STATEMENT OF WORK

A/C System for CGC OSPREY

REVISED PR RFQ 52000PR23Q0020159

1. BACKGROUND: Contractors shall troubleshoot cutter’s a/c system and performed nitrogen pressure test. Compressor was found to be faulty, and all the compressor oil had been forced into the system. Evidence of a leak in the system was found at the thermostatic expansion valve, which had pipe insulation soaked in compressor oil. Contractor shall determine if the system became over-pressurized due to compressor over-running and the high-pressure relief valve may have released some refrigerant out of the system. Determine if replacement of compressor and TXV, and cleaning oil system of all compressor oil. Contractor shall locate parts for an estimate for repairs.

2. SCOPE: Contractor to remove failed compressor and replace with new to include system recharge and successful OP TEST.

Dates: TBD

Location: 102 Benedict Street, Port Townsend, WA

Time: 0800-TBD

3. REQUIREMENTS: The vendor will provide support for the package detailed below.

3.1. Contractor to replace failed compressor and TXV, replace filter dryer, install new hot gas bypass valve (unit provided), and clean the oil system of all compressor oil, recharge refrigerant and complete a successful OP TEST.

4. POINTS OF CONTACT: MK2 Hayden Chapman 903-771-8380