RFB950500-01 - Drawings.pdf
PDF 9 MB Posted
- Solicitation number
- RFB950500-01
- Issued by
- Story County, Iowa
About this file
This file comprises construction drawings and specifications for the Sally Port Automated Gate Replacement project at Fort Dodge Correctional Facility, prepared by the Iowa Department of Administrative Services (DAS), Division of Business and Property Services, with engineering services provided by Shive-Hattery, Inc., and construction management by Boyd Jones Construction Company. The project involves the replacement of two existing sally port gates at the facility located at 1550 L Street, Fort Dodge, Iowa 50501, with new automated gates providing 15-foot opening width and height. The scope of work includes demolition of existing gates and fencing, pavement removal and replacement, installation of temporary security fencing and gates to maintain facility access and security during construction, sidewalk adjustments, conduit installation for pedestrian gate controls, and site restoration. The drawings reference RFB 950500-01 and DAS Project No. 9505.00, with an issued date of March 2, 2026, and include multiple sheets detailing existing conditions, demolition plans, site plans, construction details, and specifications.
The construction documents specify concrete paving requirements including 8-inch PCC pavement for drives and 6-inch PCC pavement for sidewalks, with compaction to 95 percent Proctor density. All work must comply with the most recent Iowa Statewide Urban Design and Specifications (SUDAS) standards and applicable OSHA requirements. The contractor is responsible for coordinating all utility locates through Iowa One-Call (48-hour advance notice required), protecting existing utilities and structures, maintaining emergency access at all times, controlling traffic and pedestrians, and performing daily site cleanup. Critical project requirements include maintaining two operational gates throughout construction, installing temporary chain-link fencing with manual lockable swing gate prior to existing fence removal, limiting temporary fence gaps to less than four inches, and minimizing disruption to facility operations. The contractor must provide photographic documentation of existing conditions, repair or replace all damaged site features at no cost to the state, and coordinate staging areas and construction access with facility management and the construction manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB950500-01 - Notice to Bidders.pdf | ||
| RFB950500-01 - Bid Form.pdf | ||
| RFB950500-01 - Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C000
C O
VE
R
S H
EE
T
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
CO
VE
R
SH
EE
T.
dw g
3/ 1/
:2
2:
P M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
FDCF SALLY PORT AUTOMATED GATE REPLACEMENT
DAS PROJECT NO: 9505.00
RFB: 950500-01
FORT DODGE CORRECTIONAL FACILITY
1550 L ST.
FORT DODGE, IA 50501
VICINITY MAP
NTS
PROJECT MAP
NTS
LIGHT POLE
GAS MAIN
SANITARY SEWER
STORM SEWER
WATER MAIN
CURB AND GUTTER (PCC)
PROPOSEDDESCRIPTIONEXISTING
TRANSFORMER
ELECTRICAL LINE
BUILDING
PCC PAVING
PAVING DEMO
OWNERENGINEER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF BUSINESS AND PROPERTY SERVICES
ATTN: JENNIE ELLIOTT
JENNIE.ELLIOTT@IOWA
109 SE 13TH STREET
DES MOINES, IA 50319
515-380-8049
SHIVE-HATTERY, INC.
ATTN: CHRIS BAUER
CBAUER@SHIVE-HATTERY.COM
4125 WESTOWN PKWY, SUITE 100
WEST DES MOINES, IA 50266
515-223-8104
SITE ADDRESS
FORT DODGE CORRECTIONAL FACILITY
1550 L ST.
FORT DODGE, IA 50501
CONSTRUCTION MANAGER
BOYD JONES CONSTRUCTION COMPANY
ATTN: ROB GREINER
RGREINER@BOYDJONES.BIZ
11204 NW AURORA AVE,
URBANDALE, IA 50322
402-553-1804
BOLLARD
CONTACT INFORMATION
PROJECT
LOCATION
ENTRANCE
FORT DODGE, IA
L STREET
PROJECT
LOCATION
MAIN ENTRANCE
INTO FACILITY
GENERAL NOTES
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS PLOTTED ON THE DRAWINGS ARE APPROXIMATE ONLY
AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THE DRAWINGS. THE VERIFICATION OF EXISTENCE OF AND THE DETERMINATION OF THE EXACT LOCATION OF UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR(S).
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT CRITICAL LOCATIONS TO VERIFY EXACT
HORIZONTAL AND VERTICAL LOCATION.
3. THE FACILITY WILL COMPLETE PRIVATE UTILITY LOCATES OF ALL FACILITY UTILITIES REQUIRED BY IOWA ONE-CALL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ALL LOCATES AND CONFIRM THEY ARE COMPLETED PRIOR TO THE START OF
CONSTRUCTION.
4. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL BY CALLING 811 OR 1-800-292-8989 NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
5. NOTIFY UTILITY COMPANIES WHOSE FACILITIES ARE SHOWN ON THE PLANS OR KNOWN TO BE WITHIN THE CONSTRUCTION LIMITS OF
THE SCHEDULE PRIOR TO EACH STAGE OF CONSTRUCTION.
6. ALL UTILITY WORK, PUBLIC OR PRIVATE, SHALL BE DONE IN ACCORDANCE WITH SUDAS STANDARD SPECIFICATIONS AND CITY
REQUIREMENTS.
7. TRENCH, EXCAVATION AND BACKFILL SHALL FOLLOW DIVISION 3 SUDAS SPECIFICATION SECTIONS.
8. UNLESS OTHERWISE SPECIFIED, ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MOST RECENT EDITION OF IOWA
STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS).
9. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY/STATE REGULATIONS/CODES AND OSHA STANDARDS.
10. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE
CONTRACTOR.
11. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION FROM THE OWNER'S
REPRESENTATIVE.
12. PROTECT EXISTING UTILITIES DURING CONSTRUCTION.
13. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
14. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS. DRIVES, ROADWAYS, ETC. SHALL BE KEPT CLEAN AT ALL TIMES.
15. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
16. REPAIR OR REPLACE DAMAGED SITE FEATURES (WALLS, PAVEMENT, UTILITIES, FENCES, ETC.) TO REMAIN AT NO ADDITIONAL EXPENSE
TO THE STATE.
17. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SPECIFICALLY CALLED OUT SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION TO BE ALLOWED FOR THE COMPLETION OF THIS WORK.
18. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE CONSIDERED UNACCEPTABLE.
UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK SHALL BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER AS REQUIRED BY THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNER'S REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS
OR ANY EXTRA WORK DONE WITHOUT WRITTEN AUTHORIZATION WILL NOT BE PAID FOR.
19. THE CONTRACTOR SHALL MATCH EXISTING GRADES AND SLOPES AND CONFIRM POSITIVE DRAINAGE ON ALL NEW AND ADJACENT
PAVEMENT.
20. STAGING LOCATIONS AND CONSTRUCTION ACCESS ROUTES FOR CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE
COORDINATED WITH AND APPROVED BY THE FACILITY AND CONSTRUCTION MANAGER.
21. ALL AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE A MINIMUM OF 6" OF TOPSOIL PER SUDAS SPECIFICATIONS. SEEDING WILL
BE DONE BY THE FACILITY.
22. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
23. CONTRACTOR TO COORDINATE ANY SITE, UTILITY OR GRADE ADJUSTMENTS WITH THE CONSTRUCTION MANAGER PRIOR TO
PROCEEDING WITH THE WORK.
24. EACH PRIME CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK OF ALL SUBCONTRACTOR(S) INVOLVED ON THE
PROJECT.
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C001 CONSTRUCTION NOTES
CD01 EXISTING CONDITIONS AND DEMOLITION PLAN
C101 SITE PLAN
C102 SITE PHOTOS
C501 CONSTRUCTION DETAILS
C502 CONSTRUCTION DETAILS
{{t:s;r:y;o:"Civil";w:140;h:25;}}
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
CIVIL ENGINEER
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
19737
CHRISTOPHER BAUER
03/02/2026
ALL SHEETS
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C001
C O
N
ST
R U
C
TI
O N
N O
TE
S
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
CO
NT
RU
CT
IO
N
NO
TE
S.
dw g 3/
1/
:5 6:
P
M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
CONSTRUCTION STAGING NOTES
1. CONTRACTOR SHALL COORDINATE ALL STAGING AREAS WITH THE FACILITY AND CONSTRUCTION MANAGER.
2. CONTRACTOR SHALL REPLACE ALL PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES AT THE END OF CONSTRUCTION.
CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION OF EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
3. CONTRACTOR TO RESTORE ANY ADJACENT RIVER ROCK DISTURBED DURING CONSTRUCTION.
4. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING OR OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL OUT OF
PROJECT SITE.
5. CONTRACTOR WILL BE REQUIRED TO HAVE STEEL PLATES OR TEMPORARY ROCK ON SITE TO MAINTAIN EMERGENCY ACCESS AT ALL TIMES. ANYTIME THE CONTRACTOR IS NOT ON SITE THE DRIVES MUST BE LEFT IN A CONDITION THAT
EMERGENCY ACCESS CAN BE PROVIDED.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR TO COORDINATE WITH FACILITY PRIOR TO CLOSING DOWN GATES DURING CONSTRUCTION. ACCESS TO ADJACENT BUILDINGS, DRIVES, PARKING AND SIDEWALKS ARE TO BE MAINTAINED THROUGHOUT CONSTRUCTION UNLESS
APPROVED BY OWNER.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL TRAFFIC DURING CONSTRUCTION AND PROVIDE ADEQUATE
TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE.
