RFB944200-01 - Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- RFB944200-01
- Issued by
- Harrison County, Iowa
About this file
These are architectural design and technical drawings for a tuckpointing and maintenance project at the Mount Pleasant Correctional Facility (MPCF) in Mount Pleasant, Iowa, prepared by Horizon Architecture for the Iowa Department of Administrative Services (DAS). The project involves comprehensive exterior masonry repairs, including repointing brick and stone veneer, resealing concrete walk-to-building joints, repairing spalled face stone, and applying a vapor-open sealer to stone veneer surfaces across multiple building elevations (west, east, north, south, and staircase areas). The drawings are dated 3/29/2025 and are issued for bidding and construction, with project number 9442.00, covering the South Core and East/West Staircase areas of the facility.
The project directory indicates key stakeholders include the owner (Iowa DAS) represented by Brandon Adams, construction manager McGough (represented by Adam Douglas), and the architect Horizon Architecture (led by Michael Nolan). The applicable building code is the 2015 IEBC, and the work is classified as a repair involving repointing, tuckpointing exterior masonry, and exterior maintenance. The site staging plan shows the project location within the correctional facility complex, with designated areas for contractor parking, visitor parking, and a sally port. The drawings provide detailed elevations and floor plans highlighting specific areas and zones of masonry work, with keynotes indicating precise locations for repair, repointing, and surface treatments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB944200-01 - Notice to Bidders.pdf | ||
| RFB944200-01 - Bid Form.pdf | ||
| RFB944200-01 - Project Manual.pdf | ||
| 1305668-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
C-101
COVER
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
6" TYPICAL, UNLESSOTHERWISE NOTED
OFFICE
1/A-201
D0 1.1
B2
C3
D4
A1
1.01.01
1.01.01
D01.1
S01
W01
GRAPHIC
SYMBOLS INDICATES SECTION
LOCATION ON SHEET
INDICATES SHEET
ON WHICH DRAWING
IS SHOWN
SECTION / DETAIL MARKER DETAIL / ENLARGED PLAN MARKER
INTERIOR ELEVATION MARKER
INDICATES ELEVATION
LOCATION ON SHEET
INDICATES SHEET
ON WHICH DRAWING
IS SHOWN
ELEVATION / SECTION MARKER
INDICATES ELEVATION
LOCATION ON SHEET
INDICATES SHEET
ON WHICH ELEVATION
IS SHOWN
XX
YY
XX
XX
YY
DETAIL / ENLARGED PLAN MARKER
INDICATES DETAIL
LOCATION ON SHEET
INDICATES SHEET
ON WHICH DETAIL
IS SHOWN
SPACE DESIGNATION
WINDOW MARKER
DOOR IDENTIFIERS
SPACE NAME
SPACE NUMBER
WALL TYPE MARKER 4C
SKYLIGHT MARKER
DOOR IDENTIFIER
(ELEVATIONS/SECTIONS)
ENLARGED PLAN REFERENCE
KEYNOTE IDENTIFIER
XX
YY
DOOR
IDENTIFIER
(PLANS)
KEYNOTE; SEE KEYNOTE LEGEND
ON DRAWING'S LAYOUT
ALTERNATE KEYNOTE;
SEE KEYNOTE LEGEND
ON DRAWING'S LAYOUT
(SEE PARTITION LEGEND)
SHEET INDEX
ID
C-101
A-101
A-201
A-202
A-203
A-204
A-205
A-206
Name
COVER
KEY PLAN
WEST ELEVATION
WEST ELEVATION
NORTH SOUTH ELEVATIONS
EAST ELEVATION
EAST ELEVATION
SOUTH ELEVATIONS
800 ft
N
N
A-101
CONTRACTOR
PARKING
VISITOR AND
PUBLIC PARKING
APPROXIMATE DUMPSTER
LOCATION - COORDINATE
WITH CM AND MPCF STAFF
GARAGE/MPCF TO SET OUT
CONTAINER FOR METAL
AND WILL EMPTY DAILY
SALLY PORT
06926
NOLAN
MICHAEL
LI
CE
NS
ED
PROFESS IONAL
ARCH
ITEC
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED HEREIN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT
UNDER THE LAWS OF THE STATE OF IOWA.
MICHAEL NOLAN DATE
LICENSE NUMBER 06926.
MY LICENSE RENEWAL DATE IS JUNE 30, 2023.
