDS

PLYWOOD

INSULATION

(BLANKET OR BATT)

GLASS FIBER REINFORCED

GYPSUM BOARD

GRAVEL / SAND FILL

CONCRETE

BRICK

STONE

FINISHED WOOD

RIGID INSULATION

SEALANT

GYPSUM BOARD

EXISTING CONSTRUCTION

METAL (LARGE SCALE)

WOOD BLOCKING

ACOUSTICAL CEILING

ELEVATION DIRECTION

W1

101A

101A5 DIGIT

4 DIGIT

B-3

W

B

F

K

ROOM NAME

WALLS

BASE

FLOOR

NOTE

ROOM FINISH TAG

ROOM NAME

ROOM NUMBER

ROOM WALL FINISH

ROOM WALL BASE FINISH

ROOM FLOOR FINISH

ROOM KEYNOTES

MINERAL WOOL SPRAY FOAM AIR SEAL

Signature

Pages or sheets covered by this seal:

Printed or typed name:

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly Licensed Architect under the laws of the State of

Date

License Number:

My license renewal date is

ARCHITECT

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

SHEET INDEX

REVISIONS

PROFESSIONAL SEALS

SHEET

PROJECT LOCATION

/1

7/

:2

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

T

IT

L E

DOC FDCF UNIT A, B & G ROOF REPLACEMENT

IOWA DAS

FORT DODGE, IOWA

T.01

GENERAL

T.01 TITLE

ARCHITECTURAL

A1.00 SITE PLANS

A2.00 DEMO PLAN - BUILDING A

A2.01 DEMO PLAN - BUILDING B & G

A2.02 ROOF PLAN - BUILIDNG A

A2.03 ROOF PLAN - BUILDING B & G

A4.00 ROOF DETAILS

OWNER'S PROJECT NUMBER: 9508.00

RFP 950800-01

N

NOT TO SCALE

REPLACEMENT OF ROOFING SYSTEM ON THE FORT DODGE CORRECTIONAL FACILITY INDICATED ROOFS

AS SHOWN ON THE DRAWINGS. REFERENCE FULL BUILDING DRAWINGS FOR CODE INFORMATION

ADDRESSING THE EXISTING BUILDING.

• 2024 IBC: ALL APPLICABLE CHAPTERS

• 2024 International Building Code as adopted by Iowa Administrative Rule chapters 661-201 and 661-301

• 2024 International Fire Code as adopted by Iowa Administrative Rule chapters 661-201

• 2012 International Energy Conservation Code as adopted by Iowa Administrative Rule chapters 661-303

• 2024 International Existing Building Code as adopted by Iowa Administrative Rule chapters 661-301 and 661-350

• 2012 NFPA 101 Life Safety Code as adopted by Iowa Administrative Rule chapter 661-205

• 2010 Americans with Disabilities Act as adopted by Iowa Administrative Rule chapter 661-302

• State Mechanical Code as adopted by the Department of Public Health Iowa Administrative Rule chapter 641-61

• State Plumbing Code as adopted by the Department of Public Health Iowa Administrative Rule chapter 641-25

• State Electrical Code as adopted by the State Electrical Licensing Board Iowa Administrative Rule chapter 661-504

• ANSI 117.1, 2009, ALL APPLICABLE CHAPTERS

Iowa Department of Administrative Services Owner's Representative:

Geoff Wheelock State Design & Construction Resources Bureau 109 S.E. 13th Street Des Moines, IA 50319 Office: 515-822-8197

CMBA Architects 505 Grand Avenue Spencer, IA 51301

PH: 712-262-3426

Architect Responsible: Adam Van Gorp, AIA Email: vangorp.a@cmbaarchitects.com

The Iowa Department of Inspections, Appeals, and Licensing, Building & Construction Division

PROJECT SUMMARY

STATE OF IOWA:

OWNER

ARCHITECT

BUILDING OFFICIAL:

On Site Contact:

Physical Plant Manager:

Jeremiah Johnson 1550 L Avenue Ft Dodge, IA 50501

PH: 515-574-4716

IBC 2024 REQ / ALLOWED PROVIDED

USE AND OCCUPANCY

CONSTRUCTION TYPE

AUTOMATIC SPRINKLER SYSTEM

BUILDING HEIGHT

BUILDING STORIES

LARGEST FLOOR AREA / STORY /

1ST FLOOR AREA

CHAPTER 3

SECTION 602 / TABLE 601

SECTION 903

TABLE 504.3

TABLE 504.3

TABLE 506.2

YES

85' MAX

2 STORIES

I-3

II-B

YES

Appx. 40'