3. CONTRACTOR TO INSTALL AND MAINTAIN CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION.
CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT THE PROJECT DURATION.
4. CONTRACTOR TO COORDINATE CONSTRUCTION ACCESS, STAGING AND PARKING AREAS WITH FACILITY AND
CONSTRUCTION MANAGER AND MINIMIZE IMPACTS TO FACILITY'S OPERATIONS.
DEMOLITION NOTES
1. REMOVAL REQUIREMENTS SHOWN ON THE PLANS SHOULD BE CONSIDERED MINIMUM REMOVAL AND REPLACEMENT REQUIREMENTS. CONTRACTORS SHALL ADJUST REMOVAL LIMITS AND DIMENSIONS AS REQUIRED BY CONSTRUCTION MEANS AND METHODS AND ACTUAL SITE CONDITIONS. CONTRACTORS SHOULD FACTOR ADDITIONAL ANTICIPATED REMOVAL AND REPLACEMENT REQUIREMENTS INTO THEIR BIDS AS ADDITIONAL COMPENSATION REQUESTS FOR ADJUSTED OR EXPANDED REMOVAL LIMITS REQUIRED BY CONTRACTOR MEANS AND METHODS WILL NOT BE APPROVED.
2. CONTRACTOR SHALL REPLACE AT NO COST TO THE STATE ALL DAMAGED STREETS, DRIVES, SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE
REMOVED DURING THE COURSE OF THE WORK.
3. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS AND GUTTERS AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTOGRAPH) ALL CRACKED PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), THE CONTRACTOR SHALL REPLACE THE
DAMAGED AREA AT NO ADDITIONAL COST TO STATE.
GRADING AND EROSION CONTROL NOTES
1. THE DISTURBED CONSTRUCTION AREA IS LESS THAN 1 ACRE, SO AN NPDES GENERAL PERMIT NO. 2 AND STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) ARE NOT REQUIRED.
2. BEST MANAGEMENT PRACTICES (BMPs) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY CONSTRUCTION
MANAGER OR OWNER'S REPRESENTATIVE.
3. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND
PROPERLY TREATED OR DISPOSED.
4. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
AND CLEAN UP FUEL OR CHEMICAL SPILLS AND LEAKS.
5. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS
FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
6. RUBBISH, TRASH, GARBAGE, LITTER OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS.
MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER
DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
7. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS
MUST BE REMOVED IMMEDIATELY.
8. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE IOWA DNR, US EPA AND LOCAL REGULATIONS DEALING WITH
STORMWATER RUNOFF AND EROSION CONTROL.
9. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXCESS SOIL MATERIAL CREATED BY THE PROJECT
PAVEMENT GENERAL NOTES
1. ALL PROPOSED PAVEMENT PATCHES ARE APPROXIMATE ONLY AND SHOULD BE CONSIDERED MINIMUM REMOVAL EXTENTS.
EXTEND AND ADJUST PAVEMENT PATCHES AS REQUIRED WITH PRIOR APPROVAL BY ENGINEER.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES, NEW PAVING
OR ADJACENT PAVING WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. USE TYPE "A" COMPACTION PER IOWA DOT STANDARD SPECIFICATIONS ON SUBGRADE AND SUBBASE.
SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL SITE
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. CONCRETE PAVING
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA
DOT SPECIFICATIONS FOR AIR-ENTRAINED TYPE M-4 OR C-4 MIX WITH TYPE I CEMENT.
FLY ASH (CONTRACTOR'S OPTION): ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE: DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1" or 8" MAXIMUM WITH SUPER PLASTICIZER OR AS APPROVED BY GEOTECHNICAL ENGINEER
AIR CONTENT: 7.0% ± 1.0% OR AS APPROVED BY GEOTECHNICAL ENGINEER
WATER/CEMENT RATIO: NOT TO EXCEED 0.488 FOR TYPE C-4 MIX AND NOT TO EXCEED .400 FOR TYPE M-4 MIX
FINISH: HEAVY BROOM FINISH
TESTING: ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 CY, OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND
SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED OR WITHIN 30 MINUTES AFTER
FORMS ARE REMOVED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNER'S PREFERENCE TO AVOID COLD WEATHER CONCRETE AND PROVIDE TEMPORARY
GRANULAR SURFACING FOR SIDEWALK AND PAVING AS REQUIRED.
