RFB927940-03 - Addendum 1.pdf

PDF 5 MB Posted

Attached to
WRC Fire Alarm Phase 4
Solicitation number
RFB927940-03
Issued by
Dallas County, Iowa

About this file

This is Addendum No. 1 to Request for Bids (RFB) 927940-03 issued by the Iowa Department of Administrative Services for the Woodward Resource Center Fire Alarm Phase 4 project. The addendum modifies the original bidding documents dated December 12, 2025, and addresses fire alarm system installation across thirteen buildings at the facility located at 1251 334th Street in Woodward, Iowa. The project scope includes new fire alarm control panels (FACPs), fire alarm cabling in conduit, smoke detectors, heat detectors, linear heat detection wiring, door holders, fire alarm relays, ceiling-mounted speaker strobes, duct smoke detectors, and related installation labor. The original bid due date of February 5, 2026, at 2:00 PM has been extended to February 24, 2026, at 2:00 PM, with bid opening occurring at 3:00 PM the same day. Written questions must be submitted by 10:00 AM on February 17, 2026. The addendum includes three new alternates for optional bid pricing: Alternate 01 for Oak Hall Fire Alarm, Alternate 02 for Maple Lodge Fire Alarm, and Alternate 03 for Water Treatment Building Fire Alarm. Construction is anticipated to commence on March 30, 2026, with substantial completion targeted for December 18, 2026. A non-mandatory pre-bid meeting was held on January 22, 2026.

The contract will be awarded as a lump sum agreement utilizing a modified ConsensusDOCS 802 Standard Form of Agreement. Bid security of five percent of the total bid amount is required, submitted as a bid bond, cashier's check, or certified check. Unit pricing is also included in the bid form for six categories: smoke detectors, heat detectors, fire alarm relays, ceiling-mounted speaker strobes, ceiling-mounted strobes, and duct smoke detectors, with each unit price including labor, material, thirty feet of conduit, thirty feet of fire alarm cable, and device programming. The project is exempt from Iowa sales tax and Davis-Bacon wage requirements. Contractor responsibilities include lead-safe certification for work in areas with lead-based paint, coordination with abatement contractors for asbestos-related penetrations, daily site logs, cleanup at end of each shift, proper handling of hazardous materials, and adherence to strict site security rules including background checks for all personnel. The apparent low bidder must submit a subcontractor and supplier list within forty-eight hours of bid opening. Procore will be used for project management at no cost to the trade contractor, and the contractor must provide project-specific Performance and Payment bonds and certificates of insurance prior to contract execution.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO.1

RFB - 927940-03

WRC Fire Alarm Phase 4

Woodward, Iowa

Date: February 3rd, 2026

Project: 9279.40 BI#03 Fire Alarm Phase 4

TO: PROSPECTIVE BIDDERS:

THIS ADDENDUM FORMS A PART OF THE BIDDING AND CONTRACT DOCUMENTS AND MODIFIES THE

BIDDING DOCUMENTS DATED 12-12-2025, WITH AMENDMENTS AND ADDITIONS NOTED BELOW.

THIS ADDENDUM SUPERSEDES AND SUPPLEMENTS ALL PORTIONS OF THE ORIGINAL BIDDING AND

CONTRACT DOCUMENTS WITH WHICH IT CONFLICTS. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN

THE IMPACS ELECTRONIC PROCUREMENT SYSTEM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER.

CLARIFICATIONS

Reference Section 00 1113 Notice To Bidders. Original Bid Date of February 5th, 2026 will now be changed to February 24th, 2026. Bids will be due at 2:00pm February 24th, 2026 and Bid Opening will be at 3:00pm on February 24th, 2026. Questions are due no later than 10:00am on February 17th. Teleconference number and meeting link are the same as the original.

Reference Section 00 4116 Bid Form. Three alternates have been added as a part of this project. BP 28-1

Alternate 01 Oak Hall Fire Alarm, BP 28-1 Alternate 02 Maple Lodge Fire Alarm, BP 28-1 Alternate 03 Water

Treatment Building Fire Alarm.

QUESTIONS AND ANSWERS

1. What is the correct method for installing fire alarm cabling above finished ceilings and along walls?

A) Notes about installing cabling are added to drawings 00-E000 and 00-G002. Refer to clouded drawings in the Addendum #1.

2. Where are the patch panels located?

A) Drawings are updated to add information on connecting the patch panels to the new FACP.

Refer to clouded drawings in the Addendum #1 on drawing sheets 02-E301, 14-E301, 17-

E301, 22-E301.

3. What is the preferred method for removing the existing fire alarm devices?

A) Disconnect power, remove the device and all related cables, and leave boxes and conduit in place.

RFB 9279.40 BI#03 Addendum #1

4. How should linear heat detection wiring be installed in areas without ceilings compared to areas with ceilings?

A) 00-E000. Refer to clouded drawings in the Addendum #1.

5. Fire alarm cabling is typically run separately from other electrical cabling and, by code, should not share conduit with other wires, including low-voltage systems. Does this requirement still apply in locations where fire alarm cabling is proposed to be installed in conduit with fiber

A) Conduit is added for fire alarm cabling to Employee Home. Refer to clouded drawings in the Addendum #1

6. Maple Lodge drawings show a new FACP in the basement; however, that building is abandoned. Is the FACP still required to be installed?

A) No. A revised drawing sheet will be issued in Addendum #1.

7. Specifications call for shielded cable for fire alarm, is shielded needed?

A) Shielded cable is required.

8. Where are the electrical panels located to get power to the new FACP’s?

A) Existing circuit that feeds existing FACP’s will be extended to feed the new FACP’s

9. Will everyone on site need to take a lead base paint course?

A) Contractor shall be lead-certified and all work done on areas with lead-containing or lead-based paint must be done by a lead-certified crew member. See specification section 01

1200 1.09 A.3.

