Revised Exh C Price Prop Add #3 9-23-2024 v2.xlsx

XLSX spreadsheet 139 KB Posted

Attached to
Districtwide Contamination Assessment and Remediation Services
Solicitation number
IN-10376
Issued by
Miami-Dade County, Florida

About this file

This document is the Price Proposal for Districtwide Contamination Assessment and Remediation Services for the Florida Department of Transportation (FDOT), District Six. The solicitation, DOT-RFP-25-6193SD, is for a contract to provide environmental services including contamination assessment, remediation, and related support services. The contract has a Financial Project Number of 249943-5-32-01. The Price Proposal includes line items for direct labor, equipment, sampling/testing, drilling, recovery/treatment, construction/excavation, miscellaneous items, and expendables. Pricing is requested for standard and rush turnaround times on various analytical tests. Transportation and disposal rates are also included. No set quantities are guaranteed, and the unit rates are to remain firm regardless of actual quantities. The contract term and any renewal options are not specified in this document.

The Price Proposal requires the vendor to provide hourly labor rates, daily/weekly/monthly equipment/vehicle rental rates, and unit prices for various analytical tests, drilling services, and expendable materials. No information is provided regarding any set-asides, incumbents, funding sources, or budgets. The document indicates the Department does not guarantee any minimum or maximum quantities under this contract.

View the file

Other files

File Type Posted
Addendum #3 - dated September 23, 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page Exhibit C Price Prop

State of Florida
Department of Transportation

EXHIBIT “C”, Price Proposal

FOR

DISTRICTWIDE CONTAMINATION ASSESSMENT AND REMEDIATION SERVICES FOR
THE FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT SIX
PROJECT/PROPOSAL NUMBER: DOT-RFP-25-6193SD
FINANCIAL PROJECT NUMBER: 249943-5-32-01

Revised Exhibit C Price Proposal - Addendum #3 dated 9/23/2024

Price Proposal Section 1

EXHIBIT "C"
DOT-RFP-25-6193SDPRICE PROPOSAL - SECTION 1
ENVIRONMENTAL SERVICES RATES

PROPOSERS NAME VENDOR ID#

DIRECT LABOR*Straight TimeStraight TimeTotalOvertimeOvertimeTotalTotal Straight
Hourly Rate*XQuantity=Straight TimeHourly Rate*XQuantity=Overtime& Overtime
1-1Contract Manager0.001000$0.00N/AN/AN/A$0.00
1-2Assistant Contract Manager - Technical0.00500$0.00N/AN/AN/A$0.00
1-3Assistant Contract Manager - Administrative0.002000$0.00N/AN/AN/A$0.00
1-4Project Manager0.001500$0.00N/AN/AN/A$0.00
1-5**/***Senior Scientist0.00500$0.00N/AN/AN/A$0.00
1-6Task Manager0.00250$0.00N/AN/AN/A$0.00
1-7 ***Project Scientist0.008000$0.00N/AN/AN/A$0.00
1-8 ***Staff Scientist0.003000$0.00N/AN/AN/A$0.00
1-9Certified Industrial Hygienist0.0075$0.00N/AN/AN/A$0.00
1-10Drafts / GIS Person0.00200$0.00N/AN/AN/A$0.00
1-11Document Control Assistant0.00250$0.00N/AN/AN/A$0.00
1-12Administrative Assistant0.002000$0.00N/AN/AN/A$0.00

