RFB _ SPLOST 6 _ 2026 Work Package 4 _ Road S.docx
DOCX document 103 KB Posted
- Attached to
- Road Striping
- Solicitation number
- PE-67400-NONST-2027-000000012
- Issued by
- Georgia
About this file
This is a Request for Bids (RFB) issued by the Heard County Board of Commissioners in Franklin, Georgia for road striping services on multiple roads throughout the county. The County seeks bids from Georgia state-licensed contractors to provide all materials and services necessary to complete road striping work in accordance with current GDOT specifications. The project includes traffic control setup, solid yellow traffic stripes measuring 5 inches over 224.46 linear miles, and solid white traffic stripes measuring 24 inches over 360 linear feet, with pricing to be submitted via the provided pricing proposal worksheet. The RFB was issued on October 9, 2026, with a deadline for written questions on October 21, 2026 at 12:00 PM, answers posted by October 28, 2026 at 5:00 PM, and bids due on November 4, 2026 at 11:00 AM. Bidders must submit one original and three copies to Felicia Adams, Finance Director, at the Heard County Administration Building, 201 Park Avenue, Room 200, Franklin, Georgia 30217. The contract will become effective upon signing and remain in force until project completion, with work to begin within the timeframe specified in the Notice to Proceed and achieve substantial completion within 120 days, followed by final completion within 14 days thereafter.
All bidders must be prequalified and in good standing with GDOT. Mandatory requirements include a completed pricing proposal addressing all scope elements, evidence of insurance, a signed Bidder's Certification (Appendix A), a SAVE Affidavit (Appendix B), an E-Verify Form (Appendix C), and any signed addenda. A 5% bid bond is required at submission, with 100% performance and payment bonds required of the awarded contractor. The County reserves the right to reject any or all bids and to waive any technicalities or informalities. Payment terms follow the Owner's standard agreement form with a maximum 10% retainage until 50% of contract value is complete and satisfactory, after which retainage reduces accordingly. The contractor shall maintain general liability insurance of $2,000,000, automobile liability of $1,000,000, and workers' compensation as required by Georgia law. Contractor shall pay $500 per day in liquidated damages for each day of unexcused delay beyond the 120-day substantial completion deadline and $100 per day for delays beyond the final completion deadline. The contractor must warrant and correct any defective work within one year after completion and maintain all required insurance coverage through the warranty period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Work Package 4 Appendix D_1 Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
| Issuing Agency | Heard County Board of Commissioners | |
| Purchasing Department | ||
| Heard County Administration Building | ||
| P.O. Box 40, 201 Park Avenue, Rm#200 | ||
| Franklin, Georgia 30217 | ||
| Phone: 706-675-3821 | ||
| Fax: 706-675-2493 |
Issue Date Wednesday, October 9, 2026
Buyer Felicia Adams
BID Closing Date Wednesday, November 4, 2026
BID Closing Time 11:00 AM
Commodity Road Striping
REQUEST FOR BIDS
The Heard County Board of Commissioners is requesting bids from Georgia state licensed contractors to complete road striping in Heard County. The Contractor shall provide all materials and services necessary in the performance of this contract.
Bids will be received by Heard County Board of Commissioners, Purchasing Department, Heard County Administration Building, 201 Park Avenue, Room 200, Franklin, Georgia 30217 until 11:00 AM local time on Wednesday, November 4, 2026. Late bids will not be considered nor returned. Bids will be formally accepted and acknowledged at the County Administration Building by staff personnel.
The bid documents and specifications are available for inspection at the Heard County Purchasing Department, Heard County Administration Building, 201 Park Avenue, Room 200, Franklin, Georgia 30217; phone 706-675-3821 or fax 706-675-2493.
Bids may not be withdrawn for ninety (90) days after the time and date set for closing, except as allowed by OCGA. Heard County reserves the right to reject any and all bids and to waive any technicalities.
BID DOCUMENTS ARE AVAILABLE AT THE HEARD COUNTY, GEORGIA WEBSITE: www.heardcountyga.com
1.0 INTRODUCTION
1.1 Purpose of Procurement
The Heard County Board of Commissioners is requesting bids from Georgia State licensed contractors to complete road striping on multiple roads.
1.2 Proposal Certification
Pursuant to the provisions of the Official Code of Georgia Annotated 50-5-67(a), Heard County certifies that the use of competitive sealed bidding will be practical or advantageous to the County in completing the acquisition described in this document.
The Owner shall have the right to waive any informality, irregularity, or insufficiency in the proposal procedure and in any bid or bids received and to accept the bid which, in the Owner’s sole judgment, is in the Owner’s own best interests.
1.3 Schedule of Events
This Request for Bids shall be governed by the following schedule:
| DATE | ACTIVITY | |
| October 9, 2026 | ||
| Release of RFB |
October 21, 2026 12:00 P.M.
Deadline for written questions to be submitted
October 28, 2026 5:00 P.M.
Answers to written questions posted to website: www.heardcountyga.com
November 4, 2026
11:00 AM
BIDS Due
1.4 Restrictions on Communications
From the issue date of this RFB until a contractor is selected and the award is announced, Contractors are not allowed to communicate for any reason with any County staff or elected officials except: 1) through the Project Manager or Purchasing Director named herein, or 2) as provided by existing work agreement(s). The County reserves the right to reject the submittal of any bidder violating this provision.