10. There was a mention of asbestos, and that you would handle any asbestos-related issues as well as the drilling or penetrations required in those areas. Can you please confirm this?

A) The Contractor shall mark all wall locations for new devices and conduit. Floor penetrations will be made only in areas not requiring abatement. Additional testing is underway to identify these locations, and a revised drawing will be issued. If no such locations are available, the Contractor shall mark those areas. The abatement contractor will be responsible for abating all marked locations prior to any work.

11. On page 07-E01 top of page is a new door hold, I assume this is not needed and just did not get removed from the demo drawings? Can you please confirm.

A) Door holder will be removed from the drawings. Refer to clouded drawings in the

Addendum #1

RFB 9279.40 BI#03 Addendum #1

ATTACHMENTS:

1. Pre-Bid Meeting Agenda

2. Sign in sheet from pre-bid meeting on January 22nd, 2026

3. Specification Sections: 001113 Notice To Bidders, 003113 Preliminary Schedule, 00 4116 Bid

Form, 01 1200 Contract Summary

4. Drawings: 00-E000, 00-G002, 02-E301, 07-E300, 07-E301, 07-E302, 08-E300, 14-E301, 17-E301, 19-E301, 22-E301, 28-E301

END OF ADDENDUM

AGENDA

PRE-BID MEETING

WRC Fire Alarm Phase 4

DAS Project No 9279.40

Woodward, Iowa

10:00 am on January 22, 2026

I. Introductions

a. Please register your attendance on the sign-in sheet.

II. Project Overview

a. Project Description: Installing new fire alarm in the following buildings: Administration*, Larches, Hemlock, Employee Home, Maple Lodge, Laundry, Car Wash, Supply Depot, Oak Hall, Water Treatment, CDC Central Distribution, Westwood Storage Building and the Chiller

Building at Woodward Resource Center.

b. Bid Packages

i. Bid Package #28-1 – Fire Alarm: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. Specifications:

a. Division 00 – Procurement and Contracting Requirements

i. 00 31 26.1 Hazardous Building Survey -Atlas

b. Division 01 – General Requirements

c. Division 02 – Existing Conditions

d. Division 07 – Thermal and Moisture Protection

e. Division 26 - Electrical

f. Division 28 – Fire Alarm

ii. Includes drawings: All sheets in 2025-12-12_FA Ph4_CD Dwgs

c. Allowances - None

d. Alternates - None

e. Unit Prices

i. BP#28-1 Unit Price #01 – Smoke Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included.

ii. BP#28-1 Unit Price #02 – Heat Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included.

iii. BP#28-1 Unit Price #03 – Fire Alarm Relay: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

WRC Decentralization and Fire Alarm Pre-Bid Meeting

January 22, 2026

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included

iv. BP#28-1 Unit Price #04 – Ceiling Mounted Speaker Strobe: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included.

v. BP#28-1 Unit Price #05 – Ceiling Mounted Strobe: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included.

vi. BP#28-1 Unit Price #06 – Duct Smoke Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. One unit to include: Cost for labor and material for device, 30’ of conduit and

30’ of fire alarm cable. Programming of device to also be included.

f. Schedule

i. Substantial Completion by 12/04/2026.

ii. Final schedule to be established during Phase-Pull exercise of the CP2.0 process.

g. Site Rules

i. Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractor/suppliers is taking place.

ii. Contractor shall provide daily logs for each day they are on site.

iii. Construction progress meeting will be established once construction starts.

iv. Clean debris, materials, and bring all finishes back to existing conditions in the area they were working prior to moving to the next area.

v. Each person must pass a State of Iowa background check prior to working at this campus. There is no cost to the Contractors. We recommend that two weeks be allowed for this process.

vi. Each person must attend a 15-minute WRC/Story Construction orientation prior to working at this campus.

vii. Ladders and scaffolding must be taken down when not in use and at the end of each shift.

viii. Fuel cans are always to be secured.

ix. During an emergency, follow the instructions of the security staff.

x. Company and personal vehicles are to be parked, windows up, and locked in designated or authorized area of the work and never leave keys in the vehicle.

xi. All state properties are tobacco free. No smoking will be permitted or tolerated on campus unless in designated areas.

xii. Wearing hardhats, safety glasses, work boots, long pants, and shirts with sleeves are a requirement of this project.

xiii. Work Hours 7:00am to 05:00pm Monday through Friday

xiv. Temporary Facilities and Controls

1. The Contractor will be allowed to utilize existing utilities. However, the

Contractor shall install, maintain, and remove temporary utilities as necessary to suit their needs. Temporary utilities shall not disrupt the

Facility’s need for continuous service. If using the permanent electrical and water utilities, the Owner will pay for the cost of consumption. (Section 01

5000-1.02)

2. The Construction Manager/Owner will provide the following:

a. Sanitary facilities.

b. Temporary gravel parking, laydown, and trailer area.

c. Dumpster/waste haul-off.

d. Relocate all moveable furniture, fixtures and equipment (FF&E).

e. Perform fire watch when necessary.

3. Contractor to provide:

a. Temporary lighting as required

xv. Safety

1. Lock-Out Tag-Out

2. Silica requirements must be followed

3. Public Safety

4. Site Safety Plan

5. Vehicles Need to be Locked at all Times

III. RFB Overview

a. Bid Submission

i. Bids are due at 2:00 pm on Thursday, February 5th, 2026.

ii. Bids shall be submitted to the Issuing Officer through the IMPACS Electronic

Procurement System.

1. Link and information is in the project manual.

2. Contractors will need to register prior to bidding.

3. Bidders will need to register regardless of whether it has already done business with the State of Iowa.

4. Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.

5. Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.

6. Do not send a qualified bid. Bid the contract drawings and specifications as written.

iii. Bid Opening will be held via conference call Thursday, February 5th at 3:00 pm.

iv. Contractor shall reference section 00 0116 for the bid submittal checklist.

1. Bid Proposal Information

2. Non Discrimination Clause Information

3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information

4. Bid Security – 5% of total Bid amount

v. Apparent low bidder will be required to submit subcontractor/supplier list 48 hours after bid opening.

b. Bid Schedule

i. Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov:

1/28/2026 at 10:00 am

ii. Addendum Issued: None currently. Plan for addendum #1 to be issued no later than

1/29

iii. Bids Due: Thursday February 5th, 2026 at 2:00 pm

iv. Tentative NOI Issued: 02/06/2026

c. Administrative Details

i. The contract between the State of Iowa and the Contractor will be for a lump sum amount, utilizing a modified ConsensusDOCS 802 Standard Form of Agreement. An example of the contract is included in Division 00 of the specifications.

ii. The project is exempt from Sales Tax. See Section 00 2113-3.02.

iii. Davis-Bacon rules do not apply to this project.

iv. Project-specific P&P bonds must be provided prior to contract execution.

v. Project-specific Certificate of Insurance must be provided prior to contract execution.

Follow example in the project manual and limits in the 802.

vi. The successful contractor must turn in their list of subcontractors and suppliers within

48 hours of the bid.

vii. DAS will provide tax exempt certificates upon request.

viii. Procore will be used for all project management, at no cost to the trade contractor.

1. Submittals, Invoicing, RFIs, ASIs, PRs, RFQs

2. Contracts, Change Orders and Certificates of Substantial and Final

Completion will also use DocuSign.

ix. Contractor Schedule of Values shall be broken out as specified in the project manual.

1. SOV must contain a closeout line item for the greater value of 1% of the total contract value or $1,000.

2. The line item can only be invoiced once the certificate of final completion has been signed by all parties.

IV. Questions

V. Walkthrough

PROJECT 9279.40 NOTICE TO BIDDERS 00 1113 - 1

SECTION 00 1113

NOTICE TO BIDDERS

RFB #927940-03

The Iowa Department of Administrative Services will be receiving bids for installing new fire alarm in the following buildings: Administration, Larches, Hemlock, Employee Home, Maple Lodge, Laundry, Car Wash, Supply Depot, Oak Hall, Water Treatment, CDC Central Distribution, Westwood Storage Building, and the Chiller Building at Woodward Resource Center, 1251 334th Street, Woodward, Iowa 50276.

The Iowa Department of Administrative Services anticipates construction to begin on March 30th, 2026 and end on December 18, 2026.

Bids must be received no later than 2:00 pm, Tuesday, February 24th, 2026. Late bids will not be considered. Bids shall be submitted on IMPACS Electronic Procurement System. The Bid shall be accompanied by a Bid Security as set forth in the Instructions to Bidders in the amount of 5% of the total bid amount. Each bid shall be accompanied by a bid bond, cashier’s check or a certified check drawn upon a solvent bank chartered under the laws of the United States of America.

Bid Opening The time and place of bid opening will be held at meet.google.com/yrb-iffu-twb teleconference number (US)+1 414-909-4797 Pin: 651 771 508# at 3:00 pm on February 24th, 2026.

The Iowa Department of Administrative Services reserves the right to reject any and all bids, and to waive irregularities and to accept a bid that is deemed in the best interest of the State of Iowa.

Bidders must comply with all affirmative action/equal employment opportunity provisions of the State of Iowa and the Federal Government.

This project is exempt from Iowa Sales Tax. Davis Bacon Wages will not apply to this project.

Questions must be submitted by 10:00 am, February 17th, 2026, to the Issuing Officer.

Bidding documents may stipulate a specific product. Substitute product will be considered if a written request is received by 10:00 am, February 17th, 2026, prior to bid opening. Substitution requests will be considered for all products per Section 01 2500 Substitution Procedures, even if the specification does not include a statement such as “or equal,” “equal to,” “equivalent to,” or “basis of design,” unless otherwise noted.

An optional Pre-Bid meeting will be held on Thursday, January 22, 2026, at 10:00 am at Woodward Resource Center at the Story Construction trailer at 1251 334th Street, Woodward, Iowa 50276. This meeting is not mandatory but is highly recommended.

Bidding Documents, including drawing sheets bearing the project name Fire Alarm Phase 4 (#9279.40) Bid Issuance #3, Dated 12/12/2025 and the Project Manual prepared by Shive-Hattery dated 12/12/2025, may be obtained from Rapids Reproductions by visiting www.rapidsrepro.com or by calling (515) 251-3222 on

Monday through Friday 8:00 am to 5:00 pm.

For further information regarding this project contact:

Michael Bradbury – Issuing Officer Phone: (515) 823-9327

E-Mail: construction.procurement@iowa.gov

END OF SECTION

MasonG Cloud

MasonG Callout

ADD. #1

MasonG Cloud

MasonG Callout

ADD. #1

PROJECT 9279.40 PRELIMINARY SCHEDULE 00 3113 - 1

SECTION 00 3113

PRELIMINARY SCHEDULE

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Preliminary Construction Schedule B. Schedule Durations

1.02 PRELIMINARY SCHEDULE

A. A preliminary schedule has been identified by the Owner for the implementation of the Project.

Refer to the schedule following this Section for references to anticipated milestones and construction duration.

B. Each step of the Preliminary Schedule is subject to receipt of acceptable bids, Owner’s decision process and date of commencement.

C. A proposed construction schedule shall be submitted by all Trade Contractors to the Construction Manager no later than 48 hours prior to the pre-construction meeting. A revised Construction Schedule will be submitted by the Construction Manager once all preliminary schedules are reviewed and approved by the Owner.