$0.00 Sub Total $0.00

FIELD OPERATIONS*Straight TimeStraight TimeTotalOvertimeOvertimeTotalTotal Straight
Hourly Rate*XQuantity=Straight TimeHourly Rate*XQuantity=Overtime& Overtime
1-14Supervisor0.00500$0.000.00100$0.00$0.00
1-15Field Foreman0.00200$0.000.00100$0.00$0.00
1-16Electrician0.0050$0.000.0010$0.00$0.00
1-17Equipment Operator0.00500$0.000.00100$0.00$0.00
1-18Truck Driver0.00250$0.000.0050$0.00$0.00
1-19Senior Technician0.00200$0.000.0050$0.00$0.00
1-20Technician/Laborer0.002000$0.000.00500$0.00$0.00
1-21Pipe Layer0.00100$0.000.0020$0.00$0.00
$0.00Sub Total$0.00
Total Labor$0.00
* These rates are to include overhead, fringe benefits and operating margin.
** Includes, but is not limited to, P.E./P.G.
*** Scientist classification includes those of Engineer, Chemist, Geologist, Hydrogeologist and Scientist.
All costs for Quality Assurance/Quality Control and Accounting/Financial Management are overhead and are not billable.
Overtime is defined as work performed by Field Operations Personnel on weekends, FDOT holidays or after 40 hours of working only in FDOT-D6 projects on any given week.
EQUIPMENTEQUIVALENTDailyDailyTotalWeeklyWeeklyTotalMonthlyMonthlyTotalTotal Daily,
VEHICLES*Unit RateXQuantity=Daily RateUnit RateXQuantity=Weekly RateUnit RateXQuantity=Monthly RateWeekly, Monthly
2-1Automobile0.0030$0.000.003$0.000.001$0.00$0.00
2-2Box Truck - Two ton0.005$0.000.002$0.000.001$0.00$0.00
2-3Pick-up Truck0.00400$0.000.0020$0.000.005$0.00$0.00
2-4Truck (dump, 15CY)0.0030$0.000.003$0.000.001$0.00$0.00
2-5Truck (emergency response)0.0030$0.000.002$0.000.001$0.00$0.00
2-6Truck (vacuum, 3000-gal)0.0015$0.000.001$0.000.001$0.00$0.00
2-7Truck (water)0.0020$0.000.003$0.000.001$0.00$0.00
Daily Total$0.00Weekly Total$0.00Monthly Total$0.00
Total Equipment Vehicles$0.00
* Where applicable, item equivalent can be used (if so, please note) in the column specified.
SAMPLING ANDEQUIVALENTDailyDailyTotalWeeklyWeeklyTotalMonthlyMonthlyTotalTotal Daily,
TREATMENT EQUIPMENT*Unit RatexQuantity=Daily RateUnit RateXQuantity=Weekly RateUnit RateXQuantity=Monthly RateWeekly, Monthly
3-1Air Monitoring Pump (Personal)0.0020$0.000.001$0.000.001$0.00$0.00
3-2Multi Parameter Groundwater Meter0.0020$0.000.001$0.000.001$0.00$0.00
3-3Data Logger0.005$0.000.002$0.000.001$0.00$0.00
3-4Dredge Sampling Device (Ponar)0.005$0.000.002$0.000.001$0.00$0.00
3-5Explosimeter0.0010$0.000.001$0.000.001$0.00$0.00
3-6Handheld GPS Unit0.0050$0.000.002$0.000.001$0.00$0.00
3-7Trimble GPS0.0050$0.000.002$0.000.001$0.00$0.00
3-8High Volume Air Sampling Pump0.005$0.000.002$0.000.001$0.00$0.00
3-9Metal Detector0.005$0.000.002$0.000.001$0.00$0.00
3-10Ground Penetraring Radar (GPR)0.005$0.000.002$0.000.001$0.00$0.00
3-11Oil/water Interface Probe0.005$0.000.002$0.000.001$0.00$0.00
3-12Organic Vapor Analyzer (OVA) /
Flame Ionization Detector (FID)0.0050$0.000.005$0.000.001$0.00$0.00
3-13Organic Vapor Analyzer (OVA) /
Photo Ionization Detector (PID)0.0050$0.000.005$0.000.001$0.00$0.00
3-14Peristaltic Pump w/ hoses and tubing0.0030$0.000.002$0.000.001$0.00$0.00
3-15Water Level Indicator0.0030$0.000.002$0.000.001$0.00$0.00
3-16Turbidity Meter0.0030$0.000.002$0.000.001$0.00$0.00
3-17Pump Sprayer0.0050$0.000.003$0.000.001$0.00$0.00