ADAM DONAVAN

VAN GORP

07319

S

O

N D

RP

IOWA

L

IC

E E

FESSIONAL

A R

C H

IT

E

C T

ADAM DONAVAN VAN GORP

07319

JUNE 30TH, 2027

ALL "T" & "A" SHEETS

NO. DESCRIPTION DATE

03/17/2026

.17

.2

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X

X XX X

XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X XX X X X

X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X

X XX

XX X

X X

X X

X

X XX X X

X XX X

X XX X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X X

X X

X

X X

X

X

X

X XX X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X XX X X X X X X X X X X X X X X X X

GENERAL NOTES

KEYNOTES

APPROX. CONSTRUCTION STAGING AREA. MAINTAIN ACCESS FOR

PATROL VEHICLE. CONTRACTOR TO REVIEW SITE PRIOR TO BIDDING

AND INCLUDE ALL ACCOMMODATIONS TO ACCESS ROOF OVER

SECURITY FENCING. RETURN SITE CONDITIONS TO PRE-CONSTRUCTION

CONDITION AT PROJECT COMPLETION.

CONTRACTOR TO COORDINATE IN ADVANCE WITH OWNER FOR ALL

GATE PASSINGS.

ALL WORK AREAS TO BE FULLY CLEANED AFTER EACH WORKING DAY.

SEE SPECIFICATIONS FOR DAILY TOOL INVENTORY REQUIREMENTS.

CONTRACTOR IS RESPONSIBLE FOR HAULING MATERIALS INCLUDING

CONSTRUCTION WASTE IN AND OUT OF THE OUTERMOST FENCED

AREA EACH DAY.

PROTECT UNDERGROUND UTILITY LINES IDENTIFIED ON THE SITE

PLAN. VERIFY LOCATION WITH OWNER.

ALL CONTRACTORS PERSONNEL ARE TO HAVE BACKGROUND CHECKS

PRE-APPROVED AND COMPLETE PREA TRAINING BEFORE BEING

ALLOWED ON SITE FOR WORK.

CONTRACTOR TO COORDINATE IN ADVANCE WITH FDCF STAFF FOR

ALL GATE PASSING. GATE LOCATIONS ARE IDENTIFIED IN THE

DOCUMENTS. KEEP GATES CLEAR AT ALL TIMES EXCEPT FOR

COORDINATED PASSING.

ALL WORK AREAS ARE TO BE THOROUGHLY CLEANED AT THE END OF

EACH DAY.

SEE SPECIFICATION FOR DAILY TOOL INVENTORY REQUIREMENTS. A

STANDARDIZED LIST OF DAILY TOOLS ENTERING AND EXITING IS

PREFERRED. ALL CONSTRUCTION EQUIPMENT MUST BE REMOVED

FROM THE SITE DAILY TO THE DESIGNATED STAGING AREA IN THE

PARKING LOT WITH THE EXCEPTION OF A JOB BOX THAT CAN REMAIN

SECURED ON THE ROOF AREA.

SEE SPECIFICATIONS FOR SITE ACCESS, STORAGE, WASTE REMOVAL,

AND WORK HOURS.

PROTECT GRASS AREAS FROM EQUIPMENT AND LIFTS. SEE DRAWING

FOR PROTECTED UNDERGROUND UTILITY LINES. DAMAGE IS THE

RESPONSIBILITY OF THE CONTRACTOR.

A

B

C

LEGEND

D

E

BUILDINGS WHERE WORK OCCURS

AVAILABLE LAYDOWN SPACE

GATE

FENCEX X X

UNDERGROUND UTILITIES

- PROVIDE PROTECTION PADS AS NEEDED

F

G

H

I

J

K

C B

D

E

F G

H

MAIN ADMIN BLDG

- CHECK-IN

A

P

MAIN ENTRY

SALLYPORT

PERIMETER SECURITY ROAD

(KEEP CLEAR FOR PATROL

VEHICLE)

DOUBLE PERIMETER

PRISON SECURITY FENCE

COORDINATE WITH FACILITIES TO AVOID

UNDERGROUND UTILITIES

- DO NOT DRIVE OVER

PERIMETER SECURITY ROAD

(KEEP CLEAR FOR PATROL

VEHICLE)

A B

O U

T

'-0

'-0

'-0

LIFT ACCESS AS REQ'D

WAREHOUSE

BUILDING

CONTRACTOR PARKING

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/1

7/

:3

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A1.00

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

S

IT

E P

L A

N S

1" = 50'-0"2 Site Map

KEY PLAN

NO. DESCRIPTION DATE

.17

.2

W.T.O

V.T.R

V.T.R

R.T.O

V.T.R

V.T.R

R.T.O

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

V.T.R

V.T.R

R.T.O

L.R.

