RFB #30 2025-12.PDF
PDF 1 MB Posted
- Attached to
- Aluminum Box Culvert - CTH DE
- Solicitation number
- RFB-RFB #30 2025-12-0-2025/TS
- Issued by
- Eau Claire County, Wisconsin
About this file
This document is a Request for Bids (RFB) issued by the Dodge County Highway Department in Wisconsin for an aluminum box culvert replacement project on County Trunk Highway (CTH) DE. The RFB seeks a qualified contractor to supply and deliver a 20'-6" span x 7'-3" rise x 65'-3" long aluminum box culvert, along with a 24' wide, 2' high aluminum headwall and 18.25' and 22.75' long wingwalls. The bid is scheduled to be opened on September 25, 2025, at 9:00 am, with bid packets available starting September 11, 2025, on the Dodge County website and Demandstar. The Highway Department will handle the culvert installation, and the project is expected to be reviewed and potentially awarded in September/October 2025.
The RFB includes specific requirements for the culvert, such as a WisDOT load rating of HL-93 and a foundation bearing capacity of 3,000 psf. Bidders must submit a bid bond of 5% of the total bid amount, and projects over $50,000 will require a 100% Performance and Payment Bond. Insurance requirements are detailed, including professional liability, commercial general liability, automobile liability, and umbrella liability coverage. The county encourages participation from minority, women-owned, and disadvantaged business enterprises and reserves the right to reject any bids or award the contract to the most advantageous bidder. The bid pricing must remain firm for 90 days, and the county is tax-exempt.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DODGE COUNTY
REQUEST FOR BIDS
Aluminum Box Culvert – CTH DE Dodge County Highway Department, Dodge County WI
RFB NUMBER: #30 2025-12
Issued Date: September 11, 2025
RFB Opening Thursday, September 25, 2025 at 9:00 am
Dodge County Highway Department 211 E Center St.
Juneau, WI 53039-1309
Submit Sealed RFB’s To:
Dodge County Highway Department 211 E Center St.
Juneau, WI 53039-1309
(920) 386-3650
Office Hours: 6:30 am – 4:30 pm (Monday – Thursday) Closed (Friday)
DODGE COUNTY CORPORATION COUNSEL
Purchasing Division
127 East Oak Street, Juneau, WI 53039 (920)386-4224
Email: tsteinbach@co.dodge.wi.us
ADVERTISEMENT FOR BIDS
DODGE COUNTY, WISCONSIN
The Dodge County Highway Department is requesting sealed bids from qualified contractors to provide an Aluminum Box Culvert as specified in the Specifications and the Plans for a box culvert replacement on CTH DE in Dodge County. Dodge County Highway Department will install the box culvert. The selected contractor shall supply and deliver the box culvert to the work site (see attached plans).
Request for bid packets will be available starting September 11, 2025, on the Dodge County website at https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids and may also be obtained on Demandstar at: www.demandstar.com .
Bids must be submitted to the Dodge County Highway Department located at 211 E. Center St., Juneau, WI 53039 no later than 9:00 am on Thursday, September 25, 2025. After the official bid closing time, the bids will be publicly opened and read aloud.
Bids must be submitted in a sealed envelope marked “ALUMINUM BOX CULVERT – CTH DE”. No faxed or emailed bids will be accepted and there is not an option to submit bids online.
Dodge County encourages the participation of minority, women-owned and disadvantaged business enterprises.
Dodge County reserves the right to waive any informalities or technicalities and to reject any and all bids or parts thereof deemed to be unsatisfactory or not in the County’s best interest. Furthermore, Dodge County reserves the right to cancel any order or contract for failure of the successful contractor to comply with the terms, conditions and specifications of the request and/or contract. Dodge County reserves the right to award this request to the contractor whose bid is overall the most advantageous to the County in the County’s sole determination.
By order of the Dodge County Highway Department.
Publish: September 11, 2025 mailto:tsteinbach@co.dodge.wi.us https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids http://www.demandstar.com/
RFB #30 2025-12 3
RFB PROJECT DETAILS
1. Intent
It is the intent of Dodge County to contract with a contractor/vendor, hereafter referred to as the “Contractor” to supply an aluminum box culvert on CTH DE. The contractor shall deliver the culvert to the work site (see attached plans). The Highway Department will install the culvert. All contractors are responsible for any addendums issued for this project.
2. Packets and Addendums
RFB packet, updates and addenda are available on the Dodge County Request for Proposals/Bids website, https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids. and may also be obtained on DemandStar at: www.demandstar.com
It is the contractor’s responsibility to view the RFB document and check the website for any updates and addenda prior to submitting a bid for this request. Failure to do so in no way obligates the County to issue addendum or other information concerning this request to the contractor.
3. Tentative Project Timeline
Date Time
(CT)
RFB Issued September 11, 2025
Deadline for questions: Questions bust be emailed to:
tsteinbach@co.dodge.wi.us
September 18, 2025 11:00 am
RFB Questions & Answers Published September 19, 2025 11:00 am
Bid Submission Deadline & Public Opening September 25, 2025 9:00 am
Review and Recommendation September/October 2025
Contract Negotiation / Awarding of Contract September/October 2025
4. Questions Due: September 18, 2025, by 11:00 am
Questions- All questions related to this RFB must be in writing and received by the Dodge County Purchasing Department at least five (5) business days prior to the bid due date.
• Questions shall be directed to the Purchasing Agent via email to: tsteinbach@co.dodge.wi.us
• Questions MUST be clearly marked in the subject line: “Questions for RFB # 30 2025-12
MAILED, PHONE CALL AND FAXED QUESTIONS WILL NOT BE ACCEPTED. QUESTIONS RECEIVED AFTER THIS
TIME WILL NOT BE ANSWERED.
5. Questions & Answers Published Date: September 19, 2025, by 11:00 am
Answers: If any questions are received, answers to all written questions will be issued in the form of an addendum.
• Answers will be published on the Dodge County website at: www.co.dodge.wi.us https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids http://www.demandstar.com/ mailto:tsteinbach@co.dodge.wi.us http://www.co.dodge.wi.us/
RFB #30 2025-12 4
• AND on the DemandStar website at www.demandstar.com
It is the responsibility of all interested contractors to access the website(s) for addenda prior to submitting your bid. Oral or other interpretations or clarifications will be without legal effect. Calls for assistance with the website can be made to (920) 386-4224.
6. Due Date & Delivery Address Details: September 25, 2025 by 9:00 am
Bids must be received in a sealed envelope or container no later than the time set above. Bids are due to the Dodge County Highway Department, 211 E. Center St., Juneau, WI 53039. Bids can be submitted by: Hand Delivery, DHL, FedEX, Mail, UPS, USPS, etc. Late bids will not be accepted.
The following information must be clearly marked on the front of the envelope/shipping package:
Name & Address of Bidder Due Date of Bid Bid Number & Title
The following sample mailing label is provided here for your convenience:
• No faxed or email bids are accepted.