Daily Total$0.00Weekly Total$0.00Monthly Total$0.00
Total Sampling and Treatment Equipment$0.00
* Where applicable, item equivalent can be used (if so, please note) in the column specified.
=Total
DRILLING*UnitUnit RateXQuantityUnit Rate
4-1Permanent PVC 2" Monitoring Wellper foot0.00300$0.00
4-2Permanent PVC 4" Monitoring Wellper foot0.00300$0.00
4-3Abandonment of Permanent PVC 2" Monitoring Wellper foot0.00300$0.00
4-4Abandonment of Permanent PVC 4" Monitoring Wellper foot0.00300$0.00
4-5Temporary PVC 2" Monitoring Well (including abandonment)per foot0.001,000$0.00
4-6Flush Mount Manhole Cover for 2" and 4" Monitoring Well (installed)per well0.0020$0.00
4-7Soil Boringper foot0.00500$0.00
4-8Drill Rig Mobilization/Demobilization - (one rate to include both Mobilization and Demobilization) - < 50 milesper day0.0050$0.00
4-9Direct Push Technologyfull day0.0050$0.00
4-10Pre-pack Monitoring Well Screen 1" x 5'Each0.0050$0.00
4-11PVC Monitoring Well Riser 1" x 5'Each0.0050$0.00
Total Drilling$0.00
* Rates are to include decontamination of equipment, steam cleaning where applicable and locking well cap with lock (installed).
* Monitoring wells are to be installed by a certified environmental well driller and according to regulatory agency specifications.
ON-SITE RECOVERYDailyDailyTotalWeeklyWeeklyTotalMonthlyMonthlyTotalTotal Daily,
AND TREATMENT EQUIPMENT*EQUIVALENTUnit RateXQuantity=Daily RateUnit RateXQuantity=Weekly RateUnit RateXQuantity=Monthly RateWeekly, Monthly
5-1Carbon Cell 4000 lb0.00200$0.000.0020$0.000.005$0.00$0.00
5-2Carbon Cell 6000 lb0.0050$0.000.001$0.000.001$0.00$0.00
5-3Containment Boom 4"0.005$0.000.002$0.000.001$0.00$0.00
5-4Containment Boom 6"0.005$0.000.002$0.000.001$0.00$0.00
5-5Frac Tank (Mobile-20,000 gallon)0.00200$0.000.0010$0.000.005$0.00$0.00
5-6Jet Pump (4")0.0030$0.000.005$0.000.005$0.00$0.00
5-7Jet Pump (6")0.0015$0.000.005$0.000.005$0.00$0.00
5-8Pool, 10,000 gallon w/ liner0.005$0.000.002$0.000.001$0.00$0.00
5-9Pool, 20,000 gallon w/liner0.005$0.000.002$0.000.001$0.00$0.00
5-10Pump, Centrifugal 3"0.005$0.000.002$0.000.001$0.00$0.00
5-11Pump, Diaphragm 3"0.005$0.000.002$0.000.001$0.00$0.00
5-12Pump, Submersible 2"0.005$0.000.002$0.000.001$0.00$0.00
5-13Lay Flat Discharge Hose 4" x 50'0.0020$0.000.0010$0.000.005$0.00$0.00
5-14Suction Hose 4" x 20'0.00200$0.000.0020$0.000.005$0.00$0.00
Daily Total$0.00Weekly Total$0.00Monthly Total$0.00
Total On-Site Recovery And Treatment Equipment$0.00
* Where applicable, item equivalent can be used (if so, please note) in the column specified.
CONSTRUCTION/EXCAVATIONEQUIVALENTDailyDailyTotalWeeklyWeeklyTotalMonthlyMonthlyTotalTotal Daily,
AND HEAVY EQUIPMENT*Unit RateXQuantity=Daily RateUnit RateXQuantity=Weekly RateUnit RateXQuantity=Monthly RateWeekly, Monthly
6-1Air Compressor, 185 CFM0.0010$0.000.005$0.000.001$0.00$0.00
6-2Backhoe, CAT 4160.005$0.000.002$0.000.001$0.00$0.00
6-3Backhoe, CAT 4260.005$0.000.002$0.000.001$0.00$0.00
6-4Dozer CAT D-60.005$0.000.002$0.000.001$0.00$0.00
6-5Excavator 43,000 - 49,999 lb0.0030$0.000.005$0.000.001$0.00$0.00
6-6Excavator 50,000 - 65,000 lb0.0010$0.000.002$0.000.001$0.00$0.00
6-7Excavator 70,000 - 80,000 lb0.005$0.000.002$0.000.001$0.00$0.00
6-8Jack Hammer (0-90 lb)0.005$0.000.002$0.000.001$0.00$0.00