D. The final construction schedule will be established post award of bids with the cooperation of all contractors.

1.03 SCHEDULE DURATIONS

A. Anticipated Notice of Intent to Award – 02/25/2026

B. Anticipated Date of Commencement – 03/30/2026

C. Substantial Completion by – 12/18/2026

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION – NOT USED

WRC Fire Alarm Ph.4

Page 1 of 1Exported on January 30, 2026 1:41:43 PM CST

MasonG Cloud

MasonG

PROJECT 9279.40 BID FORM 00 4116 - 1

SECTION 00 4116

BID FORM

The Bid Form must be submitted online through the State’s IMPACS Electronic Procurement System.

RFB #927940-03

BID FORM for CONSTRUCTION CONTRACT for

Woodward Resource Center 1251 334th Street, Woodward, Iowa 50276

Project 9279.40

Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut Street Des Moines, Iowa 50319-0105

The following information is to be completed and submitted with your bid..

1. Bid Form - Completed and Signed (to be uploaded with bid submission)

2. Non Discrimination Clause Information

3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information

4. Bid Security – 5% of total Bid amount (to be uploaded with bid submission)

Authorized Representative:

The undersigned Bidder, in response to your Request for Bid for construction of the above project, having examined the Drawings, Specifications, and other Bidding Documents dated December 12, 2025, and Addenda issued and acknowledged below as received and being familiar with all the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies to perform all work to construct the project in strict accordance with the proposed Contract Documents, within the time and at the prices stated below. Prices are to cover all expenses incurred in performing the work required under the proposed Contract Documents, of which this bid is a part.

Bidder acknowledges receipt of the following Addenda which are a part of the Bidding Documents and for which any effect on cost of the Work is included in the bid amounts indicated:

Number ________ ________ ________ ________ ________

Dated ________ ________ ________ ________ ________

Note that the State of Iowa is exempt from State and Local sales and use taxes (including local option and school option) for this project. Taxes on construction materials shall NOT be included in the bid amounts.

PROJECT 9279.40 BID FORM 00 4116 - 2

Amounts shall be indicated in both words and figures. In case of discrepancy, the amount indicated in words shall govern.

BID PACKAGES:

BP 28-1

Description: Fire Alarm

Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:

Dollars

ALTERNATES:

BP 28-1 ALTERNATE 01

Description: Oak Hall Fire Alarm

Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum

BP 28-1 ALTERNATE 02

Description: Maple Lodge Fire Alarm

Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum

PROJECT 9279.40 BID FORM 00 4116 - 3

BP 28-1 ALTERNATE 03

Description: Water Treatment Building Fire Alarm

Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum

UNIT PRICES:

UNIT 01

Description: Smoke Detector

UNIT 02

Description: Heat Detector

UNIT 03

Description: Fire Alarm Relay

PROJECT 9279.40 BID FORM 00 4116 - 4

UNIT 04

Description: Ceiling Mounted Speaker Strobe

UNIT 05

Description: Ceiling Mounted Strobe

UNIT 06

Description: Duct Smoke Detector

Bidder hereby certifies that:

1. This bid is genuine and is not made in the interest of or on behalf of any undisclosed person, firm or corporation;

2. Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding;

and Bidder has not sought by collusion to obtain any advantage over any other bidder or over the Owner.

3. Bidder hereby certifies that the Bidder is registered with the Iowa Labor Commissioner as a Contractor as required by Chapter 91C, Code of Iowa.

4. Bidder agrees to comply with all Federal and State Affirmative Action/Equal Employment Opportunity requirements concerning fair employment and will not discriminate between or among them by reason of race, color, religion, sex, national origin or physical handicap.

5. All construction under this Contract shall conform to the requirements of the Iowa State Building Code.

PROJECT 9279.40 BID FORM 00 4116 - 5

6. Bidder agrees that this bid shall remain valid and shall not be withdrawn for a period of thirty (30) calendar days after the date for receipt of bids.

7. Bidder agrees that if written notice of acceptance of this bid is mailed, emailed, or delivered to the undersigned within thirty (30) days after the date in which bids are due, or at any time thereafter before it is withdrawn, the undersigned will sign and return the Contract Agreement, prepared in accord with the Bidding Documents and this bid as accepted; and will also provide proof of insurance coverage and required surety bonds.

8. Bidder understands that the Owner reserves the right to reject any and all bids, and to waive irregularities or informalities and enter into a contract for the work, as the Owner deems to be in the best interest of the State.

9. Bidder understands that the Owner reserves the right to accept any, or no, Alternate Bid, if requested, and that the Alternate Bids may be considered in any order or combination, and the low Bidder shall be determined on the basis of the sum of the base bid and any Alternate(s) accepted.

Subcontractors:

The Trade Contractor must identify all Subcontractors and Suppliers within 48 hours of the published date and time for which bids must be submitted, in accordance with Iowa Code Section 8A311, as amended by House File 646 in 2011. Subcontractors and suppliers may not be changed without the approval of the Owner. Requests for changing a Subcontractor or supplier must identify the reason for the proposed change, the name of the new Subcontractor or supplier, and the change in the subcontractor or supplier price as a result of the change. Any reduction in subcontractor or supplier price as a result of the change, if the change is approved by the Owner, shall be deducted from the Trade Contract Price via a deductive Change Order. Any such changes, if approved by the Owner, which result in an increase in the Trade Contract Price shall be borne by the Trade Contractor.

Enforcement of Reciprocal Resident Bidder Preference, per Iowa Code 73A.21.

All bidders shall either check the box next to “Resident Bidder” or check the box next to “Nonresident Bidder” and by doing so and signing thereafter certifies and attests to the same. All information requested must be provided. Seek out the advice of an attorney if you have questions.