1.5 Pre-Proposal Meeting
OMIT
1.6 Questions & Addenda
All questions concerning this RFB must be submitted in writing (email is preferred but fax and mail may be used) to the Program Manager no later than 12:00 pm on October 21, 2026, local time.
The Inquiries must be directed to:
Kevin Hamby, SPLOST Program Manager Heard County Board of Commissioners Heard County Administration Building 201 Park Avenue, Room #200 Franklin, GA 30217 Kevin@hambymanagement.com Fax (706) 675-2493
No response to inquiries other than written will be binding upon the County. Heard County reserves the right to issue written addenda to any inquiries that alter the scope of the Request for Bids. Addenda shall be posted to the county website, www.heardcountyga.com, no later than October 28, 2026, at 5:00 PM. A signed copy of any addenda shall accompany submitted Bids. Bidders are advised to check the website for addenda before submitting their Bids.
1.7 Definition of Terms
BOC - Heard County Board of Commissioners
OCGA - Official Code of Georgia Annotated (State Statute)
Bidder - Respondent to this Request for Bids
Contractor - The successful respondent to this Request for Bids, after being placed under contract with the County.
RFB - Request for Bids
Contract Documents – The Contract Documents are defined as all Drawings, Specifications, Bulletins, Agreement Forms and Addenda issued through the completion of the project including, but not limited to:
· Appendix A Bidders Certification
· Appendix B Save Affidavit.
· Appendix C E-Verify Form
· Appendix D Pricing Proposal
· Appendix D.1 Road Striping Worksheet
· Appendix E Heard County’s Contract
1.8 Contract Term
The contract between the County and the Contractor shall become effective upon signing and shall remain in force until completion of the project, or until notice of termination in writing is given by the other party as provided herein. Heard County reserves the right to terminate contract at any time if successful bidder fails to meet requirements stated in this RFB.
The contract shall terminate absolutely and without further obligation at such time as appropriated and otherwise unobligated funds are no longer available to satisfy the obligations of the County under this contract.
1.9 Bonds
| Bid Bonds | 5% of total bid amount | |
| Performance Bonds | 100% of total contract price (required of awarded vendor only) | |
| Payment Bonds | 100% of total contract price (required of awarded vendor only) |
Information regarding bonds to be furnished is stated in the 6.0 Terms and Conditions section of this bid document, 6.26 “Bid Bonds, Performance Bonds & Payment Bonds”.
1.10 Exception to RFB
Each BID shall be deemed to agree to comply with all terms, conditions, specifications, and requirements of this RFB. An “exception” is defined as the Bidder’s inability or unwillingness to meet a term, condition, specification, or requirement in the manner specified in the RFB. All exceptions taken must be identified and explained in writing in your proposal and must specifically reference the relevant section(s) of this RFB. If the bidder provides an alternate solution when taking an exception to the requirement, the benefits of this alternative solution and impact, if any, on any part of the remainder of the bidder’s solution, must be explained in detail.
The County welcomes innovative suggestions and recommendations from Contractors that will ensure a 100% successful service approach.
2.0 SCOPE OF WORK
The term "Work" means the construction and services required by the Contract Documents, and includes all other labor, materials, equipment and services provided by the Contractor to fulfill the Contractor's obligations to complete road striping on multiple roads.
3.0 MANDATORY REQUIREMENTS
This section identifies all mandatory requirements which must be present in the proposal before further consideration will be given.
3.1 Bid Requirements
a. Completed Pricing Proposal that addresses all elements of the Scope of Work referenced in Section 2 of this RFB (Appendix D).
b. Evidence of Insurance.
| c. | Bidder’s Certification (Appendix A) |
| d. | SAVE Affidavit (Appendix B) |
| e. | E-Verify Form (Appendix C) |
| f. | Signed Addendum (if any) |
3.2 Pricing Proposal
The pricing proposal is to provide Heard County on how your company charges for the materials and services needed. Pricing should include normal fees associated with the performance of the service specified, including materials, supervision, labor, transportation, delivery, and related costs in accordance with the current version of GDOT Specifications.
The Pricing Proposal must be signed by an authorized individual/officer of the firm along with company name and address and printed name of authorized individual/officer.
4.0 QUALIFICATIONS INFORMATION
All Bidders must be prequalified and in good Standing with GDOT to perform the services as listed in this Request for Bids.
5.0 SUBMISSION OF BIDS
5.1 Submission of Bids
Bids will be received by the Heard County Purchasing Agent until 11:00 AM on November 4, 2026. The original and three (3) copies must be mailed, hand-delivered, or express mailed to:
Felicia Adams, Finance Director Heard County Board of Commissioners Heard County Administration Building 201 Park Avenue, Room #200 Franklin, GA 30217 feliciaadams@heardcountyga.com
Any submission received after the due date and time will not be considered.
NOTE: Many express mail services do not guarantee overnight delivery times to Heard County. Any proposal received after 11:00 AM on November 4, 2026 will not be opened.