6-9Jumping Jack Compactor0.005$0.000.002$0.000.001$0.00$0.00
6-10Lowboy 9-20 ton0.0030$0.000.005$0.000.001$0.00$0.00
6-11Lowboy 35 ton0.005$0.000.002$0.000.001$0.00$0.00
6-12Road Tractor0.0030$0.000.005$0.000.001$0.00$0.00
6-13Off Road Dump Truck D-250.005$0.000.002$0.000.001$0.00$0.00
6-14Plate Compactor (20" x 22")0.005$0.000.002$0.000.001$0.00$0.00
6-15Stake Bed (one ton)0.005$0.000.002$0.000.001$0.00$0.00
6-16Street Sweeper0.005$0.000.002$0.000.001$0.00$0.00
6-17Trailer (cargo 16')0.005$0.000.002$0.000.001$0.00$0.00
6-18Trailer, Tank ( 500 gallon )0.005$0.000.002$0.000.001$0.00$0.00
6-19Wheel Loader 1 - 2 cubic yard0.0010$0.000.002$0.000.001$0.00$0.00
6-20Wheel Loader 3 - 3.4 cubic yard0.0010$0.000.002$0.000.001$0.00$0.00
6-21Wheel Loader 3.5 cubic yard0.005$0.000.002$0.000.001$0.00$0.00
6-22Vibry Roller, 80" wide0.005$0.000.002$0.000.001$0.00$0.00
6-23Vibratory Roller 25"0.005$0.000.002$0.000.001$0.00$0.00
6-24Vibratory Roller 32" (riding)0.005$0.000.002$0.000.001$0.00$0.00
Daily Total$0.00Weekly Total$0.00Monthly Total$0.00
Total Construction/Excavation and Heavy Equipment$0.00
* Where applicable, item equivalent can be used (if so, please note) in the column specified.
MISCELLANEOUS EQUIPMENT*EQUIVALENTDailyDailyTotalWeeklyWeeklyTotalMonthlyMonthlyTotalTotal Daily,
Unit RateXQuantity=Daily RateUnit RateXQuantity=Weekly RateUnit RateXQuantity=Monthly RateWeekly, Monthly
7-1Barricades0.00100$0.000.0020$0.000.001$0.00$0.00
7-2Concrete Saw (hand held)0.005$0.000.002$0.000.001$0.00$0.00
7-3Concrete Saw (walk behind)0.005$0.000.002$0.000.001$0.00$0.00
7-4Cutoff Saw0.005$0.000.002$0.000.001$0.00$0.00
7-5Directional Arrow Board0.005$0.000.002$0.000.001$0.00$0.00
7-6Generator, 5 KW0.0020$0.000.0010$0.000.001$0.00$0.00
7-7Generator, 50 KW0.0010$0.000.002$0.000.001$0.00$0.00
7-8Generator, 100 KW0.005$0.000.002$0.000.001$0.00$0.00
7-9Hepa Vacuum0.005$0.000.002$0.000.001$0.00$0.00
7-10Level and Grade Rod0.005$0.000.002$0.000.001$0.00$0.00
7-11Light Plant 6 KW0.0010$0.000.002$0.000.001$0.00$0.00
7-12Pipe Laser and Target0.005$0.000.002$0.000.001$0.00$0.00
7-13Traffic Cones0.001000$0.000.0030$0.000.001$0.00$0.00
7-14Traffic Warning Signs0.00100$0.000.002$0.000.001$0.00$0.00
Daily Total$0.00Weekly Total$0.00Monthly Total$0.00
Total Miscellaneous Equipment$0.00
* Where applicable, item equivalent can be used (if so, please note) in the column specified.
EXPENDABLES*EQUIVALENTUnitRateXQuantity=Total Unit Rate
8-1Absorbent Boom (4")linear foot0.00400$0.00
8-2Asphalt Patch Well/Boringeach0.0050$0.00
8-3Blades, Cut-off Saweach0.0020$0.00
8-4Disposable Bailer (3 ft)each0.0050$0.00
8-5Drum, Steel (closed top)each0.005$0.00
8-6Drum, Steel (open top)each0.0015$0.00
8-7Drum, Overpack (poly)each0.005$0.00
8-8Drum, Overpack (steel)each0.005$0.00
8-9Drum, Poly (55 gal)each0.005$0.00
8-10Dry Icepound0.0010$0.00
8-11Hazard Taperoll0.005$0.00
8-12Hepa Vac Hepa Filtereach0.005$0.00
8-13Isopropyl Alcoholgallon0.0010$0.00
8-14Marking Painteach0.0050$0.00
8-15Oil Drybag0.0020$0.00
8-16Peat Moss40 lb. bag0.005$0.00
8-17Portland Cementbag0.0010$0.00
8-18Reddy-Mix Concretebag0.0010$0.00
8-19Sorbent Padseach0.001000$0.00
8-20Sorbent Rollroll0.0030$0.00
8-21Visqueenroll0.00100$0.00
Total Expenditures$0.00