• No bid may be withdrawn for ninety (90) days.
• Pricing is to remain firm for a minimum of ninety (90) calendar days following the bid opening date unless the Contractor, upon the request of the County, agrees to an extension.
• A public Bid Opening will be held immediately following the due date and time
7. Selection Criteria
Selection will be based on qualified, responsible, and responsive bidder with lowest price. Dodge County requires a high level of service from any contractor who is looking to do business with the County. Quality, service and price are all critical factors that Dodge County considers when doing business and in continuing business with contractors. This is especially important when it comes to the requirements of this request.
Dissatisfaction due to product or performance may result in Dodge County discontinuing service with a contractor.
From:
To: Dodge County Highway Department 211 E Center St Juneau, WI 53939
SEALED BID
RFB # {RFB # 30-2025-12 & Aluminum Box Culvert – CTH DE} Due Date: September 25, 2025 at 9:00 am
Sample Mailing Label
RFB #30 2025-12 5
8. Award Notification
Intent to Award or Thank you letters will be sent via email to all contractors submitting responses.
9. Format & Submission Requirement
Any deviation from these requirements may result in the bid being considered non-responsive, thus eliminating the contractor from consideration. Return the bid package in its entirety to include the following completed attachments (failure to provide the required documents will result in the automatic rejection of the bid):
• Attachment A – Specifications / Drawings
• Attachment B – RFB Cost Sheet
Cost sheet must be included in the bid package
• Attachment C – Statement of Acknowledgement
Include Bidder’s Certificate with your bid. Even if you have recently submitted this form on a previous project, submittal is required for every project requesting this form.
• Attachment D - Addendum Acknowledgement Complete form and return with the bid package. If no addenda were issued, the contractor shall so indicate and sign this document.
• Bid Bond. If required in Section 10 below, include the Bid Bond (in the form of a Cashier’s Check or Certified Check) with your bid submittal.
• Submit a list of any consultants or subcontractors that may be used to complete this project.
10. Bond Requirements for this Project
Failure to submit a required Bid Bond concurrent with your bid will result in the automatic rejection of your bid. Performance and Payment Bonds may be submitted after the Contract is awarded and signed.
• Bid Bond
A bid bond must be submitted with your bid. The bid bond must be in the form of a Cashier’s Check or Certified Check in the amount of five percent (5%) of the total bid amount. Cashier’s Check or Certified Check will be returned after the project is awarded.
• Performance Bond All projects estimated to cost over $50,000 will require a 100% Performance and Payment Bond to be obtained by the selected contractor and provided to Dodge County prior to commencement of work.
11. Insurance Requirements
Minimum Scope and Limits A. Architects, Engineers, Other professionals – Errors & Omissions (Professional Liability) coverage, with a minimum limit of $1,000,000 per claim, $2,000,000 annual aggregate. This insurance is to be maintained for at least two years after completion of the project. If the contractor changes insurance carriers and this policy is provided on a “claims made” basis, the contractor will secure the appropriate coverage extension to provide coverage to the project for a period of at least two years following the completion of the project.
B. Commercial General Liability coverage with limits of no less than the following:
1. General aggregate limit per project $2,000,000
(Other than Products-Completed Operations)
2. Products-Completed Operations Aggregate per project $1,000,000
3. Personal and Advertising Injury Limit $1,000,000
4. Each Occurrence Limit $1,000,000
5. Fire Damage Limit-any one Fire $ 50,000
RFB #30 2025-12 6
6. Medical Expense Limit-any one Person $ 10,000.
C. Automobile Liability coverage with minimum limits of $1,000,000 combined single limit per accident for bodily injury and property damage, provided on a Symbol 1- Any Auto basis.
D. Worker’s Compensation and Employers Liability Insurance with sufficient limits to meet underlying Umbrella Liability Insurance requirements.
E. Umbrella Liability providing coverage at least as broad as the underlying General Liability, Automobile
Liability and Employers Liability coverages, with a minimum limit of $2,000,000 each occurrence and $2,000,000 annual aggregate, and a maximum self-retention of $10,000.
Other Requirements A. Acceptability of Insurers. Insurance is to be placed with insurers who have a Best’s Insurance Reports rating of no less than A and a Financial Size Category of no less than a Class VI, authorized as an admitted insurance company in the State of Wisconsin.
B. Certificates of Insurance acceptable to Dodge County shall be submitted prior to commencement of the work. Certificates shall contain a provision that coverage afforded under the policies will not be cancelled until at least 30 days’ prior written notice has been given to Dodge County.
C. Dodge County, Dodge County’s elected and appointed officials, and Dodge County employees shall be named as additional insureds on all liability policies for liability arising out of project work. Please provide a copy of this endorsement with your certificate of insurance.
12. General RFB Information
A. Dodge County requires a high level of service from any contractor who is looking to do business with the County. Quality, service and price are all critical factors that Dodge County considers when doing business and in continuing business with contractors. This is especially important when it comes to the requirements of this request. Dissatisfaction due to product or performance may result in Dodge County discontinuing service with a contractor.
B. Dodge County is a tax-exempt municipality under Section 77.54(9a) (b), Wis. Stats.
C. Successful Contractor(s) shall provide a certificate of insurance, including naming Dodge County, its officers, elected officials and employees as Additional Insureds, upon bid award.
D. All bids shall be binding for ninety (90) calendar days following the bid opening date unless the contractor(s), upon the request of the County, agrees to an extension.
E. Payment for services will be made to successful contractor(s) contingent upon County’s acceptance and approval of all work done and/or products provided, or services rendered. Acceptance as herein means acceptance by the County of all work performed or products provided and services rendered, after the department’s authorized agent has found it to be in compliance with the specification requirement. Fuel surcharges or surcharges of any kind will not be allowed.
F. Contractors may withdraw their bid at any time before the bid due date and time by written request for withdrawal to the Purchasing Agent and by presenting proper identification upon request. Faxed and emailed bids will be rejected. Late bids will not be accepted.
RFB #30 2025-12 7
G. Dodge County’s Standard Terms and Conditions available at:
https://www.co.dodge.wi.gov/departments/departments-e-m/finance/purchasing- division are applicable to this request and are hereby made a part of it.
H. RFB packet, updates and addenda are available on the Dodge County Request for Proposals/Bids website, https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids. and may also be obtained on DemandStar at: www.demandstar.com It is the contractor’s responsibility to view the RFB document, and check the website for any updates and addenda prior to submitting a bid for this request. Failure to do so in no way obligates the County to issue addendum or other information concerning this request to the contractor.
I. No reimbursement will be made by the County for any cost incurred in preparing responses to this solicitation, or for cost incurred before a formal notice to proceed is issued if a contract is awarded.
J. Dodge County shall be the owners of any, and all of the reports, plans, specifications and documents resulting from this RFB, and contractor shall provide both digital and hard copies of all reports, plans and documents as indicated in this RFB to Owner in a format usable to the County. Awarded contractor(s) shall also waive any rights to copyright protection so Owner may reproduce, distribute and use all reports, plans, specifications and documents as it so chooses.
K. Any bid/response and any, and all supporting materials submitted in conjunction with this request may become a public record, subject to public inspection.
L. Contractors responding to this request shall include with the bid a proposed contract covering all the terms, conditions and specifications for the performance of all work for this request. Proposed contract shall incorporate at a minimum the County’s terms and conditions and the contract requirements contained herein.
M. Bidders shall list any consultants or subcontractors that may be used to complete this project.
N. All questions resulting in further clarification or modification to this (RFB) document will be handled by written addenda. Questions shall be directed to the Purchasing Agent via email to tsteinbach@co.dodge.wi.us. Questions must be asked at least five (5) business days prior to the bid due date. Questions received after this time may not be answered. Any changes as a result of issues raised will be made by written addenda and posted on the Dodge County website at https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids. and may also be obtained on DemandStar at: www.demandstar.com. It is the contractor’s responsibility to check the website for addenda prior to submitting your bid. Oral and other interpretations or clarifications will be without legal effect.
O. Dodge County assumes no responsibility or liability for any error or omission in any part of this RFB or resulting design. Prior to the deadline for questions, a contractor shall notify Dodge County of any error for any error or omission in any part of this RFB or resulting design. Prior to the deadline for questions, a contractor shall notify Dodge County of any error, omission, inconsistency or other factor which requires clarification that is discovered while reviewing the documents or preparing a bid. Such notification shall be made in writing to Dodge County Purchasing Agent.
P. Confidentiality and Security – This document or any portion thereof may not be used for any purpose other than the submission of bids. The successful contractor must agree to maintain security standards consistent with the confidentiality and security policies of Dodge County and any applicable state or federal laws or regulations. These include strict control of access to secure areas, sensitive data and maintaining confidentiality of information gained while carrying out their contractual obligations. The https://www.co.dodge.wi.gov/departments/departments-e-m/finance/purchasing-division https://www.co.dodge.wi.gov/departments/departments-e-m/finance/purchasing-division https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids https://www.co.dodge.wi.gov/departments/departments-e-m/finance/request-for-proposals-bids
RFB #30 2025-12 8
successful contractor will be required to ensure that all contractor’s personnel providing services to the County which require access to secure and confidential Dodge County information or facilities, meet the criteria for personal security clearance prescribed by Dodge County. Dodge County reserves the right to deny access to any individual that is not fully compliant with security criteria without disruption to timeline or adjustment to project cost.
Q. Dodge County reserves the right to require background checks for any employee or subcontractor employee involved in this project from the awarded contractor(s).
R. Unpublished information pertaining to Dodge County, or its employees obtained by the contractor as a result of participation in this RFB or resulting contract is confidential and must not be disclosed without written authorization from Dodge County Corporation Counsel or pursuant to a court order.
S. INDEMNIFICATION Dodge County requires any contract or agreement to contain an indemnification clause in which contractor holds harmless Dodge County, its officers, elected officials and employees harmless from and against any and all claims arising from contracts between the contractor and third parties made to effectuate the purposes of this RFB. Dodge County will not agree to mutual indemnification or to indemnify vendor.
T. NON-COLLUSIVE STATEMENT Each contractor, by submitting a response, certifies that it is not a party to any collusive action with Dodge County personnel and/or Contractors. Each contractor also certifies that it is not a party to any collusive action with any other party submitting a bid in response to this solicitation.
U. Dodge County reserves the right to reject any or all bids or parts thereof, to waive any technicality in any bid and accept any bid deemed to be the most advantageous to the County. It is possible that multiple awards may be made through this RFB process.
V. This request and possible resulting contract shall be interpreted under the laws of the State of Wisconsin.
Any disputes or claims that arise under this contract shall be litigated in the Circuit Court of Dodge County, WI.
13. RFB Attachments
A. Specifications / Drawings
1) Contractors must adhere to specifications/drawings for this project.
B. RFB Cost Sheet C. Statement of Acknowledgement D. Addendum Acknowledgement
1) Dodge County reserves the right to make changes to this project. Any changes in the scope of work shall be mutually agreed upon by the Contractor and the County.
RFB #30 2025-12 9
ATTACHHMENT A
Specifications / Drawings
SECTION 33 42 26
ALUMINUM BOX CULVERTS
PART 1 GENERAL
1.01 SUMMARY
A. Provide aluminum box culverts as shown and as specified. Comply with applicable provisions of Divisions 00 and 01.
1.02 PRE-INSTALLATION MEETING
A. The manufacturer shall conduct a pre-construction meeting with the aluminum box culvert installer and provide onsite technical assistance as required by the installer.
1.05 SUBMITTALS
A. Shop Drawings: Submit shop drawings and specifications for aluminum box culverts, aluminum headwalls, and aluminum wingwalls. Submitted shop drawings shall include a professional stamp licensed in the state of Wisconsin.
PART 2 PRODUCTS
2.01 ALUMINUM BOX CULVERT
A. Aluminum box culvert structural design shall be based on AASHTO Section 12.
1. Size of culvert shall be 20’-6” span x 7’-3” rise x 65’-3” long.
A. Provide 24’ wide, 2’ high aluminum headwall.
B. Provide 18.25’ and 22.75’ long wing walls consisting of corner and wing panels as shown in the plans. Include necessary deadman and anchors as needed. Slopes along wingwalls will be less than 2:1.
2. Culvert shall have full plate invert with toewalls.
3. Culvert shall be designed to accommodate a minimum depth of cover of 1.4 feet.
B. The manufacturer shall provide the Owner a list detailing a minimum of 10 successful installations of aluminum box culverts they have supplied in the past year.
C. The manufacturer will provide a WisDOT load rating of HL-93.
D. The manufacturer shall assume a foundation bearing capacity of 3,000 psf.
2.03 GRANULAR BEDDING AND BACKFILL
A. Per culvert manufacturer recommendations.
END OF SECTION
33 42 26-1
WESTFORD
CALAMUS
G
D
D
S
G
Beaver Dam So.
Leipsig
Beaver Dam
BEAVER
DAM
CF
FW
DE
DE
DE
CC
Lost L.
R.
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ 1-
Ti tle
S he et .d w g, L ay ou t:
G -1
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
CWG
DODGE COUNTY
CTH DE BRIDGE REPLACEMENT
DODGE COUNTY
AUGUST 2025
COUNTY MAP
NTS
SHEET INDEX
SHEET NUMBER SHEET TITLE
G-1 TITLE SHEET
G-2 GENERAL SYMBOLS AND ABBREVIATIONS
G-3 GENERAL NOTES
C-101 PLAN AND PROFILE
C-102 GRADING PLAN
X-101 THRU X-103 CROSS SECTIONS
D-1 GENERAL DETAILS
NORTH
DODGE
COUNTY
PROJECT
LOCATION
G-1TITLE SHEET
T T
TV TV
OH OH
SAN SAN
100 99
W W
G G
SANITARY SEWER
SANITARY SEWER
GAS MH
STM MH
WATER VALVEHYD
SECTION CORNER
MONUMENT
ASPHALT, CONCRETE, ETC.
GRAVEL, DIRT, ETC.
GUARD RAIL
INL
POLE
PULLBOX
WTR MH
TOP OF FILL
OVER/DECK
WATER MAIN
UNDERGROUND GAS
UNDERGROUND ELECTRIC
UNDERGROUND FIBER OPTIC
UNDERGROUND TELEPHONE
UNDERGROUND VIDEO
OVERHEAD ELECTRIC
CURB AND GUTTER
SIDEWALK
HARD SURFACED ROADWAY
NON-SURFACED ROADWAY
TREE LINE
CONTOURS
DITCH
FENCE
RIGHT OF WAY
PROPERTY LINE
SECTION LINE
RETAINING WALL
WETLAND
STREET CENTERLINE
WATER'S EDGE
SWAMP EDGE
BUILDING
FORCE MAIN
WATER MAIN
STORM SEWER
CURB AND GUTTER
SIDEWALK
HARD SURFACE ROADWAY
NON-SURFACED ROADWAY
CONTOURS
FENCE
BASELINE
PERMANENT EASEMENT
TEMPORARY EASEMENT
SILT FENCE
EROSION BALES
EROSION MAT
EROSION LOG
SAW CUT
DITCH
RETAINING WALL
POND
SPOT ELEVATION
UTILITY EASEMENT
SETBACK
IRON PIPE
SIDEWALK
UTILITY POLES:
TELEPHONE POLE
LIGHT POLE
TREES
BENCHMARK
STORM SEWER
DECIDUOUS CONIFEROUS
BUSH / SHRUB
HEDGE OR BUSH LINE
ANCHOR
CONTROL BOX
PARKING METER
SIGN
SPRINKLER HEAD
METER
RR SIGNAL FLASHER / BOX
TRAFFIC SIGNAL
VALVE
CONTROL POINT
RAILROAD
TOP OF CUT
SAN MH
W/ LIGHT
ELECTRIC MH
TELEPHONE MH
TELEVISION MH
FIBER MH
W/ MAST
ARM
E E
FO FO
OH OH
TRACER BOX
OVERHEAD UTILITY
EXISTING NEW
SAN
VLV
PED
ANCHOR
WELL
SAN
MH
STM
MH
TANK
TV
MH
TPED
TVPD
EPED
MON
xx xx xx xx xx xx
R
T N
E
VLV
T
CSWAT
MH
WV
STM
MH
GAS
MH
ELEC
MH
FIBER
MH
TEL
MH
GV
ETRAN
IP
IP
GUARD RAIL
ELECTRIC
TRANSFORMER
ELECTRIC
PED
W/ MAST
ARM
POWER
POLE
ROW
MARKER
W/ MAST
ARM
DEMOLITION / REMOVAL
AREA
INL
FENCE CHAIN LINK
FENCE WOOD
DIGGERS HOTLINE
Dial or (800)242-8511 www.DiggersHotline.com
STM STM
ABBREVIATIONS:
ALTERNATE
ALUMINUM
ALT
AL
APPROXIMATE
AT
AUTOMATIC
AVENUE
APPROX
AUTO
AVE
BACK OF CURB
BACK OF SIDEWALK
BASELINE
BENCH MARK
BITUMINOUS
BLOCK
BOTTOM
BOULEVARD
BUILDING
BM
BIT
BLK
BLDG
CAST IRON
CONCRETE
CHECK VALVE
CHLORINE
CLEANOUT
COLD WATER
CENTER OF STRUCTURE
FERTILIZER
FINISHED
FLANGED
FLOOR DRAIN
FLOWLINE
FOOT
FOOTING
FORCE MAIN
FOUNDATION
GAGE
GARAGE
GAS
GATE VALVE
GENERAL
GRADE, GROUND
GRAVEL
GROUNDWATER
CI
CB CATCH BASIN
CV
CO
CW
CONC
CMU
FERT
FIN
FLG
FD
FL
FT (')
FTG
FM
FDN
GA
GAR
G
GV
GEN
GRAV
GW
CORRUGATED METAL PIPE
COUNTY TRUNK HIGHWAY
COUPLING
CUBIC FOOT
CULVERT
CURB AND GUTTER
CMP
CTH
CPLG
CF
CY
DETAIL
DIAMETER
DIMENSION
DOOR
DRAWING
DRIVEWAY
DUCTILE IRON
DTL
DIA
DIM
DR
DWG
DI
EACH
EACH WAY
EAST
EFFLUENT
ELBOW
ELECTRICAL
ELEVATION
END RADIUS BACK OF CURB
EQUAL
EXISTING
EXPANSION
EA
EW
E
EFF
ELB
ELEC
EL
ER
EQ
EXP
JOINTJT
LEFT
LENGTH OF CURVE
LIGHT POLE
LINEAL FEET
LUMP SUM
MANHOLE
MANUFACTURER
MASONRY
MAXIMUM
MECHANICAL JOINT
MINIMUM
MISCELLANEOUS
LT
LC
LP
LF
LS
MH
MFG
MAS
MAX
MJ
MIN
MISC
HOT WATER
HOUSE
HYDRANT
INCHES
INFLUENT
INLET
INSIDE DIAMETER
INSULATION
INVERT
IRON PIPE
IN (")
INF
INL
ID
INSUL
INV
IP
NON-POTABLE WATER
NORTH
NOT TO SCALE
NUMBER
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
NPW
N
OC
OD
OH
BLVD
CULV
GRD
HW
HSE
HYD
ASPHALTASPH
CORRUGATED STEEL PIPECSP
HOT WATER RETURNHWR
NTS
DEGREE
C&G
NOM NOMINAL
BTM
MP MID POINT
COS
DEG °
CHL
BO BREAKOFF
DW
CP CONTROL POINT
EX
F-F FACE TO FACE
BC
BOW
FV FIELD VERIFY
FINISHED FLOORFF
GALV GALVANIZED
A/E ARCHITECT/ENGINEER
NO #
CONCRETE MASONRY UNIT
CUBIC YARD
B L
MR MID RADIUS BACK OF CURB
AC ASBESTOS CONCRETE
CENTERLINEC/LC
L
CORRUGATED POLYPROPYLENE PIPECPP
CAST-IN-PLACECIP
HOT MIX ASPHALTHMA
PAVEMENT
PEDESTAL
PERCENT
PERFORATE
POINT OF INTERSECTION
POINT OF CURVE
POINT OF TANGENCY
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
POWER POLE
PROPERTY LINE
QUANTITY
RADIUS
RAILROAD
REDUCER
REFERENCE
REINFORCED CONCRETE PIPE
REQUIRED
REVISED
RIGHT
RIGHT OF WAY
ROAD
ROADWAY
PVMT
PED
PERF
PE
PI
PC
PT
PVC
PL
QTY
RAD
RR
RED
REF
RCP
REQD
REV
RT
RW
RD
RDWY
SANITARY
SCHEDULE
SHEET
SIDEWALK
SPECIFICATION
SOUTH
SQUARE
SQUARE FOOT
SQUARE YARD
STAINLESS STEEL
STANDARD
STATE TRUNK HIGHWAY
STEEL
STORM
STREET
TELEPHONE
THICKNESS
THROUGH
TOP BACK OF CURB
TYPICAL
SAN
SCH
SHT
SW
S
SPEC
SQ
SF
SY
SS
STD
STH
STL
STM
ST
TEL
THK
THRU
TYP
UNEXCAVATED
UNITED STATES HIGHWAY
UNEXC
USH
VARIABLE
VALVE
VERTICAL CURVE
WATER
WATER MAIN
WATER SURFACE
WATER TREATMENT PLANT
WELDED WIRE FABRIC
WEST
WITH
WITHOUT
WOVEN WIRE MESH
WWTP
WTP
WTR
WS
WM
WWF
W W/ W/O
WWM
VAR
V
VC
PP
PRIVATE ENTRANCE
PSF
PSI
WASTEWATER TREATMENT
PLANT
SLOPESL
V&B VALVE & BOX
SSMH STORM SEWER MANHOLE
SANITARY MANHOLESAMH
TC
P/L
TOP OF PIPET/O/P
PERMANENT LIMITED EASEMENTPLE
TEMPORARY LIMITED EASEMENTTLE
100 99
SAN MH
HYDRANT
INSULATION
REDUCER
GATE VALVE & BOX
UNDERDRAIN
STM MH
SAN SAN
SF SF
X X X X X
INL
800.80
10+00
SIDEWALK
GRAVEL, DIRT, ETC
ASPHALT, CONCRETE, ETC
T
TRACER WIRE
ACCESS BOX SAN LATERAL WITH
CLEAN OUT
STRUCTURE LABEL
ID, STRUCTURE TYPE SIZE-CASTING
APRON ENDWALL AND
RIP RAP
CP1
BM100
WTR SERVICE
& CURB STOP
W W
FM FM
CS
BEND
AREA
INL
CO
FIELD ENTRANCEFE
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ 2-
G en
S ym
A bb rv
.d w g, L ay ou t:
G
-2
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
CWG
G-2GENERAL SYMBOLS AND ABBREVIATIONS
HORIZONTAL CONTROL
CONTROL POINT NORTHING EASTING DESCRIPTION
900 721682.30 826298.04 3
4" REBAR IRON ROD W/ AYRES CAP
901 721762.52 826430.03 3
4" REBAR IRON ROD W/ AYRES CAP
VERTICAL CONTROL
BENCH MARK ELEVATION DESCRIPTION
800 875.93 RR SPIKE IN POWER POLE #847512
801 879.20 RR SPIKE IN POWER POLE #CL8 90
PROJECT CONTACTS
NAME OF OWNER ADDRESS CONTACT PERSON PHONE NUMBER/EMAIL SERVICE
DODGE COUNTY 211 EAST CENTER STREET
JUNEAU, WI 53039 NATHAN KEMPKE
(920) 386-3655 nkempke@co.dodge.wi.us ASSISTANT COMMISSIONER
WISCONSIN DEPARTMENT OF
NATURAL RESOURCES
3911 FISH HATCHERY ROAD
FITCHBURG, WI 53711 ERIC HEGGELUND (608) 228-7927 WDNR LIASON
AYRES ASSOCIATES 700 PILGRIM WAY, SUITE 180
GREEN BAY, WI 54304 TRACE HUBBARD (920) 498-1200 PROJECT MANAGER
AYRES ASSOCIATES 700 PILGRIM WAY, SUITE 180
GREEN BAY, WI 54304 CODY GORGES (920) 498-1200 PROJECT ENGINEER
GENERAL PROJECT NOTES
EROSION CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING PROPERTY IRONS. PROPERTY IRONS REMOVED OR DISTURBED DURING CONSTRUCTION SHALL BE RE-ESTABLISHED BY A REGISTERED LAND SURVEYOR.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING UTILITIES AND APPURTENANCES NOT SHOWN TO BE REPLACED. TEMPORARY REMOVAL AND ANY DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITIES SHOWN ON THE PLANS MAY VARY. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITIES TO AVOID POTENTIAL CONFLICTS.
3. EXISTING MATERIALS AND THEIR THICKNESS MAY VARY. ALL COSTS ASSOCIATED WITH REMOVAL OF EXISTING MATERIALS
SHALL BE INCLUDED IN THE COST OF THE WORK.
4. ASPHALT ROADWAY AND DRIVEWAYS SHALL BE SAWCUT PRIOR TO EXCAVATION. REPLACEMENT OF ROADWAY BEYOND LIMITS
SHOWN ON DRAWINGS WITHOUT APPROVAL OF A/E WILL BE AT CONTRACTORS EXPENSE.
5. ALL MATERIALS USED FOR CONSTRUCTION OF THE ROADWAY IMPROVEMENTS SHALL MEET THE MINIMUM MATERIAL AND
INSTALLATION REQUIREMENTS OF THE SPECIFICATION REQUIREMENTS OF THIS PROJECT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING ASPHALT ON STREETS OUTSIDE OF PROPOSED ROADWAY IMPROVEMENTS. ANY DAMAGE DURING CONSTRUCTION UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED
AT CONTRACTORS EXPENSE.
7. PROVIDE FILL AT EACH CORNER OF THE STRUCTURE TO TAPER EXISTING SLOPES INTO THE NEW STRUCTURE AND PROPOSED TYPICAL SECTION. GRADUALLY TAPER SLOPES EAST AND WEST TO MATCH EXISTING.
8. WORK IS TO BE COMPLETED DURING NO/LOW FLOW PERIOD WITH CONSIDERATION FOR FORECASTED PRECIPITATION.
9. CONTRACTOR TO PREPARE AND SUBMIT BYPASS AND DEWATERING PLAN TO ENGINEER FOR REVIEW AND APPROVAL.
10. IN-STREAM DISTURBANCE CANNOT OCCUR BETWEEN MARCH 1 AND JUNE 15. BOTH DATES INCLUSIVE.
1. INSTALL EROSION CONTROL PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY.
2. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION UNTIL THE SITE IS STABILIZED
BY VEGETATION OR OTHER APPROVED MEASURES.
3. EROSION CONTROL DEVICES DESTROYED OR DAMAGED SHALL BE REPAIRED BY THE END OF THE WORK DAY.
4. INSPECT ALL EROSION CONTROL MEASURES AT LEAST ONCE A WEEK AND AFTER ANY RAINFALL OF 0.5-INCHES OR MORE AND MAKE NEEDED
REPAIRS. RECORD INSPECTIONS AS SPECIFIED.
5. ALL ACTIVITIES SHALL BE CONDUCTED IN A LOGICAL SEQUENCE AS TO MINIMIZE THE AMOUNT OF BARE SOIL EXPOSED AT ANY ONE TIME.
MAINTAIN EXISTING VEGETATION AS LONG AS POSSIBLE.
6. DRAWINGS SHOW GENERAL LOCATIONS OF EROSION CONTROL DEVICES AND SIGNS. ACTUAL LOCATIONS MAY VARY AS DETERMINED BY
ENGINEER IN THE FIELD.
7. EROSION MAT SHALL BE PLACED AT ALL DISTURBED AREAS TO RECEIVE LAWN RESTORATION. THE CONTRACTOR IS RESPONSIBLE FOR
PREVENTING BANK EROSION UNTIL VEGETATION IS ESTABLISHED.
8. IF BYPASS PUMPING IS DONE, USE AN APPROVED SEDIMENT TRAP, FILTER BAG, OR OTHER APPROVED METHOD TO REMOVE SEDIMENT.
9. IF A DIVERSION CHANNEL IS CONSTRUCTED, ADJUST PROPOSED SILT FENCE AS NECESSARY.
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ 3-
G en
N ot es .d w g, L ay ou t:
G -3
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
G-3GENERAL NOTES
BM 800 BM 801
CP 900
CP 901
18" HDDP PCP
18" HDDP PCP
18" CMCP
18" CMCP
TPED
18" CMCP
18" CMCP
GUY
WZ
WZ
WZ
WZ
T T
OH
OH OH OH OH OH OH OH OH OH
10+00 11+00 12+00 13+00 13+50
BP
: 1
0+
.0
PI
: 1
1+
.5
EP
: 1
3+
.0
50+00
+0
51+81
BP: 50+00.00
PI: 50+70.84
PI: 50+98.52
EP: 51+80.78
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
10+25 10+50 10+75 11+00 11+25 11+50 11+75 12+00 12+25 12+50 12+75 13+00 13+25
-0.38% 0.18%
VP
I 1
1+
.0
EL
.3
VP
I 1
1+
.0
EL
.0
VP
I 1
2+
.0
EL
.1
6.9
6.7
6.5
6.3
6.1
6.0
3.5
6.0
6.1
6.3
6.5
6.8
7.1
6.
6.
6.
6.
6.
6.
49+50 49+75 50+00 50+25 50+50 50+75 51+00 51+25 51+50 51+75 52+00
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ Pl an a nd P ro fil e.
dw g, L ay ou t:
C
-1
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
CWG
NORTH
20 400
C-101PLAN AND PROFILE
GENERAL NOTES:
1. SUBMIT WRITTEN PLAN AND DRAWINGS OF PROPOSED METHOD FOR DE-WATERING
AND DIVERSION OF WATER TO WDNR AT LEAST 14 DAYS PRIOR TO START OF
CONSTRUCTION.
2. WATER PUMPED FROM SITE, MUST PASS THROUGH A FILTRATION DEVICE PRIOR TO
ENTERING CREEK.
3. STREAM FLOWS: Q2 = 90 CFS, Q100 = 330 CFS. DURING CONSTRUCTION, ENTIRE
VOLUME OF STREAM FLOW SHALL BE MAINTAINED DOWNSTREAM OF PROJECT SITE.
4. STOCKPILE TRENCH SPOILS AND TOPSOIL IN UPLAND AREAS. PROVIDE SILT FENCE
AROUND ANY MATERIAL STOCKPILES. DO NOT PLACE SPOILS IN WETLAND AREAS
NEAR CREEK. STABILIZE ANY AREAS WITHIN 75-FEET OF ORDINARY HIGH WATER
MARK WITHIN 24 HOURS.
5. THERE SHALL BE NO IN-STREAM / CREEK DISTURBANCE BETWEEN MARCH 1 AND
JUNE 15. BOTH DATES INCLUSIVE.
6. TEMPORARY DAM AND PUMP STATION AS NECESSARY. DAM TO BE APPROVED BY
ENGINEER, AND SHALL CONSIST OF NON-ERODABLE MATERIAL. PUMP DISCHARGE
MUST BE PROTECTED BY EROSION CONTROL.
7. INSTALL EROSION CONTROL PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY.
8. EROSION CONTROL CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE
DURATION OF CONSTRUCTION UNTIL THE SITE IS STABILIZED BY VEGETATION.
9. WORK IS TO BE COMPLETED DURING LOW/NO FLOW PERIOD WITH CONSIDERATION
FOR FORECASTED PRECIPITATION.
10. SEE DETAIL 3/D-1 FOR WINGWALL AND HEADWALL ELEVATION DETAIL.
11. SUBGRADE SOIL BEARING PRESSURE SHALL BE VERIFIED TO MEET OR EXCEED
CULVERT MANUFACTURER SPECIFICATIONS. IF SUBGRADE SOIL BEARING PRESSURE
DOES NOT MEET CULVERT MANUFACTURER SPECIFICATIONS, UNDERCUT SUBGRADE
1-FOOT. PROVIDE STRUCTURAL BACKFILL AND COMPACT IN 6-INCH LIFTS.
CTH DE
SLIT FENCE
(TYP)
LIMITS OF CONSTRUCTION
SAWCUT ASPHALT
(TYP)
MEDIUM RIPRAP
(TYP)
ALUMINUM HEADWALL
AND WINGWALLS (TYP)
PROPOSED PROFILE
EXISTING PROFILE
BYPASS SYSTEM
SILT FENCE
TURN-AROUND
(TYP)
BYPASS SYSTEM
DRAINAGE SWALE
W/ MEDIUM RIRAP
SLOPE INTERCEPT
(TYP)
18" PLASTIC CULVERT
W/ CMP ENDWALLS
INV (W) 869.14
INV (E) 873.54
80 LF @ 5.5%
REMOVE EXISTING BRIDGE
STRUCTURE (TYP)
20'-6" SPAN X 7'-3" RISE X 65'-3" LONG
ALUMINUM BOX CULVERT W/ FULL INVERT
DRAINAGE SWALE
INV 865.00
INV 865.00
PROPOSED PROFILE
SEE DETAILS
PROPOSED ℄ ELEVATION
876.04
EXISTING STREAM
BED
EXCAVATE EXISTING
STREAM BED MATERIAL
EROSION CONTROL NOTES:
1. ALL AREAS TO BE RESTORED WITH WISDOT SEED MIXTURE #10 AND EROSION MAT
CLASS I TYPE 'B' URBAN.
2. PLACE EROSION CONTROL DEVICES AS TO NOT INTERFERE WITH PROPOSED WORK.
HEADWALL
EL 874.25
HEADWALL
EL 874.25
REMOVE EX CULVERT
MEDIUM RIPRAP
MEDIUM RIPRAP
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
REMOVE EX SIGNS
(TYP OF 4)
GRAVEL DRIVEWAY RESTORATION
25-FT LANE WIDTH
TRANSITION (TYP)
BM 800 BM 801
CP 900
CP 901
18" HDDP PCP
18" HDDP PCP
18" CMCP
18" CMCP
GUY
WZ
WZ
WZ
T T T T T T
T
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
11+00 12+00
PI
: 1
1+
.5
50+00
+0
PI: 50+70.84
PI: 50+98.52
0.5 871.0
871.5 87 2.0
872.5
873.0 873.5
874.0
873.5 874.0
874.5 875.0
875.5
876.0
876.0
875.5
875.0 874.5 874.0
873.5 873.0 872.5
872.0
1.587
1.0
869.5
870.0
870.5
871.0
871.5
872.0
872.5
873.0
873.5
874.0
874.5
875.0
875.5
876.0
871.0
871.5
872.0
872.5 873.0
873.5 874.0 874.5 875.0 875.5
876.0
2 87
7 87
8 87
876 875
876.0 876.0
874.0
875.0
9.
7.
7.
8.
9.
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ Pl an G ra di ng .d w g, L ay ou t:
C -1
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
CWG
NORTH
10 200
C-102GRADING PLAN
CTH DE
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
SLOPE INTERCEPT
(TYP)
DRAINAGE SWALE
DRAINAGE SWALE
11+00
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
11+25
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
11+50
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
11+10
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75 0.
6.
0.
5.
0.
6.
0.
5.
-1 0.
6.
-1 4.
5.
-1 0.
5.
.6
6.
.0
6.
.6
5.
-3 5.
1.
.0
1.
-2.6% -0.7%-7.6% -2.7%
18.5% 23.2%
0.
6.
0.
5.
0.
6.
0.
5.
-1 5.
5.
-1 0.
6.
-1 0.
5.
.8
6.
.0
5.
.8
5.
-3 7.
1.
.5
1.
-2.3% -1.2%-6.0% -3.2%
18.6% 21.4%
0.
6.
0.
5.
0.
6.
0.
5.
-1 2.
5.
-1 7.
5.
-1 2.
5.
.0
5.
.0
5.
.0
5.
-4 2.
0.
.4
1.
-2.0% -2.0%-4.0% -4.0%
18.7% 19.3%
0.
6.
0.
5.
0.
6.
0.
5.
-1 2.
5.
-1 7.
5.
-1 2.
5.
.0
5.
.0
5.
.0
5.
-3 2.
3.
.1
3.
43-2.0% -2.0%-4.0% -4.0%
-10.9% -12.3%
RW
RW
RW
RW
RW
RW
RW
RW
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ X-
Se ct io ns
.d w g, L ay ou t:
XS
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
X-101CROSS SECTIONS
11+75
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
12+00
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
12+15
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
11+69
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
0.
6.
0.
5.
0.
6.
0.
5.
-1 2.
5.
-1 7.
5.
-1 2.
5.
.0
5.
.0
5.
.0
5.
-3 2.
4.
.4
4.
-2.0% -2.0%-4.0% -4.0% -8.5% -8.7%
0.
6.
0.
5.
0.
6.
0.
5.
-1 2.
5.
-1 7.
5.
-1 2.
5.
.0
5.
.0
5.
.0
5.
-3 3.
4.
.1
4.
-2.0% -2.0%-4.0% -4.0% -8.4% -9.0%
0.
6.
0.
5.
0.
6.
0.
5.
-1 2.
5.
-1 7.
5.
-1 2.
5.
.0
5.
.0
5.
.0
5.
-3 8.
1.
.9
2.
-2.0% -2.0%-4.0% -4.0%
17.6% 18.2%
0.
6.
0.
5.
0.
6.
0.
5.
-1 6.
5.
-1 1.
5.
-1 1.
5.
.6
5.
.1
5.
.6
5.
.2
1.
1.6% -1.2%-3.5% -6.4%
18.2% 16.8%
-5 6.
2.
.8
2.
-6 1.
1.
.0
1.
.7
0.
RW
RW
RW
RW
RW
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ X-
Se ct io ns
.d w g, L ay ou t:
XS
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
X-102CROSS SECTIONS
12+25
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 750-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75
0.
6.
0.
5.
0.
6.
0.
5.
-1 0.
6.
-1 6.
5.
-1 0.
5.
.4
6.
.6
5.
.4
5.
.3
1.
-1.3% -0.7%-3.3% -8.3%
19.1% 11.6%
-5 4.
3.
.9
2.
RW
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ X-
Se ct io ns
.d w g, L ay ou t:
XS
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
X-103CROSS SECTIONS
NOT TO SCALE1 SILT FENCE
3' MAX*
3' MAX*
3' MAX*
3' MAX*
2'
FOLD
3" MAX
SUPPORT
CHORD
FLOW
GEOTEXTILE
FABRIC
WOOD POSTS LENGTH
4' MIN, 2' MIN DEPTH IN
GROUND
GEOTEXTILE
FABRIC ONLY
BACKFILL AND COMPACT
TRENCH WITH EXCAVATED
SOIL
ATTACH FABRIC TO
TIE POSTS WITH WIRE
STAPLES OR WOODEN
LATH AND NAILS
FLOW
SILT FENCE
*NOTE:
8'-0" POST SPACING ALLOWED IF A
WOVEN GEOTEXTILE FABRIC IS USED.
NOTE:
ADDITIONAL POST DEPTH OR TIE BACKS
MAY BE REQUIRED IN UNSTABLE SOLS.
GENERAL NOTES:
TRENCH SHALL BE A MIN OF 4" WIDE & 6" DEEP TO BURY AND ANCHOR THE
GEOTEXTILE FABRIC, FOLD THE MATERIAL TO FIT TRENCH AND BACKFILL & COMPACT
TRENCH WITH EXCAVATED SOIL.
WOOD POSTS SHALL BE A MIN SIZE OF 1 18" x 1 18" OAK OR HICKORY.
CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTING
LENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY, USE ONE OF THE FOLLOWING
TWO METHODS;
A. TWIST METHOD -- OVERLAP THE END POSTS AND TWIST, OR ROTATE, AT LEAST 180
DEGREES.
B. HOOK METHOD -- HOOK THE END OF EACH SILT FENCE LENGTH.
TRENCH DETAIL HOOK METHOD
JOINING 2 LENGTHS OF SILT FENCE
TWIST METHODSILT FENCE TIE BACK
(WHEN ADDITIONAL SUPPORT REQUIRED)
FL
O
W
GEOTEXTILE
FABRIC
WOOD POST
WOOD POST GEOTEXTILE
FABRIC
WOOD POST
GEOTEXTILE
FABRIC
FL
O
W
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
2' MIN
1' M
INWOOD
POST
WOOD
POST
TIEBACK BETWEEN
FENCE POST AND
ANCHOR
FLOW
ANCHOR STAKE
MIN 18" LONG
SILT FENCE
GEOTEXTILE
FABRIC
EXCESS FABRIC
FLOW
NOT TO SCALE2 SILT FENCE TURNAROUND
1' MIN TO
1.5' MAX
10' APPROX
SILT FENCE
NOTE:
TURNAROUNDS - TO REDIRECT AMPHIBIANS AND
REPTILES AWAY FROM CONSTRUCTION ZONE.
NOT TO SCALE3 CULVERT HEADWALL / WINGWALL
18.25' 22.75'
18.25' 22.75'
24' HEADWALL
EL 874.25
24' HEADWALL
EL 874.25
18.25' WINGWALL
EL 871.70
22.75' WINGWALL
EL 872.14
22.75' WINGWALL
EL 871.52
18.25' WINGWALL
EL 872.22
NOTE:
SIDE SLOPES ALONG WINGWALL ARE FLATTER THAN 2:1. ACTUAL SLOPES
TO BE DETERMINED IN THE FIELD.
12' 5'
6:1 MAX
2%4%
6:1 MAX
2% 4%
4" - BASE AGGREGATE SHOULDERS
(TYP)
15" - 1 14" BASE AGGREGATE
DENSE
4" HMA PAVEMENT
(1 3 4" - 4LT 58-34S)
(2 14" - 3LT 58-28S)
NOTES:
TOPSOIL, SEED, FERTILIZE, AND EROSION MAT ALL DISTURBED AREAS.
EROSION MAT TO BE CLASS I, TYPE 'B' URBAN
12'5'
2:1 M
AX 2:1 MAX
20'20'
GEOGRID, TYPE 'SR'
NOT TO SCALE4 PROPOSED TYPICAL SECTION AT CULVERT
°' 15°'
15°'
REVISIONDATEREVISIONDATE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
NO NO
8/
/2
I:\
\D od ge
C ou nt y of \2
5-
.0
D od ge
C o
C
TH
D E
Br id ge R ep la ce m en t\C
3D \S he et s\ 7-
G en
D et ai ls
.d w g, L ay ou t:
D
-1
AA
-S ta nd ar d.
st b
25-0418.00
AUGUST 2025
Green Bay, WI 54304
920.498.1200
CTH DE BRIDGE REPLACEMENT
DODGE COUNTYJWS
TAH
D-1GENERAL DETAILS
RFB #30 2025-12 19
ATTACHMENT B
RFB COST SHEET
BASE BID: Base bid includes all work required to complete the Project, including permits, general conditions, overhead, profit, insurance, bonds, taxes, and all other expenses. The base bid shall be awarded to one lowest, responsive, and responsible bidder. Dodge County reserves the right to reject any or all bids or parts thereof, to waive any technicality in any bid and accept any bid deemed to be the most advantageous to the County.
We, the undersigned, propose to the Dodge County Highway Department, Juneau, Wisconsin, the following items, as herein specified by us in accordance with this RFB.
RFB Pricing
Base Bid
Provide costs for all labor, materials, and equipment to complete the project in strict accordance with the Specifications and/or Drawings
FOR THE SUM OF
Dollars $
Pricing will be held for 90 days
Company Submitting Bid
Signature Title
Printed Name
Company Mailing Address
City, State, Zip
Telephone Number
( ) Fax Number ( )
Date Signed
BID MUST BE SIGNED OR IT WILL BE REJECTED. RETURN PACKAGE IN ITS ENTIRETY. ATTACH
DOCUMENTS AS NECESSARY.
RFB #30 2025-12 20
ATTACHMENT C
Statement of Acknowledgment
RFB NUMBER: #30 2025-12
Complete this page and include it with your sealed response to the request.
I have read this Request for Bid (RFB), all the attachments, addenda (if any) and exhibits issued for this project and understand the contents and requirements.
Binding Signatures:
The undersigned contractor, submitting their bid, hereby declares and agrees to be bound, and to perform the work in accordance with all the terms, conditions and requirements of this Request for Bid, the within and foregoing bid, the contract, the applicable specifications, special provisions, and the schedule of prices as hereby submitted and made part of their bid submission.
Company:
Address:
Original Signature:
Name (Print/Type)
Title Date
Phone Number: Fax Number:
E-mail:
RFB #30 2025-12 21
ATTACHMENT D
Addendum Acknowledgement
I/we hereby acknowledge receipt of the following addendum(s):
Addendum No. Dated:
I/we further certify that no agreement has been entered into to prevent competition for said work and that I/we carefully examined the plans, specifications, form of contract and all other contract documents.
I/we further agree to enter into the contract, as provided in the contract documents, under all the terms, conditions and requirements of those documents.
If no addendum were issued, the contractor shall so indicate and sign this document.
Contractor
Representative Signature
| RFB #30 2025-12.pdf |
| DODGE COUNTY CORPORATION COUNSEL |
| Purchasing Division |
| RFB PROJECT DETAILS |
| 1. Intent |
| 2. Packets and Addendums |
| 3. Tentative Project Timeline |
| 4. Questions Due: September 18, 2025, by 11:00 am |
| 5. Questions & Answers Published Date: September 19, 2025, by 11:00 am |
| 6. Due Date & Delivery Address Details: September 25, 2025 by 9:00 am |
| 7. Selection Criteria |
| 8. Award Notification |
| 9. Format & Submission Requirement |
| 10. Bond Requirements for this Project |
| 11. Insurance Requirements |
| Minimum Scope and Limits |
| Other Requirements |
| 12. General RFB Information |
| 13. RFB Attachments |
| A. Specifications / Drawings |
| B. RFB Cost Sheet |
| C. Statement of Acknowledgement |
| D. Addendum Acknowledgement |
| ATTACHHMENT A Specifications / Drawings |
| ATTACHMENT B RFB COST SHEET |
| ATTACHMENT C Statement of Acknowledgment |
| Binding Signatures: |
ATTACHMENT D Addendum Acknowledgement
| Dodge CTH DE Culvert 8-21-25 |
| 33 42 26 - Aluminum Box Culverts |
| SECTION 33 42 26 ALUMINUM BOX CULVERTS |
| PART 1 GENERAL |
| 1.01 Summary |
| 1.02 Pre-Installation Meeting |
| 1.05 Submittals |
| PART 2 PRODUCTS |
| 2.01 Aluminum box culvert |
| 2.03 Granular Bedding and Backfill |
File details come from the government source that posted it. Updated .