L.R.

L.R.

V.T.R

V.T.R

R.T.O

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

V.T.R

L.R.

V.T.R

L.R.

L.R.

L.R.

V.T.R

L.C.P.P

L.C.P.P

L.R.L.R.

V.T.R

L.R.

L.R.

L.R.

L.R. L.R.

V.T.R

W.T.O

GENERAL NOTES

KEYNOTES

DEMO GUTTER

EXISTING DOWN SPOUT - TO BE REUSED

EXISTING ROOF CURB TO REMAIN

LIGHTNING CABLE OVER SIDE OF WALL TO LOWER ROOF

- REMOVE AND REINSTALL.

TYPICAL - REMOVE FLASHING AND PARAPET CAP

DASHED LINES INDICATE DEMOLITION. NOT ALL ITEMS NOTED FOR

CLARITY.

EACH CONTRACTOR TO CAREFULLY EXAMINE EXISTING CONDITIONS

PRIOR TO TIME OF BID.

PATCH AND REPAIR EXISTING SURFACES, INDICATED TO REMAIN,

DAMAGED DURING DEMOLITION. PREPARE FOR INSTALLATION OF NEW

FINISHES AS SPECIFIED.

PROTECT EXISTING FINISHES TO REMAIN.

MAINTAIN WEATHER TIGHT CONDITIONS ON ALL EXISTING SPACES

THROUGHOUT CONSTRUCTION.

REMOVE AND DISPOSE OFF SITE EXISTING MEMBRANE, INSULATION,

METAL TRIM AND PAVERS. CONTRACTOR TO REMOVE AGGREGATE

BALLAST OFFSITE AND DISPOSE.

CONTRACTOR TO REMOVE & REINSTALL LIGHTNING PROTECTION

CABLES & RODS. PROVIDE NEW CABLE CLIPS. RE-CERTIFICATION IS

NOT REQUIRED.

EXISTING ROOF TIE OFF ANCHORS TO BE REMOVED BY THE

CONTRACTOR. COORDINATE THIS WORK WITH THE OWNER SO THE

THROUGH BOLT DOES NOT DROP INTO THE BUILDING.

DURING ROOF DEMOLITION, CHECK ALL PIPE COUPLINGS ON ROOF

VENTS. NOTIFY FACILITY IF ANY NEED TO BE REPLACED.

CONTRACTOR TO IMMEDIATELY NOTIFY THE OWNER IF ANY MATERIALS

AND/OR TOOLS FALL OFF OF ROOF. ONLY THE OWNER WILL BE

ALLOWED TO RETRIEVE THE FALLEN ITEMS.

ALL ROOF AND BUILDING MOUNTED SECURITY CAMERAS OR DEVICES

WILL BE REMOVED AND REINSTALLED BY THE OWNER.

A

B

C

D

E

F

G

H

I

J

EXSITING ROOF ASSEMBELY

EXISTING ROOF STACK HGT: 5"

1. LOOSE LAID BALLAST

2. 60 MIL. EPDM

3. 4 1/2" XPS INSULATION (2 LAYERS)

4. 1/2" GYPSUM SUBSTRATE

5. SLOPED CONCRETE DECK

K

INDICATES PAVERS TO BE REMOVED

LEGEND

INDICATES PAVER WALKING PATHS TO BE REMOVED

AREA OPEN TO BELOW. CONTRACTOR TO COVER ENTIRE

AREA AS TO NOT ALLOW ANY MATERIALS AND/OR TOOLS

FALL INTO THE AREA BELOW.

V.T.R - VENT THROUGH ROOF

- TO REMAIN REMOVE ROOFING MEMBRANE AS

NEEDED TO PREP FOR NEW ROOFING

MATERIALS.

L.C.P.P. - LIGHTNING CABLE PROTECTION PENETRATION

- TO BE REMOVED AND REINSTALLED WITH NEW

CLIPS

R.T.O. - ROOF TIE OFF

- REMOVE FULLY NOT TO BE REINSTALLED,

PATCH HOLES IN THE CONCRETE DECK.