* Where applicable, item equivalent can be used (if so, please note) in the column specified.

SECTION NO.CATEGORYTOTAL EACH SECTION
1TOTAL LABOR$0.00
2TOTAL EQUIPMENT VEHICLES$0.00
3TOTAL SAMPLING AND TREATMENT EQUIPMENT$0.00
4TOTAL DRILLING$0.00
5TOTAL ON-SITE RECOVERY AND TREATMENT EQUIPMENT$0.00
6TOTAL CONSTRUCTION/EXCAVATION AND HEAVY EQUIPMENT$0.00
7TOTAL MISCELLANEOUS EQUIPMENT$0.00
8TOTAL EXPENDABLES$0.00

SUMMARY TOTAL FOR SECTION 1 $0.00

The Consultant named below agrees that if this agreement is renewed, it shall be renewed for the terms and conditions as set forth in the original agreement.
NOTE: No set volume is intended to be guaranteed by the quantities shown. If the actual quantities during the Agreement period are less than or greater than what is identified, the unit rate shall remain unchanged. The Department does not guarantee any minimums or maximums on this Contract/Agreement.
Company Name
Title
Authorized Signature
Type or Print Name
Address
City, State, Zip
Telephone
Fax

&11Page &P of &N

Price Proposal Section 2

EXHIBIT "C"
PRICE PROPOSAL - SECTION 2
ENVIRONMENTAL SERVICES RATES
DOT-RFP-25-6193SDLABORATORY SERVICES

PROPOSERS NAME: ___________________________________ VENDOR ID#:_____________________________________

PLEASE INDICATE: Standard Turnaround Time ____________________________ Calendar Days Rush Turnaround Time _______________________ hours