5.2 Rejection of Bids/Cancellation of RFB
Heard County reserves the right to reject any or all submissions, to waive any irregularity or informality in a submission, and to accept or reject any item or combination of items, when to do so would be to the advantage of the County. It is also within the right of the County to reject submissions that do not contain all elements and information requested in this document. The County reserves the right to cancel this RFB at any time. The County will not be liable for any cost/losses incurred by the Contractors throughout this process.
6.0 TERMS AND CONDITIONS
6.1 RFB Amendments
The County reserves the right to amend this RFB prior to the proposal due date. All addenda and additional information will be posted to the County website at: www.heardcountyga.com, prior to 5:00 PM on October 28, 2026. It is the Bidder’s responsibility to check the website for addenda before submitting a Bid. All signed addenda shall be included in the Qualifications Proposal.
6.2 Agreement and Project Forms
The Agreement form shall be the Owner’s agreement form. The Owner’s payment, waiver of lien and change order form(s) shall be used.
6.3 Bid Withdrawal
A submitted bid may be withdrawn prior to the due date by a signed written request to the Purchasing Director.
6.4 Cost for Preparing Bids
The cost for developing the bid is the sole responsibility of the bidder. The County will not provide reimbursement for such costs.
6.5 Conflict of Interest
If a Bidder has any existing client relationship that involves Heard County, the bidder must disclose each relationship.
6.6 Contractor Selection
Heard County reserves the exclusive right to determine which Bidder should be awarded the Contract. The County also reserves the right to reject any or all bids at its discretion with or without cause.
6.7 Negotiations with Apparent Winner
Prior to award, the apparent winning bidder will be required to enter into discussions with the County to resolve any contractual differences. These discussions are to be finalized within one (1) week of notification unless extending the time period is advantageous to the County. Failure to resolve differences will lead to rejection of the Contractor's bid.
The County reserves the right to negotiate modifications and costs with the successful bidder provided that no such modifications affect the evaluation criteria set forth herein.
The Contractor shall commence work only after the transmittal of a fully executed contract and Notice to Proceed from the County.
6.8 Taxes
Heard County is exempt from taxes; however the Contractor shall pay all taxes required of him by law. Heard County cannot exempt others from tax.
6.9 Compliance with Laws
The Contractor will comply with all State and Federal laws, rules, and regulations.
6.10 Cancellation for Cause
If either party shall refuse, fail, or be unable to perform or observe any of the terms or conditions of the contract for any reason, then the party claiming such failure shall give the other party a written notice of such breach. If, within thirty (30) days from such notice, the failure has not been corrected, the injured party may cancel the contract effective thirty (30) days after notice of cancellation.
Heard County reserves the right to terminate the contract immediately in the event that the Contractor discontinues or abandons operations; is adjudged bankrupt, or is reorganized under any bankruptcy law; or fails to keep in force any required insurance policies or bonds.
Failure of the successful contractor to comply with any section or part of the contract will be considered grounds for immediate termination of the contract by the County without penalty to Heard County. Heard County shall pay for services rendered up to the point of termination.
Notwithstanding anything to the contrary contained in the contract between the County and the successful contractor, the County may, without prejudice to any other rights it may have, terminate the contract for convenience and without cause, by giving thirty (30) days written notice to the successful contractor.
If the termination clause is used by the County, the successful contractor will be paid by the County for all scheduled work completed satisfactorily by the successful contractor up to the termination date set forth in the written termination notice.
6.11 Condition of Materials
It is understood and agreed that materials delivered shall be new, of latest design, and in first quality condition.
6.12 Rejection of Submissions/Cancellation of Request for Bids
Heard County reserves the right to reject any or all bids, to waive any irregularity or informality in a bid, and to accept or reject any item or combination of items, when to do so would be to the advantage of Heard County. It is also within the rights of Heard County to reject bids that do not contain all elements and information requested in this document. Heard County reserves the right to cancel this Request for Bid at any time. Heard County will not be liable for any cost/losses incurred by the Contractors throughout this process.
6.13 Non-discrimination
Heard County does not discriminate on the basis of race, religion, color, sex, national origin, age, or disability.
6.14 Payment
Payment terms and invoicing requirements shall be as defined by the Agreement form. See Section 6.2 of this RFB for more information on the Agreement form.
6.15 Insurance
The Contractor shall be responsible for his work and every part thereof, and for all materials, tools, equipment, appliances, and properties of any and all description used in connection with this project.
The Contractor assumes all risks of direct and indirect damage or injury to the property of persons used or employed on or in connection with the work contracted for, and of all damage or injury to any person or property wherever located, resulting from any action, omission, commission or operation under the Contract, or in connection in any way whatsoever with the contracted work.
The Contractor shall, during the continuance of all work under the Contract, provide the coverage as listed in Appendix E – Heard County’s Contract
6.16 Project Coordination
The Contractor shall employ and assign only qualified and competent personnel to perform any service or task involved in this project. The Contractor shall designate one such person as a Project Manager, and the Project manager shall be deemed to be the Contractor’s authorized representative, who shall be authorized to receive and accept any and all communications from the County. The County shall name a Project Manager who shall be authorized to generate, receive and accept communication as an authorized representative of the County.