B. JOINT SEALANT
PAVING JOINTS SHALL BE SEALED PER IOWA DOT SPECIFICATIONS. BACKER ROD SHALL NOT BE USED FOR JOINT SEALING.
C. PAVEMENT JOINTING
PROVIDE IDOT TYPE 'C' JOINTS FOR JOINTS IN DRIVES AND PAVEMENT. PROVIDE JOINTS AT A MAXIMUM SPACING OF 12 FEET
FOR PAVING OR SQUARE PANELS FOR SIDEWALKS.
PROVIDE IDOT TYPE 'RD' OR TYPE 'BT' JOINTS TO TIE INTO EXISTING CONCRETE PAVING.
PROVIDE IDOT TYPE 'DW' JOINTS FOR END OF DAY PAVING.
SAW CUTTING TO BE COMPLETED A MAXIMUM OF 24 HOURS FROM CONCRETE PLACEMENT. RANDOM CRACKING CAUSED BY
DELAYED SAW CUTTING MAY REQUIRE REMOVAL AND REPLACEMENT.
CONTRACTOR TO PROVIDE OWNER'S REPRESENTATIVE WITH A POURING SEQUENCE AND JOINTING PLAN FOR APPROVAL
PRIOR TO PAVING.
D. TOPSOIL
STRIP, STOCKPILE AND RESPREAD EXISTING TOPSOIL IN ALL AREAS TO BE SODDED. THE DEPTH OF TOPSOIL SHALL BE A MINIMUM OF 6" AFTER NATURAL SETTLEMENT AND SHALL CONFORM SMOOTHLY TO THE ADJACENT LINES, GRADES AND ELEVATIONS. PROVIDE ADDITIONAL TOPSOIL IF EXISTING TOPSOIL IS NOT PROPERLY HANDLED AND PROTECTED.
1 GRADE BEAM SECTION
18"
4' -0
" M
IN
PROPOSED
PAVEMENT
4" EXPANSION JOINT
WITH SEALANT (TYP)
#4 DOWEL @ 24" OC
QTY (4) #4 LONGITUDINAL
BARS CONTINUOUS
#3 TIES @ 24" OC
GRADE BEAM MAY BE
EARTH FORMED
EXCEPT FOR TOP 8"
TO ALLOW CLEAN
EXPANSION JOINT
BETWEEN PAVING
GRADE BEAM MAY BE
POURED CONCURRENTLY
WITH FENCE FENCE/GATE
POST FOUNDATIONS OR
SEPARATE
#4 BARS 24" OC EW (TYP)
EXISTING ACC/PCC
PAVEMENT
8" PCC PAVEMENT
12" SCARIFIED AND
COMPACTED
SUBGRADE TO 95%
PROCTOR DENSITY
2 PAVEMENT CROSS SECTION
6" PCC PAVEMENT
6" SCARIFIED AND
COMPACTED
SUBGRADE TO 95%
PROCTOR DENSITY
3 SIDEWALK/MAINTENANCE STRIP
REFER TO GATE
MANUFACTURER FOR
RECOMMENDED GUIDE
AND ATTACHMENT (TYP)
REMOVE AND REPLACE EXISTING FENCING AS
NECESSARY TO ACCOMMODATE NEW GATE.
PROTECT EXISTING
PEDESTAL (TYP)
REMOVE AND REPLACE EXISTING GATE AND POSTS. NEW
GATE TO PROVIDE 15' OPENING WIDTH AND 15' OPENING
HEIGHT. SEE SHEET C104 FOR ADDITIONAL INFORMATION.
