Revised US 127 D-7 WLS.pdf

PDF 98 KB Posted

Attached to
RoW Mow, Trim, & Litter Removal US 127 D-7
Solicitation number
RFB-605-2300000444-2
Issued by
Mercer County, Kentucky

About this file

This document is a Revised Mowing Work Location Sheet for a Route Project in the state of Kentucky. The project involves mowing along various US and state highways across multiple counties, including Franklin, Anderson, Mercer, Boyle, Garrard, and Jessamine. The project covers a total of approximately 108.5 miles, divided into 5 cycles, with a maximum time of 15 working days to complete each cycle. The document provides detailed information on the route numbers, county numbers, beginning and ending mileposts, total lengths, acreage, and number of cycles for each highway segment. The project allows for the use of a batwing mower on certain routes.

The document does not include information on pricing terms, set asides, incumbents, funding requirements, or other salient financial details. It appears to be a technical specification sheet detailing the scope of work and mowing requirements for the state and local transportation agencies involved.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Type 3 Number Removal Route Project Project Mowing of Cntrln.

Number County Number Begin End Length Acres Cycles Miles US 127* Franklin FE01 037-0127 Anderson County Line I-64 4.164 69 3 4.2

4.164

US 127* Anderson FE01 003-0127 US 127B Franklin County Line 2.223 23 3 2.2 5

000-012 (MP 8.897) (MP 11.120)

US 127B* Anderson FE01 003-127B US 127 US 127 6.656 71 3 6.6 5

000-007 (MP 0.000) (MP 6.656)

US 127* Anderson FE01 003-0127 Mercer County Line US 127B 2.535 41 3 2.5 5

000-003 (MP 0.000) (MP 2.535)

US 127* Mercer FE01 084-0127 Morris Road Anderson County Line 11.816 80 3 11.8 5

005-018 (MP 5.334) (MP 17.150)

US 127B* Mercer FE01 084-127B US 127 South US 127 North 4.483 57 3 4.5 5

000-005 (MP 0.000) (MP 4.483)

US 127* Mercer FE01 084-0127 Boyle County Line Cardinal Drive in 3.495 21 3 3.5 5 000-004 (MP 0.000) Harrodsburg

(MP 3.495)

KY 390* Mercer FE01 084-0390 0.286 Mile West of 0.036 Mile West of 1.012 10 3 1 5

-012-014 M Mobley Road

(MP 12.565)

US 127* Boyle FE01 011-0127 Lincoln County Line US 150B 3.442 42 3 3.4

US 127* Boyle FE01 011-0127 US 127B Mercer County Line 2.236 22 3 2.2 5

-007-010 M (MP 8.083) (MP 10.319)

US 127B* Boyle FE01 011-127B US 127 US 127 5.270 74 3 5.3 5

-000-006 M (MP 0.000) (MP 5.270)

US 150B* Boyle FE01 011-150B US 150 US 127 2.272 40 3 2.2 5

-000-003 M (MP 0.000) (MP 2.272)

US 150* Boyle FE01 011-0150 US 150B Lincoln County Line 2.064 33 3 2.1 5

-016-019 M (MP 16.441) (MP 18.505)

US 150* Boyle FE01 011-0150 US 68 US 150 Bypass 8.092 47 3 8.1 5

-000-004 M (MP 0.000) (MP 3.442)

Cycles

000-005 (MP 0.000) (MP 4.164)

Subtotal MP (D-5) 69

4.2

US 127

(MP 13.577)

of

MOWING WORK LOCATION SHEET

Litter

Limits of Projects Number

Type 3 Number Removal Route Project Project Mowing of Cntrln.

Number County Number Begin End Length Acres Cycles Miles

004-013 M (MP 4.234) (MP 12.326)

KY 34 Boyle FE01 -84-0034 500 feet West of Garrard County Line 5.382 41 3 5.4 5

013-018 M Grabruck Street (MP 18.993)

(MP 13.611)

KY 2168* Boyle FE01 011-2168 US127 KY 34 3.088 59 3 3.1 5

000-004 M (MP 0.000) (MP 3.088)

KY 34 Garrard FE01 040-0034 Boyle County Line US 27 1.610 20 3 1.6 5

000-002 M (MP 0.000) (MP 1.610)

US 27* Garrard FE01 040-0027 Lincoln County Line Jessamine County Line 16.417 215 3 16.4 5

000-017 M (MP 0.000) (MP 16.417)

US 27* Jessamine FE01 057-0027 Garrard County Line US 27X 6.011 84 3 6

US 27* Jessamine FE01 057-0027 US 27X Fayette County Line 9.267 110 3 9.3 5

005-016 M (MP 5.803) (MP 15.070)

US 68 Jessamine FE01 057-0068 Jessamine County Line KY 29 6.966 105 3 6.966 5

005-012 M (MP 12.0008) (MP 5.042)

104.337

108.501

Maximum time to complete a cycle: 15 working days.

of Cycles

-000-006 M (MP 0.000) (MP 6.011)

Subtotal MP (D-7) 1195 104.3

GRAND TOTAL 1,264

108.5

*A Batwing Mower will be allowed on this route(s).

MOWING WORK LOCATION SHEET

Sheet 2 of 2

Limits of Projects Number

Sheet1

File details come from the government source that posted it. Updated .