About this file
This document is a set of drawings and specifications for a civil engineering project to construct a new parking area at the Cherokee Mental Health Institute in Cherokee, Iowa, which is being managed by the Iowa Department of Administrative Services. The project includes the demolition of existing asphalt and concrete, the installation of approximately 6,000 square yards of new 5-inch and 6-inch PCC paving, new sidewalks, storm sewer improvements, grading, and landscaping. The bid due date is September 8, 2023 with an anticipated award and start of construction shortly thereafter. The contract term is not specified, but the work is expected to be completed within a standard construction timeline.
The drawings and specifications provide details on the construction requirements, including materials, installation methods, erosion control measures, grading, and site restoration. Pricing is to be provided as lump sum bids, with some bid alternates for additional sidewalk work. The project is being funded by the Iowa Department of Administrative Services, with no specific funding source or set-aside requirements noted. No incumbent contractor information is provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
PROJECT
LOCATION
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL 'C' SHEETS
KYLE A. LAWSON
26414
CIVIL ENGINEER
CHEROKEE MHI PARKING LOT ADDITION
DAS PROJECT NO: 9316.00
CHEROKEE MENTAL HEALTH INSTITUTE
1251 W CEDAR LOOP
CHEROKEE, IA 51012
VICINITY MAP
NTS
PROJECT MAP
NTS
PROJECT
LOCATION
ENTRANCE
CHEROKEE,
IOWA
LIGHT POLE
FIRE HYDRANT
VALVE
DRAINAGE MANHOLE
CURB INTAKE
GAS MAIN
SANITARY SEWER
MINOR CONTOUR
STORM SEWER
WATER MAIN
TREE
TREE REMOVAL
CURB AND GUTTER (PCC)
MAJOR CONTOUR
STORM INTAKE
909 909
PROPOSEDDESCRIPTIONEXISTING
TRANSFORMER
ELECTRICAL LINE
BUILDING
PCC PAVING
PAVING DEMO
GENERAL NOTES
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS PLOTTED ON THE DRAWINGS ARE
APPROXIMATE ONLY AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THE DRAWINGS. THE VERIFICATION OF EXISTENCE OF AND THE DETERMINATION OF THE EXACT LOCATION OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR(S).
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT CRITICAL LOCATIONS TO VERIFY EXACT
HORIZONTAL AND VERTICAL LOCATION.
3. THE FACILITY WILL COMPLETE PRIVATE UTILITY LOCATES OF ALL FACILITY UTILITIES REQUIRED BY IOWA ONE-CALL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ALL LOCATES AND CONFIRM THEY ARE COMPLETED PRIOR TO THE START
OF CONSTRUCTION.
4. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL BY CALLING 811 OR 1-800-292-8989 NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
5. NOTIFY UTILITY COMPANIES WHOSE FACILITIES ARE SHOWN ON THE PLANS OR KNOWN TO BE WITHIN THE CONSTRUCTION
LIMITS OF THE SCHEDULE PRIOR TO EACH STAGE OF CONSTRUCTION.
6. UNLESS OTHERWISE SPECIFIED, ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MOST RECENT EDITION OF
IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS).
7. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY/STATE REGULATIONS/CODES AND OSHA STANDARDS.
8. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE
CONTRACTOR.
9. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION FROM THE OWNER'S
REPRESENTATIVE.
10. PROTECT EXISTING UTILITIES DURING CONSTRUCTION.
11. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
12. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS. DRIVES, ROADWAYS, ETC. SHALL BE KEPT CLEAN AT ALL TIMES.
13. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
14. REPAIR OR REPLACE DAMAGED SITE FEATURES (WALLS, PAVEMENT, UTILITIES, FENCES, ETC.) TO REMAIN AT NO ADDITIONAL
EXPENSE TO THE STATE.
15. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SPECIFICALLY CALLED OUT SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION TO BE ALLOWED FOR THE COMPLETION OF THIS
WORK.
16. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE CONSIDERED UNACCEPTABLE.
UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH
CARELESSNESS OR ANY OTHER CAUSE FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK SHALL BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER AS REQUIRED BY THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNER'S REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS OR ANY EXTRA WORK DONE WITHOUT WRITTEN AUTHORIZATION WILL NOT BE PAID
FOR.
17. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.
18. THE CONTRACTOR SHALL MATCH EXISTING GRADES AT THE CONSTRUCTION LIMITS.
19. STAGING LOCATIONS AND CONSTRUCTION ACCESS ROUTES FOR CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE
COORDINATED WITH AND APPROVED BY THE FACILITY AND CONSTRUCTION MANAGER.
20. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES NECESSARY TO PROTECT AGAINST SILTATION, EROSION AND DUST POLLUTION ON THE PROJECT SITE AND ANY OFF-SITE BORROW OR DISPOSAL AREAS USED FOR THIS PROJECT.
COMPLY WITH SOIL EROSION CONTROL REQUIREMENTS OF IOWA CODE, FEDERAL REGULATIONS AND LOCAL ORDINANCES.
21. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE SEEDED PER THE SPECIFICATIONS. A MINIMUM OF 6" OF TOPSOIL SHALL
BE PROVIDED PER SPECIFICATIONS.
22. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
23. CONTRACTOR TO COORDINATE ANY SITE, UTILITY OR GRADE ADJUSTMENTS WITH THE CONSTRUCTION MANAGER PRIOR TO
PROCEEDING WITH THE WORK.
24. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK OF ALL SUBCONTRACTOR(S) INVOLVED ON
THE PROJECT.
25. SIGNING, STRIPING OR OTHER TRAFFIC CONTROL DEVICES ON THE ROADWAY SHOULD CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD, FEDERAL HIGHWAY ADMINISTRATION, 2009 EDITION)
OWNERENGINEER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF BUSINESS AND PROPERTY SERVICES
ATTN: BRANDON ADMS
BRANDON.ADAMS@IOWA.GOV
109 SE 13TH STREET
DES MOINES, IA 50319
515-201-2197
SHIVE-HATTERY, INC.
ATTN: CHRIS BAUER OR KYLE LAWSON
CBAUER@SHIVE-HATTERY.COM
KLAWSON@SHIVE-HATTERY.COM
4125 WESTOWN PKWY, SUITE 100
WEST DES MOINES, IA 50266
515-223-8104
SITE ADDRESS
CHEROKEE MENTAL HEALTH INSTITUTE
1251 W CEDAR LOOP
CHEROKEE, IA
CONSTRUCTION MANAGER
STORY CONSTRUCTION
ATTN: DARREN MILLIKEN
DARREN.MILLIKEN@STORYCON.COM
2810 WAKEFIELD CIRCLE
AMES, IA 50010
515-291-5358
BOLLARD
CONTACT INFORMATION
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C001 CONSTRUCTION NOTES
C002 EXISTING CONDITIONS
C003 OVERALL SITE PLAN
CD01 DEMOLITION PLAN
C101 SITE PLAN
C201 GRADING PLAN
C501 CONSTRUCTION DETAILS
E101 ELECTRICAL SITE PLAN
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C000
C O
VE
R
S H
EE
T
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
CO
VE
R
SH
EE
T.