The Contractor hereby agrees to replace any personnel or sub-contractor, at no cost or penalty to the County, if the County reasonably determines that the performance of any sub-contractor or personnel is unsatisfactory.
6.17 Accuracy of Work
| The Contractor shall be responsible for the accuracy of the work performed and shall promptly correct its errors and omissions without additional compensation. Acceptance of the work by the County will not relieve the Contractor of the responsibility for subsequent correction of errors, the clarification of any ambiguities, or the costs associated with any additional work caused by negligent acts, errors, or omissions by the Contractor or latent defects in the products sold by the Contractor. | |
| At any time during the execution of this project or during any phase of work performed by others based on data secured by the Contractor under this Agreement, the Contractor shall confer with the County for the purpose of interpreting the information supplied by the Contractor and to correct any errors or omissions. The above consultations, clarifications, and/or corrections shall be made without added compensation to the Contractor. The Contractor shall give immediate attention to these changes so there will be minimum delay to others. The Contractor shall be responsible for errors and omissions and save harmless the County and its agents as provided in this Agreement. | |
| 6.18 | Ownership |
| Reports, plans, data, statistics, specifications, and other supporting records compiled or prepared in the performance of the Services required by this Contract, shall be the absolute property of the County and shall not be used by the Contractor for purposes unrelated to this Contract without the prior written approval of the County. Such original documents shall be turned over to the County upon completion of the contract except that Contractor shall have the right to retain copies of the same. | |
| 6.19 | News Releases by Contractor |
| As a matter of policy, the County does not endorse the products or services of a Contractor. News releases concerning any resultant contract from this solicitation shall not be made by a Contractor without the prior written approval of the County. All proposed news releases shall be routed to the Heard County Purchasing Director for review and approval. | |
| 6.20 | Severability/Cancellation |
| It is understood and agreed by the parties hereto that if any part, term, or provision of this Contract is held illegal or in conflict with any law of the State where made or having jurisdiction over any of the parties hereto, the validity of the remaining portions or provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the Contract did not contain the particular part, term, or provisions held to be invalid. | |
| The County and the Contractor agree to resolve through negotiation or mediation prior to filing any cause of action. The venue for any litigation arising from this contract shall be Heard County, Georgia. | |
| The County reserves the right to cancel the contract and discontinue the services with a thirty (30) day written notice as a result of the failure of the Contractor to provide acceptable work and services as delineated in the response to this document or if determined that services can be better provided by in-house or other sources. | |
| 6.21 | Drug Free Workplace |
By submission of a Proposal, the Contractor certifies that the provisions of Code Sections 5024-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the "Drug-free Workplace Act", have been complied with in full. The Contractor further certifies that:
· A drug-free workplace will be provided for the Contractor's employees during performance of the contract; and
· Each Contractor who hires a sub Contractor to work in a drug-free work place shall secure from that sub Contractor the following written certification:
· As part of the subcontracting agreement with (Contractor's name), (Sub Contractor's name) certifies to the Contractor that a drug-free workplace will be provided for the sub Contractor's employees during the performance of this Contract pursuant to Paragraph (7) of Sub-section (b) of Code Section 50-24-3".
· The Contractor further certifies that he will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.
6.22 Assignment of Contractual Rights
It is agreed that the Contractor will not assign, transfer, convey, or otherwise dispose of a contract that may result from this bid or his right, title, or interest in or to the same, or any part thereof, without written consent of the County.
6.23 Indemnity
To the fullest extent permitted by law, the Contractor will indemnify, defend, and hold Heard County harmless from and against any and all claims, damages, losses, and expenses, including, but not limited to, fees and charges of attorneys and court and arbitration costs, arising out of or resulting from the negligent acts, negligent omissions, willful misconduct, or reckless misconduct of the Contractor or anyone for whom the Contractor is responsible.
6.24 Appropriation of Funds
The initial contract and any continuation contract(s) shall terminate immediately and absolutely at any such time as there are no appropriated and otherwise unencumbered funds available to satisfy the County’s obligations under said contract(s).
6.25 Documents Deemed Part of Contract
All Contract Documents issued by the Owner and executed by both parties through the completion of the project shall be deemed part of the contract. No documentation or information provided by the bidder or contractor, as part of this proposal or otherwise, shall be deemed part of the contract unless and until incorporated into the contract documents issued by the Owner.
6.26 Bid Bonds, Performance Bonds & Payment Bonds
A five percent (5%) Bid Bond, a one hundred percent (100%) Performance Bond, and/or a one hundred percent (100%) Payment Bond shall be furnished to Heard County if stated as required in Paragraph 1.9 in the “Introduction” section of this document. Failure to submit appropriate bonding will result in automatic rejection of bid. Bonding company must be authorized to do business in Georgia by the Georgia Insurance Commission, listed in the Department of Treasury’s publication of companies holding certificates of authority as acceptable surety on Federal bonds and as acceptable reinsuring companies, and have an A.M. Best rating.
