This document is a Statement of Work (SOW) for the 20th Logistics Readiness Squadron's R-11 Tank Sump Replacement, dated 25 Mar 25. The SOW requires a contractor to replace the tank sump on registration number 08L00022, which involves comprehensive technical specifications for tank handling and modification. Key requirements include performing internal tank atmosphere testing, disconnecting electrical and pneumatic connections, removing the tank using a specialized 6,000-gallon tank rotisserie fixture, fabricating a new sump assembly with specified aluminum alloy and dimensions, welding according to design standards, and repainting the affected area.

The scope of work mandates adherence to DOT 406 specifications and the original tank manufacturer's design requirements. Transportation logistics are handled by the government, which will transport the R-11 tank to the contractor's facility within a 400-mile radius of Shaw Air Force Base and return it after completion. The contractor must make the vehicle available for government inspection upon project completion. No government-furnished property, specific hours of operation, or security requirements are specified in this SOW.

View the file

Other files

File Type Posted
Tank Sump Sources Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

20th LOGISTICS READINESS SQUADRON R-11 TANK SUMP REPLACEMENT 25 Mar 25

1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, other items and services necessary to replace the tank sump on registration number 08L00022 for the 20th Logistic Readiness Squadron.

1.1. SCOPE OF WORK: The R-11 tank will be drained but cannot be assumed to contain a safe atmosphere.

The Contractor must perform internal tank atmosphere testing to ensure safety. The Contractor shall disconnect all electrical connections, air lines, vents, and jet fuel plumbing connections necessary to provide access to the tank sump. To ensure proper accessibility to effectively perform the required work, the tank must be removed and placed in a tank rotisserie fixture made for a 6,000-gallon tank. The tank sump will then be removed in a manner that will prevent damage to the tank body yet allow complete removal of sump and all welds between the sump and tank body. The sump assembly will be fabricated with the designer-specified aluminum alloy, in the specified thickness, and in the specified dimensions IAW the tank data plate. Welds will be completed in accordance with design standards, using the specified filler metal alloy IAW the tank data plate. The replacement sump will be fabricated with same fittings placed in same locations as the original sump. Once welded the tank sump and surrounding tank area affected by the preparation and welding work will be painted to match the surrounding tank area. The tank will then be mounted using correct fasteners and all previous disconnections will be reconnected. Electrical functions of associated connections will be checked, and remaining connections will be checked for leaks.

1.2. STANDARDS: All industry standard methods will be used, DOT 406 spec. The Contractor will ensure design specifications of the original tank manufacturer are met or exceeded.

1.3.TRANSPORTATION: The Government will transport the R-11 to the Contactor’s facility within a 400-mile radius of Shaw Air Force Base. Once complete the Government will transport the R-11 back to Shaw AFB.

1.4. INSPECTION: Upon completion the Contractor will make the vehicle available for inspection by the Government, if desired.

2. GOVERNMENT FURNISHED PROPERTY AND SERVICE: N/A