REMOVE AND DISPOSE OF EXISTING PCC PAVING (TYP). SAWCUT
FULL DEPTH AND REMOVE TO NEAREST JOINT. REMOVE AND
REPLACE ONE HALF OF PAVING AT A TIME TO ALLOW ACCESS
THROUGH THE DRIVE THROUGHOUT THE PROJECT
PROTECT EXISTING
PEDESTAL (TYP)
FACILITY TO REMOVE DOOR LOCKING
MECHANISM PRIOR TO FENCE
REMOVAL AND REPLACEMENT
FACILITY TO REMOVE DOOR LOCKING
MECHANISM PRIOR TO FENCE
REMOVAL AND REPLACEMENT
REMOVE AND DISPOSE OF EXISTING PCC PAVING (TYP). SAWCUT
FULL DEPTH AND REMOVE TO NEAREST JOINT. REMOVE AND
REPLACE ONE HALF OF PAVING AT A TIME TO ALLOW ACCESS
THROUGH THE DRIVE THROUGHOUT THE PROJECT
PROTECT EXISTING UNDERGROUND
ELECTRICAL (TYP)
PROTECT EXISTING TAUGHT WIRE SYSTEM. CONDUIT
TO BE REPLACED FOR TAUGHT WIRE. SYSTEM TO BE
DOWN FOR MAXIMUM 24 HOURS. COORDINATE WITH
FACILITY PRIOR TO CONSTRUCTION (TYP)
PROTECT EXISTING TAUGHT WIRE
SYSTEM. COORDINATE WITH FACILITY
PRIOR TO CONSTRUCTION (TYP)PROTECT EXISTING FENCE (TYP)
PROTECT EXISTING
PAVEMENT (TYP)
PROTECT EXISTING FENCE (TYP)
PROTECT EXISTING BUILDING (TYP)
REMOVE AND DISPOSE OF EXISTING
STRUCTURAL FENCE BRACE
FACILITY TO REMOVE AND
REPLACE BARBED WIRE AND
RAZOR MESH (TYP)
REMOVE AND DISPOSE OF TWO (2)
SIDEWALK PANELS
PROTECT EXISTING FENCE GROUNDING
SYSTEMS AND WIRES - REMOVE AND REPLACE
AS REQUIRED BY CONSTRUCTION - REATTACH
WIRES TO GROUNDING RODS IF CURRENTLY
NOT ATTACHED (TYP)
REMOVE AND DISPOSE OF BROKEN
MOW STRIP AND PEDESTAL APRON
CONTRACTOR TO DISCONNECT AND PROTECT
EXISTING PEDESTRIAN GATE CONTROLS
CONDUIT AND WIRING TO ACCOMMODATE
PHASED ACCESS REQUIREMENTS (TYP)
CONTRACTOR TO DISCONNECT AND PROTECT
EXISTING PEDESTRIAN GATE CONTROLS
CONDUIT AND WIRING TO ACCOMMODATE
PHASED ACCESS REQUIREMENTS (TYP)
GATE POSTS FOR MAN DOOR TO BE REMOVED AND REPLACED
IN THE SAME LOCATION FOR PAVING REPLACEMENT
8' TALL MINIMUM TEMPORARY CHAIN LINK FENCE AND GATE TO BE
INSTALLED PRIOR TO REMOVAL OF EXISTING FENCING AND MAINTAINED
UNTIL NEW GATES ARE OPERATIONAL. FENCE POSTS TO BE MOUNTED
TO SURFACE OR CORE DRILLED INTO PAVEMENT. MANUAL LOCKABLE
SWING GATE TO BE MINIMUM 16' WIDE AND INCLUDE LOCKABLE DOWN
ROD OR OTHER APPROVED METHOD FOR SECURITY. COORDINATE
EXACT FENCE LOCATION WITH OWNER.
CONNECT TO EXISTING FENCE
- CONFIRM EXACT LOCATION
WITH FACILITY
X X X X X X
X
X
X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
PLACE NEW TEMPORARY POST ADJACENT
TO EXISTING FENCE WITHOUT DISTURBING
MOTION DETECTION SYSTEM - MAXIMUM GAP
BETWEEN FENCES TO BE LESS THAN 4"
PROTECT EXISTING
LIGHT AND ELECTRICAL
SERVICE (TYP)
REMOVE AND REPLACE
SIDEWALK PANELS AS
REQUIRED FOR CONDUIT
INSTALLATION
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: CD01
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
AN
D D
EM
O
LI
TI
O N
PL
AN
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
D0
- E
XI
ST
IN
G C
O
ND
IT
IO
NS
A
ND
D
EM
O
LI
TI
O N.
dw g
3/ 1/
:5
6:
P M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
NORTH
GENERAL NOTES:
1. EXISTING ELECTRICAL AND COMMUNICATION LINES ARE SHOWN TO
BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR IS
RESPONSIBLE FOR COORDINATION WITH FACILITY AND LOCATING ALL
EXISTING LINES. ANY LINES DAMAGED DURING DEMOLITION AND
CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AS PART
OF THE PROJECT.
2. THERE MUST BE TWO GATES OPERATIONAL AT ALL TIMES DURING THE
PROJECT, THIS INCLUDES THE TEMPORARY GATE AND FENCE.
X X X X X X
X
X
X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
8" PCC PAVING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)
REMOVE AND REPLACE EXISTING FENCING AS NECESSARY
TO ACCOMMODATE NEW GATE. NEW FENCING TO HAVE <4"
OF CLEARANCE BELOW BOTTOM OF FENCE AND SIDES. SEE
SHEET C102 FOR ADDITIONAL INFORMATION.