Appendix A
BIDDER’S CERTIFICATION
Date of Bid___________________
I certify that this Bid is submitted without prior understanding, agreement or connection with any corporation, firm or person submitting a Bid for the same goods/services and is in all respects fair and without collusion or fraud. I understand that collusive bidding is a violation of state and Federal law and can result in fines, prison sentences and civil damages awards. I agree to abide by all conditions of this bid and certify that I am authorized to sign this bid for the bidder.
| Bidder Information | Name and Mailing Address | |
| (Type or Print) | (Where to Send Payment) |
| ___________________________________ | _________________________________ | |
| Name of Company | Name of Company |
| ___________________________________ | _________________________________ | |
| Address | Address |
| ___________________________________ | _________________________________ | |
| City, State, & Zip Code | City, State, & Zip Code |
| ___________________________________ | _________________________________ | |
| Phone Number | Phone Number |
| ___________________________________ | _________________________________ | |
| Fax # | Email Address |
| __________________________ OR __________________________ | ||
| Tax ID Number | Social Security Number |
Name & Title of Person Authorized to Sign
| ____________________________________ | ___________________________________ | |
| Name | SIGNATURE |
Title
Proposals or Bids not signed shall be declared as “Non-Responsive” and may not be considered for award.
Appendix B & C SAVE Affidavit and E-Verify Affidavit
HEARD COUNTY COMMISSIONER
(Systematic Alien Verification for Entitlements) Affidavit for a Public Benefit as required by the Georgia Security and Immigration Compliance Act
By executing this affidavit under oath, as an applicant for a public benefit as referenced in the Georgia Security and Immigration Compliance Act (O.C.G.A. § 50-36-1), I am stating the following:
_____ I am a United States citizen; or
_____ I am a legal permanent resident of the United States*; or
| _____ | I am an otherwise qualified alien or non-immigrant under the Federal Immigration and |
| Nationality Act, 18 years of age or older and lawfully present in the United States.* |
*Alien registration number for non-citizens issued by the Department of Homeland Security or other federal immigration agency is:______________________________________
Document for identification purposes must be provided. See list on page 2 of this document.
In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation in an affidavit shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia.
Applying on behalf/Name of associated business
| _________________________________________ | _______________________ | |
| Signature of Applicant | Date |
Printed Name
SUBSCRIBED AND SWORN BEFORE ME ON THIS _____ DAY OF _______________, 20_____.
Notary Public My Commission Expires:___________________
NOTE: O.C.G.A. § 50-36-1(e)(2) requires that aliens under the Federal Immigration and Nationality Act, Title 8 U.S.C., as amended, provide their alien registration number. Because legal permanent residents are included in the federal definition of “alien”, legal permanent residents must also provide their alien registration number.
[Page 1 of 2]
SECURE AND VERIFIABLE DOCUMENTS UNDER O.C.G.A. § 50-36-2
[Issued August 1, 2011 by the Office of the Attorney General, Georgia]
The following list of secure and verifiable documents, published under the authority of O.C.G.A. § 50-36-2, contains documents that are verifiable for identification purposes, and documents on this list may not necessarily be indicative of residency or immigration status.
INDICATE AND ATTACH A COPY OF THE DOCUMENT (front and back).
· United States passport or passport card
· United States military identification card
· Merchant Mariner Document or Merchant Mariner Credential issued by the United States Coast Guard
· Secure Electronic Network for Travelers Rapid Inspection (SENTRI) card
· Driver’s license issued by one of the United States, the District of Columbia, the Commonwealth of the Northern Marianas Islands, the United States Virgin Island, American Samoa, or the Swain Islands, provided that it contains a photograph of the bearer or lists sufficient identifying information regarding the bearer, such as name, date of birth, gender, height, eye color, and address to enable the identification of the bearer.
· Identification card issued by one of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Commonwealth of the Northern Marianas Islands, the United States Virgin Island, American Samoa, or the Swain Islands, provided that it contains a photograph of the bearer or lists sufficient identifying information regarding the bearer, such as name, date of birth, gender, height, eye color, and address to enable the identification of the bearer.
· Tribal identification card issued by one of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Commonwealth of the Northern Marianas Islands, the United States Virgin Island, American Samoa, or the Swain Islands, provided that it contains a photograph of the bearer or lists sufficient identifying information regarding the bearer, such as name, date of birth, gender, height, eye color, and address to enable the identification of the bearer.
· Passport issued by a foreign government
· Free and Secure Trade (FAST) card
· NEXUS card
· United States Permanent Resident Card or Alien Registration Receipt Card
· Employment Authorization Document that contains a photograph of the bearer.
· Certificate of Citizenship issued by the United States Department of Citizenship and Immigration Services (USCIS) [Form N-560 or Form N-561]
· Certificate of Naturalization issued by the United States Department of Citizenship and Immigration Services (USCIS) [Form N-550 or Form N-570] [Page 2 of 2] E-Verify Affidavit
Georgia Security & Immigration Compliance (GSIC) Act
(CONTRACTOR) E-VERIFY AFFIDAVIT AND AGREEMENT
Heard County BOC and Contractor agree that compliance with the requirements of O.C.G.A. § 13-10-91 and Rule 300-10-1-.02 of the Rules of the Georgia Department of Labor are conditions of this Agreement for the physical performance of services.
