Revised SOW ITB 2223-013a Pump Valve Replace.pdf

PDF 71 KB Posted

Attached to
Rebid Pump and Valve Replacement
Solicitation number
ITB-04464
Issued by
Alachua County, Glencoe CDP, Florida

About this file

This document is a Revised Scope of Services for ITB 2223-013a, a state and local contract opportunity issued by the Agency in the state of Florida, specifically for Leon County and the City of Tallahassee. The scope of work requires the vendor to provide labor and materials to replace and install one secondary chilled water pump, one isolation valve, and one condenser pump. The minimum acceptable equipment is detailed, including the specific pump and motor models to be installed. The scope of services includes disconnecting and reconnecting the piping, electrical, start-up, and alignment. The contract opportunity is for the Rebid Pump and Valve Replacement project.

The pricing terms, set-asides, incumbents, and funding details are not provided in the document. However, the document does state that the chilled water pump and valve replacement work will require the chiller plant to be shut down, which must be scheduled in advance with the Tacachale Maintenance department.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED SCOPE OF SERVICES

Attachment A

The Agency requires the vendor to provide the necessary labor and materials to replace and install secondary chilled water pump, isolation valve, and condenser pump, per the Scope of Work.

Minimum Acceptable Equipment Description:

Labor and materials to replace (1) existing B & G Chilled Water Pump with new B & G eHSC-Model 150 Chilled Water Horizontal Pump with 100 HP motor and Model 150 Condenser Water Horizonal Pump with 10 HP Motor.

Labor and materials to replace (1) existing B & G Model 150 Condenser Water Horizonal Pump with 10 HP Motor.

Labor and materials to replace (1) – 8” butterfly valve with new flanges to repair valve that is leaking and insulate piping to match the existing.

Scope of Services:

The scope of services shall include the following: disconnect and reconnect of piping, electrical, start up, and alignment.

• Chilled Water Pump #1: Replace existing pump and motor with a pump and motor of similar construction and specifications. Replace flex connectors. Contractor is responsible for all electrical and plumbing connections/modifications and any mounting pad modifications.

• Chilled Water Pump #1 Valve: Replace existing water valve and check valve. Insulate new water valve and check valve. Contractor is responsible for all modifications to existing plumbing where required. Chiller Plant shutdown for valve replacement must be scheduled in advance with Tacachale Maintenance with estimated shutdown time.

• Condenser Water Pump #5: Replace existing pump and motor with a pump and motor of similar construction and specifications. Replace flex connectors. Contractor is responsible for all electrical and plumbing connections/modifications and any mounting pad modifications.

• The services shall include disconnect and reconnect of piping, electrical, start up, and alignment.

File details come from the government source that posted it. Updated .