dw g 9/
7/
0:
:5
AM PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
E101
KEVIN J. BRUXVOORT
19927
ELECTRICAL ENGINEER
9-8-20239-8-2023
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C001
C O
N
ST
R U
C
TI
O N
N O
TE
S
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
CO
NS
TR
UC
TI
O N
NO
TE
S.
dw g 9/
7/
0:
:0
AM THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS SHALL APPLY TO ALL
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
COORDINATE SYSTEM: IOWA STATE PLANE - NORTH
CONTROL POINTS
NAME NORTHING EASTING ELEVATION DESCRIPTION
1 3746069.892 4364778.694 1360.252 CUT X
2 3746078.351 4364869.605 1356.913 CUT X
3 3746090.504 4364924.053 1356.160 CUT X
4 3745822.093 4364891.524 1361.632 CUT X
5 3745620.856 4364854.371 1360.958 CUT X
6 3745428.132 4364835.573 1359.506 CUT X
7 3745823.369 4364729.223 1362.701 CUT X
CONSTRUCTION STAGING NOTES
1. CONTRACTOR SHALL COORDINATE ALL STAGING AREAS WITH THE FACILITY AND CONSTRUCTION MANAGER.
2. CONTRACTOR SHALL REPLACE ALL PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES AT THE END OF CONSTRUCTION.
CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION OF EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
3. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS NOT TO BE PAVED TO THEIR ORIGINAL CONDITION AT THE END OF CONSTRUCTION. ALL DISTURBED AREAS SHALL BE SCARIFIED, TILLED AND SEEDED. CONTRACTOR TO PROVIDE PHOTO
DOCUMENTATION PRIOR TO BEGINNING WORK.
4. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING OR OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL OUT OF
PROJECT SITE.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR IS ALLOWED TO CLOSE DOWN ADJACENT STREET PARKING DURING CONSTRUCTION. ACCESS TO ADJACENT BUILDINGS, DRIVES, PARKING AND SIDEWALKS ARE TO BE MAINTAINED THROUGHOUT CONSTRUCTION UNLESS APPROVED
BY OWNER.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL TRAFFIC DURING CONSTRUCTION AND PROVIDE ADEQUATE
TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE.
3. CONTRACTOR TO INSTALL AND MAINTAIN ORANGE CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION.
CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT THE PROJECT DURATION.
4. CONTRACTOR TO COORDINATE CONSTRUCTION ACCESS, STAGING AND PARKING AREAS WITH FACILITY AND
CONSTRUCTION MANAGER AND MINIMIZE IMPACTS TO FACILITY'S OPERATIONS.
DEMOLITION NOTES
1. REMOVAL REQUIREMENTS SHOWN ON THE PLANS SHOULD BE CONSIDERED MINIMUM REMOVAL AND REPLACEMENT REQUIREMENTS. CONTRACTORS SHALL ADJUST REMOVAL LIMITS AND DIMENSIONS AS REQUIRED BY CONSTRUCTION MEANS AND METHODS AND ACTUAL SITE CONDITIONS. CONTRACTORS SHOULD FACTOR ADDITIONAL ANTICIPATED REMOVAL AND REPLACEMENT REQUIREMENTS INTO THEIR BIDS AS ADDITIONAL COMPENSATION REQUESTS FOR ADJUSTED OR
EXPANDED REMOVAL LIMITS WILL NOT BE APPROVED.
2. CONTRACTOR SHALL REPLACE AT NO COST TO THE STATE ALL DAMAGED STREETS, DRIVES, SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE STRUCTURES NOT SCHEDULED TO BE
REMOVED DURING THE COURSE OF THE WORK.
3. ALL LANDSCAPING, INCLUDING TREES, SHRUBS AND PERENNIALS NOT CALLED OUT TO BE REMOVED OR APPROVED FOR REMOVAL BY CONSTRUCTION MANAGER, SHALL BE PROTECTED AND REPLACED AT NO COST TO THE STATE IF DAMAGED DURING CONSTRUCTION. REPLACE TREES WITH (1) EQUIVALENT TREE UP TO 6" CALIPER AND (1) ADDITIONAL TREE FOR EVERY 6" CALIPER BEYOND THAT. ALL PLANTS THAT ARE DESTROYED OR DAMAGED SHALL BE REPLACED WITH NEW PLANTS
OF THE EQUIVALENT TYPE.
4. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER OR SIDEWALK IS CUT OR OTHERWISE DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS AND GUTTERS AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTOGRAPH) ALL CRACKED PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), THE CONTRACTOR SHALL REPLACE THE DAMAGED
AREA AT NO ADDITIONAL COST TO STATE.
5. FIRE PROTECTION ACCESS AND FIRE HYDRANTS SHALL BE MAINTAINED THROUGHOUT THE PROJECT. ALL EXISTING FIRE
HYDRANTS SHALL BE PROTECTED AND MAINTAINED.
6. TREES AND VEGETATION INDICATED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY, INCLUDING ALL STUMPS AND ROOT STRUCTURES THAT ARE 2” DIAMETER AND LARGER. BACKFILL ALL EXCAVATIONS AND DEPRESSIONS WITH
COMPACTED SUITABLE TOPSOIL MATERIAL.
7. THE CONTRACTOR SHALL COORDINATE ANY DISRUPTION OF EXISTING UTILITIES SERVING THE FACILITY WITH THE FACILITY
AND CONSTRUCTION MANAGER.
EXCAVATION NOTES
1. EXCAVATE TRENCH AND PROVIDE PIPE BEDDING AND BACKFILL MATERIAL PER IOWA SUDAS SPECIFICATIONS OR AS SHOWN
ON THE DRAWINGS.
2. STRIP, STOCKPILE AND RESPREAD A MINIMUM OF 6” OF TOPSOIL IN ALL SEEDING OR SODDING AREAS DISTURBED BY CONSTRUCTION. DISTURBED AREAS SHALL BE LEFT IN SMOOTH CONDITION READY FOR FINAL SEEDBED PREPARATION BY SITE RESTORATION CONTRACTOR. GRADE ALL DISTURBED ARES TO DRAIN, AS PONDING OF WATER WILL NOT BE
ACCEPTABLE.
3. CONTRACTOR IS RESPONSIBLE FOR ALL TRENCH AND FILL SETTLEMENT FOR THE PROJECT'S ONE YEAR WARRANTY PERIOD.
CONTRACTOR SHALL PROVIDE ADDITIONAL FILL MATERIAL AND IS RESPONSIBLE FOR RESEEDING OF ALL SETTLEMENT
AREAS AFTER SITE RESTORATION HAS BEEN COMPLETED.
GRADING AND EROSION CONTROL NOTES
1. THE DISTURBED CONSTRUCTION AREA IS LESS THAN 1 ACRE, SO AN NPDES GENERAL PERMIT NO. 2 AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP) ARE NOT REQUIRED. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR
INSTALLING AND MAINTAINING EROSION CONTROL THROUGHOUT CONSTRUCTION.
2. BEST MANAGEMENT PRACTICES (BMPs) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY CONSTRUCTION MANAGER
OR OWNER'S REPRESENTATIVE.
3. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND
PROPERLY TREATED OR DISPOSED.
4. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
AND CLEAN UP FUEL OR CHEMICAL SPILLS AND LEAKS.
5. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS
FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
6. RUBBISH, TRASH, GARBAGE, LITTER OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS.
MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER
DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
7. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS
MUST BE REMOVED IMMEDIATELY.
8. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE.
9. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND
EROSION.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, WATTLES, INLET PROTECTION, ETC.) TO PREVENT EROSION.
11. ALL STORM SEWER INTAKES THAT RECEIVE STORMWATER RUNOFF FROM DISTURBED AREAS SHALL BE PROVIDED WITH
INLET PROTECTION.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION, PERIODIC CHECKING AND REINSTALLATION OF EROSION AND
SEDIMENTATION CONTROL MEASURES.
13. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE IOWA DNR, US EPA AND LOCAL REGULATIONS DEALING WITH
STORMWATER RUNOFF AND EROSION CONTROL.
PAVEMENT GENERAL NOTES
1. ALL PROPOSED PAVEMENT PATCHES ARE APPROXIMATE ONLY AND SHOULD BE CONSIDERED MINIMUM REMOVAL EXTENTS.
EXTEND AND ADJUST PAVEMENT PATCHES AS REQUIRED WITH PRIOR APPROVAL BY ENGINEER.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES, NEW PAVING OR
ADJACENT PAVING WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. SALVAGE ALL SIGNS WITHIN THE CONSTRUCTION LIMITS AND REINSTALL IN THE SAME LOCATION AND CONDITION AFTER CONSTRUCTION. ANY STREET SIGNS OR POLES DAMAGED DURING THE COURSE OF WORK TO BE REMOVED AND REPLACED
AT NO ADDITIONAL COST TO THE STATE. COORDINATE LOCATIONS WITH THE OWNER.
4. USE TYPE "A" COMPACTION PER IOWA DOT STANDARD SPECIFICATIONS ON SUBGRADE AND SUBBASE.
SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL SITE
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. CONCRETE PAVING
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA DOT
SPECIFICATIONS FOR AIR-ENTRAINED TYPE C-4 MIX WITH TYPE I CEMENT.
FLY ASH (CONTRACTOR'S OPTION): ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE: DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1" or 8" MAXIMUM WITH SUPER PLASTICIZER
AIR CONTENT: 7.0% ± 1.0%
WATER/CEMENT RATIO: NOT TO EXCEED 0.53
FINISH: HEAVY BROOM FINISH
TESTING: ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 CY, OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND
SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED OR WITHIN 30 MINUTES AFTER
FORMS ARE REMOVED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNER'S PREFERENCE TO AVOID COLD WEATHER CONCRETE AND PROVIDE TEMPORARY
GRANULAR SURFACING FOR SIDEWALK AND PAVING AS REQUIRED.
B. EXPANSION JOINT FILLER
CLOSED CELL POLYETHYLENE WITH STRIP-OFF CAP FOR SEALANT.
C. JOINT SEALANT
PAVING JOINTS SHALL BE SEALED PER IOWA DOT SPECIFICATIONS. BACKER ROD SHALL NOT BE USED FOR JOINT SEALING.
D. PAVEMENT JOINTING
PROVIDE IDOT TYPE 'C' JOINTS FOR JOINTS IN PARKING LOT. PROVIDE JOINTS AT A MAXIMUM SPACING OF 12 FEET FOR PAVING
OR SQUARE PANELS FOR SIDEWALKS.
PROVIDE IDOT TYPE 'RD' OR TYPE 'BT' JOINTS TO TIE INTO EXISTING PAVING.
PROVIDE IDOT TYPE 'DW' JOINTS FOR END OF DAY PAVING.
SAW CUTTING TO BE COMPLETED A MAXIMUM OF 24 HOURS FROM CONCRETE PLACEMENT. RANDOM CRACKING CAUSED BY
DELAYED SAW CUTTING MAY REQUIRE REMOVAL AND REPLACEMENT.
CONTRACTOR TO PROVIDE OWNER'S REPRESENTATIVE WITH A POURING SEQUENCE AND JOINTING PLAN FOR APPROVAL PRIOR
TO PAVING.
E. TRENCH EXCAVATION AND BACKFILL
BEDDING AND BACKFILL MATERIAL: SHALL COMPLY WITH IOWA SUDAS SECTION 3010.
F. TOPSOIL
STRIP, STOCKPILE AND RESPREAD EXISTING TOPSOIL IN ALL AREAS TO BE SEEDED. THE DEPTH OF TOPSOIL SHALL BE A MINIMUM OF 6" AFTER NATURAL SETTLEMENT AND SHALL CONFORM SMOOTHLY TO THE ADJACENT LINES, GRADES AND ELEVATIONS. PROVIDE ADDITIONAL TOPSOIL IF EXISTING TOPSOIL IS NOT PROPERLY HANDLED AND PROTECTED.
G. SITE RESTORATION
HYDRAULIC SEEDING: ALL DISTURBED AREAS ON THE SITE NOT TO BE PAVED OR LANDSCAPED SHALL RECEIVE HYDRAULIC SEEDING. HYDRAULIC SEEDING MATERIALS AND INSTALLATION SHALL MEET SUDAS SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR PREPARING SEEDBED, APPLYING HYDRAULIC SEEDING AND FIRST AND SECOND APPLICATIONS OF
FERTILIZER.
SEED MIXTURE: SUDAS TYPE 1 SEED MIXTURE (PERMANENT LAWN MIXTURE) OR APPROVED EQUAL.
H. GEOTECHNICAL
1. IN AREAS UNDER AND WITHIN FIVE (5) FEET OF PROPOSED PAVING AND SIDEWALKS, THE CONTRACTOR SHALL REMOVE THE TOP 12 INCHES OF EXISTING FILL MATERIAL AND THEN SCARIFY, MOISTURE CONDITION AND COMPACT THE TOP 12 INCHES OF THE EXISTING FILL MATERIAL SUBGRADE PER THE REQUIREMENTS OF THIS SECTION. THE 12 INCHES OF EXISTING FILL MATERIAL THAT WAS REMOVED SHALL BE MOISTURE CONDITIONED AND PLACED IN TWO 6-INCH COMPACTED LIFTS PER THE
REQUIREMENTS OF THIS SECTION.
2. THE DAY BEFORE PAVEMENT IS PLACED, FINAL PAVEMENT SUBGRADE PREPARATION SHALL CONSIST OF SCARIFYING, MOISTURE CONDITIONING AND COMPACTING THE TOP 12 INCHES OF THE SUBGRADE PER THE REQUIREMENTS OF THIS SECTION.
3. EXISTING FILL MATERIAL THAT CONTAINS EXCESSIVE AMOUNTS OF CINDERS OR BRICK AND CONCRETE DEBRIS SHALL BE
REMOVED AND REPLACED.
4. SAND, ASPHALT, VEGETATION, ROOTS, SOFT MATERIAL, ORGANIC MATERIAL, MATERIAL CONTAINING FROST AND UNSUITABLE
SOILS IN THE PROJECT AREA SHALL BE STRIPPED FROM THE SITE AND WASTED.