MATCH EXISTING GRADES
AT REMOVAL LIMITS (TYP)
PROVIDE ISOLATION JOINTS AROUND ALL
FENCE POSTS, GATE POSTS, CONDUIT
AND OTHER STRUCTURES (TYP)
REMOVE AND REPLACE EXISTING GATE AND POSTS. NEW
GATE TO PROVIDE 15' OPENING WIDTH AND 15' OPENING
HEIGHT. SEE SHEET C102 FOR ADDITIONAL INFORMATION.
ADJUST FENCING AND GATE AS REQUIRED TO
ACCOMMODATE NEW CONCRETE. PROVIDE <4" OF
CLEARANCE BELOW BOTTOM AND SIDES OF FENCE.
POSITION NEW POSTS IN THE SAME
LOCATION AS EXISTING POSTS
.4
14.2'
.0
8" PCC PAVING. CONTRACTOR TO USE HIGH
EARLY STRENGTH (M-MIX) CONCRETE TO
MINIMIZE DRIVE CLOSURES (TYP)
WEST GATE TO MOVE
INTERIOR TO SALLY PORT
MATCH EXISTING GRADES
AT REMOVAL LIMITS (TYP)
PROVIDE ISOLATION JOINTS AROUND ALL FENCE POSTS, GATE
POSTS, CONDUIT AND OTHER STRUCTURES (TYP)
PROVIDE POSITIVE DRAINAGE AND
CONSISTENT SLOPES THROUGH PAVEMENT
REPLACEMENT AREA
INSTALL GRADE BEAM UNDER ENTIRE
GATE. ADJUST EXACT LOCATION AS
RECOMMENDED BY GATE
MANUFACTURER AND PHASING
POSITION NEW POSTS IN THE SAME
LOCATION AS EXISTING POSTS
.0
.0
44.0'
.0
14.7'
31.4'
6" SIDEWALK PCC
PAVING (TYP)
APPROXIMATE PHASING LIMITS.
ENSURE 12' MINIMUM DRIVE WIDTHS
APPROXIMATE PHASING LIMITS.
ENSURE 12' MINIMUM DRIVE WIDTHS
.0
8.
0'
12.9'
16.2'
1.5'
12.2'
16.4'
.0
.4
EAST GATE TO MOVE
INTERIOR TO SALLY PORT
CONTRACTOR TO INSTALL FENCE MOTION DETECTION COMMUNICATION
LINE PRIOR TO REMOVAL OF EXISTING CONDUIT AND WIRE MOUNTED ON
THE FENCE ABOVE THE GATE - MAXIMUM CUT OVER DOWNTIME OF 1-DAY
WILL BE ALLOWED - ADDITIONAL PHASED CONCRETE REMOVAL WILL BE
REQUIRED WITH TEMPORARY GRANULAR MATERIAL OR STEEL PLATE
CROSSING TO MAINTAIN FACILITY ACCESS. REFER TO 1/C102 FOR
LOCATION OF EXISTING ABOVE GROUND CONDUIT TO BE INSTALLED
UNDERGROUND. INSTALL IN 1" PVC CONDUIT. REUSE EXISTING
CONDUCTIONS AND SPLICE WIRE AS REQUIRED.
CONTRACTOR TO EXTEND POWER
AND COMMUNICATION CONDUIT
AND WIRING TO GATE CONTROLS
TO NEW GATE CONTROL BOX
CONTRACTOR TO EXTEND POWER
AND COMMUNICATION CONDUIT
AND WIRING TO GATE CONTROLS
TO NEW GATE CONTROL BOX
1.5'
INTERCEPT EXISTING POWER
FEED AND CONTROL WIRING
AND ROUTE TO NEW GATE
CONTROLLER. INSTALL
CONTROL WIRING IN 1" PVC.
TRANSITION BOTH CONDUITS
TO RMC AT GRADE.
INSTALL POWER WIRING IN 1" PVC. PROVIDE
NEW CONDUCTORS BETWEEN THE GATE
CONTROLLERS. FURNISH AND INSTALL 3 #10
AND 1 # G THWN. FIELD VERIFY EXISTING
CONDUCTORS AND MATCH CONDUCTORS.
TRANSITION CONDUIT TO RMC AT GRADE
INSTALL CONTROL WIRING IN 1" PVC. PROVIDE NEW CONDUCTORS
BETWEEN THE GATE CONTROLLERS. FIELD VERIFY EXISTING
WIRING. NEW WIRING TO MATCH EXISTING WIRING SIZE AND
QUANTITY. TRANSITION CONDUIT TO RMC AT GRADE
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
SI
TE
P
LA
N
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
SI
TE
P
LA
N.
dw g 3/
1/
:5 6:
P
M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
NORTH
NOTE: SEE PROJECT MAP ON
SHEET C000 FOR PROJECT
LOCATION
PHASING NOTES:
1. BOTH GATES WILL BE REQUIRED TO BE
CONSTRUCTED IN TWO PHASES EACH TO
MAINTAIN CONTINUOUS EMERGENCY
ACCESS TO THE FACILITY AT ALL TIMES
2. CONTRACTOR TO PROVIDE MEANS TO
ALLOW EMERGENCY VEHICLE ACCESS INTO
THE FACILITY AT ALL TIMES WITH GRANULAR
MATERIAL OR STEEL PLATES AVAILABLE
ADJACENT TO AREAS OF ACTIVE TRENCHING
OR CONCRETE REMOVAL
3. MEANS OF EMERGENCY VEHICLE ACCESS
MUST BE PROVIDED AT ALL TIMES WHEN
CONSTRUCTION IS NOT ACTIVELY BEING
COMPLETED OR CONTRACTOR PERSONNEL
ARE NOT ONSITE
4. POWER MAY BE REMOVED TO BOTH GATES
DURING CONSTRUCTION BY CONTRACTORS
MEANS AND METHODS WITH GATES TO BE
OPERATED MANUALLY.
5. TWO (2) SECURITY BARRIERS MUST BE
PROVIDED AT ALL TIMES. INSTALL
TEMPORARY FENCE AND SWING GATES
PRIOR TO REMOVAL OF EXISTING GATE.
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C102
SI
TE
P H
O
TO
S
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
SI
TE
P
LA
N.
dw g 3/
1/
:5 6:
P
M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
3 WEST GATE
1 WEST GATE 2 EAST GATE
OWNER TO REMOVE AND
REPLACE RAZOR WIRE (TYP)
OWNER TO REMOVE AND
REINSTALL EXISTING SIGNAGE
(TYP)
OWNER TO REMOVE AND
REPLACE RAZOR WIRE (TYP)
REMOVE FENCE FABRIC FOR
INSTALLATION OF NEW GATE AND
ADJACENT CONCRETE WHERE
REQUIRED. REINSTALL UPON
COMPLETION
OWNER TO REMOVE AND
REINSTALL EXISTING SIGNAGE
(TYP)
OWNER TO REMOVE AND
REPLACE RAZOR MESH (TYP)
OWNER TO REMOVE AND
REPLACE RAZOR MESH (TYP)
GATE AND FENCE REMOVAL EXTENTS
GATE AND FENCE
REMOVAL EXTENTS
MAN DOOR AND FENCE POSTS
TO BE REMOVED AND REPLACED
FOR CONCRETE REPLACEMENT
AND PHASED ACCESS
4 EAST GATE
MOTION DETECTION FENCE
CONTROL CONDUIT TO BE
REPLACED UNDERGROUND
PRIOR TO REMOVAL OF
EXISTING CONDUIT
CONFIRM BOTTOM CONDUIT IS
ABANDONED WITH FACILITY AND
REMOVE AS REQUIRED FOR
CONSTRUCTION
MOTION DETECTION FENCE CONTROL
CONDUIT TO BE REPLACED UNDERGROUND
PRIOR TO REMOVAL OF EXISTING CONDUIT
OWNER TO REMOVE AND
REPLACE LOCKING MECHANISM
INCLUDING CONNECTION OF
COMMUNICATION CABLING
MAN DOOR AND FENCE POSTS
TO BE REMOVED AND REPLACED
FOR CONCRETE REPLACEMENT
AND PHASED ACCESS
OWNER TO REMOVE AND
REPLACE LOCKING MECHANISM
INCLUDING CONNECTION OF
COMMUNICATION CABLING
REMOVE FENCE FABRIC FOR
INSTALLATION OF NEW GATE AND
ADJACENT CONCRETE WHERE
REQUIRED. REINSTALL UPON
COMPLETION
CONTRACTOR TO REMOVE AND
REPLACE CONDUIT TO LOCKING
MECHANISM. PROTECT
COMMUNICATION CABLING DURING
CONSTRUCTION. INSTALL NEW RMC
TO NEW LOCKING MECHANISM.
EXISTING COMMUNICATION CABLING
TO BE INSTALLED IN NEW RMC
CONDUIT TO LOCKING MECHANISM.
CONTRACTOR TO REMOVE AND
REPLACE CONDUIT TO LOCKING
MECHANISM. PROTECT
COMMUNICATION CABLING DURING
CONSTRUCTION. INSTALL NEW RMC
TO NEW LOCKING MECHANISM.