“Resident Bidder” means a person or entity authorized to transact business in of the State of Iowa and having a place of business for transacting business within the State of Iowa at which it is conducting and has conducted business for at least three years prior to the date of the first advertisement for the public improvement. Note, however, that if a nonresident bidder’s state or foreign country has a more stringent definition of a resident bidder, the more stringent definition is applicable as to bidders from that state or foreign country.

Resident Bidder

Name of Resident Bidder: ___________________________

By: _____________________________________ Authorized Agent and Signatory of Resident Bidder

OR:

Nonresident Bidder

Name of Nonresident Bidder: ___________________________

Name of State or Foreign Country of Nonresident Bidder: ___________________________

PROJECT 9279.40 BID FORM 00 4116 - 6

Particularly identify and describe any preference, labor preference, or any other type of preferential treatment, in effect in the nonresident bidder’s state or foreign country at the time of this bid:

NOTICE: Nonresident Bidders domiciled in a state or country with a resident labor force preference shall make and keep, for a period of not less than three years, accurate records of all workers employed on the public improvement. The records shall include each worker’s name, address, telephone number when available, social security number, trade classification, and the starting ending time of employment.

By: ________________________________________ Authorized Agent and Signatory of Nonresident Bidder

REQUIRED: Bid Form shall be signed by an officer of the company with authority to bind in a contract. Notice of acceptance of this bid, or request for additional information by the Department of Administrative Services, may be addressed to the undersigned at the address set forth below:

Legal Name of Firm: ____________________________________________________________

Date: _________________________________________________

Signature of Bidder: ____________________________________________________

Title: ______________________________________________________

Typed Name of Signatory: _____________________________________________________

Email: _______________________________________

Business Address:

Telephone Number: ____________________ Fax Number: ____________________

Federal Tax Identification Number: ____________________

Iowa Contractor Registration Number: _________________________

Bidder Safety Manager Name:_______________________________

For an out-of-state Bidder, Bidder certifies that the Resident Preference given by the State or

Foreign Country of Bidder’s residence, _________________________, is _______ %.

PROJECT 9279.40 CONTRACT SUMMARY 01 1200 - 1

SECTION 01 1200

CONTRACT SUMMARY

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Project Information B. Project Summary C. Bid Scope Summary D. Work Hour Restrictions E. Access to Site F. Coordination with Occupants G. Rules for Construction Workers H. Bid Package Instructions

1.02 PROJECT INFORMATION

A. Facility Name/Location: Woodward Resource Center, 1251 334th Street, Woodward, IA 50276 B. DAS Project #: 9279.40 C. Owner: State of Iowa, Department of Administrative Services, Hoover State Office Building, Level 3, 1305 East Walnut Street, Des Moines, IA 50319 D. Owner’s Representative: Jennifer Kleene, Iowa Department of Administrative Services, 109 SE

13th Street, Des Moines, IA 50319 E. Construction Manager: Darren Milliken, Story Construction, 2810 Wakefield Circle, Ames, Iowa

50010

1.03 PROJECT SUMMARY

A. The project includes installing new fire alarm in the following buildings: Administration, Larches, Hemlock, Employee Home, Maple Lodge, Laundry, Car Wash, Supply Depot, Oak Hall, Water Treatment, CDC Central Distribution, Westwood Storage Building, and the Chiller building.

B. Target date to provide substantial completion is December 18, 2026.

1.04 BID SCOPE SUMMARY

A. Scope Applicable to All Bid Packages:

1. The Contractor’s Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor’s Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor’s scope.

2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement.

3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place.

MasonG Cloud

MasonG

PROJECT 9279.40 CONTRACT SUMMARY 01 1200 - 2

4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager.

5. Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager.

6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor’s scope shall be repaired or restored to proper conditions by the Contractor.

7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor’s Scope of work.

1.05 WORK HOUR RESTRICTIONS

A. Work hours are from 07:00 AM to 05:00 PM, Monday through Friday unless arrangements are made in advance.

1.06 CONTRACTOR USE OF SITE AND PREMISES

A. Construction Operations: Limited to areas noted on Drawings.

B. Provide access to and from site as required by law and Owner:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permission of Owner and permit if required.

C. Facility will be occupied at all times during duration of work. Contractor personnel shall conduct themselves in an agreeable manner at all times. Failure to do so may result in removal from the work site.

1.07 OWNER OCCUPANCY

A. Owner intends to occupy the Project throughout construction.

B. Cooperate with Owner to minimize conflict and to facilitate Owner’s operations.

C. Schedule the Work to accommodate Owner occupancy.

1.08 RULES FOR CONSTRUCTION WORKERS

A. The staff of the State of Iowa has a responsibility to protect the public by providing a secure environment. All work site rules must be followed to the letter, at all times.

B. All construction workers must have a background check completed prior to entering the campus to perform work.

C. All State properties are tobacco free. No smoking will be permitted or tolerated on campus unless in designated areas.

D. You are permitted access only to the work site and no other area of the institution.

E. No drugs, alcohol, or firearms are allowed on the work site.

F. Do not leave money, drugs, alcohol, or firearms in your personal vehicle.

G. Company and personal vehicles are to be parked and locked in designated or authorized area of the work.

H. Secure all tools at the end of the day.

I. Maintain control of all tools, supplies, and debris at all times during the work.

PROJECT 9279.40 CONTRACT SUMMARY 01 1200 - 3

J. Never leave keys in any vehicle. If a security officer finds keys in a vehicle, they are under orders to turn them in to a security supervisor.

K. Do not give anything to residents or take anything from residents; if they offer, inform your supervisor.

L. Secure all tools at the end of each day. Never leave tools unattended. All tools shall be checked in at the beginning of the day and checked out at the end of the day. If security officers find loose tools, they are under orders to turn them in to their supervisor.