5. AFTER STRIPPING AND EXCAVATING TO THE PROPOSED SUBGRADE LEVEL, THE PROPOSED PAVEMENT AREAS SHALL BE PROOFROLLED WITH A LOADED TANDEM AXLE DUMP TRUCK OR SIMILAR HEAVY RUBBER TIRED VEHICLE.
6. FILL MATERIALS SHALL BE LEAN CLAY MATERIAL FREE OF ORGANIC OR OTHER DELETERIOUS MATERIALS, HAVE A MAXIMUM PARTICLE SIZE OF LESS THAN 3 INCHES AND HAVE A LIQUID LIMIT LESS THAN 45 AND PLASTICITY INDEX LESS THAN 22.
7. FILL MATERIAL SHALL BE PLACED IN MAXIMUM COMPACTED LIFTS OF 3 INCHES FOR HAND COMPACTION EQUIPMENT AND 6 INCHES FOR RIDING COMPACTION EQUIPMENT. LEAN CLAY MATERIAL SHALL BE COMPACTED TO 95% OF MAXIMUM STANDARD PROCTOR DENSITY AND GRANULAR BASE MATERIAL SHALL BE COMPACTED TO 98% OF MAXIMUM STANDARD PROCTOR DENSITY.
8. COMPACTION TESTING OR PROOFROLLING SHALL BE COMPLETED ON A FREQUENCY OF ONE TEST PER 100 LINEAR FEET AT APPROXIMATELY EVERY OTHER 6" LIFT OR AT ALTERNATIVE LOCATIONS AND FREQUENCIES AS RECOMMENDED BY TESTING AGENCY. COMPACTION TESTING TO BE DONE BY AN INDEPENDENT TESTING LABORATORY AND PAID FOR BY OWNER.
CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION
MANAGER.
18"
30"
36"
36"
30"
42"
36"
36"
36"
36"
48"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
FF = 1365.16
CP-CX
FF = 1367.47
FF = 1367.31
15" RCP W/ FES
IE = 1349.50
STORM MH
RIM = 1358.76
IE (E) = 1353.54 (15" RCP)
IE (W) = 1353.81 (15" RCP)
STORM INT
RIM = 1358.36
IE (E) = 1354.16 (15" RCP)
MH
RIM = 1361.62
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STORM INT
RIM = 1362.35
STAIRS
DRAIN
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
CONCRETE
BA
R
BW
IR
E / C
H
AI
N
LI
N K
SE
C
U R
IT
Y
FE
N
C
IN
G
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STONE
COLUMNS (TYP.)
LANDSCAPING
STAIRS
HANDICAP
ACCESS
AS
PH
AL
T
STAIRS
STAIRS
SI
D
EW
AL
K
SIDEWALK /
ENTRY RAMP
SANITARY SEWER
(PER MAPPING)
SANITARY SEWER(PER MAPPING)
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
UNDERG
RO
UND
ELECTRICAL (PER M
APPING
W
AT
ER
S
ER
VI
C E
(P
ER
M
AP
PI
N
G
MEDIUM VOLTAGE
POWER
4.75' DEEP
MEDIUM VOLTAGE
POWER
4.58' DEEP
MEDIUM VOLTAGE
POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
LIGHT POLE POWER
2' DEEP
1' WEST OF SIDEWALK
LIGHT POLE POWER
2' DEEP
3.75' WEST OF SIDEWALK
15" STORM
15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN 6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
CP1
N: 3746069.892 E: 4364778.694
ELEV: 1360.252
CUT X
CP2
N: 3746078.351 E: 4364869.605
ELEV: 1356.913
CUT X
CP3
N: 3746090.504 E: 4364924.053
ELEV: 1356.160
CUT X
CP4
N: 3745822.093 E: 4364891.524
ELEV: 1361.632
CUT X
CP5
N: 3745620.856 E: 4364854.371
ELEV: 1360.958
CUT X
CP6
N: 3745428.132 E: 4364835.573
ELEV: 1359.506
CUT X
CP7
N: 3745823.369 E: 4364729.223
ELEV: 1362.701
CUT X
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C002
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
EX
IS
TI
NG
C
O
ND
IT
IO
NS
.d wg 9/
7/
0:
:4
AM
36"
36"
30"
42"
36"
36"
36"
48"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
FF = 1365.16
CP-CX
FF = 1367.47
FF = 1367.31
15" RCP W/ FES
IE = 1349.50
STORM MH
RIM = 1358.76
IE (E) = 1353.54 (15" RCP)
IE (W) = 1353.81 (15" RCP)
STORM INT
RIM = 1358.36
IE (E) = 1354.16 (15" RCP)
MH
RIM = 1361.62
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STORM INT
RIM = 1362.35
STAIRS
DRAIN
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
CONCRETE
BA
R
BW
IR
E / C
H
AI
N
LI
N K
SE
C
U R
IT
Y
FE
N
C
IN
G
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STONE
COLUMNS (TYP.)
LANDSCAPING
STAIRS
HANDICAP
ACCESS
AS
PH
AL
T
STAIRS
STAIRS
SI
D
EW
AL
K
SIDEWALK /
ENTRY RAMP
SANITARY SEWER
(PER MAPPING)
SANITARY SEWER(PER MAPPING)
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
UNDERG
RO
UND
ELECTRICAL (PER M
APPING
W
AT
ER
S
ER
VI
C E
(P
ER
M
AP
PI
N
G
MEDIUM VOLTAGE
POWER
4.75' DEEP
MEDIUM VOLTAGE
POWER
4.58' DEEP
MEDIUM VOLTAGE
POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
LIGHT POLE POWER
2' DEEP
1' WEST OF SIDEWALK
LIGHT POLE POWER
2' DEEP
3.75' WEST OF SIDEWALK
15" STORM
15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN 6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
NORTH VIEW
SOUTH VIEW
CONSTRUCTION
LIMITS (TYP)
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C003
O
VE
R
AL
L
SI
TE
P
LA
N
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
O
VE
RA
LL
S
IT
E
PL
AN
.d wg
9/ 7/
0:
:3
48"
36"
36"
CP-CX
CP-CX
STORM MH
RIM = 1358.76
IE (E) = 1353.54 (15" RCP)
IE (W) = 1353.81 (15" RCP)
STORM INT
RIM = 1358.36
IE (E) = 1354.16 (15" RCP)
MH
RIM = 1361.62
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
BA
R
BW
IR
E / C
H
AI
N
LI
N K
SE
C
U R
IT
Y
FE
N
C
IN
G
CONCRETE
STONE
COLUMNS (TYP.)