COORDINATE DEMOLITION WITH OWNER SO

MATERIAL DOES NOT FALL INSIDE OF BUILDING.

W.T.O. - WALL TIE OFF

- TO REMAIN

E.F. - EXHAUST FAN

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR DEMO OF

ROOF MEMBRANE.

S.A - SUPPLY AIR (AIR INTAKE)

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR DEMO OF

ROOF MEMBRANE.

- LIGHTNING ROD & CABLES

- FIELD VERIFY LOCATIONS, REMOVE AND

REINSTALL TO EXISTING LOCATIONS WITH NEW

CLIPS

L.R. - LIGHTNING ROD

- FIELD VERIFY QUANTITIES & LOCATIONS,

REMOVE AND REINSTALL TO EXISTING

LOCATIONS WITH NEW CLIPS.

R.H - ROOF HATCH

- TO REMAIN

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/1

7/

:3

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A2.00

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

D E

M O

P L

A N

B

U

IL

D

IN

G A

1/8" = 1'-0"1

DEMO - BUILDING A

N

KEY PLAN

NO. DESCRIPTION DATE

.17

.2

V.T.R V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

R.T.O

R.T.O

W.T.O

R.T.O R.T.O

R.T.O

L.C.P.P L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

E.F.

E.F.

E.F.

E.F.

S.F.

E.F.

S.A.

E.F.

R.H.

E.F.

S.A

S.A

E.F.

L.R. L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R. L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

2 2 2 2

GENERAL NOTES

KEYNOTES

DEMO GUTTER

EXISTING DOWN SPOUT - TO BE REUSED

EXISTING ROOF CURB TO REMAIN

LIGHTNING CABLE OVER SIDE OF WALL TO LOWER ROOF

- REMOVE AND REINSTALL.

TYPICAL - REMOVE FLASHING AND PARAPET CAP

DASHED LINES INDICATE DEMOLITION. NOT ALL ITEMS NOTED FOR

CLARITY.

EACH CONTRACTOR TO CAREFULLY EXAMINE EXISTING CONDITIONS

PRIOR TO TIME OF BID.

PATCH AND REPAIR EXISTING SURFACES, INDICATED TO REMAIN,

DAMAGED DURING DEMOLITION. PREPARE FOR INSTALLATION OF NEW

FINISHES AS SPECIFIED.

PROTECT EXISTING FINISHES TO REMAIN.

MAINTAIN WEATHER TIGHT CONDITIONS ON ALL EXISTING SPACES

THROUGHOUT CONSTRUCTION.

REMOVE AND DISPOSE OFF SITE EXISTING MEMBRANE, INSULATION,

METAL TRIM AND PAVERS. CONTRACTOR TO REMOVE AGGREGATE

BALLAST OFFSITE AND DISPOSE.

CONTRACTOR TO REMOVE & REINSTALL LIGHTNING PROTECTION

CABLES & RODS. PROVIDE NEW CABLE CLIPS. RE-CERTIFICATION IS

NOT REQUIRED.

EXISTING ROOF TIE OFF ANCHORS TO BE REMOVED BY THE

CONTRACTOR. COORDINATE THIS WORK WITH THE OWNER SO THE

THROUGH BOLT DOES NOT DROP INTO THE BUILDING.

DURING ROOF DEMOLITION, CHECK ALL PIPE COUPLINGS ON ROOF

VENTS. NOTIFY FACILITY IF ANY NEED TO BE REPLACED.

CONTRACTOR TO IMMEDIATELY NOTIFY THE OWNER IF ANY MATERIALS

AND/OR TOOLS FALL OFF OF ROOF. ONLY THE OWNER WILL BE

ALLOWED TO RETRIEVE THE FALLEN ITEMS.

ALL ROOF AND BUILDING MOUNTED SECURITY CAMERAS OR DEVICES

WILL BE REMOVED AND REINSTALLED BY THE OWNER.

A

B

C

D

E

F

G

H

I

J

EXSITING ROOF ASSEMBELY

EXISTING ROOF STACK HGT: 5"

1. LOOSE LAID BALLAST

2. 60 MIL. EPDM

3. 4 1/2" XPS INSULATION (2 LAYERS)

4. 1/2" GYPSUM SUBSTRATE

5. SLOPED CONCRETE DECK

K

INDICATES PAVERS TO BE REMOVED

LEGEND

INDICATES PAVER WALKING PATHS TO BE REMOVED

AREA OPEN TO BELOW. CONTRACTOR TO COVER ENTIRE

AREA AS TO NOT ALLOW ANY MATERIALS AND/OR TOOLS

FALL INTO THE AREA BELOW.