PAGES OR SHEETS COVERED BY THIS SEAL: ALL
I OWA
T
NOT TO SCALE3 SITE STAGING PLAN
PROJECT LOCATION
VERIFY SCALE
BAR IS ONE (1) INCH LONG ON
ORIGINAL DRAWING
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
ABBREVIATIONS
A.D. AREA DRAIN
ABV. ABOVE
ADA ACCESSIBLE / AMERICANS
WITH DISABILITIES ACT
ADJ. ADJUSTABLE
A.o.R. AREA OF REFUGE
ALUM. ALUMINUM
ALT. ALTERNATE
A.F.F. ABOVE FINISHED FLOOR
AC. ACOUSTIC / ACOUSTICAL
A.F. ALUMINUM FACE
APPX. APPROXIMATE /
APPROXIMATELY
BD. BOARD
BLK. BLOCK / BLOCKING
BLDG. BUILDING
B.O. BOTTOM OF
B.O.S. BOTTOM OF STEEL
CAB. CABINET
C.C. CENTER-TO-CENTER
CLG. CEILING
CLOS. CLOSET
C.M. CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
C.J. CONTROL JOINT
CONC. CONCRETE
CORR. CORRIDOR
COL. COLUMN
CONT. CONTINUE / CONTINUOUS
CONTR. CONTRACTOR
DIA. DIAMETER
DTL. DETAIL
DN DOWN
DWG. DRAWING
DEPT. DEPARTMENT
DBL. DOUBLE
DIM. DIMENSION
DR. DOOR
EXIST. EXISTING
EQ. EQUAL
E.C. ELECTRICAL CONTRACTOR
EL. ELEVATION
ELEV. ELEVATOR
ELEC. ELECTRIC / ELECTRICAL
EXP. EXPANSION
EXT. EXTERIOR
EA. EACH
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
FIN. FINISH / FINISHED
FLR. FLOOR
F.O. FACE OF
FT. FEET / FOOT
FLUOR. FLUORESCENT
GYP. GYPSUM
GALV. GALVANIZED
GA. GAUGE
G.C. GENERAL CONTRACTOR
HR. HOUR
H.P. HIGH POINT
HVAC HEAT, VENTILATION, AIR-
CONDITIONING
HORIZ. HORIZONTAL
HT. HEIGHT
INSUL. INSULATION / INSULATING
I.D. INSIDE DIAMETER
INCAND. INCANDESCENT
JAN. JANITOR
JT. JOINT
LBS. POUNDS
LAV. LAVATORY
LAM. LAMINATE
L.P. LOW POINT
MAX. MAXIMUM
MFR. MANUFACTURER /
MANUFACTURED
MTL. METAL
MIN. MINIMUM
MIRR. MIRRORED
MTD. MOUNTED
M.O. MASONRY OPENING
MISC. MISCELLANEOUS
MECH. MECHANICAL
N.I.C. NOT IN CONTRACT
NO. NUMBER
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OPP. OPPOSITE
OPG. OPENING
P.C. PLUMBING CONTRACTOR
P.F. PANEL FACE
PR. PAIR
P.T. PRESSURE TREATED
PL. LAM PLASTIC LAMINATE
QTY. QUANTITY
R RISER
R.W.C. RAIN WATER CONDUCTOR
REINF. REINFORCING / REINFORCED
REQ. REQUIRED
R.O. ROUGH OPENING
REV. REVISED / REVISION
REFL. REFLECTED
REC. RECESSED
RAD. RADIUS
S.S. STAINLESS STEEL
ST. STREET
SIM. SIMILAR
STL. STEEL
SQ. SQUARE
SAN. SANITARY
SUSP. SUSPENDED
STD. STANDARD
SPEC. SPECIFICATION
TEL. TELEPHONE
T.O. TOP OF
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TOIL. TOILET
TYP. TYPICAL
THK. THICK
TMP. TEMPERED
T.S.G. TEMPERED SAFETY
GLASS
U.O.N. UNLESS OTHERWISE
NOTED
U.L. UNDERWRITERS
LABORATORIES
VEST. VESTIBULE
V.C.T. VINYL COMPOSITION
TILE
W/ WITH
W.C. WATER CLOSET
WD WOOD
& AND
@ AT
± PLUS OR MINUS
° DEGREE
� ANGLE
[ CHANNEL
# NUMBER
□ SQUARE
Ø ROUND / DIAMETER
� / C.L. CENTER LINE
� / PL. PLATE
∏ U-BAR
∟ LEG-BAR
BUILDING INFORMATION
APPLICABLE BUILDING CODE - 2015 IEBC
CLASSIFICATION OF WORK - REPAIR
REPOINTING, TUCKPOINTING EXTERIOR MASONRY AND
EXTERIOR MAINTENANCE
PROJECT DIRECTORY
OWNER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES (DAS)
109 EAST 13TH STREET
DES MOINES, IA 50319
OWNER'S REPRESENTATIVE: BRANDON ADAMS
PHONE: 515.201.2197
EMAIL: BRANDON.ADAMS@IOWA.GOV
CONSTRUCTION MANAGER
MCGOUGH
217 EAST 2ND STREET SUITE 120
DES MOINES, IA 50309
PROJECT MANAGER: ADAM DOUGLAS
PHONE: 515.822.4229
EMAIL: adam.douglas@mcgough.com
ARCHITECT
HORIZON ARCHITECTURE
3116 ALPINE COURT IOWA CITY IA 52245
PHONE: (563) 506-4965
CONTACT: MICHAEL NOLAN, AIA
EMAIL: MICHAEL@HORIZON-ARCHITECTURE.COM
9442.00 DOC MPCF SOUTH CORE & EAST/WEST
STAIRCASE TUCKPOINTING
MOUNT PLEASANT CORRECTIONAL FACILITY
MOUNT PLEASANT, IA
3/30/2025
C-101 THRU A-206
2025.