LANDSCAPING
ACCESS
SI
D
EW
AL
K
SIDEWALK / ENTRY RAMP
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
W
AT
ER
S
ER
VI
C E
(P
ER
M
AP
PI
N
G
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
LIGHT POLE POWER
2' DEEP
1' WEST OF SIDEWALK
LIGHT POLE POWER
2' DEEP
3.75' WEST OF SIDEWALK
PROTECT EXISTING
LIGHT POLE AND
POWER SUPPLY (TYP)
PROTECT EXISTING
LIGHT POLE
PROTECT OR REMOVE
AND REINSTALL
EXISTING SIGNS
PROTECT EXISTING
PCC SIDEWALK (TYP)
PROTECT
EXISTING SIGN
36"
36"
30"
42"
36"
36"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
CP-CX
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STAIRS
DRAIN
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STAIRS
AS
PH
AL
T
STAIRS
UNDERG
RO
UND ELECTRICAL (PER M
APPING
MEDIUM VOLTAGE POWER
4.75' DEEP
MEDIUM VOLTAGE POWER
4.58' DEEP
MEDIUM VOLTAGE POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
15" STORM15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN
6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
REMOVE AND
DISPOSE OF EXISTING
TREE AND STUMP
PROTECT
EXISTING TREE
REMOVE AND
DISPOSE OF EXISTING
PCC SIDEWALK (TYP)
REMOVE AND DISPOSE
OF EXISTING ASPHALT
PAVING (TYP)
PROTECT EXISTING
LIGHT POLE
PROTECT EXISTING
LIGHT POLE
PROTECT EXISTING
ASPHALT PAVING (TYP)
PROTECT OR REMOVE
AND REINSTALL
EXISTING SIGNS
PROTECT EXISTING
PCC SIDEWALK (TYP)
PROTECT EXISTING
PCC SIDEWALK (TYP)
PROTECT EXISTING
ELECTRICAL
SERVICE (TYP)
PROTECT EXISTING PCC
ROLLED CURB (TYP)
PROTECT EXISTING
BUILDING (TYP)
REMOVE AND DISPOSE
OF EXISTING PCC
ROLLED CURB (TYP)
PROTECT EXISTING PCC
INTEGRAL CURB (TYP)
PROTECT
EXISTING SHRUB
SAWCUT PAVING
FULL DEPTH (TYP)
REMOVE AND DISPOSE OF
EXISTING PCC PAVING (TYP)
SAWCUT PAVING FULL
DEPTH AND REMOVE TO
NEAREST JOINT (TYP)
PROTECT EXISTING
STORM SEWER
CONTRACTOR TO VERIFY
LOCATION AND DEPTH
PRIOR TO CONSTRUCTION
PROTECT EXISTING
PCC SIDEWALK (TYP)
PROTECT EXISTING
PCC PAVING (TYP)
REMOVE TO EDGE OF
ASPHALT PAVING
PROTECT EXISTING
PCC PAVING (TYP)
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: CD01
D
EM
O
LI
TI
O
N
PL
AN
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C D0
DE
M O
LI
TI
O N
PL
AN
.d wg
9/ 7/
0:
:1
AM
NORTH VIEW SOUTH VIEW
ASPHALT REMOVAL
PCC REMOVAL
SIDEWALK REMOVAL
36"
30"
42"
36"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
CP-CX
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STAIRS
DRAIN
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STAIRS
AS
PH
AL
T
STAIRS
UNDERG
RO
UND ELECTRICAL (PER M
APPING
MEDIUM VOLTAGE POWER
4.75' DEEP
MEDIUM VOLTAGE POWER
4.58' DEEP
MEDIUM VOLTAGE POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
15" STORM15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN
6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
R=5.00' R=5.0 0'
.0
0' (T
YP
18.00'
(TYP)
9.
(T
YP
18.00'
(TYP)
9.
(T
YP
24.00'
(TYP)
5.
(T
YP
5.00'
(TYP)
6" PCC
PAVING (TYP)
4" WIDE, PAVEMENT
STRIPING, WHITE (TYP)
5" PCC
PAVING (TYP)
HATCH STRIPING 4" WIDE,
2" O.C., WHITE (TYP)
2' SIDEWALK EXTENSION
(BID ALTERNATE)
SEE SIDEWALK
UNDERPINNING DETAIL
CONSTRUCTION
LIMITS (TYP)
5" PCC
SIDEWALK
6" PCC
PAVING
6" PCC
PAVING
5" PCC
SIDEWALK (TYP)
DRILL JOINTS
INTO ABUTTING
PAVEMENT (TYP)
SEED DISTURBED AREAS
NOT TO BE PAVED (TYP)
2.00'
R=15.00'
R=1 5.0
0'
18"
30"
48"
36"
36"
CP-CX
CP-CX
STORM MH
RIM = 1358.76
IE (E) = 1353.54 (15" RCP)
IE (W) = 1353.81 (15" RCP)
STORM INT
RIM = 1358.36
IE (E) = 1354.16 (15" RCP)
MH
RIM = 1361.62
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
BA
R
BW
IR
E / C
H
AI
N
LI
N K
SE
C
U R
IT
Y
FE
N
C
IN
G
CONCRETE
STONE
COLUMNS (TYP.)
LANDSCAPING
ACCESS
SI
D
EW
AL
K
SIDEWALK / ENTRY RAMP
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
W
AT
ER
S
ER
VI
C E
(P
ER
M
AP
PI
N
G
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
LIGHT POLE POWER
2' DEEP
1' WEST OF SIDEWALK
LIGHT POLE POWER
2' DEEP
3.75' WEST OF SIDEWALK
2' SIDEWALK EXTENSION
(BID ALTERNATE)
SEE SIDEWALK
UNDERPINNING DETAIL
2.00'
2.00'
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
SI
TE
P
LA
N
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
SI
TE
P
LA
N.
dw g
9/ 7/
0:
:1
AM
NORTH VIEW SOUTH VIEW
5" PCC PAVING
5" PCC SIDEWALK
(BASE BID)
6" PCC PAVING
5" PCC SIDEWALK
(ALTERNATE BID)
30"
42"
36"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
CP-CX
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STAIRS
DRAIN
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STAIRS
AS
PH
AL
T
STAIRS
UNDERG
RO
UND ELECTRICAL (PER M
APPING
MEDIUM VOLTAGE POWER
4.75' DEEP
MEDIUM VOLTAGE POWER
4.58' DEEP
MEDIUM VOLTAGE POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
15" STORM15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN
6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
MATCH EXISTING
GRADES (TYP)
GRADING
LIMITS (TYP)
MATCH EXISTING
GRADES (TYP)
MATCH EXISTING
GRADES (TYP)
(BID ALTERNATE)
MATCH EXISTING
GRADES (TYP)
MATCH EXISTING
GRADES (TYP)
1362 1361
1360.85
1360.49
1360.35
1360.30 13
.65
.70
.56
.20
.92
.70 1361.40
1361.17 13
.11
.99
.85
.40
.35 1362.30
1361.80 13
.61
.49
1361.37
1362.24
1362.16
1361.69 1361.57
SILT FENCE
(TYP)
INLET
PROTECTION
18"
30"
48"
36"
36"
CP-CX
CP-CX
STORM MH
RIM = 1358.76
IE (E) = 1353.54 (15" RCP)
IE (W) = 1353.81 (15" RCP)
STORM INT
RIM = 1358.36
IE (E) = 1354.16 (15" RCP)
MH
RIM = 1361.62
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
BA
R
BW
IR
E / C
H
AI
N
LI
N K
SE
C
U R
IT
Y
FE
N
C
IN
G
CONCRETE
STONE
COLUMNS (TYP.)