V.T.R - VENT THROUGH ROOF

- TO REMAIN REMOVE ROOFING MEMBRANE AS

NEEDED TO PREP FOR NEW ROOFING

MATERIALS.

L.C.P.P. - LIGHTNING CABLE PROTECTION PENETRATION

- TO BE REMOVED AND REINSTALLED WITH NEW

CLIPS

R.T.O. - ROOF TIE OFF

- REMOVE FULLY NOT TO BE REINSTALLED,

PATCH HOLES IN THE CONCRETE DECK.

COORDINATE DEMOLITION WITH OWNER SO

MATERIAL DOES NOT FALL INSIDE OF BUILDING.

W.T.O. - WALL TIE OFF

- TO REMAIN

E.F. - EXHAUST FAN

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR DEMO OF

ROOF MEMBRANE.

S.A - SUPPLY AIR (AIR INTAKE)

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR DEMO OF

ROOF MEMBRANE.

- LIGHTNING ROD & CABLES

- FIELD VERIFY LOCATIONS, REMOVE AND

REINSTALL TO EXISTING LOCATIONS WITH NEW

CLIPS

L.R. - LIGHTNING ROD

- FIELD VERIFY QUANTITIES & LOCATIONS,

REMOVE AND REINSTALL TO EXISTING

LOCATIONS WITH NEW CLIPS.

R.H - ROOF HATCH

- TO REMAIN

1/8" = 1'-0"1

DEMO - BUILDING B & G

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/1

7/

:3

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A2.01

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

D E

M O

P L

A N

B

U

IL

D

IN

G B

G

KEY PLAN

NO. DESCRIPTION DATE

.17

.2

GENERAL NOTES

KEYNOTES

METAL GUTTER - RECONNECT TO EXISTING DOWNSPOUT

BUILDING LABEL - BUILT WITH WHITE WALKING PAD , VERIFY LETTER

ORIENTATION WITH OWNER PRIOR TO INSTALLATION

ROOF HATCH FALL PROTECTION

ROOF ACCESS LADDER - REMOVE AND REINSTALL AS NEEDED

ROOF ACCESS DOOR - DOOR TO REMAIN SIM 6/A4.00

EXISTING DOWNSPOUT TO BE REUSED - FIELD VERIFY LOCATION

EXPANSION JOINT - LOCATION SHOW FOR REPRESENTATION ONLY,

CONTRACTOR IS TO PROVIDE JOINTS PER MANUFACTURERS

REQUIREMENTS.

EXISTING ROOF CURB TO REMAIN

LIGHTNING CABLE OVER SIDE OF WALL TO LOWER ROOF

ROOF ACCESS DOOR - NO WORK REQUIRED.

QUANTITY, SIZE AND LOCATIONS OF ALL MEP ITEMS ARE APPROXIMATE,

CONTRACTOR IS TO FIELD VERIFY.

CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS AND NOTIFY THE

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH

WORK.

PROVIDE CURBS AND/OR FLASHING TO MAKE ALL PENETRATIONS

WEATHER-TIGHT.

PONDING WATER WILL NOT BE ACCEPTED.

ROOF COPING (CAPS), FLASHING AND TRIMS SHALL BE SLOPED A

MINIMUM OF 1/2" PER 1'-0" UNLESS NOTED OTHERWISE

ROOF LAYOUT, TAPERED INSULATION, CRICKETS, ETC ARE

DIAGRAMMATIC IN NATURE. FINAL DESIGN AND LAYOUT TO BE

COORDINATED WITH ROOFING MANUFACTURER.

MATCH EXISTING GUTTER SIZE AND THICKNESS

DOWNSPOUT LOCATIONS ARE SHOWN IN APPROXIMATE LOCATIONS,

CONTRACTOR IS TO FIELD VERIFY LOCATIONS.

A

B

C

D

E

F

G

LEGEND

WALKING PATH - REMOVE PAVERS WHERE APPLICABLE

AREA OPEN TO BELOW. CONTRACTOR TO COVER ENTIRE

AREA AS TO NOT ALLOW ANY MATERIALS AND/OR TOOLS

FALL INTO THE AREA BELOW.