M. All delivery vehicles must go directly to the job site. Extra time should be anticipated for all deliveries. Provide 24-hour notice to the facility of deliveries.

N. During an emergency, follow the instructions of the security staff.

1.09 BID PACKAGE INSTRUCTIONS

A. Bid Package #28-1 – Fire Alarm: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. Base Bid includes all drawings titled 00-G001, 00-G002, 00-E000, 02-E301, 03-ED300, 02-ED301, 03-ED302, 03-E300, 03-E301, 03-E302, 06-ED300, 06-ED301, 06-ED302, 06-E300, 06-E301, 06-E302, 07-ED300, 07-ED301, 07-ED302, 07-E300, 07-E301, 07-

E302, 14-ED301, 14-E301, 17-E301, 19-ED300, 19-ED301, 19-ED302, 19-E300, 19-

E301, 19-E302, 22-ED301, 22-E301, 28-E301, 29-E301 WRC Fire Alarm Phase 4 (#9279.40) Bid Issuance #3

2. Includes all specifications titled Woodward Resource Center Fire Alarm Phase 4 (9279.40) Bid Issuance #3

3. Clarification: Contractor shall be lead-certified and all work done on areas with lead-containing or lead-based paint must be done by a lead-certified crew member.

B. Alternate #01 – Oak Hall Fire Alarm: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. Provide all labor, material, and equipment to replace the fire alarm systems at the Oak

Hall building.

2. Drawing Sheets Include: 00-G001, 00-G002, 00-E000, 20-ED300, 20-ED301, 20-ED302, 20-E300, 20-E301, 20-E302 WRC Fire Alarm Phase 4 (#9279.40) Bid Issuance #3

3. Includes all specifications titled Woodward Resource Center Fire Alarm Phase 4

(9279.40) Bid Issuance #3

4. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

5. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

6. Execute accepted alternates under the same conditions as other work of the Contract.

C. Alternate #02 – Maple Lodge Fire Alarm: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. Provide all labor, material, and equipment to replace the fire alarm systems at the Maple

Lodge Building.

2. Drawings Sheets Include: 00-G001, 00-G002, 00-E000, 08-ED300, 08-ED301, 08-

ED302, 08-E300, 08-E301, 08-E302 WRC Fire Alarm Phase 4 (#9279.40) Bid Issuance #3

3. Includes all specifications titled Woodward Resource Center Fire Alarm Phase 4 (9279.40) Bid Issuance #3

4. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

5. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

6. Execute accepted alternates under the same conditions as other work of the Contract.

Architect

MasonG

PROJECT 9279.40 CONTRACT SUMMARY 01 1200 - 4

D. Alternate #03 – Water Treatment Building Fire Alarm: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

1. Provide all labor, material, and equipment to replace the fire alarm systems at the Water

Treatment Building.

2. Drawings Sheets Include: 00-G001, 00-G002, 00-E000, 21-E301 WRC Fire Alarm Phase

4 (#9279.40) Bid Issuance #3

3. Includes all specifications titled Woodward Resource Center Fire Alarm Phase 4

(9279.40) Bid Issuance #3

4. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

5. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

6. Execute accepted alternates under the same conditions as other work of the Contract.

E. Unit Price #01 – Smoke Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that involves use of established unit prices and to have this work measured, at the Owner’s expense, by an independent surveyor acceptable to the Contractor.

F. Unit Price #02 – Heat Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that

G. Unit Price #03 – Fire Alarm Relay: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that

H. Unit Price #04 – Ceiling Mounted Speaker Strobe: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that

Architect

MasonG

PROJECT 9279.40 CONTRACT SUMMARY 01 1200 - 5

I. Unit Price #05 – Ceiling Mounted Strobe: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that

J. Unit Price #06 – Duct Smoke Detector: Trade Contractor shall include all of the following, but not limited to, as part of the contract:

a. One unit to include: Cost for labor and material for device, 30’ of conduit and 30’ of fire alarm cable. Programming of device to also be included.

b. Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.

c. Owner reserves the right to reject Contractor’s measurements of work in place that

K. Work Performed by Owner: WRC Staff and Construction Manager will perform the following work items:

1. Relocate all moveable furniture, fixtures and equipment (FF&E), including window treatments; and personal materials from each sequenced work area prior to demolition and construction activities and after new construction is completed.

2. Perform fire watch when necessary.

3. Temporary granular surface for parking and laydown area.

4. Temporary fencing for laydown area.

5. All painting required for the project.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION – NOT USED

1P 1 POLE (2P, 3P, 4P, ETC.)

A AMPERE

AC ABOVE COUNTER

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT

INTERRUPTER

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AMPL AMPLIFIER

ANNUN ANNUNCIATOR

APPROX APPROXIMATELY

AQ-STAT AQUASTAT

ARCH ARCHITECT, ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BD BOARD

BLDG BUILDING

BMS BUILDING MANAGEMENT

SYSTEM

C CONDUIT

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

COMB COMBINATION

CMPR COMPRESSOR

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR

CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

CP CIRCULATING PUMP

CRT CATHODE-RAY TUBE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER

DCP DOMESTIC WATER

CIRCULATING PUMP

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DPR DAMPER

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EP ELECTRIC PNEUMATIC

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPLOSION PROOF

FA FIRE ALARM

FABP FIRE ALARM BOOSTER POWER

SUPPLY PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT

SWITCH

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT

INTERRUPTER

GFP GROUND FAULT PROTECTOR

GND GROUND

GRS GALVANIZED RIGID STEEL

(CONDUIT)