LANDSCAPING
ACCESS
SI
D
EW
AL
K
SIDEWALK / ENTRY RAMP
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
W
AT
ER
S
ER
VI
C E
(P
ER
M
AP
PI
N
G
U N
D
ER
G R
O U
N D
E
LE
C
TR
IC
AL
(P
ER
M
AP
PI
N
G
LIGHT POLE POWER
2' DEEP
1' WEST OF SIDEWALK
LIGHT POLE POWER
2' DEEP
3.75' WEST OF SIDEWALK
MATCH EXISTING
ELEVATIONS (TYP)
MATCH EXISTING
ELEVATIONS (TYP)
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C201
G R
AD
IN
G P
LA
N
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
G
RA
DI
NG
P
LA
N.
dw g
9/ 7/
0:
:2
NORTH VIEW SOUTH VIEW
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C501
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
KA
L
KA
L
CO
NS
TR
UC
TI
O
N
/0
8/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
CO
NS
TR
UC
TI
O N
DE
TA
IL
S.
dw g
9/ 7/
0:
:3
AM
D4 PAVEMENT CROSS-SECTION
6"
SCARIFIED AND
RECOMPACTED SUBGRADE
(95% STANDARD PROCTOR
DENSITY)
EXISTING SUBGRADE OR
COMPACTED FILL (95%
STANDARD PROCTOR
DENSITY)
P.C.C.
6" PCC PAVING
12"
A2 SILT FENCE
FRONT VIEW
FABRIC
POST
WIRE
CORD
TRENCH BOTTOM
EMBEDDED 28" BELOW
STEEL POST TO BE
DETAILS OF SILT FENCE
GROUND
LINE
ENGINEERING
FABRIC
TRENCH BOTTOM
SECURE WITH WIRE.
PLACE AROUND POST,
HAVE A MINIMUM 36" WIDTH.
ENGINEERING FABRIC SHALL
PLACED TO BOTTOM OF TRENCH.
POST TOP VIEW
NOTE: TWIST CORD ANDENGINEERING FABRIC TO BE
SECURE TOP OF ENGINEERING
DETAILS OF DITCH CHECK
FABRIC TO STEEL POST.
NOTES:
POST
WIRE
CORD
GROUND LINE
12" MIN DEPTH AND 4" MIN WIDTH
TRENCH AND COMPACTED BACKFILL
FOLDED ACROSS BOTTOM OF TRENCH
FLOW
PO
ST
'-0
" M
IN
ENGINEERING FABRIC TO BE
TYPICAL SECTION
FORESLOPE
ENGINEERING
FABRIC
ENGINEERING FABRIC
FLOW
SILT FENCE DITCH CHECK
TYPICAL SECTION
PO
ST
'-0
" M
IN
GROUND LINE
ENGINEERING FABRIC
TO BE FOLDED ACROSS
TRENCH AND COMPACTED
BACKFILL 12" MIN DEPTH
4" MIN WIDTH
BOTTOM OF TRENCH
TRENCH BOTTOM
FOLD FABRIC TO
FIT TRENCH
NORMAL
BACKSLOPE
1' ABOVE GROUND
NORMAL FORESLOPE
2" RISE
IN FENCE
6"
5"
EXISTING SUBGRADE OR
COMPACTED FILL (95%
STANDARD PROCTOR
DENSITY)
SCARIFIED AND
RECOMPACTED SUBGRADE
(95% STANDARD PROCTOR
DENSITY)
P.C.C.
5" PCC PAVING/
SIDEWALK
EXISTING
SIDEWALK
PROPOSED
SIDEWALK WIDENING
5"
3" 2"
2.00'
2" MIN.
D3 SIDEWALK UNDERPINNING DETAIL
A4 FILTER SACKS
WIDTH = W
DEPTH = D
LENGTH = L
1/4" BRIGHTLY COLORED NYLON
ROPE EXPANSION RESTRAINT
OVERFLOW HOLES
(OPTIONAL)
GEOTEXTILE BAG
INLET GRATE
LOOPS SIZED FOR 1" REBAR.
LIFT FILTER BAG FROM INLET
USING REBAR FOR HANDLES
LOOPS SIZED FOR 1" REBAR.
USING REBAR FOR A
HANDLE TO EMPTY FILTER
SACK AT A SEDIMENT
COLLECTION LOCATION.
2"x2"x3/4" RUBBER
BLOCK (TYP)
1/4" BRIGHTLY
COLORED NYLON
ROPE EXPANSION
RESTRAINT
2"x2"x3/4" RUBBER
BLOCK (TYP)
SECURE LIFTING LOOPS TO OR
UNDER SUROUNDING SURFACE
ISOMETRIC VIEW
ELEVATION VIEW
PROFILE VIEW OF
INSTALLED FILTER SACK
DO NOT USE ON ROADWAYS
WHERE PONDING MAY CAUSE
TRAFFIC HAZARDS
FILTER SACKS
(GRATED INLETS)
1. EMPTY FILTER SACK WHEN BRIGHTLY COLORED
EXPANSION RESTRAINT CAN NO LONGER BE
SEEN.
2. GEOTEXTILE WILL BE WOVEN POLYPROPYLENE
FABRIC THAT MEETS OR EXCEEDS.
3. AN OIL ADSORBENT PAD OR PILLOW CAN BE
PURCHASED WHEN OILS SPILLS ARE A CONCERN.
4. INSPECT PER REGULARTORY REQUIREMENTS.
5. THE WIDTH, "W", OF THE FILTER SACK WILL
MATCH THE INSIDE WIDTH OF THE GRATED INLET
BOX.
6. THE DEPTH, "D", OF THE FILTER SACK WILL BE
BETWEEN 18 INCHES AND 36 INCHES.
7. THE LENGTH, "L", OF THE FILTER SACK WILL
MATCH THE INSIDE LENGTH OF THE GRATED
INLET BOX.
LOW TO MODERATE FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
PUNCTURE
MULLEN BURST
TRAPEZOID TEAR
UV RESISTANCE
APPARENT OPENING SIZE
FLOW RATE
PERMITTIVITY
ASTM D-4632
ASTM D-4632
ASTM D-4833
ASTM D-3786
ASTM D-4533
ASTM D-4355
ASTM D-4751
ASTM D-4491
ASTM D-4491
300 LBS
20%
120 LBS
800 PSI
120 LBS
80%
40 US SIEVE
40 GAL/MIN/SQ FT
0.55 SEC -1
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
PUNCTURE
MULLEN BURST
TRAPEZOID TEAR
UV RESISTANCE
APPARENT OPENING SIZE
FLOW RATE
PERMITTIVITY
ASTM D-4632
ASTM D-4632
ASTM D-4833
ASTM D-3786
ASTM D-4533
ASTM D-4355
ASTM D-4751
ASTM D-4491
ASTM D-4491
265 LBS
20%
135 LBS
8420 PSI
45 LBS
90%
20 US SIEVE
200 GAL/MIN/SQ FT
1.5 SEC -1
PROPERTIES TEST METHOD UNITS
PROPERTIES TEST METHOD UNITS
MODERATE TO HIGH FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
D2 JOINTING DETAILS
'L'
CONTRACTION JOINT
Crack or Joint Line
T/3 ± 14''
4'' ± 1
16'' Saw Cut
TIE BAR PLACEMENT
(Applies to all joints unless otherwise detailed.)