V.T.R - VENT THROUGH ROOF

- TO REMAIN - 1/A4.00

L.C.P.P. - LIGHTNING CABLE PROTECTION PENETRATION

- INSTALL NEW FLASHING- 5/A4.00

W.T.O. - WALL TIE OFF

- TO REMAIN

E.F. - EXHAUST FAN

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR

INSTALLATION OF NEW ROOFING MEMBRANE.

SIM - 6/A4.00

S.A - SUPPLY AIR (AIR INTAKE)

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR

INSTALLATION OF NEW ROOFING MEMBRANE.

SIM - 6/A4.00

- LIGHTNING ROD CABLES

- FIELD VERIFY LOCATIONS, REMOVE AND

REINSTALL TO EXISTING LOCATION WITH NEW

CLIPS

L.R. - LIGHTNING ROD - VERIFY LOCATION AND QUANTITY

IN FIELD.

- SEE DETAIL 2/A4.00

R.H - EXISTING ROOF HATCH

ROOF CRICKET - SLOPE A MIN OF 1/8" / 1'

ROOF ASSEMBILIES

ROOF MEMBRANE - FULLY ADHERED

ROOF COVER BOARD - FULLY ADHERED

INSULATION, R-30 MIN. - FULLY ADHERED

EXITING CONCRETE DECK TO REMAIN

H

37' -

88' - 6"

37' - 4"

88' - 6"

16' - 0"

56' - 0"

97' - 6 1/

4"

5'

19' - 11"

5'

97' - 6 1/4"

1/ 4"

1' -0

1/4" / 1'-0"

1/4" / 1'-0"

/4

A4.00

A4.00

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

W.T.O

V.T.R

V.T.R

V.T.R

V.T.R

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

V.T.R

V.T.R L.R.

L.R.

L.R.

V.T.R

V.T.R

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

V.T.R

L.R.

V.T.R

L.R.

L.R.

L.R.

V.T.R

L.C.P.P

L.C.P.P

L.R.L.R.

V.T.R

L.R.

L.R.

L.R.

L.R. L.R.

V.T.R

W.T.O

A4.00

A4.00

Sim

A4.00

Sim

A4.00

Sim

E.F.

A4.00

Sim

A4.00

Sim

A4.00

Sim 2

E.F.

S.F.

E.F.

E.F.

E.F.

E.F.

S.F.

S.F.

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/1

7/

:3

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A2.02

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

R O

O F

P L

A N

B

U

IL

ID

N

G A

1/8" = 1'-0"1

BLDG. A - ROOF PLAN

KEY PLAN

NO. DESCRIPTION DATE

.17

.2

GENERAL NOTES

KEYNOTES

METAL GUTTER - RECONNECT TO EXISTING DOWNSPOUT

BUILDING LABEL - BUILT WITH WHITE WALKING PAD , VERIFY LETTER

ORIENTATION WITH OWNER PRIOR TO INSTALLATION

ROOF HATCH FALL PROTECTION

ROOF ACCESS LADDER - REMOVE AND REINSTALL AS NEEDED

ROOF ACCESS DOOR - DOOR TO REMAIN SIM 6/A4.00

EXISTING DOWNSPOUT TO BE REUSED - FIELD VERIFY LOCATION

EXPANSION JOINT - LOCATION SHOW FOR REPRESENTATION ONLY,

CONTRACTOR IS TO PROVIDE JOINTS PER MANUFACTURERS

REQUIREMENTS.

EXISTING ROOF CURB TO REMAIN

LIGHTNING CABLE OVER SIDE OF WALL TO LOWER ROOF

ROOF ACCESS DOOR - NO WORK REQUIRED.

QUANTITY, SIZE AND LOCATIONS OF ALL MEP ITEMS ARE APPROXIMATE,

CONTRACTOR IS TO FIELD VERIFY.

CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS AND NOTIFY THE

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH

WORK.

PROVIDE CURBS AND/OR FLASHING TO MAKE ALL PENETRATIONS

WEATHER-TIGHT.

PONDING WATER WILL NOT BE ACCEPTED.

ROOF COPING (CAPS), FLASHING AND TRIMS SHALL BE SLOPED A

MINIMUM OF 1/2" PER 1'-0" UNLESS NOTED OTHERWISE

ROOF LAYOUT, TAPERED INSULATION, CRICKETS, ETC ARE

DIAGRAMMATIC IN NATURE. FINAL DESIGN AND LAYOUT TO BE

COORDINATED WITH ROOFING MANUFACTURER.