EXISTING COMMUNICATION CABLING
TO BE INSTALLED IN NEW RMC
CONDUIT TO LOCKING MECHANISM.
DO NOT DISTURB
EXISTING MOTION
DETECTION SYSTEM (TYP)
DO NOT DISTURB
EXISTING MOTION
DETECTION SYSTEM (TYP)
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C501
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S.
dw g 3/
1/
:5 6:
P
M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
ELEVATION - EAST AND WEST GATE
PLAN VIEW
ACCESS COVER
PRISON DEAD LOCK - ADDITIONAL
LOCK REQUIREMENTS INCLUDED
IN SPECS
MOTOR BOX
LOCKING TANG (3 TYP.)
1 1/2" X 2 1/2" X 1/4"
BOTTOM GUIDE ANGLE
BOTTOM GUIDE (TYP.)
2" x 2" x 1/4" MOTOR BOX MOUNTING ANGLE (TYP.)
CONCRETE GRADE BEAM - REFER TO DETAIL
Scale: None2
NEW 4" O.D. FENCE POST
LOCKING COLUMN
GATE FRAME
CHAIN TUBE
MOTOR BOX
1 Scale: None
NEW 4" O.D. POST
MOTOR BOX SUPPORT POST
FINISHED GRADE
BEAM ASSEMBLY
3" x 3" x 3/16" ANGLE CLIP (TYP.)
BEAM ASSEMBLY
34'-7 1/2"
15'-4"
17'-7 1/2"
15'-0"
'-0
'-5
/2
3'-10"
5' -8
1'-0" TO 4'-0"
1/ 2"
C
LE
AR
NEW FENCING
MODIFY EXISTING FENCING TO CONNECT TO NEW
GATE
MODIFY EXISTING FENCING TO CONNECT TO NEW
GATE
ADJUST POSITION OF
NEW POST TO ALIGN
WITH LOCATION OF
THE REMOVED POST
PROVIDE OPENING IN
NEW FENCING FOR
ACCESS TO COVER
INSIDE OF VEHICULAR SALLY PORT
NEW FENCING AND RAILS
EXISTING FENCE FABRIC
EXISTING FENCE RAILS -
ADJUST AND CONNECT
TO NEW GATE POST AS
REQUIRED
EXISTING FENCE AND
RAILS - ADJUST AND
CONNECT TO NEW
GATE POST AS
REQUIRED
EXISTING FENCE FABRIC
4' -0
" M
IN
NEW GATES AND FENCE TO HAVE
<4" OF CLEARANCE BETWEEN
BOTTOM AND SIDES (TYP)
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C501
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
BD
D
CR
B
CO
NS
TR
UC
TI
O
N
/0
2/
.0
DA
S
PR
O
JE
CT
: 9
5.
FD
C
F
- S
AL
LY
P O
R T
AU
TO
M
AT
ED
G
AT
E
R
EP
LA
C
EM
EN
T
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
L S
T.
F
O
RT
D O
DG
E, IA
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\C
CO
NS
TR
UC
TI
O
N
DE
TA
IL
S.
dw g 3/
1/
:5 6:
P
M
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B
A B C D E F
C D E F
NOTES:
1. GATE FRAME SECTIONS WILL BE WELDED TOGETHER IN THE FIELD.
2. UNLESS NOTED OTHERWISE, ALL GATE FRAME MEMBERS ARE 2 3/8" O.D.
GALVANIZED STEEL PIPE.
3/16" 2" @ 36"
SECTION "A-A"
Scale: None
1 7/8" O.D. PIPE SLEAVE WELDED TO
BOTTOM PANEL
1 1/2" x 2 1/2" x 1/4"
STEEL ANGLE
1 1/2" x 2 1/2" x 1/4" GALVANIZED STEEL ANGLE
GALVANIZED STEEL TRUSS ROD (TYP.)
7' -2
3 4"
'-5
1 2" (G
AT
E
H
EI
G H
T W
H
EN
A
SS
EM
BL
ED
A
7' -2
3 4"
A
7'-8"
15'-4"
| C000 COVER SHEET |
| C000 COVER SHEET |
| C001 CONSTRUCTION NOTES |
| C001 CONSTRUCTION NOTES |
| CD01 EXISTING CONDITIONS AND DEMOLITION PLAN |
| CD01 EXISTING CONDITIONS AND DEMOLITION PLAN |
| C101 SITE PLAN |
| C101 SITE PLAN |
| C102 SITE PHOTOS |
| C102 SITE PHOTOS |