GYP BD GYPSUM BOARD

HOA HANDS-OFF-AUTOMATIC

SWITCH

HORIZ HORIZONTAL

HP HORSEPOWER

HPF HIGH POWER FACTOR

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND

AIR CONDITIONING

HWP HYDRONIC WATER PUMP

IC INTERRUPTING CAPACITY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

I/W INTERLOCK WITH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LOC LOCATE OR LOCATION

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MAG.S MAGNETIC STARTER

M/C MOMENTARY CONTACT

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDC MAIN DISTRIBUTION CENTER

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT

SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMS MANUAL MOTOR STARTER

MOA MULTIOUTLET ASSEMBLY

MSP MOTOR STARTER PANELBOARD

MSBD MAIN SWITCHBOARD

MT MOUNT

MT.C EMPTY CONDUIT

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S

ASSOCIATION

NFDS NON-FUSED SAFETY

DISCONNECT SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NPF NORMAL POWER FACTOR

NTS NOT TO SCALE

OH OVERHEAD

OL OVERLOADS

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PE PNEUMATIC ELECTRIC

PED PEDESTAL

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PP POWER POLE

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE

(CONDUIT)

PWR POWER

QUAN QUANTITY

RCPT RECEPTACLE

REQD REQUIRED

RM ROOM

RSC RIGID STEEL CONDUIT

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SHT SHEET

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

S/S STOP/START PUSHBUTTONS

STA STATION

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TL TWIST LOCK

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TVTC TELEVISION TERMINAL

CABINET

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UT UNDERGROUND TELEPHONE

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VDT VIDEO DISPLAY TERMINAL

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WG WIRE GUARD

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

L L

ELECTRICAL ABBREVIATIONS LIST

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Ø PHASE

C CENTER LINE

P PLATE

HT AFF SYMBOL DESCRIPTION

EM

E E

K

D

OS

MS

T

SP

M

UC

CLG

A

A

P

E

J J

T

25 KVA

1 SF-1

M

R

OS IR

LS A

PC

W

X

TV

SS

S S

S

V

IC

FS

TS

FA ANNUN

FACP

FARP

P P

R/F135 R/F135

P

DH

CH

FR

N

N 1

NCM

NC ANNUN

FB 1

ASD

DR

TV

TRACK AND TRACK LIGHT (TYPE DENOTED)AS NOTED

EMERGENCY BATTER LIGHT (TYPE DENOTED)96"

EXIT SIGN (TYPE DENOTED)

LIGHT FIXTURE ON EMERGENCY CIRCUITAS NOTED

SINGLE POLE SWITCH

3-WAY SWITCH

48"

48"

4-WAY SWITCH48"

KEYED SWITCH48"

DIMMER SWITCH48"

OCCUPANCY SENSOR SWITCH48"

MOMENTARY CONTACT SWITCH48"

TIMER SWITCH48"

FAN SPEED CONTROL48"

MOTOR HORSEPOWER RATED SWITCH48"

PUSH BUTTON48"

DURESS PUSH BUTTON, UNDER COUNTER48"

DUPLEX RECEPTACLE18" UNO

FOURPLEX RECEPTACLE18" UNO

FLOOR BOX (TYPE DENOTED)

CEILING MOUNTED DUPLEX RECEPTACLE

HT AFF SYMBOL DESCRIPTION

SURFACE RACEWAY (TYPE DENOTED)18"

CLOCK (TYPE DENOTED)

POWER POLE (OPEN OFFICE STYLE)

ELECTRICAL CONNECTION (SEE SCHEDULE)

JUNCTION BOXAS NOTED

CIRCUIT BREAKER PANEL72"**

POWER OR DISTRIBUTION PANEL72"**

SPECIAL CABINET (TYPE DENOTED)72"**

TRANSFORMER (TYPE DENOTED)

GENERATOR (KVA DENOTED)

MOTOR (SEE SCHEDULE)

MOTORIZED DAMPER

SAFETY DISCONNECTION SWITCH72"**

ADJUSTABLE SPEED DRIVE

RELAY72"**

OCCUPANCY SENSOR (TYPE DENOTED)

LIGHT LEVEL SENSOR (TYPE DENOTED)

SM

PHOTOCELLAS NOTED

CCTV CAMERA (TYPE DENOTED)AS NOTED

SURVEILLANCE MONITOR

HT AFF SYMBOL DESCRIPTION HT AFF SYMBOL DESCRIPTION

CONDUIT CONCEALED IN WALL OR OVERHEAD

CONDUIT CONCEALED BELOW FLOOR

CONDUIT TRANSITION UP

CONDUIT TRANSITION DOWN

CONDUIT STUBBED OUT

BRANCH CIRCUIT HOME RUN

CABLE TRAY (TYPE DENOTED)

CONDUIT SLEEVE (SIZE DENOTED)

WALL TELEPHONE OUTLET (TYPE DENOTED)48"***

TELEPHONE OUTLET (TYPE DENOTED)18" UNO

DATA OUTLET (INDICATED QTY CABLES)18" UNO

VOICE/DATA OUTLET (TYPE DENOTED)18" UNO

WIRELESS ACCESS POINT

TELEVISION OUTLET18" UNO

CEILING MOUNTED TELEVISION OUTLET

SPEAKER (WALL OR CEILING MOUNT)84"

HORN TYPE SPEAKER84"

SURFACE MOUNT SPEAKER SUSPENDED FROM CEILING

VOLUME CONTROL48"

INTERCOM STATION48"

ICM INTERCOM MASTER

KEYED NOTE (SEE SCHEDULE)E#

SPRINKLER FLOW SWITCH

SPRINKLER VALVE TAMPER SWITCH

MANUAL PULL STATION (46" ABOVE FLOOR)

AUDIO NOTIFICATION DEVICE - CEILING MOUNTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