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-101
KEY PLAN
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
3'-0"
'-1
1"
88'-6 3/4"
6'-7 3/4"
'-1
/4
'-1
1/
2"
'-7
'-3
2' -7
AREA OF
WORK
A-201
A-204
A-203
A-203
A-206
A-206
A-206
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
WALL TO SIDEWALK JOINT TO RESEAL (PLAN ONLY)
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 1/32" = 1'-0"1 1st FLOOR PLAN 0 16' 32' 64'
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-201
WEST
ELEVATION
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
4 44
4 6 4 6 4 6 4 6
4 4 4 4
4 6 4 6 4 6
4 4
4 6
M
AT
C H
L
IN
E
7 77
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 3/16" = 1'-0"1 WEST ELEVATION
0 4' 8' 12'
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-202
WEST
ELEVATION
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
222 2 2
3 3
M
AT
C H
L
IN
E
7 7
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 3/16" = 1'-0"1 WEST ELEVATION
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-203
NORTH SOUTH
ELEVATIONS
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
52 2
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 3/16" = 1'-0"1 NORTH ELEVATION
0 4' 8' 12' SCALE: 3/16" = 1'-0"2 SOUTH ELEVATION
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-204
EAST
ELEVATION
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
M
AT
C H
L
IN
E
7 77
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 3/16" = 1'-0"1 EAST ELEVATION
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-205
EAST
ELEVATION
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
4 4 4 4 4 4 46 6 6
M
AT
C H
L
IN
E
W O
R K
AR
EA
B O
U N
D
AR
Y
7 7
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 3/16" = 1'-0"1 EAST ELEVATION
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-206
SOUTH
ELEVATIONS
G25-001
MSN
3/29/2025
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
D A S M
PC
F
Tu ck po in t an d W in do w s\
M od el a nd D es ig n\ M
PC
F
S ou th co re T uc kp oi nt in g
M ik e' s
R es to re
4.
pl n
.0
D O
C M
P C
F S
O U
TH
C
O R
E
E A
S T/
W
ES
T S
TA
IR
C A
S E
TU
C
K P
O
IN
TI
N
G
IS
SU
ED
F
O R
B
ID
D
IN
G A
N D
C O
N
ST
R U
C
TI
O N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
RESEAL CONCRETE WALK-TO BUILDING JOINT
REPOINT MASONRY VENEER IN AREA INDICATED
REPAIR OR REPLACE SPALLED FACE STONE
REPOINT NATURAL STONE VENEER IN AREA INDICATED
LIMESTONE VENEER AREA OF WORK
NATURAL STONE VENEER AREA OF WORK
REPOINT BRICK IN AREA INDICATED
REMOVE ANCHORS AND PATCH/REPAIR STONE FACE.
APPROXIMATE LOCATION NOTED AT KEYNOTE LOCATION.
REMOVE AND REINSTALL DOWNSPOUT AS REQUIRED
BRICK VENEER AREA OF WORK
GENERAL SCOPE NOTE
- KEYNOTES ARE APPLICABLE TO PROJECT AS A WHOLE AND MAY
NOT APPEAR ON EVERY SHEET
- CLEAN AND APPLY VAPOR OPEN SEALER TO ALL STONE VENEER
IN AREA OF WORK.
- AREAS FOR REPOINTING AND REPAIRS GENERALLY LOCATED
BASED ON FIELD OBSERVATIONS. EXACT EXTENTS OF
REPOINTING TO BE FIELD VERIFIED.
SCALE: 1/4" = 1'-0"1 SOUTHWEST PARTIAL ELEVATION
0 2' 4' 8' SCALE: 1/4" = 1'-0"2 SOUTHEAST PARTIAL ELEVATION
0 2' 4' 8'
SCALE: 1/4" = 1'-0"3 NORTH STAIRTOWER ELEVATION
0 2' 4' 8'
| 9442 MPCF SOUTHCORE REPOINTING ISSUED FOR BIDDING 20250329 |
| MPCF Southcore Tuckpointing Mike's Restore 20250224 |
| SOUTH CORE TUCKPOINT |
| C-101 COVER |
| A-101 KEY PLAN |
| A-201 WEST ELEVATION |
| A-202 WEST ELEVATION |
| A-203 NORTH SOUTH ELEVATIONS |
| A-204 EAST ELEVATION |
| A-205 EAST ELEVATION |
| A-206 SOUTH ELEVATIONS |
File details come from the government source that posted it. Updated .