MATCH EXISTING GUTTER SIZE AND THICKNESS

DOWNSPOUT LOCATIONS ARE SHOWN IN APPROXIMATE LOCATIONS,

CONTRACTOR IS TO FIELD VERIFY LOCATIONS.

A

B

C

D

E

F

G

LEGEND

WALKING PATH - REMOVE PAVERS WHERE APPLICABLE

AREA OPEN TO BELOW. CONTRACTOR TO COVER ENTIRE

AREA AS TO NOT ALLOW ANY MATERIALS AND/OR TOOLS

FALL INTO THE AREA BELOW.

V.T.R - VENT THROUGH ROOF

- TO REMAIN - 1/A4.00

L.C.P.P. - LIGHTNING CABLE PROTECTION PENETRATION

- INSTALL NEW FLASHING- 5/A4.00

W.T.O. - WALL TIE OFF

- TO REMAIN

E.F. - EXHAUST FAN

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR

INSTALLATION OF NEW ROOFING MEMBRANE.

SIM - 6/A4.00

S.A - SUPPLY AIR (AIR INTAKE)

- TO REMAIN - OWNER WILL REMOVE AND

REINSTALL AS NEEDED TO ALLOW FOR

INSTALLATION OF NEW ROOFING MEMBRANE.

SIM - 6/A4.00

- LIGHTNING ROD CABLES

- FIELD VERIFY LOCATIONS, REMOVE AND

REINSTALL TO EXISTING LOCATION WITH NEW

CLIPS

L.R. - LIGHTNING ROD - VERIFY LOCATION AND QUANTITY

IN FIELD.

- SEE DETAIL 2/A4.00

R.H - EXISTING ROOF HATCH

ROOF CRICKET - SLOPE A MIN OF 1/8" / 1'

ROOF ASSEMBILIES

ROOF MEMBRANE - FULLY ADHERED

ROOF COVER BOARD - FULLY ADHERED

INSULATION, R-30 MIN. - FULLY ADHERED

EXITING CONCRETE DECK TO REMAIN

H

59'-0"

'-0

74'-0"

44'-0"

'-0

'-5

1/4" / 1'-0"

/4

"1/ 4"

1' -0

59' - 0"

V.T.R V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

V.T.R

W.T.O

R.T.O

L.C.P.P L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

L.C.P.P

E.F.

E.F.

E.F.

E.F.

S.F.

E.F.

S.A.

E.F.

R.H.

E.F.

S.A

S.A

E.F.

L.R. L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R. L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

L.R.

8' - 6"

10' - 2"

8' - 8"

'-2

/2

'-2

/2

122'-5"

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

Sim

A4.00

E.F.

1/4" / 1'-0"

1/4" / 1'-0"

6 7 6 6 7 6

C M

B A

A R

C H

IT

E

C T

S

G R

A N

D A

V E

S P

E N

C E

R , I

A

(P

) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/1

7/

:3

:0

P M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A2.03

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

R O

O F

P L

A N

B

U

IL

D

IN

G B

G

1/8" = 1'-0"1

ROOF PLAN - BUILDING B & G

N

BUILDING G LABEL

KEY PLAN

NO. DESCRIPTION DATE

.17

.2

M A

T C

H E

X

IS

T

IN

G

5 4

/2

M A

T C

H E

X

IS

T

IN

G

M

IN

/2

V

IF

'-7

V .I .F

M

A T

C H

E X

IS

T

IN

G

4 8

M

IN

BASE WRAP TO EXTEND MIN. 1" UP

VERTICAL SURFACE OF PIPE AND 2"

MIN. ONTO FIELD MEMBRANE

UPPER WRAP TO EXTEND 1 1/2" ONTO

BASE WRAP AND 8" MIN. UP PIPE AND

SEALED INTO A BEAD OF MEMBRANE

WATERSTOP WITH A STAINLESS STEEL

CLAMPING RING.