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the Heard Count y BOC has registered with and is participating in the federal work authorization program known as “E-Verify”, web address https://e-verify.uscis.gov/enroll/ operated by the United States Citizenship and Immigration Services Bureau of the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 [(IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A. § 13-10-91. The undersigned Contractor also verifies that he/she/it is using and will continue to use the federal work authorization program throughout the contract period.
The undersigned Contractor agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to the contract with the Heard County BOC, Contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A. § 13-10-91 on the Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form. Contractor further agrees the Contractor will advise the Heard County BOC of the hiring of a new subcontractor and will provide Heard County BOC with a Subcontractor Affidavit attesting to the Subcontractor’s name, address, user identification number, and date of authorization to use the Federal Work Authorization Program within five (5) days of the hiring before the Subcontractor begins working on the Project. Contractor also agrees to maintain all records of such compliance for inspection by Heard County BOC at any time and to provide a copy of each such verification to the Heard County BOC at the time the subcontractor(s) is retained to perform such services.
| _____________________________________________________________________________ |
| E-Verify Employment Eligibility Verification User identification Number |
| _____________________________________________________________________________ |
| Date of Authorization to Use Federal Work Authorization Program |
| _____________________________________________________________________________ |
| NAME OF CONTRACTOR |
| _____________________________________________________________________________ |
| Title of Authorized Officer or Agent of Contractor |
| _____________________________________________________________________________ |
| Signature and Printed Name of Authorized Officer or Agent |
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE ______ DAY OF __________________, 20______.
| ______________________________________________________ |
| Notary Public |
My Commission Expires:__________________________________
* As of the effective date of O.C.G.A. § 13-10-91, the applicable federal work authorization program is the “EEV / Basic Pilot Program” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S. Department of Homeland Security, in conjunction with the Social Security Administration (SSA). Authority O.C.G.A. § 13-10-91. History: Original Rule entitled “Contractor Affidavit and Agreement” adopted F. May 25, 2007; eff. June 18, 2007, as specified by the Agency.
Appendix D
BIDDER’S PRICING PROPOSAL
| Proposal Line Number |
| Pay – Item |
| Description |
| Estimated Units |
Bid Amount
| 0010 |
| 150-1000 |
| Traffic Control |
| Lump Sum |
| 0020* |
| 652-2502 |
| Solid Traffic Stripe, 5 in, Yellow |
| 224.46 LM |
| Unit Price |
| 0030 |
| 652-5701 |
| Solid Traffic Stripe, 24 in, White |
| 360 LF |
Bid Amount
*Utilize Appendix D.1 Road Striping Worksheet for Line 0020 Bid Amount and submit as a supporting document.
TOTAL BID FOR ALL ROADS: ___________________________________________________
Name & Title of Person Authorized to Sign
| ____________________________________ | ___________________________________ | |
| Name | SIGNATURE |
Title
Appendix E
HEARD COUNTY, GEORGIA
BOARD OF COMMISSIONERS
CONTRACT
DATE CONTRACT EXECUTED: _________ DAY OF __________________, 2026
CONTRACTOR
DESCRIPTION OF IMPROVEMENTS AND FACILITY
AMOUNT OF CONTRACT
PROJECT MANAGER
THIS AGREEMENT, made and entered into on the Date Contract Executed, specified above, by and between the Heard County Board of Commissioners, hereinafter referred to as the “Owner”, party of the first part; and the Contractor named above, hereinafter called the “Contractor”, party of the second part;
WITNESSETH THAT:
WHEREAS, the Owner desires to construct or improve the Facility described and identified above, and the Contractor desires to furnish and deliver material and to do and perform all the work and labor necessary to construct the Facility:
NOW, THEREFORE, THE PARTIES HERETO, in consideration of ONE DOLLAR ($1.00) in hand paid by the Owner to the Contractor, set forth in the Contract Documents and in consideration of the premises and of the covenants of the other as hereinafter expressed and contained, do hereby agree each with the other as follows:
The Contractor promises and agrees to furnish and deliver all the material and to do and perform all the work and labor required to be furnished and delivered, done and performed in and about the improvement or construction of the Facility described above in strict and entire conformity with the provisions of the Contract Documents as defined below.
The Contract Documents which comprise the entire agreement between the Owner and the Contractor concerning the Work consist of the following: The RFB document with associated Addenda, the Proposal, the Notice of Award, this Contract, the Letter of Credit or Performance and Payment Bonds, the Notice to Proceed, the General Conditions, the Supplemental General Conditions, the Special Conditions, the Specifications, the Plans, Addenda which may be issued. The terms and conditions of said Contract Documents are incorporated herein by reference and made a part hereof as though fully set forth herein. The Contract Documents are complementary, so that a recital in one is tantamount to a recital in all, and the Contractor specifically acknowledges that he has read and understands all of said Contract Documents. The Contract Documents may only be amended, modified or supplemented as provided in the General Conditions.
1. If, at any time after the execution of this Agreement, the Letter of Credit or the Performance Bond and Payment Bond, the Owner shall deem the Letter of Credit or the Performance Bond and Payment Bond to be unsatisfactory, or if for any such reason the Letter of Credit or the Performance Bond and Payment Bond shall become inadequate to cover the performance of the Work, as defined below, the Contractor shall at his own expense, within five (5) days after receipt of notice from the Owner to do so, furnish an additional bond or bonds in such form and amount and with such surety or sureties as shall be satisfactory to the Owner. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security shall have been furnished in a manner and form satisfactory to the Owner.