ANALYTICAL*Solid MatrixSolid MatrixLiquid MatrixLiquid Matrix
QuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateQuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateTotal Solid & Liquid Matrix
No.Parameter Group
9-1GC/MS-Library Search (up to 20 unknowns) Cost Per Sample50.00$0.0020.00$0.0050.00$0.0050.00$0.00$0.00
9-2Gasoline and Kerosene Analytical Group, FAC 62-770 Table 1500.00$0.00500.00$0.00200.00$0.0050.00$0.00$0.00
9-3Used Oil Analytical Group, FAC 62-770 Table 2, w/o TCLP300.00$0.00200.00$0.00300.00$0.00100.00$0.00$0.00
9-4Other Petroleum as per F.S. 376.301, FAC 62-770 Table 3100.00$0.0050.00$0.00100.00$0.0050.00$0.00$0.00
9-5Chapter 62-780 Tables C500.00$0.00200.00$0.00500.00$0.00100.00$0.00$0.00
9-6Chapter 62-780 Tables D200.00$0.0050.00$0.00200.00$0.0050.00$0.00$0.00
9-7Chapter 62-780 Tables E200.00$0.0050.00$0.00200.00$0.0050.00$0.00$0.00
9-8TRPH Fractation Method- Massachusetts Department of Environmental Protection (MADEP)200.00$0.0050.00$0.00200.00$0.0050.00$0.00$0.00
9-9TRPH Fractation Method- Total Petroleum Hydrocarbon Criteria Working Group (TPHCWG)100.00$0.0050.00$0.00100.00$0.0050.00$0.00$0.00
9-10Total Recoverable Petroleum Hydrocarbons (TRPH) by FL-PRO500.00$0.00200.00$0.00500.00$0.00200.00$0.00$0.00
9-11EPA Method 608 - Organochlorine Pesticides & PCBs (Wastewater)20NO RATE REQUIRED$0.0010NO RATE REQUIRED$0.00200.00$0.0050.00$0.00$0.00
9-12EPA Method 624 - Volatile Organics (Wastewater)20NO RATE REQUIRED$0.0010NO RATE REQUIRED$0.00200.00$0.0050.00$0.00$0.00
9-13EPA Method 625 - Semivolatile Organics (Wastewater)20NO RATE REQUIRED$0.0010NO RATE REQUIRED$0.00200.00$0.0050.00$0.00$0.00
9-14EPA Method 8015 - Non-Halogenated Solvents200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
9-15EPA Method 8260 - VOH300.00$0.00200.00$0.00300.00$0.00200.00$0.00$0.00
9-16EPA Method 8260 - VOA300.00$0.00200.00$0.00300.00$0.00200.00$0.00$0.00

* For parameters or analytical tests where a 24 hour turnaround time is not feasible/available then the earliest possible rush turn around time applies.

PLEASE INDICATE: Standard Turnaround Time ____________________________ Calendar Days Rush Turnaround Time _______________________ hours

ANALYTICAL*Solid MatrixSolid MatrixLiquid MatrixLiquid Matrix
QuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateQuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateTotal Solid & Liquid Matrix
No.Parameter Group
9-17EPA Method 8081- for Organochlorine Pesticides100.00$0.00100.00$0.0050.00$0.0050.00$0.00$0.00
9-18EPA Method 8082 - for PCBs (Arochlor Only)100.00$0.00100.00$0.0050.00$0.0050.00$0.00$0.00
19-Sep9-19EPA Method 8141 - Organophosphorus Pesticides100.00$0.00100.00$0.0050.00$0.0050.00$0.00$0.00
9-20EPA Method 8151 - Chlorinated Herbicides100.00$0.00100.00$0.0050.00$0.0050.00$0.00$0.00
9-21EPA Method 8260 VOC, Priority Pollutant List300.00$0.00200.00$0.00300.00$0.00200.00$0.00$0.00
9-22EPA Method 8270 SVOC, Priority Pollutant List300.00$0.00200.00$0.00300.00$0.00200.00$0.00$0.00
9-23EPA Method 8290 Dioxins200.00$0.0010.00NO RATE REQUIREDNO TOTAL50.00$0.002.00NO RATE REQUIREDNO TOTAL$0.00
9-24EPA Method 8270 PAH's only300.00$0.00200.00$0.00300.00$0.00200.00$0.00$0.00
9-25EPA Method 9020 Total Organic Halides (TOX)5.00NO RATE REQUIREDNO TOTAL2.00NO RATE REQUIREDNO TOTAL50.00$0.0050.00$0.00$0.00
9-26EPA Method 9023 Total Organic Halides (TOX)50.00$0.0020.00$0.005.00NO RATE REQUIREDNO TOTAL2.00NO RATE REQUIREDNO TOTAL$0.00
9-27EPA 300.0 Sulfate5.00NO RATE REQUIREDNO TOTAL2.00NO RATE REQUIREDNO TOTAL50.00$0.0050.00$0.00$0.00
9-28EPA 300.0/353.2 Nitrate5.00NO RATE REQUIREDNO TOTAL2.00NO RATE REQUIREDNO TOTAL50.00$0.0050.00$0.00$0.00
9-29EPA 300.0/353.2 Nitrite5.00NO RATE REQUIREDNO TOTAL2.00NO RATE REQUIREDNO TOTAL50.00$0.0050.00$0.00$0.00
TOTAL FOR GROUP 9 ANALYTICAL$0.00

* The most current version of the Analytical Method is to be used.