PRE-MOLDED

PIPE FLASHING

SEALING MASTIC

S.S. CLAMP RING

LAP SEALANT

PIPE PENETRATION

SINGLE-PLY MEMBRANE ROOFING

SINGLE-PLY MEMBRANE FLASHING

ROOF ASSEMBLY

S.S. CLAMP RING

GENERAL NOTES

KEYNOTES

EXISTING CONCRETE STRUCTURE

RIGID INSULATION

TAPERED RIGID INSULATION

COVER BOARD

TREATED BLOCKING

ALUMINUM FASCIA

NEW ALUMINUM GUTTER - CONNECT TO EXISTING DOWNSPOUT AT ALL

LOCATIONS

FULLY ADHERED ROOF MEMBRANE

EXISTING LIGHTNING SPIKE

TERMINATION BAR & SEALANT

SEALANT

EXISTING LIGHTNING GROUND WIRE

VERIFY EXISTING CURB CONDITIONS

OWNER TO REMOVE AND REATTACH EXISTING MECHANICAL

EQUIPMENT. CONTRACTOR TO COORDINATE WORK WITH OWNER.

GOOSENECK CABLE FLASHING

BACKER ROD FILL GAP

CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS AND NOTIFY THE

ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH

WORK.

PROVIDE CURBS AND/OR FLASHING TO MAKE ALL PENETRATIONS

WEATHER-TIGHT.

ROOF COPING (CAPS), FLASHING AND TRIMS SHALL BE SLOPED A

MINIMUM OF 1/2" PER 1'-0" UNLESS NOTED OTHERWISE

MATCH EXISTING GUTTER SIZE AND THICKNESS

DETAILS MAY VARY DEPENDING ON MANUFACTURER'S WARRANTY

REQUIREMENTS.

A

B

C

D

E

1 3/4"

EXPANSION JOINT CAP.

INSTALL OVER TOP, FRONT, &

BACK EDGES OF JOINT

BETWEEN GUTTER SECTIONS.

PROVIDE BUTT TYPE EXPANSION

JOINTS W/ SLEEVE COVER & JOINT.

PROVIDE JOINTS AS REQUIRED BY

MANUFACTURER.

NOTE: SLEEVE COVER AND JOINT CAP

ARE TO ALLOW FOR EXPANSION /

CONTRACTION MOVEMENT.

GUTTER CAPS

GUTTER

VARIES

1"

C M

B A

A R

C H

IT

E

C T

S

G

R A

N D

A V

E S

P E

N C

E R

, I A

(P ) 7

.2

.3

REVISIONS

SHEET

D A

T E

P R

O J

E C

T

PL

O

T D

AT

E

FI

LE

P

AT

H

COPYRIGHT. Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Cannon Moss Brygger & Associates is prohibited by copyright law.

IF THIS DRAWING IS NOT 30"x42" IT IS NOT TO SCALE

/2

/2

:4 7:

P

M

A u to d e sk

D o c s:

D

O C

F D

C F

U n it A

, B , G

R o o f

R e p la c e m e n t

/2

D O

C F

D C

F U n it

A , B

, G , R o o f R e p la c e m e n t

R F

T

. U

S E

.r vt

A4.00

F O

R T

D O

D G

E , I

O W

A

.1

.2

.0

D O

C F

D C

F U

N

IT

A

B

G R

O O

F R

E P

L A

C E

M E

N T

IO

W

A D

A S

R O

O F

D E

T A

IL

S

1 1/2" = 1'-0"3

GUTTER DETAIL

1 1/2" = 1'-0"4

FASCIA DETAIL

1 1/2" = 1'-0"2

LIGHTNING ROOF SPIKE DETAIL

1 1/2" = 1'-0"7

STEPPED ROOF DETAIL

1 1/2" = 1'-0"8

STEPPED ROOF DETAIL

1" = 1'-0"1

ROOF PENETRATION

1 1/2" = 1'-0"6

TYP. MECH. CURB DETAIL

1 1/2" = 1'-0"5

CABLE THROUGH ROOF DETAIL

1 1/2" = 1'-0"10

GUTTER AND EXPANSION JOINT

PROVIDE FASCIA EXPANSION JOINT AT GUTTER EXPANSION JOINT LOCATIONS

1 1/2" = 1'-0"9

ALLOWANCE - SEAL ROOF DECK

NO. DESCRIPTION DATE

Sheets
T.01 - TITLE
A1.00 - SITE PLANS
A2.00 - DEMO PLAN - BUILDING A
A2.01 - DEMO PLAN - BUILDING B & G
A2.02 - ROOF PLAN - BUILIDNG A
A2.03 - ROOF PLAN - BUILDING B & G
z_00 - CMBA STARTING VIEW
A4.00 - ROOF DETAILS

File details come from the government source that posted it. Updated .