1. The Owner agrees and promises to pay to the Contractor for said work, when completed in accordance with the provisions of this contract, the prices set forth in the proposal, amounting approximately to the Amount of Contract stated above, subject to adjustments, if any, with payments to be made as provided in said specifications and Contract Documents.
1. The contractor shall begin work required by the Contract Documents on the start date specified by the Project Manager in the Notice to Proceed. The project shall be substantially complete within 120 days following the Notice to Proceed. Substantial Completion is achieved when construction is sufficiently completed, in accordance with the Contract Documents, so that the project can be safely, conveniently and beneficially utilized for the purposes for which it is intended. Final Completion shall be within 14 days following Substantial Completion.
1. This work shall be done in accordance with the laws of the State of Georgia under the direct supervision and to the entire satisfaction of the Owner. The decision of the Owner or their authorized representatives upon any questions connected with the execution and fulfillment of this agreement or any failure or delay in the prosecution of the work by the Contractor will be final and conclusive.
1. The Contractor agrees to warrant and correct any defective or faulty work or material that may appear within (1) one year after completion of the work and receipt of final payment.
1. The Contractor shall pay the Owner the sum of $500 per day for each and every calendar day of unexcused delay in achieving Substantial Completion of the Project beyond the date set forth in the Contract Documents for Substantial Completion. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the Owner, estimated at the time of executing this Contract. When the Owner reasonably believes that Substantial Completion will be inexcusably delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
1. If the Contractor fails to achieve Final Completion of the Project within thirty (30) days of the date of Substantial Completion, the Contractor shall pay the Owner the sum of $100.00 per day for each and every calendar day of unexcused delay in achieving Final Completion beyond the date set forth herein for Final Completion of the Work. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing the estimate of delay damages likely to be sustained by the Owner, estimated at or before the time of executing this Contract. When the Owner reasonably believes that Final Completion will be inexcusably delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Final Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
1. The Contractor shall furnish separate performance and payment bonds to the Owner. Each bond shall set forth a penal sum in an amount not less than the Contract Price. Each bond furnished by the Contractor shall incorporate by reference the terms of this Contract as fully as though they were set forth verbatim in such bonds. In the event the Contract Price is adjusted by Change Order executed by the Contractor, the penal sum of both the performance bond and the payment bond shall be deemed increased by like amount. The performance and payment bonds furnished by the Contractor shall be in form suitable to the Owner and shall be executed by a surety, or sureties, reasonably suitable to the Owner. In the discretion of Owner, Owner may accept a letter of credit under terms acceptable to Owner, instead of a performance and/or payment bond.
1. Contractor shall comply with the Equal Employment Opportunity federal and state laws, and shall not discriminate in the employment of any person based upon race, gender, color, creed or other protected classifications under federal and state law.
1. Contractor shall furnish performance and payment bonds, each in an amount equal to the contract price as security for the faithful performance and payment of all of Contractor’s obligations under the contract documents. These bonds shall remain in effect until the last day of the warranty period of one (1) year. All bonds shall be in a form approved by the County Attorney, and shall be executed by such sureties as are licensed and registered with the Georgia Secretary of State and the Georgia Insurance Commissioner. All bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. Contractor shall provide the payment and performance bonds to Owner prior to beginning any part of the scope of the work required of Contractor under the contract. In the discretion of Owner, Owner may accept a letter of credit under terms acceptable to Owner, instead of a performance and/or payment bond.
1. Contractor shall verify its compliance with O. C. G. A. § 13-10-91, by providing an affidavit by an agent authorized to bind Contractor and which affirmatively states that the individual, firm or corporation which is contracting with Owner has registered with and is participating in the federal work authorization program [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program to verify information of newly hired employees]. Contractor will secure from each subcontractor that participates in the project, a similar verification of compliance and provide a copy of each such verification to Owner
IN WITNESS WHEREOF, the parties hereto have executed this Agreement in three counterparts, each of which shall be deemed an original contract.*
PARTY OF THE FIRST PART
OWNER: The Heard County Board of Commissioners
By:
Commission Chairman
Attest:
Clerk of Commission
SEAL
PARTY OF THE SECOND PART
CONTRACTOR:
By:
(Signature)*
(Printed name and title)
By:________________________________________ (Signature)
(Printer name and title)
Attest:
SEAL
*In the event that the contractor is a corporation, there shall be attached to each counterpart a Corporate Certificate. Provide signature identical to that shown on the Corporate Certificate.
GENERAL CONDITIONS
ARTICLE 1
GENERAL PROVISIONS
1.1 The Contract Documents
The RFB, the Bid, the Notice of Award, the Contract, the Letter of Credit or Performance and Payment Bonds, the Notice to Proceed, the General Conditions, the Special Conditions, the Plans, and any Addenda which may be issued, constitute the Contract Documents. The Contract Documents represent the entire and integrated agreement between the parties and supersede prior negotiations, representations or agreements, either written or oral. The Contract Documents may be amended or modified only by a written modification.