PLEASE INDICATE: Standard Turnaround Time ____________________________ Calendar Days Rush Turnaround Time _______________________ hours

ANALYTICAL (METALS)Solid MatrixSolid MatrixLiquid MatrixLiquid Matrix
QuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateQuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateTotal Solid & Liquid Matrix
No.Parameter Group
10-1Aluminum500.00$0.00250.00$0.00500.00$0.00250.00$0.00$0.00
10-2Antimony200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-3Arsenic700.00$0.00500.00$0.00700.00$0.00500.00$0.00$0.00
10-4Barium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-5Beryllium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-6Boron200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-7Cadmium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-8Calcium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-9Chromium500.00$0.00250.00$0.00500.00$0.00250.00$0.00$0.00
10-10Chromium (Hexavalent)200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-11Cobalt200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-12Copper500.00$0.00250.00$0.00500.00$0.00250.00$0.00$0.00
10-13Iron700.00$0.00500.00$0.00700.00$0.00500.00$0.00$0.00
10-14Lead700.00$0.00500.00$0.00700.00$0.00500.00$0.00$0.00
10-15Magnesium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-16Manganese200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-17Mercury200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-18Molybdenum200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-19Nickel200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-20Potassium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-21Selenium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-22Silver200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-23Sodium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-24Thallium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-25Tin200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-26Vanadium200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-27Zinc200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
10-28* TCLP Extraction500.00$0.0025.00NO RATE REQUIREDNO TOTAL500.00$0.0025.00NO RATE REQUIREDNO TOTAL$0.00
10-298 RCRA Metals500.00$0.00250.00$0.00500.00$0.00250.00$0.00$0.00
10-30*SPLP Extraction500.00$0.0025.00NO RATE REQUIREDNO TOTAL500.00$0.0025.00NO RATE REQUIREDNO TOTAL$0.00
10-31SPLP 8 RCRA Metals500.00$0.00250.00$0.00500.00$0.00250.00$0.00$0.00
TOTAL FOR GROUP 10 ANALYTICAL (METALS)$0.00

* The TCLP/SPLP Extraction fee for metals is a per sample fee. Individual metal analysis will be billed separately.

PLEASE INDICATE: Standard Turnaround Time ____________________________ Calendar Days Rush Turnaround Time _______________________ hours

ANALYTICAL (OTHER)Solid MatrixSolid MatrixLiquid MatrixLiquid Matrix
QuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateQuantityXStandard Rate=Total Standard RateQuantityXRush Rate=Total Rush RateTotal Solid & Liquid Matrix
No.Parameter Group
11-1Ammonia200.00$0.00100.00$0.00500.00$0.00200.00$0.00$0.00
11-2Oil and Grease (O & G)200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
11-3Chloride200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
11-4Total Solids50NO RATE REQUIREDNO TOTAL20NO RATE REQUIREDNO TOTAL200.00$0.00100.00$0.00$0.00
11-5Total Dissolved Solids50NO RATE REQUIREDNO TOTAL20NO RATE REQUIREDNO TOTAL200.00$0.00100.00$0.00$0.00
11-6Total Suspended Solids50NO RATE REQUIREDNO TOTAL20NO RATE REQUIREDNO TOTAL200.00$0.00100.00$0.00$0.00
11-7Total Halogens500.00$0.0020NO RATE REQUIREDNO TOTAL200.00$0.0020NO RATE REQUIREDNO TOTAL$0.00
11-8pH50NO RATE REQUIREDNO TOTAL20NO RATE REQUIREDNO TOTAL200.00$0.00100.00$0.00$0.00
11-9Total Organic Carbon200.00$0.00100.00$0.00200.00$0.00100.00$0.00$0.00
TOTAL FOR GROUP 11 ANALYTICAL ( OTHER)$0.00
SECTION NO.CATEGORYTOTAL EACH SECTION
9TOTAL GROUP 9 ANALYTICAL$0.00
10TOTAL GROUP 10 ANALYTICAL (METALS)$0.00
11TOTAL GROUP 11 ANALYTICAL (OTHER)$0.00