'DW'
DAY'S WORK JOINT(Non-working)
See dowel assemblies for fabrication details.
See Bar Size Table.
Locate 'DW' joint at a mid-panel location between future 'C' joints. Place no closer than 5 feet to a 'C' joint.
Place bars within the limits shown under dowel assemblies.
Edge with 1/8 inch tool for length of joint.
Hole Diameter 18'' Larger than Dowel 18'' Long Dowel at 12'' Centers
'RD'
ABUTTING PAVEMENT JOINT 3
4'' Dia. Hole for BT-3 and BT-4 Joint 8'' Dia. Hole for BT-5 Joint
'BT'
ABUTTING PAVEMENT JOINT - RIGID TIE (Drilled)
' DETAIL C'
CONTRACTION JOINT
T/4'' ± 1/4'' Saw Cut
4'' ± 18''
Crack or Joint Line
DETAIL A
(Saw cut formed by conventional concrete sawing equipment.)
4''
Tie Bar Size
Dowel Diameter
NOTE: EXISTING SIDEWALK
DEPTH HAS BEEN FOUND TO
BE APPROXIMATELY 3"
THROUGH FIELD VERIFICATION.
MATCH EXISTING
SIDEWALK JOINTS
THICKEN UNDERPINNING
AS REQUIRED FOR
CONSTRUCTIBILITY
HAND EXCAVATE
UNDERPINNING
AS REQUIRED
30"
42"
36"
36"
36"
CP-CX
CP-CX
CP-CX
CP-CX
FF = 1362.96
FF = 1367.27
CP-CX
STORM INT
RIM = 1362.50
IE (N-NE) = 1359.30 (12" HDPE)
STAIRS
DRAIN
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
CONCRETE
CONCRETE
CONCRETE
STORM MH
RIM = 1356.07
IE (NE) = 1350.87 (15" RCP)
IE (W) = 1350.97 (15" RCP)
STORM MH
RIM = 1356.09
IE (E) = 1351.69 (15" RCP)
IE (W) = 1352.57 (15" HDPE)
SI
D
EW
AL
K
SI
D
EW
AL
K
STAIRS
CONCRETE
STAIRS
LANDING /
ENTRYWAY
STONE
COLUMNS (TYP.)
STAIRS
AS
PH
AL
T
STAIRS
UNDERG
RO
UND ELECTRICAL (PER M
APPING
MEDIUM VOLTAGE POWER
4.75' DEEP
MEDIUM VOLTAGE POWER
4.58' DEEP
MEDIUM VOLTAGE POWER
4.42' DEEP
LIGHTING POWER
1.83' DEEP
15" STORM15" STORM
12" STORM
6" RO
O
F DRAIN
6" R
OOF DRAIN
6" ROOF DRAIN
C O
N C
R
ET
E
(A
PP
R O
XI
M
AT
E
LO
C
AT
IO
N
S2
E1
E2
E3
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
NORTH VIEW
1. ***
SCHEDULE NOTES:
A.
B.
C.
D.
WHERE "OR APPROVED EQUIVALENT" IS LISTED IN THE MANUFACTURER COLUMN, FIXTURES MUST BE SUBMITTED AS A SUBSTITUTION FOR APPROVAL PRIOR TO BID SUBMISSION.
LISTED LUMENS ARE DELIVERED LUMENS. PROVIDE FIXTURE WITHIN +/- 5% OF LISTED LUMENS.
LIGHTING PRODUCTS SHALL BE PROVIDED THROUGH THE AUTHORIZED LIGHTING MANUFACTURER'S REPRESENTATIVE RESIDING WITHIN PROJECT LOCATION.
SUBMITTALS SHALL BE PRODUCED AND SUBMITTED BY LOCAL AUTHORIZED LIGHTING MANUFACTURER'S REPRESENTATIVE. LETTERHEAD SHALL CONTAIN REPRESENTATIVES' CONTACT INFORMATION, PROJECT NAME, AND PROJECT LOCATION.
GENERAL NOTES:
LED DRIVER TYPES: STND = STANDARD DRIVER, DIM10 = 0-10V 10% DIMMING, DIM1 = 0-10V 1% DIMMING, DIMD = 0-10V DIM TO DARK, STEP = STEP DIMMING, NOND = NON-DIMMING, DALI = DIGITAL ADDRESSABLE LIGHTING INTERFACE, DMX = DIGITAL MULTIPLEX, LUTR = LUTRON HI-LUME, POE = POWER OVER ETHERNET, SDIM = STEP DIMMING
MOUNTING STYLES (MTG): RE-A = RECESSED (ACT), RE-G = RECESSED (GYP), RE-W = RECESSED (WALL), CL = CEILING SURFACE, PW = PERIMETER WALL, SP = SUSPENDED (AIR-CRAFT CABLE), ST = STEM, WL = WALL, WL-H = WALL HORIZONTAL, WL-V = WALL VERTICAL, UNV = UNIVERSAL, POLE = POLE, UC = UNDER CABINET, TR = TRACK, GND = GROUND
CATALOG NUMBER SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND CATALOG NUMBER ONLY. THE DESCRIPTION AND THE SPECIFICATIONS SHALL BE COORDINATED WITH THE CATALOG NUMBER TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE FIRST MANUFACTURER LISTED IS THE BASIS FOR DESIGN. ALL LAMPS/LIGHT SOURCES FOR THIS PROJECT SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS OTHERWISE NOTED. ALL LIGHT FIXTURES SHALL BE PROVIDED WITH INTEGRAL DISCONNECT(S) FACTORY INSTALLED IN ACCORDANCE WITH NEC. REFER TO SPECIFICATIONS FOR SHOP DRAWING SUBMITTAL REQUIREMENTS AND ADDITIONAL INFORMATION.
LIGHTING FIXTURE SCHEDULE - BASE BID
TYPE DESCRIPTION LENS-LOUVER MTG LIGHTING
OUTPUT/CCT DRIVER VOLT WATT BASIS OF
DESIGN APPROVED EQUIVALENT NOTES
S2
SINGLE HEAD POLE FIXTURE, DIE-CAST ALUMINUM HOUSING, DIRECT
ARM MOUNT TYPE IV MEDIUM DISTRIBUTION, BACKLIGHT CONTROL
SHIELD WITH INTEGRAL SURGE SUPRESSION, 20' HIGH 4" SQUARE
STRAIGHT STEEL POLE WITH VIBRATION DAMPER
PRECISION-MOLDED
SILICONE LENS
POLE LED, 14810 LUMENS,
5000K
NOND 120 V 267 W CREE THE EDGE LITHONIA, BEACON, DECO
LIGHTING, EATON, PHILIPS,
OR APPROVED EQUIVALENT
REMOVABLE TOP CAP
A B
C
D
3" CLR.
LIGHT FIXTURE (SEE PLAN FOR TYPE)
STEEL POLE
3"x5" HAND HOLE OPEN. w/ 3 1/2" x6" #14 GA. STL. REMOVABLE COVER PLATE
GROUND LUG INSIDE POLE
LOCKING NUT, LEVELING NUT
PVC CONDUIT & WIRE.