VISUAL NOTIFICATION DEVICE - CEILING MOUNTED

FIRE ALARM REMOTE ANNUNCIATOR 72"**

FIRE ALARM CONTROL PANEL72"**

FIRE ALARM RELAY PANEL72"**

SMOKE DETECTOR (TYPE DENOTED)8"****

HEAT DETECTOR (TYPE AND TEMP DENOTED)

DUCT SMOKE DETECTOR (TYPE DENOTED)

LINEAR HEAT DETECTOR

DOOR HOLDER

DOOR CLOSER/HOLD OPEN

SMOKE DAMPER RELEASE

FIRE ALARM SHUT DOWN RELAY

NURSE CALL SINGLE PATIENT STATION60"

37 PIN BED INTERFACE RECEPTACLE60"

AUXILIARY ALARM STATION, TWO JACK60"

EMERGENCY PULL CORD STATION36" UNO

STAFF TERMINAL, TOUCHSCREEN60"

60" DUTY STATION

12"* NURSE CALL DOME LIGHT

48"*** NURSE CALL MASTER STATION

NCC48"*** NURSE CALL EQUIPMENT CABINET

72"*** NURSE CALL ANNUNCIATOR PANEL

ELECTRICAL SYMBOL LEGEND

ALL DISTANCES ARE TO CENTER OF DEVICE OR EQUIPMENT UNLESS OTHERWISE NOTED. DEVICES INDICATED AT 48" MAY NOT BE INSTALLED WITH ANY OPERABLE PART HIGHER THAN 48". DEVICES MAY BE INSTALLED IN CONCRETE MASONRY UNITS WITH THE TOP OF THE DEVICE AT 48".

* DISTANCE ABOVE DOOR FRAME ** DISTANCE TO TOP OF EQUIPMENT OR DEVICE *** DISTANCE TO HIGHEST OPERABLE POINT OF EQUIPMENT **** DISTANCE BELOW CEILING ***** DISTANCE TO BOTTOM OF DEVICE

1 LIGHTING CONTROL DENOTATION

P

J

E

T

D

B

STAFF ASSIST60"

CODE BLUE STATION48"

A

NURSE CALL STAFF STATION60" S

SURFACE LIGHT (TYPE DENOTED)X

X RECESSED LIGHT (TYPE DENOTED)

X

X

X

WALL MOUNTED LIGHT (TYPE DENOTED)PER SCHED

WALL MOUNTED FLOOD LIGHT (TYPE DENOTED)PER SCHED

SITE POLE MOUNTED LIGHT (TYPE DENOTED)PER SCHED

SURFACE LIGHT (TYPE DENOTED)

SUSPENDED OR PENDANT LIGHT (TYPE DENOTED)

RECESSED LIGHT (TYPE DENOTED)

SITE BOLLARD LIGHT (TYPE DENOTED)XPER SCHED

L S

B

L

L S

B

L

F

AUDIO NOTIFICATION DEVICE - CEILING MOUNTED

80" ABOVE FLOOR OR AS NOTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

VISUAL NOTIFICATION DEVICE - WALL MOUNTED

80" ABOVE FLOOR OR AS NOTED

AUDIO/VISUAL NOTIFICATION DEVICE - CEILING MOUNTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

AUDIO/VISUAL NOTIFICATION DEVICE - WALL MOUNTED

80" ABOVE FLOOR OR AS NOTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

CT CONTACT SENSING CONTROL MODULE

CR RELAY OUTPUT CONTROL MODULE

1. ALL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL

ELECTRICAL CODE - LATEST EDITION ADOPTED BY THE

STATE, THE STATE AMENDMENTS, CODES AND ORDINANCES,

AND THE AUTHORITY HAVING JURISDICTION. THE COMPLETE

INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADAAG

(AMERICANS WITH DISABILITIES ACT ACCESSIBILITY

GUIDELINES).

2. IT IS THE INTENT OF THESE DOCUMENTS TO COMPLY WITH

THE APPLICABLE CODES. WHERE DISCREPANCIES OCCUR,

NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR

INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS

TO COMPLY WITH THE CODES AND STANDARDS AT NO

ADDITIONAL COST TO THE OWNER.

3. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY

INCLUDING ALL LABOR, MATERIALS, PERMITS, TAXES, FEES,

INSPECTIONS, HARDWARE, AND COST FOR INSTALLATION

FOR A COMPLETE AND OPERATIONAL SYSTEM.

4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE

NEW, COMPLETE WITH MANUFACTURER’S GUARANTEE OR

WARRANTY AND SHALL BE LISTED BY A NATIONALLY

RECOGNIZED TESTING LABORATORY (NRTL).

5. COORDINATE ELECTRICAL INSTALLATION WITH ALL TRADES

PRIOR TO INSTALLATION. IF ELECTRICAL WORK INSTALLED

INTERFERES WITH OTHER TRADES AFTER INSTALLATION,

THE CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES

TO CORRECT THE CONDITION AT NO ADDITIONAL COST TO

THE OWNER.

6. DEVICES, OUTLETS, AND JUNCTION BOXES SHOWN ON

DRAWINGS ARE DIAGRAMMATIC. COORDINATE EXACT

PLACEMENT OF ALL DEVICES WITH OWNER AND OTHER

TRADES PRIOR TO INSTALLATION. VERIFY DOOR SWING

PRIOR TO INSTALLATION OF ALL SWITCH BOXES.

ADJUSTMENT OF LOCATION PRIOR TO INSTALLATION, SHALL

BE DONE WITH NO ADDITIONAL COST TO THE OWNER.

7. DRAWINGS ARE DIAGRAMMATIC. ALL DIMENSIONS SHOWN

ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL

FURNITURE, MODULAR FURNITURE, AND EQUIPMENT

LOCATIONS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .