RF-BNY-RFP-Battery Quality Control Equipment-12Nov2026-V1.0.pdf

PDF 958 KB Posted

Attached to
Battery Quality Control Equipment
Solicitation number
2140886
Issued by
Broome County, New York

About this file

Summary of RF-BNY-RFP-Battery Quality Control Equipment

This is a Request for Proposal issued by The Research Foundation of SUNY for Battery Quality Control Equipment to support Battery-NY, a lithium-ion battery technology development and prototyping facility located at 10 University Boulevard, Johnson City, New York 13790. Battery-NY seeks a comprehensive, digitally integrated quality control laboratory infrastructure capable of supporting cell prototyping activities from incoming raw material inspection through slurry preparation, electrode manufacturing, cell assembly, electrochemical testing, and finished cell post-mortem analysis. The procurement strongly prefers a single-vendor turnkey solution for supply, integration, installation, commissioning, training, and support, though proposals from specialist vendors offering differentiated capabilities will be considered. The RFP was posted on November 16, 2026, with bidder questions due by November 30, 2026 at 5:00 PM EST and proposals due by December 14, 2026 at 5:00 PM EST. The target decision date is December 22, 2026, with equipment delivery to the final destination required by March 2, 2027 and full installation, commissioning, and User Acceptance Testing completion by March 30, 2027.

All pricing must be submitted in U.S. Dollars with proposals including itemized pricing in Excel format, general assembly drawings, 3D models, utility and process gas requirements, computer and software specifications, critical spare parts lists, project management details with Gantt charts, compliance matrices, team qualifications, and payment schedules. Battery-NY expects bidders to provide competitive commercial offerings including educational discounts, strategic partnership discounts, and reference-site discounts, with proposals clearly identifying list price, discount percentage, and net selling price for transparent comparison. The facility is funded by the U.S. Economic Development Administration and New York State Empire State Development and will operate as a flagship battery development center expected to host industrial partners, government stakeholders, and prospective customers. Bidder proposals constitute binding offers valid for 180 days after the submission deadline, and the resulting contract shall be governed by New York State law.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

For: Battery Quality Control Equipment

Document reference: RF-BNY-RFP-Battery Quality Control Equipment www.rfsuny.org

Version Date Author Comments/Reason for Change V1.0 12 Nov 2026 Jeffrey Skojec First issue http://www.rfsuny.org/

-i-

Contents

Section Contents Page

1 General Standard Information and Instructions

Summary Proposal Submission Response to Inquiries The Research Foundation of SUNY Reserved Rights Compliance with Laws and Regulations Liability and Indemnification Additional Terms and/or Conditions Bidder's Certification

2 Overview

3 Proposal Submission Requirements

4 Business Requirements (Scope of Work Section)

5 Evaluation and Selection Criteria

6 Codes and Standards

7 List of Abbreviations www.rfsuny.org -1-

You are invited to submit a bid proposal to The Research Foundation of SUNY. For more information on the Research Foundation visit our website @ www.rfsuny.org

Section 1: General Standard Information and Instructions

Summary

Due Dates (and Times, if applicable):

RFP posted to portal: 16 November 2026 Bidder’s questions received by: 30 November 2026 by 17:00 EST Bidder’s proposals received by: 14 December 2026 by 17:00 EST Bidder/SUNY RF review/negotiations: 18 December 2026 SUNY RF target decision date (followed by kickoff): 22 December 2026

Complete equipment delivery to final destination: 2 March 2027 or sooner Equipment installed, commissioned with UAT signed: 30 Mar 2027 or sooner

Location of Service:

10 University Blvd.

Johnson City, NY 13790

Inquiries to:

Paul Malliband Executive Director – Battery-NY pmalliband@binghamton.edu

Proposal Submission

When submitting a proposal, you must:

1. Prepare a clearly readable document that provides information in the order requested and attach all required information. All pricing in the proposal must be in U.S. Dollars.

2. Indicate any deviations from the specifications, including line reference/description/requirement(s) from

Section 4.

3. Sign the proposal. Your signature indicates full knowledge and acceptance of this Request for

Proposal (“RFP”).

4. Submit one (1) complete proposal electronically, which must have original signatures.

5. Submit the proposal so that it is received by the due date (and time, if applicable).

www.rfsuny.org -2-

Response to Inquiries

Any inquiries about the requirements of this Request for Proposal or any apparent omission or discrepancy should be presented in writing to the Research Foundation (RF) representative listed above. All formal inquiries must be submitted no later than fourteen (14) calendar days after the issuance of this Request for Proposal. Failure to submit inquiries by this deadline may result in the inquiry not being answered. The RF representative will then answer each question and disseminate the answers in writing to each firm or individual that received an RFP. If necessary, the RF representative will issue a written amendment to the Request for Proposal. Oral statements or instructions do not constitute an amendment to this Request for Proposal.

The Research Foundation reserves the right to

1. Reject any and all proposals received in response to this RFP.

2. Request references and financial statements for the most recently completed fiscal year.

3. Contact any or all references.

4. Waive requirements or amend this RFP on notification to all bidders. Mandatory requirements may be eliminated if unmet by all bidders.

5. Adjust or correct cost or cost figures with the concurrence of the bidders if mathematical or typographical errors exist.

6. Negotiate with bidders responding to this RFP within the requirements necessary to serve the best interests of the RF.

7. Begin contract negotiations with another bidder in order to serve the best interests of the RF should the

RF be unsuccessful in negotiating a contract with the successful bidder within an acceptable time frame.

8. Reject any or all portions of any offer, to negotiate terms and conditions consistent with the solicitation, and to make an award for any or all remaining portions.

9. Request clarifications from bidders for purposes of assuring a full understanding of responsiveness, and further to permit revisions from all bidders being considered for contract award, prior to award.

10. Waive minor irregularities.

www.rfsuny.org -3-

Compliance with Laws and Regulations: Non-Discrimination, Equal Opportunity and Affirmative Action Obligations

The awarding of this business and continuation of services are subject to the requirements of Executive Order 11246 and 11375 and the rules and regulations of the Secretary of Labor (41 CFR Chapter 60) in promoting Equal Employment Opportunities.

The successful bidder must certify that it does not and will not discriminate or unduly favor any employees or agents on the basis of race, gender, national origin, religion or disability. As part of this contract, the bidder must agree to comply with all applicable provisions of Section 503, Title V of the Vietnam Era Veterans’ Readjustment Assistance Act of 1972, as the same may be from time to time amended, together with all applicable regulations thereunder and all applicable provisions of Sections 503 and 504 of the Rehabilitation Act of 1973 (Public Law 93-516) as the same may be from time to time amended, together with all applicable regulations thereunder.

Liability and Indemnification

The successful bidder will be responsible for the work, direction and compensation of its employees, consultants, agents and contractors. Nothing in the resulting agreement or the performance thereof by the successful bidder will impose any liability or duty whatsoever on the RF including, but not limited to, any liability for taxes, compensation, commissions, unemployment insurance, Workers’ Compensation, disability benefits, Social Security, or other employee benefits for any person or entity. The successful bidder shall hold harmless and indemnify the RF, their officers and employees from and against any injury, damage, loss of liability to persons or property resulting from or arising out of (a) the agreement, and (b) the acts, omissions, liabilities, or obligations of the successful bidder, any affiliate, or any person or entity engaged by the successful bidder as an expert, consultant, independent contractor, subcontractor, employee or agent.

Additional Terms and/or Conditions

1. The following items will be incorporated into, and made part of, the formal agreement: (1) the RF’s RFP; (2) the successful bidder’s proposal.

2. In the event of any inconsistency in or conflict among the document elements of the agreement described above, such inconsistency or conflict shall be resolved by giving precedence to the document elements in the following order: (1) the Agreement (2) this RFP (3) the successful bidder’s proposal.

3. Any terms that are attached or referenced with a submission shall not be considered part of the bid or proposal, but shall be deemed included for informational purposes only.

4. The resulting agreement shall be binding upon its execution by both parties.

5. The agreement may be revised at any time upon mutual consent of the parties in writing. Such written consent will not be effective until signed by both parties.

6. The relationship of the successful bidder to the RF shall be that of independent contractor.

www.rfsuny.org -4-

7. Proposed prices should reflect all discounts including educational discounts.

8. The submission of a proposal constitutes a binding offer to perform and provide said services. Such binding offer shall be firm and not revocable for a period of 180 days after the deadline for proposal submission and will continue thereafter until the successful bidder notifies the RF otherwise, in writing. Such deadline may be further extended by mutual agreement.

9. In the event successful bidder uses partners, subcontracts or subcontractors, the successful bidder will remain responsible for compliance with all specifications and performance of all obligations under the contract resulting from this RFP.

10. The RF will not be liable for any cost associated with the preparation, transmittal, or presentation of any proposals or materials submitted in response to this RFP.

11. All bids or proposals submitted in response to the solicitation become and remain the property of the RF and should any doubt or difference of opinion arise between the RF and the bidder as to the items to be furnished or the interpretation of the provisions in the solicitation, the decision of the RF shall be final and binding upon all parties.

12. This RFP and the resulting contract shall be governed by the Laws of the State of New York.

13. Public announcements or news releases regarding this RFP or any subsequent award of a contract must not be made by any bidder without the prior written approval of the RF.

14. The successful bidder is responsible for compliance with all applicable rules, regulations, codes, and standards pertaining to cities, towns, counties and State where the services are provided, and all other laws applicable to the performance of the resulting contract. The successful bidder shall provide all necessary safeguards for safety and protection as set forth by the United States Department of Labor, Occupational Safety and Health Administration.

15. The successful bidder must ensure adherence to the prevailing wage rates as mandated by New

York State law.

www.rfsuny.org -5-

Bidders Certification

Bidders must submit the following:

1. This completed certification.

2. Information as requested in Sections 2 through 6.

If you are not submitting a bid proposal, The RF requests the following:

1. Respond “No Bid will be submitted” and state your reason(s).

2. Return only this page to the Issuing Office address on Page 1.

Bidders, please respond to the following inquiries and/or certifications:

1. Is the price quoted the same as or lower than that quoted to other corporations, institutions or governmental agencies for similar service and/or like equipment or supplies?

Yes: _____ No: _____ If no, explain:

2. Does your firm agree that all presentations and materials will be free from racial, religious, or sexual bias?

Yes: _____

3. Are you or any officer of your organization or any part owning or controlling more than 10 percent of your stock if you are a corporation or any member if you are a firm or association, an officer or employee of the RF or of a public benefit corporation of the State of New York?

4. Within the past five years has your firm, any affiliate, any predecessor company or entity, owner, director, officer, partner or proprietor been the subject of a government suspension or debarment?

5. Do you certify that, to the best of your knowledge, that your organization is not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency?

6. Name of Firm:

Address:

City/State/Zip:

Country:

Telephone Number (country code/area code/number):

Fax Number (country code/area code/number):

www.rfsuny.org -6-

Employer’s Federal ID Number:

E-Mail Address:

Bidder’s Name/Title:

Bidder’s Signature/Date: ________________________________________________ www.rfsuny.org -7-

Section 2: Overview

Battery-NY is a new lithium battery technology development and prototyping facility in New York's Southern Tier located at 10 University Blvd., Johnson City, NY 13790. Funded by the U.S. Economic Development Administration and NYS Empire State Development, Battery-NY is led by Binghamton University's Distinguished Professor M. Stanley Whittingham, 2019 Nobel Laureate and inventor of the Li-ion battery.

Battery-NY will build on existing strengths within New York State while advancing the development and enabling the scale-up and advanced manufacturing of batteries for various sectors including transportation, military, and energy, and will establish a robust manufacturing infrastructure that will advance the region by supporting multiple industries and their supply chains.

A first-in-class facility in the United States, Battery-NY will offer companies the latest technologies for the design and manufacture of batteries at up to 30 MWh scale spanning TRL 4-6 (batch sizes typically 1000 cells per campaign), that can be accessed without capital investment. These include a full range of flexible and modular equipment for anode and cathode electrode manufacturing; assembly of pouch, cylindrical and prismatic cells; and associated cell formation and cycling. Located in appropriate clean and dry rooms, the manufacturing equipment will be complemented by a suite of metrology, quality control and forensics equipment, complete with hardware interfaces and software systems (MES, ERP), providing full traceability and automatic data capture with secure storage for analysis and sharing.

Following issuance of the RF Purchase Order, a structured project management process will be followed to ensure key milestones are met with all equipment fully installed, commissioned and operational by 30 March 2027.

www.rfsuny.org -8-

Section 3: Proposal Submission Requirements

Overview

The requirements established by this RFP will be enforced in evaluating proposals. The bidder’s compliance with the format prescribed herein, as well as the bidder’s response to each specific requirement stated in the RFP will be considered during the evaluation process. Therefore, it is in the best interest of each bidder to become familiar with the format required.

General Structure of the Proposal

The bidder’s proposal to include the following key information:

Company background information (formation date, key business activities and focus, customer list and projects overview, annual accounts overview for the past five years, resource availability to support this project, contact details of 2 referees).

At least two references for comparable analytical laboratory installations delivered within the past five years.

Itemized (where possible) and overall project pricing information in U.S. Dollars to fulfill the Essential and Optional business requirements (Section 4) with the ability for Battery-NY to pick and choose items accordingly. Itemized pricing details also to be provided by the bidder in an Excel document.

General assembly drawings (plan and elevation) showing space requirements for main and ancillary equipment.

3D models where possible for virtual plant design.

Utility requirements (electricity, compressed air, chilled water, drainage, HVAC, network connectivity, etc.), including any specific power quality, voltage stabilization, grounding, UPS, or power-conditioning requirements.

Process gas requirements including gas type, purity specification, pressure, flow rate, peak consumption, average consumption, connection requirements, storage recommendations, and safety considerations. Requirements shall be identified separately for nitrogen, argon, helium, compressed air, oxygen, calibration gases, carrier gases, plasma gases, and any other gases required for operation, calibration, maintenance, or standby operation of the proposed equipment.

Complete list of supplied computers, workstations, servers, monitors, networking equipment, software packages, software licenses, and recurring software or cloud costs required for operation of the proposed solution.

Critical spare parts list with pricing.

Ability to part or fully manufacture and/or assemble the equipment in the USA with details.

Project management approach and risk mitigation details (FMEA).

Gantt chart showing main activities from PO placement through to UAT (including transportation), with key milestones and critical path.

Compliance matrix showing how each item listed in the requirements section will be fulfilled, with exceptions, alternatives, or inability to comply with certain aspects of the requirements listed.

The proposed team, their function and qualifications.

Document sharing approach including data security considerations.

Payment schedule including U.S. Dollar bank account details.

Quality control approach.

Terms and conditions.

www.rfsuny.org -9-

Section 4: Business Requirements (Scope Section)

Quality is an important part of any industry, and ensuring consistency throughout production is critical to successful manufacturing.

Battery-NY is seeking analytical instruments and support equipment to outfit the quality laboratory at its lithium-ion battery prototyping and development facility located in Johnson City, New York. The objective of this procurement is to establish a fully instrumented, standards-compliant quality control infrastructure capable of supporting cell prototyping activities from incoming raw material inspection through slurry preparation, electrode manufacturing, cell assembly, electrochemical testing, and finished cell post-mortem analysis.

Battery-NY strongly prefers a single-vendor turnkey solution for the supply, integration, installation, commissioning, training, and support of the equipment specified within this RFP. Vendors proposing a comprehensive solution covering the majority or entirety of the requested equipment portfolio are encouraged to clearly identify the benefits, integration approach, and commercial advantages of their offering. Where subcontractors, channel partners, or partner organizations are utilized, the bidder shall remain solely responsible for overall project delivery, performance, schedule, warranty obligations, and interface management.

Notwithstanding this preference, Battery-NY recognizes that certain suppliers may offer unique, market-leading, or otherwise differentiated capabilities within specific equipment categories. Accordingly, proposals from individual equipment manufacturers or specialist vendors will not be excluded from consideration where a strong technical justification can be demonstrated and where the proposed solution provides clear advantages in technical performance, functionality, capability, reliability, service support, lifecycle cost, or overall value to Battery-NY. Battery-NY reserves the right to award all equipment to a single supplier, multiple suppliers, or a combination thereof as deemed to be in its best interests.

A key objective of this procurement is the creation of a digitally connected laboratory environment rather than a collection of standalone analytical instruments. Battery-NY places significant value on the ability of suppliers to provide open, secure, and maintainable interfaces that enable seamless integration with Laboratory Information Management Systems (LIMS), Manufacturing Execution Systems (MES), quality management systems, data historians, enterprise reporting platforms, and future digital twin initiatives.

Wherever technically feasible, equipment shall support automated data collection, barcode and sample tracking, metadata exchange, audit trails, user authentication, electronic records management, and standardized communication protocols. Vendors shall clearly describe available communication methods, software interfaces, APIs, database architectures, middleware requirements, cybersecurity provisions, software licensing implications, and previous experience integrating their equipment into enterprise laboratory environments.

Battery-NY's long-term vision is to establish complete digital traceability from incoming raw materials through manufacturing, testing, characterization, storage, and post-mortem analysis. Accordingly, interoperability, accessibility of data, ease of integration, cybersecurity, data ownership, and readiness for future LIMS deployment will be important evaluation criteria in addition to technical performance and commercial considerations. Preference will be given to suppliers that support open standards, including OPC-UA, MQTT, REST APIs, SQL-accessible databases, and other non-proprietary communication standards, and that minimize the creation of proprietary data silos which could hinder future laboratory expansion and digitalization initiatives. Preference will also be given to suppliers with demonstrated www.rfsuny.org -10-successful integration into commercial LIMS platforms including LabVantage, STARLIMS, LabWare, SampleManager, Benchling, or equivalent systems. Vendors are encouraged to describe how their solutions support advanced analytics, digital twins, machine learning, artificial intelligence, and other future data-driven initiatives.

Battery-NY shall retain unrestricted ownership, access, export, backup, and archival rights to all data generated by supplied equipment. Vendors shall identify any software licensing restrictions, subscription fees, cloud-hosting requirements, data export limitations, third-party dependencies, and recurring costs associated with operation of the proposed solution.

To support these digitalization and data-management objectives, unless explicitly stated otherwise, all equipment shall be supplied as a complete and fully operational solution. This shall include all control computers, workstations, monitors, servers, software, software licenses, interface hardware, communications hardware, cables, accessories, and other items necessary to achieve the intended functionality and performance specified within this RFP. Vendors shall not assume that Battery-NY will provide computers, servers, operating systems, software licenses, databases, networking hardware, or other supporting infrastructure unless specifically agreed in writing.

Where equipment utilizes dedicated control PCs, workstations, servers, edge-computing platforms, or industrial computing hardware, the supplier shall provide and configure all required hardware and software.

Vendors shall identify hardware specifications, operating systems, software versions, licensing models, cybersecurity provisions, expected support lifecycles, data storage requirements, backup requirements, and any recurring subscription, maintenance, cloud-hosting, or licensing costs associated with the proposed solution.

Vendors shall provide complete utility and process gas requirements for all proposed equipment, including but not limited to electrical power, compressed air, chilled water, drainage, network connectivity, nitrogen, argon, helium, oxygen, carrier gases, purge gases, plasma gases, calibration gases, and any other specialty gases required for operation, calibration, maintenance, startup, shutdown, or standby operation.

As Battery-NY is intended to serve as a flagship battery development, prototyping, scale-up, and manufacturing innovation center, bidders should recognize the significant opportunity for technology demonstration, customer engagement, and commercial visibility associated with participation in this project.

The facility is expected to host industrial partners, government stakeholders, academic collaborators, investors, workforce development organizations, and prospective customers from across the battery value chain.

In recognition of the showcase nature of this project and the unique opportunity for suppliers to demonstrate their equipment, software, and technical capabilities within a world-class battery development environment, Battery-NY expects bidders to provide their most competitive commercial offering. This includes aggressive educational, strategic partnership, reference-site, multi-instrument, demonstration-site, and showcase-facility discounts where available. Suppliers should clearly identify all discounts and commercial incentives included within their proposal. Proposals shall separately identify list price, discount percentage, discount category, and net selling price for each major item of equipment to enable transparent comparison of commercial offerings. Battery-NY will consider the long-term strategic value offered by suppliers who view this project as a flagship reference installation and showcase facility for demonstrating their technologies to current and prospective customers.

www.rfsuny.org -11-

This document constitutes a formal solicitation. Responses must be complete, technically detailed, and fully responsive to all specifications contained herein. Battery-NY reserves the right to request clarification, reject any or all proposals, negotiate with any or all respondents, and make awards in a manner that best serves the technical, commercial, operational, and strategic interests of the organization.

4.1 Material Compatibility

Ref. Description Essential requirement(s) Optional requirement(s) QCL001 Cathode active materials NMC, NMCA, NCA, LFP, LMFP, LMNO, LCO, Prussian white, P2-type, including >90% nickel-rich (moisture sensitive)

QCL002 Anode active materials Graphite, hard carbon, SiOx, Si, LTO, Nb, prelithiated compatible with water-based binders

QCL003 Binders CMC, SBR, PVDF, plus UV curable and others

QCL004 Conductive additives C45, C65, SFG6, KS6L, Super P, Super C65T, CNT

QCL005 Other additives Oxalic acid QCL006 Solvents NMP, DMP, DMSO, H2O

(deionized), Cyrene Acetone

QCL007 Slurry solid content <85% QCL008 Slurry viscosity shear rates 6-700 Pa.s at 0.1/s

3-100 Pa.s at 1/s 1.5-30 Pa.s at 10/s 0.6-7 Pa.s at 100/s 0.3-1.3 Pa.s at 1000/s

QCL009 Current collector types Copper/aluminum foil Nickel, stainless steel, mesh, structured/etched, metallized polymer, carbon primed

QCL010 Copper foil thickness 4 µm to 25 µm QCL011 Aluminum foil thickness 6 µm to 25 µm QCL012 Other current collector thickness Up to 25 µm QCL013 Current collector width 100 mm to 500 mm www.rfsuny.org -12-

4.2 Material Quality Control Equipment

QCL020 Karl Fischer (KF) Moisture Titrator Coulometric AND volumetric titration modes (dual-mode or two-instrument set) Detection Limit: ≤ 1 ppm H₂O (coulometric mode) Moisture Range 1 ppm – 100% H₂O Compatible with Anhydrous methanol, imidazole-free reagents, pyridine-free reagents PTFE/glass wetted parts Internal drift correction Automatic endpoint detection Karl Fischer reagent consumption monitoring Accuracy: ± 0.5% relative moisture Repeatability: RSD ≤ 0.3%

Heated inlet sample port (up to 250 °C) for solid powder analysis Integrated drying oven compatibility

QCL021 Particle Size Analyzer Laser diffraction (static light scattering) measurement system Dynamic Range: 0.01 – 3,500 µm Wet dispersion module Dry dispersion module Mie theory and Fraunhofer theory optical models — selectable by operator Refractive index library with ≥100 materials Automated sampling and rinse capability Ultrasonic probe for dispersion Vibration Isolation — vendor to specify D50 Repeatability: ≤ ± 1% (wet and dry) Accuracy: Traceable to NIST SRM 1003c or equivalent certified reference material

QCL022 Tap Density Analyzer Dual-cylinder option preferred for simultaneous bulk and tap density determination Programmable up to 5,000 taps 10, 25, 100, 250 mL graduated cylinder options Electronic tap counter with www.rfsuny.org -13-automatic stop Deviation ≤ 0.3% of set count Stainless steel framework Anti-vibration mounting Enclosed housing preferred Repeatability: CV ≤ 0.5% for tap density measurement

QCL023 Gas Pycnometer Helium gas pycnometry preferred (inert, small molecular radius) Multi-cell configuration preferred (≥ 2 cells) Automatic run averaging Sample Volume Range: 1 – 150 cm³ Measurement cell temperature controlled at 25 ± 0.1 °C Peltier or water-jacketed Automated purge and fill cycles Operator-selectable number of runs Accuracy: ± 0.02% Repeatability: RSD ≤ 0.05%

QCL024 Contact Angle Goniometer Sessile drop (static) AND dynamic contact angle (advancing/receding) measurement modes Droplet Volume Range: 0.1 – 50 µL Automated dispensing syringe High-speed camera ≥ 1,000 fps Minimum 2 MP resolution Young-Laplace fitting, polynomial fitting, circle fitting

— all available Programmable volume and dispensing rate Angle Resolution: ± 0.1° Repeatability: ± 1°

Temperature-controlled stage (RT to 80 °C), Peltier preferred

QCL025 Powder X-ray diffractometer (PXRD) X-ray source: Cu Kα radiation or technically justified equivalent Measurement range: 5°–80° 2θ Angular resolution: sufficient to distinguish closely spaced crystalline peaks; vendor to document instrument resolution using certified reference materials

Measurement range: 5°–150° 2θ www.rfsuny.org -14-

Angular accuracy and repeatability: demonstrated using traceable reference standards Detector: high-speed solid-state detector or equivalent Capable of qualitative phase identification, quantitative phase analysis, and crystallinity evaluation Software supporting phase identification, reference-pattern matching, and Rietveld refinement Compatibility with air-sensitive or moisture-sensitive sample holders Sample capacity appropriate for research-scale powder quantities Automated sample introduction and autosampler Additional requirements:

Radiation shielding and interlocks, applicable registration and safety documentation, calibration standards, phase-reference database licensing

QCL026 Molecular spectrometer Spectral range: 4,000–650 cm⁻¹ Spectral resolution: ≤4 cm⁻¹ ATR accessory with diamond crystal or chemically compatible equivalent Suitable for solids, powders, films, and liquids Signal-to-noise performance documented under standardized measurement conditions Automated background correction and spectral processing Software supporting library searches, peak identification, spectral overlay, and comparison User-created reference spectral library Repeatable sample pressure or contact control for ATR

Spectral range: 4,000–400 cm⁻¹ Spectral resolution: ≤2 cm⁻¹ www.rfsuny.org -15-measurements Additional requirements:

Chemical compatibility with anticipated solvents and electrolytes, calibration/verification standards, and documented cleaning procedures.

Preferred capability:

Identification of PVDF, CMC, SBR, and other binder materials used in electrode manufacturing, subject to appropriate reference spectra and sample preparation.

QCL027 Optical emission spectrometer Wavelength coverage sufficient for lithium, nickel, manganese, cobalt, iron, phosphorus, aluminum, copper, and other applicable elements Detection limits: low-ppm or better for relevant elements in prepared solutions, with element-specific limits documented Precision: ≤2% RSD for suitable calibration solutions under defined conditions Axial and radial plasma observation capability preferred Automated sample introduction and autosampler Software supporting multi-point calibration, internal standards, drift correction, and quality-control checks Capable of handling appropriately digested battery-material samples Documented performance for high-matrix samples Additional requirements:

Suitable sample digestion equipment, chemical fume hood, argon supply, exhaust system, reference standards, and chemical waste handling

Simultaneous multi-element analysis

QCL028 BET gas adsorption analyzer BET specific surface area Inert-gas degassing capability www.rfsuny.org -16-measurement using nitrogen adsorption at 77 K Measurement range: 0.01– 2,000 m²/g or wider, with demonstrated accuracy over the relevant battery-material range.

Multi-point BET analysis capability Pore-size distribution analysis supported by the adsorption method and pressure range Automated adsorption and desorption measurements Dedicated degassing station with programmable temperature and duration Vacuum degassing capability Multiple sample ports preferred for research efficiency Software supporting BET calculations, isotherm analysis, and data export Additional requirements:

Vacuum equipment, liquid nitrogen supply, sample tubes, calibration/verification materials, and safe handling provisions Preferred capability: Low-surface-area measurement performance appropriate for graphite and cathode materials, with vendor-supplied precision and detection-limit data

QCL029 Thermogravimetric analyzer Temperature range: 20 to 1200°C Temperature accuracy: ±1°C Temperature precision: ±1°C Balance sensitivity: <0.01 µg Sample mass capacity: 0.05–2 g Weighing precision/accuracy:

±0.01% Atmosphere control: Nitrogen and air/oxygen; programmable gas switching Heating rates: 0.01–500°C/min Isothermal testing capability Vacuum capability:

Thermobalance and infrared furnace capable of achieving www.rfsuny.org -17-an ultimate vacuum of 50 µTorr Sample pans:

Ceramic/alumina and other application-compatible options Differential thermal analysis, high resolution TGA, and modulated TGA capabilities Overtemperature protection, purge monitoring, exhaust provisions and gas safety interlocks Automatic Sample Handling:

Up to 25 positions

QCL030 Differential Scanning Calorimeter Temperature range: −90°C to 550°C Temperature accuracy:

±0.1°C Temperature precision:

±0.05°C Heating/cooling rates: 0.1– 50°C/min Calorimetric performance:

Documented heat-flow sensitivity, baseline stability and enthalpy repeatability Enthalpy precision: ±0.1% Atmosphere: Nitrogen and air;

controlled purge Sample containment:

Standard, hermetic and pressure-rated pans as appropriate Test capabilities: Dynamic heating/cooling and isothermal testing Automatic Sample Changer:

Configurable for up to 54 pan positions Modulated DSC capability included

QCL031 Ion chromatograph Capable of anion analysis, including fluoride, chloride, sulfate, nitrate, and phosphate where applicable Cation analysis capability, including lithium, sodium, potassium, ammonium, magnesium, and calcium Conductivity detection with chemical or electrolytic suppression as appropriate www.rfsuny.org -18-

Detection limits: low-ppm minimum; ppb-level preferred for selected ions in suitable aqueous matrices Automated injection and sample sequencing Calibration over concentration ranges appropriate for anticipated samples Software supporting calibration curves, peak identification, integration, and QC verification Compatibility with aqueous extracts and appropriately prepared battery-material samples Documented repeatability and recovery performance Additional requirements:

Eluent preparation or generation, analytical columns, suppressors, standards, filtration equipment, and appropriate sample preparation

QCL032 Combustion elemental analyzer Quantitative determination of carbon, hydrogen, nitrogen, and sulfur Oxygen determination capability, using a dedicated pyrolysis mode or integrated system Measurement ranges appropriate for both high-carbon materials and low-level elemental constituents Detection limits and quantitation limits documented individually for carbon, hydrogen, nitrogen, sulfur, and oxygen Precision: target ≤0.5% absolute for suitable high-concentration reference materials, with element- and concentration-specific performance documented Automated sample introduction preferred Small sample mass capability appropriate for research-scale materials Software supporting www.rfsuny.org -19-calibration, blank correction, reference standards, and QC verification Compatibility with powders, polymers, and other applicable solid materials Additional requirements:

Carrier gases, combustion reagents, calibration standards, sample containers, exhaust requirements, and documented maintenance schedules www.rfsuny.org -20-

4.3 Slurry Quality Control Equipment

QCL040 Rheometer Rotational (steady-state flow)

AND oscillatory (dynamic viscoelastic) measurement modes Capable of measuring the full viscosity profile across shear rate Controlled stress (CS) and controlled rate (CR) Torque Range: 0.0001 – 150 mN·m Angular Velocity: 10⁻⁷ – 300 rad/s Zero-shear viscosity and yield behavior measurement capabilities Thixotropy and recovery testing Gap Setting: 0 – 60 mm Motorized automated gap Parallel plate, cone-and-plate, or concentric cylinder geometry Peltier temperature control: −10 to 200 °C Temperature Stability: ± 0.1 °C Solvent trap Anti-evaporation system Vibration Isolation — vendor to specify Viscosity Range: 0.01 – 8,000 Pa·s Repeatability: ± 1% at 100 Pa·s reference point Step response, strain: ≤ 15 ms to reach 99% of commanded value Step response, rate: ≤ 5 ms to reach 99% of commanded value

Environmental chamber

QCL041 Solids Content Analyzer (% Solids/Moisture Balance)

Halogen or infrared (IR) heating element Balance Resolution: 0.1 mg Sample Capacity: 5 – 30 g Temperature Range: Up to 250 °C Standard, ramp, step, fast, and custom programmable drying profiles Repeatability: ± 0.05% solids content Measurement Time: ≤ 15 minutes for typical electrode slurry samples www.rfsuny.org -21-

QCL042 Dispersion Quality Analyzer (Grindomenter/Hegman Gauge)

Stainless steel precision-ground plate Hegman scale 0–8 (equivalent to 0–100 µm) Manual AND semi-automated models, vendor to specify both options and pricing All wetted surfaces resistant to NMP, DMF, and aqueous solvents Precision ground single channel Resolution: 2.5 µm Repeatability: ± 2.5 µm

Precision ground dual channel if available

QCL043 Density Meter (Slurry & Electrolyte)

Oscillating U-tube digital density meter Density Range: 0 – 3 g/cm³ Resolution: 0.0001 g/cm³ Temperature Control: 15 – 40 °C measurement cell Peltier temperature control Automatic viscosity correction integrated Wetted surfaces resistant to NMP, DMF, EC/DMC, electrolyte solvents, aqueous solutions Accuracy: ± 0.0005 g/cm³ Repeatability: ± 0.0001 g/cm³ Temperature Accuracy: ± 0.05 °C

QCL044 Aqueous Chemistry Analyzer Benchtop multi-parameter meter pH Range: 0 – 14 pH Resolution: 0.001 pH Conductivity Range: 0.001 µS/cm – 200 mS/cm Ion-Selective Electrodes: Li⁺, K⁺, Na⁺, F⁻ Additional ISEs supported Automatic temperature compensation (ATC) on all channels GLP-compliant data logging, date/time stamping, user ID pH Accuracy: ± 0.005 pH Conductivity Accuracy: ± 0.5% Temperature Accuracy: ± 0.1 °C www.rfsuny.org -22-

4.4 Electrode Quality Control Equipment

QCL050 Sheet Resistance Meter (4-Point

Probe) 4-point collinear probe Probe spacing options 1.0 mm and 2.0 mm Measurement Range: 10 mΩ/sq to 10 MΩ/sq Automated X-Y stage for multi-point mapping Minimum 100-point mapping capability Automatic temperature compensation Ambient temperature sensor integrated Instrument-level EMI shielding Minimum Sample Size: 20 mm × 20 mm Accuracy: ± 1% Repeatability: ± 0.5%

QCL051 Film Thickness Gauge Laser triangulation or confocal chromatic (white light) Measurement Range: 0 – 5 mm Resolution: ≤ 0.1 µm Scan Width: ≥ 200 mm for cross-web profiling Inline AND offline configurations required, vendor to specify each Sampling Rate: ≥ 1 kHz Automatic temperature compensation integrated Accuracy: ± 0.5 µm Repeatability: ± 0.1 µm Stand-Off Distance: ≥ 20 mm

QCL052 Areal Loading/Basic Weight Analyzer Non-contact gravimetric measurement Measurement Width: ≥ 300 mm Resolution: 0.01 mg/cm² Automated traverse (scanning) or stationary configuration, in-line preferred Real-time data output to SPC software Alarm on out-of-spec areal loading Accuracy: ± 0.1 mg/cm² Repeatability: ± 0.05 mg/cm² Response Time: ≤ 1 second www.rfsuny.org -23-per data point QCL053 Adhesion/Cohesion Tester (Peel &

Pull-Off) Motorized 90° peel, 180° peel, AND pull-off (z-axis adhesion) probe Load Cell Range: 0 – 100 N, auto-ranging preferred Crosshead Speed: 1 – 500 mm/min, programmable Data Acquisition Rate: ≥ 100 Hz Extensometer: Digital extensometer or optical displacement sensor, vendor to specify Force Resolution: 0.01 N Crosshead Speed Accuracy: ± 1% of set speed Repeatability: ± 2% of reading www.rfsuny.org -24-

4.5 Scanning Quality Control Equipment

QCL060 Elemental Mapping/Composition

Analyzer Wavelength-dispersive X-ray fluorescence (WDXRF) Mapping Resolution: ≤ 100 µm spatial resolution Mapping Area: ≥ 50 mm × 50 mm Multi-element simultaneous detection, certified reference standards required Bulk elemental fingerprint detection Can analyze material ratios and compare data sets Vacuum or helium-purge chamber for light element detection Automated sample introduction and autosampler Instrument-level EMI shielding Detection Limits: ≤ 100 ppm for transition metals (Ni, Mn, Co, Fe, Cu) Energy Resolution: ≤ 145 eV at Mn Kα

QCL061 Confocal Raman microscope Spectral range: 100–3,500 cm⁻¹ Spectral resolution: ≤2 cm⁻¹ Laser excitation: minimum two selectable wavelengths Confocal optical system with adjustable spatial resolution.

Motorized sample stage capable of automated Raman mapping Microscope objectives suitable for powder, electrode, and coating examination Software supporting peak identification, spectral comparison, chemical mapping, and quantitative spectral analysis where validated Laser power control to minimize thermal damage to sensitive samples Spectral library capability with user-defined reference materials

Mapping graphite D, G, and 2D bands to evaluate carbon structural characteristics and spatial variation.

www.rfsuny.org -25-

Additional requirements: Laser safety provisions, wavelength calibration standards, suitable enclosures

QCL062 Dry Room Environmental QC System

Chilled mirror or ceramic capacitive sensor to measure dew point Range: −80 to +20 °C Particle size channels: 0.3, 0.5, 1.0, 5.0 µm Relay alarm outputs with configurable setpoints Visual and audible alarm Data Historian: Integration with plant data historian (OPC-UA or ODBC), SCADA-compatible Battery-backed data retention ≥ 72 hours Dew Point Accuracy: ± 0.2 °C Particulate Count Compliant with ISO 14644-1 Class 6 or better measurement capability Alarm Response Time: ≤ 30 seconds from threshold breach to alarm activation

QCL063 Non-Contact Optical Dimensional Measurement System

Can measure length, width, and depth of parts or electrodes (can also measure diameters of holes, radius of corner rounding, angles, etc.)

Stable edge detection Can measure multiple features simultaneously Can accommodate flat, cylindrical, prismatic, or irregularly shaped components Measurement Range: 0.1 mm to 500 mm Accuracy: ± 0.005 mm

QCL064 3D Optical Profiling Microscope Can accurately map surface with fine details Can measure length, width, and depth of electrode surface features Stable edge detection Can measure multiple features simultaneously Measurement Range: 0.01 mm to 500 mm Accuracy: ± 50 nm

QCL065 Visual Triage/Automated Optical Inspection (AOI) System

Line-scan camera ≥ 2,048 pixels active pixel count www.rfsuny.org -26-

Web Width Coverage: ≥ 300 mm Web Speed: ≥ 20 m/min Defect Resolution: ≤ 100 µm minimum detectable defect diameter Brightfield AND darkfield LED illumination, adjustable angle and intensity Automated defect classification, rule-based and/or AI-assisted, user-trainable Automated defect maps, counts, and trend reports Inline OR offline configurations

— vendor to offer both configurations with pricing False-Positive Rate: ≤ 1% Detection Sensitivity: ≤ 100 µm diameter defect Throughput: ≥ 20 m/min web speed www.rfsuny.org -27-

4.6 Post-Mortem Quality Control Equipment

QCL070 Teardown Bench/Cell Disassembly

Station Stainless steel benchtop ESD-safe surface treatment Anti-static grounding strap connections Integrated exhaust Fire-resistant enclosure panels rated ≥ UL94 V-0 Compatible with dry chemical or CO₂ suppression system connection Insulated, anti-spark tool set included, ceramic or coated cutting elements preferred Compatible with adjacent glovebox transfer Surface ESD resistance ≤ 10⁶ Ω, grounding verified with ESD meter Ventilation Flow: ≥ 150 fpm face velocity

Sealed pass-through port for glovebox transfer

QCL071 Cell Opening Fixtures Can open pouch (≤ 300 mm × 200 mm), 18650 cylindrical, 21700 cylindrical, and prismatic (≤ 200 mm × 150 mm × 50 mm) cell formats Stainless steel construction All terminal-contact surfaces anti-spark coated (ceramic, PTFE, or equivalent) Adjustable clamping force Torque-limited fasteners Alignment guides for repeatable positioning Compatible with manual and semi-automated (motorized) operation Glovebox-compatible dimensions No metal-on-metal spark risk at terminal contacts Insulated clamping jaws Dimensional Repeatability: ± 0.5 mm Damage Tolerance: No tool-induced damage to jelly roll, confirmed by vendor demonstration Confirmed operational inside standard glovebox (300 mm glove port clearance) www.rfsuny.org -28-

QCL072 Air-Sensitive Sample Transfer System

Inert atmosphere (Ar or N₂) sealed transfer vessels Vacuum-sealable sample containers Stainless steel body with PTFE or Viton O-ring seals Adapter kits for SEM, XRD, ICP- MS, XPS instrument sample stages (vendor to specify supported instruments) Wetted surfaces are stainless steel (316L) or PTFE only, no aluminum, copper, or brass in electrolyte-wetted paths Integrated pressure relief valve External labeling window Barcode-compatible label area Cycle Rating: ≥ 500 seal/unseal cycles O₂ Ingress: ≤ 1 ppm O₂ per transfer cycle H₂O Ingress: ≤ 1 ppm H₂O per transfer cycle Cycle Durability: ≥ 500 transfer cycles without seal degradation

QCL073 Stereo Microscope Documentation System

Trinocular stereo microscope Zoom Ratio: ≥ 10:1 Magnification Range: 7× – 90× (with objectives) Integrated high-resolution camera ≥ 12 MP, live preview on monitor LED ring illumination, adjustable intensity and angle Stage Area: ≥ 150 mm × 150 mm X-Y translation stage with measurement scale Area, distance, and angle measurement, calibration overlay, annotation tools Automated Z-stacking for extended depth-of-field images Resolution: ≤ 5 µm at maximum magnification Color Accuracy: ΔE ≤ 2 against reference color target Field Flatness: ≥ 85% across field of view

Oblique illumination on LED ring

QCL074 Sample Archive System −20 °C (frozen archive) and +4 °C (refrigerated) compartments Barcode and/or RFID inventory

N₂ purge for air-sensitive sample sections Inert Atmosphere O₂ Level : ≤ www.rfsuny.org -29-tracking, chain-of-custody logging, access log Bidirectional LIMS integration for sample check-in/check-out and status tracking Lockable, electronic access control with user ID logging Capacity: ≥ 500 sample positions (combined, across temperature zones) Temperature alarm with remote notification (email/SMS) Temperature Uniformity: ± 1 °C throughout storage volume Alarm Response: ≤ 5 minutes from threshold breach to notification

100 ppm O₂ in N₂-purged section

QCL075 Coin Cell Differential Scanning Calorimeter (DSC)

Capable of testing 20 mm coin cells without destructive teardown Measures thermal onset, heat flow, reaction energy, and the sequence of whole-cell thermal events Can correlate thermal events with voltage and evolved-gas analysis when configured correctly Provides a direct comparison of prototype batches, formulations, states of charge, aging conditions, and supplier changes Temperature range: 0 to 600°C for appropriate non-cycling capsules Temperature accuracy: ±0.1°C Temperature precision: ±0.05°C Heating rates: 0.01–20°C/min Baseline flatness: ≤500 µW Baseline repeatability: ≤100 µW Enthalpy precision: ±1% Containment: Designed for anticipated cell venting, gas evolution and pressure hazards Atmosphere: Controlled purge with suitable exhaust provisions

QCL076 Battery Cycler Microcalorimeter Solution

Can conduct sensitive isothermal heat-flow measurements combined with electrochemical cycling Separates cells that look similar electrically but differ in www.rfsuny.org -30-inefficiency, side reactions, or aging behavior Temperature range: 4–150°C, subject to cell and fixture limitations Measurement capability: High-sensitivity isothermal heat-flow measurement Heat-flow performance: Vendor to specify resolution, noise, detection limit, accuracy and drift Temperature stability:

Documented stability suitable for extended microcalorimetry experiments Cell compatibility: Coin cells, 18650 cylindrical cells and pouch cells; specify all supported dimensions Electrochemical integration:

Synchronized potentiostat/cycler and calorimeter operation Cycling modes: Constant current, constant voltage, CCCV and rest/open-circuit testing Measurement outputs: Heat flow, integrated heat, voltage, current, capacity, energy and time Research capabilities: Parasitic heat, self-discharge, SEI formation, entropy-related heat and cycling efficiency Simultaneous testing: Vendor to specify independent test channels and maximum concurrent cell capacity Long-duration testing: Stable operation for multiday and extended aging experiments Overtemperature, overvoltage, overcurrent and abnormal-condition protection www.rfsuny.org -31-

4.7 Reserved

Requirements in Section 4.8 apply where relevant to the design and functionality of the equipment being proposed. Bidders shall identify requirements considered not applicable and provide the basis for that determination.

4.8 Control system (where applicable)

Ref. Description Essential requirement(s) QCL090 Main hardware components and software Siemens Purchaser will provide a list of preferred components to ensure standardization across equipment

QCL091 Incoming electrical supply and isolation

480 V AC, 3 phase, 60 Hz or 120 V AC, single-phase, 60 Hz (if required) Maximum supply voltage deviation ±10% Main isolator lockable only in the off position (with padlock)

QCL092 Control voltage 24 V DC (with overvoltage suppression of inductive loads) 120 V AC for higher current loads

QCL093 Facility connectivity Ethernet capability to connect to the facility LAN Managed switch to separate machine and facility network (type TBA by purchaser) All devices with Ethernet capability to be connected to the switch for remote connectivity

QCL094 Equipment connectivity Distributed Ethernet based Fieldbus system technology shall be used as much as possible to connect peripheral devices (inverters, remote I/Os, measurement systems, etc.) to the PLC system (reduces cabling and aid assembly/dismantling)

QCL095 Electrical shock protection Appropriate barriers to be used to prevent electrocution Outlet sockets to be protected with an RCD/GFCI with appropriate leakage current Protective bonding by connecting exposed conducting parts to earth

QCL096 Motors and protection Three-phase induction motors preferred with high efficiency class Motors and their circuits to protected by circuit breakers (one per motor) providing both short-circuit and overload protection (fuses to be avoided unless specifically required) Frequency controlled motors to include thermistor winding protection Non-inverter fed three-phase motors rated ≥7.5 kW to be started by soft-starter (not DOL/star-delta starter)

QCL097 Equipment monitoring and alarming PLC…