1.2 The Plans and Specifications
1.2.1 In case of conflict between requirements shown on the Plans and provisions of the Specifications, the Specifications shall take precedence over the Plans. Dimensions, shown in figures on the Plans, shall govern in case of any discrepancy between them and scaled dimensions.
1.2.2 The Contractor shall not take advantage of any apparent error or omission which may be found in the Plans or the Specifications, and the Project Manager shall be entitled to make such corrections therein and such interpretations thereof as he may deem necessary for the fulfillment of their intent.
1.2.3 The right is reserved for the Project Manager to make, from time to time, such alterations in the Plans as he may consider necessary to complete the Project to his satisfaction and consistent with the general intention of the Contract Documents.
1.2.4 Drawings, Specifications, as builts, and any and all other Instruments of Service prepared by the Project Manager and Design Consultant or Contractor, or both, for the Project shall become and remain the property of the Owner and shall not be utilized by the Contractor on any other project without the written permission of Owner.
1.2.5 The Contractor shall have the continuing duty to read, carefully study and compare each of the Contract Documents, the Shop Drawings and the Product Data and shall give written notice to the Project Manager of any inconsistency, ambiguity, error or omission which the Contractor may discover with respect to these documents before proceeding with the affected Work. The issuance, or the express or implied approval by the Owner or the Project Manager and Design Consultant of the Contract Documents, Shop Drawings or Product Data shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor’s compliance with this Contract. The Owner has requested the Project Manager and Design Consultant to only prepare documents for the Project, including the Drawings and Specification for the Project, which are accurate, adequate, consistent, coordinated and sufficient for construction. HOWEVER, HEARD COUNTY MAKES NO REPRESENTATION OR WARRANTY OF ANY NATURE WHATSOEVER TO THE CONTRACTOR CONCERNING SUCH DOCUMENTS. By the execution hereof, the Contractor acknowledges and represents that it has received, reviewed and carefully examined such documents, has found them to be reasonably complete, accurate, adequate, consistent, coordinated and sufficient for construction.
1.3 The Work
The term "Work" means the construction and services required by the Contract Documents, and includes all other labor, materials, equipment and services provided by the Contractor to fulfill the Contractor's obligations.
1.4 Intent
The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all.
ARTICLE 2
OWNER
2.1 Right to Stop The Work
If the Contractor fails to correct Work, which is not in accordance with the Contract Documents, the Owner may direct the Contractor in writing to stop the Work until the correction is made.
2.2 Right to Carry Out The Work
If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven day period after receipt of written notice from the Owner to correct such default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies, correct such deficiencies. In such case, a Change Order shall be issued deducting the cost of correction from payments due the Contractor.
2.3 Right To Perform Construction And To Award Separate Contracts
2.3.1 The Owner reserves the right to perform construction or operations related to the project with the Owner's own forces, and to award separate contracts in connection with other portions of the project.
2.3.2 The Contractor shall coordinate and cooperate with separate contractors employed by the Owner.
2.3.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible therefor.
ARTICLE 3
CONTRACTOR
3.1 Execution Of The Contract
Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become familiar with local conditions under which the Work is to be performed, and correlated personal observations with requirements of the Contract Documents. The Contractor understands that no deviation will be allowed from the Project Manager's interpretation of the Contract Documents.
3.2 Review Of Contract Documents And Field Conditions
3.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner. Before commencing activities, the contractor shall: (1) take field measurements and verify field conditions; (2) carefully compare this and other information known to the Contractor with the Contract Documents; (3) promptly report errors, inconsistencies or omissions discovered to the Project Manager; (4) The Contractor shall provide written notice of concealed or unknown conditions to the owner and Project Manager before the conditions are disturbed and WITHIN FORTY-EIGHT HOURS AFTER FIRST OBSERVANCE OF THE CONDITIONS.
3.2.2 Contractor represents that it has physically inspected the site, is familiar with all site conditions and has had the opportunity to conduct all investigations it desires relating to site conditions. Accordingly, if Contractor encounters any differing site conditions, including but not limited to, subsurface rock, subsurface water, subsurface contamination, subsurface artifacts of historical significance or unsuitable soils, it shall bear the cost of removal, remediation, and/or added site preparation costs caused by such differing site conditions. Differing site conditions shall not entitle contractor to any increase in the contract price or time both of which are expressly waived by the Contractor.
3.2.3 It is understood and agreed that the Contractor has considered in his proposal all of the permanent and temporary utility appurtenances in their present location or relocated positions as shown on the Plans, and that no additional compensation will be allowed for any delays, inconvenience or damage sustained by him due to any interference from said utility appurtenances or the operation of moving them.
3.2.4 Contractor agrees to perform and construct all work depicted on or listed in the drawings and specifications including all work customarily associated therewith or which is necessary for the proper construction, installation and/or safe operation of the Work during and after construction. Contractor agrees that its price includes all work needed even where not specifically shown on the drawings or contained in the specifications but which is reasonably inferable there from or should be installed as part of good industry practice.
3.3 Interpretation of Unit…
This is the start of the file's text. The full file is on GovTribe.