SUMMARY TOTAL FOR SECTION 2 $0.00

The Consultant named below agrees that if this agreement is renewed, it shall be renewed for the terms and conditions as set forth in the original agreement.
NOTE: No set volume is intended to be guaranteed by the quantities shown. If the actual quantities during the Agreement period are less than or greater than what is identified, the unit rate shall remain unchaged. The Department does not guarantee any minimums or maximums on this Contract/Agreement.
Company Name
Title
Authorized Signature
Type or Print Name
Address
City, State, Zip
Telephone
Fax

Page &P of &N

Print Price Proposal - Section 2

Price Proposal Section 3

EXHIBIT "C"
PRICE PROPOSAL - SECTION 3
TRANSPORTATION AND DISPOSAL RATES
DOT-RFP-25-6193SD

PROPOSERS NAME VENDOR ID#

DESCRIPTIONUNITSQUANTITYXRATE=TOTAL UNIT RATE
12-1Transportation and Disposal -
Contaminated Material Non-Liquid/Non-HazardousDrum200.00$0.00
12-2Transportation & Disposal - Contaminated Material Non-Liquid/Non-HazardousTon12,0000.00$0.00
12-3Transportation & Disposal - Contaminated Liquid/Non-HazardousDrum200.00$0.00
12-4Transportation & Disposal - Contaminated Liquid /Non-HazardousGallon12,0000.00$0.00
12-5Transportation & Disposal-Non-Petroleum/Non-Hazardous Solid Waste containing material to a Class I LandfillTon5000.00$0.00
12-6Sludge DisposalGallon1,0000.00$0.00
SUMMARY TOTAL FOR SECTION 3$0.00
The Consultant named below agrees that if this agreement is renewed, it shall be renewed for the terms and conditions as set forth in the original agreement.
NOTE: No set volume is intended to be guaranteed by the quantities shown. If the actual quantities during the Agreement period are less than or greater than what is identified, the unit rate shall remain unchanged. The Department does not guarantee any minimums or maximums on this Contract/Agreement.
Company Name
Title
Authorized Signature
Type or Print Name
Address
City, State, Zip
Telephone
Fax

Print Price Proposal - Section 3

Price Proposal Section 4

EXHIBIT "C"
PRICE PROPOSAL - SECTION 4
TOTALS FOR ENVIRONMENTAL SERVICE RATES
FOR SECTIONS 1, 2, & 3
DOT-RFP-25-6193SD

PROPOSERS NAME VENDOR ID#

SECTION NO.CATEGORYTOTAL EACH SECTION
1TOTAL DIRECT LABOR$0.00
2TOTAL EQUIPMENT VEHICLES$0.00
3TOTAL SAMPLING AND TREATMENT EQUIPMENT$0.00
4TOTAL DRILLING$0.00
5TOTAL ON-SITE RECOVERY AND TREATMENT EQUIPMENT$0.00
6TOTAL CONSTRUCTION/EXCAVATION AND HEAVY EQUIPMENT$0.00
7TOTAL MISCELLANEOUS EQUIPMENT$0.00
8TOTAL EXPENDABLES$0.00
9TOTAL GROUP 9 ANALYTICAL$0.00
10TOTAL GROUP 10 ANALYTICAL (METALS)$0.00
11TOTAL GROUP 11 ANALYTICAL (0THER)$0.00
12TOTAL TRANSPORTATION & DISPOSAL RATES$0.00

GRAND TOTAL - ENVIRONMENTAL SERVICES RATES $0.00

The Consultant named below agrees that if this agreement is renewed, it shall be renewed for the terms and conditions as set forth in the original agreement.
NOTE: No set volume is intended to be guaranteed by the quantities shown. If the actual quantities during the Agreement period are less than or greater than what is identified. the unit rates shall remain unchanged. The Department does not guarantee any minimums or maximum on this Contract/Agreement.
Company Name
Title
Authorized Signature
Type or Print Name
Address
City, State, Zip
Telephone
Fax

Print Price Proposal - Section 4 image1.jpeg

File details come from the government source that posted it. Updated .