REFER TO PLAN FOR
CONDUIT SIZE
4-#6 VERT. REBARS EQ. SPACED
#4 REBAR CLOSED TIES
12" O.C. VERT.
3000 PSI CONCRETE BASE
ALL ANCHOR BOLTS, NUTS, AND
WASHERS TO BE HOT-DIP GALVANIZED
NOTE:
POLE BASE SCHEDULE
4 -#6
REINFORCING
BARS
#4 TIES @
12" O.C.
FIXTURE
TYPE
POLE
HEIGHT
'A' - FT
BASE
HEIGHT
'B' - IN
BASE
DEPTH
'C' - IN
BASE
DIA.
'D' - IN
S2 20 24 72 24
3/ 4"
3"
6"
3" CLEAR
TOP VIEWSECTION
TI
LT
AN
G
LE
NOTE:
STEEL PLATED ANCHOR BOLTS TIED TO REBAR CAGE.
COORD WITH POLE MFGR. REQUIREMENTS.
3/4"x10' GROUND ROD w/ CLAMP
& #6 GND WIRE TO POLE BASE
SLIGHTLY BEVEL
TOP EDGE OF STEEL
BASE PLATE
CONC. PEDESTAL w/ 45 DEG.
CHAMFERED TOP EDGE
ELECTRICAL GENERAL NOTES
1. ALL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL
ELECTRICAL CODE - LATEST EDITION ADOPTED BY THE STATE,
THE STATE AMENDMENTS, LOCAL/MUNICIPAL CODES AND
ORDINANCES, AND THE AUTHORITY HAVING JURISDICTION.
THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE
WITH THE ADAAG (AMERICANS WITH DISABILITIES ACT
ACCESSIBILITY GUIDELINES).
2. IT IS THE INTENT OF THESE DOCUMENTS TO COMPLY WITH
THE APPLICABLE CODES. WHERE DISCREPANCIES OCCUR,
NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR
INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS
TO COMPLY WITH THE CODES AND STANDARDS AT NO
ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY
INCLUDING ALL LABOR, MATERIALS, PERMITS, TAXES, FEES,
INSPECTIONS, HARDWARE, AND COST FOR INSTALLATION FOR
A COMPLETE AND OPERATIONAL SYSTEM.
4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE
NEW, COMPLETE WITH MANUFACTURER ’ S GUARANTEE OR
WARRANTY AND SHALL BE LISTED BY A NATIONALLY
RECOGNIZED TESTING LABORATORY (NRTL).
5. COORDINATE ELECTRICAL INSTALLATION WITH ALL TRADES
PRIOR TO INSTALLATION. IF ELECTRICAL WORK INSTALLED
INTERFERES WITH OTHER TRADES AFTER INSTALLATION, THE
CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES TO
CORRECT THE CONDITION AT NO ADDITIONAL COST TO THE
OWNER.
6. NO ENERGIZED CONDUCTORS SHALL BE EXPOSED AT
ANYTIME EXCEPT WHEN THE IMMEDIATE AREA IS UNDER THE
SUPERVISION OF A QUALIFIED ELECTRICIAN.
7. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL
DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING
INSTALLATION SHALL BE KEPT IN AREAS DESIGNATED BY THE
OWNER.
8. THESE DRAWINGS SHALL NOT BE SCALED TO OBTAIN
DIMENSIONS. REFER TO DIMENSIONED CIVIL PLANS. IF THE
DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION
GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR
ADDITIONAL INFORMATION.
9. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY
FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE
CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION
SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR
CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE
WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE
OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF
THE CONTRACTOR.
10. THE INFORMATION CONTAINED ON THE ELECTRICAL
DRAWINGS IS IN ITSELF INCOMPLETE AND VOID UNLESS USED
IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS,
THE SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE
STANDARDS, CODES, ETC., AND SHALL BE CONSIDERED THE
CONTRACT DOCUMENTS AND WITH ALL THEREIN BY
REFERENCE, WHICH THE CONTRACTOR CERTIFIES
KNOWLEDGE OF BY SIGNING THE CONTRACT.
11. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY,
UNRELIEVED BY REVIEW OF SHOP DRAWINGS OR PERIODIC
OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE WITH
THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE
CONFIRMED AND CORRELATED ON THE JOB SITE AND
BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR
FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES
(INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING,
ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE
VARIOUS TRADES, AND FOR SAFE CONDITIONS ON THE JOB
SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE
CONTRACT DOCUMENTS SHALL BE REPORTED TO THE
ENGINEER AS SOON AS THEY ARE FOUND. WORK SHALL NOT
PROGRESS UNTIL WRITTEN PERMISSION FROM THE ENGINEER
IS OBTAINED.
KEYNOTES
KEY NOTE
E1 FURNISH AND INSTALL 12" X12" HAND HOLE TO INTERCEPT EXISTING
SITE LIGHTING CIRCUIT. PROVIDE NEW FEEDER TO EXISTING LIGHT
POLE AND NEW LIGHT POLES/ CIRCUIT WITH 2#8 AND 1#8 GND IN 1
1/4" CONDUIT.
E2 EXTENDED EXISTING LIGHTING CIRCUIT TO NEW LIGHT FIXTURES
NOT TO SCALEF1 DETAIL LIGHT FIXTURE POLE MOUNTING DETAIL
F2 HANDHOLE DETAIL
"GROUND" LOGO
PULL SLOT
SKID RESISTANT SURFACE
NOTES:
1. DRIVE GROUND ROD IN CENTER OF 12"X12" OPEN BASE THROUGH PEA GRAVEL FILL.
2. UTILIZE QUAZITE BOX #PG1324BA18 WITH #PG1324CA0024 COVER
12" 12"
18"
NOT TO SCALE
STAINLESS STEEL HEX
HEAD BOLT W/ WASHER
3" C
LR
PEA GRAVEL DRAINAGE BED
MINIMUM 8" DEPTH
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: E101
EL
EC
TR
IC
AL
SI
TE
P
LA
N
RM
L
KJ
B
BI
D
DO
CU
M
EN
TS
/2
2/
00 ---
.0
C H
ER
O
KE
E
M H
I
PA
R
KI
N G
L O
T
AD
D
IT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
W C
ED
AR
L O
O P, C
HE
RO
KE
E, IA
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\E
EL
EC
TR
IC
AL
S
IT
E
PL
AN
.d wg 9/
7/
0:
:3
AM
1/2" EXPANSION MATERIAL
w/ SEALANT (PARKING
SURFACE ONLY)
GRADE LINE OR PARKING
SURFACE
COMPACT ANY BACKFILL TO
90% STANDARD PROCTOR
DENSITY
E3 12" x 12" HANDHOLE TO EXTEND LIGHTING CIRCUIT FOR FUTURE
LIGHT POLES.
| 2023-09-08T13:57:00+0000 | |
| SignNow | |
| Digitially Signed Read Only PDF Created by SignNow for Document ID : cf4860902ec845ef82c06822ee7d18bc7465211b |
File details come from the government source that posted it. Updated .