This document contains a technical specification for a transformer supply opportunity. The U.S. Army Corps of Engineers is seeking bids to supply four 69kV GSU transformers and associated equipment for the Old Hickory Power Plant. Bids are due by May 29, 2020 with an expected award date of June 2020. The specification provides detailed requirements for the transformers, including nameplate data, construction, accessories, ratings, testing procedures, and spare parts. Additional equipment required are control and power cabinets, cooling equipment, monitoring devices, and fall protection equipment. The specification also includes drawings and notes for the transformer requirements.

View the file

Other files

File Type Posted
Section 48 19 23.04 26 Paragraph 2.1.5 - Amendment 3.pdf PDF
W912P519R0004-0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

D R

A W

IN

G

N O

F

IL

E N

A M

E

®of Engineers

US Army Corps

P O

R T

L A

N D

O

R E

G

N

T

E V

E N

R

M

IL

E S

P

.E

P

W E

R H

O U

E

D

F

IL

E

R

A N

S I

D

NAMEPLATE DATA:

TANK AND CONSTRUCTION:

ACCESSORIES:

BUSHINGS:

INSULATING OIL:

∙ NAPTHENIC BASE - ASTM D 3487 TYPE II; 0.3% BY MASS OF OXIDATION INHIBITOR

SEPARATE CONTROL AND POWER CABINETS:

SPARE PARTS:

FACTORY ASSEMBLY AND PAINT:

FACTORY ACCEPTANCE TESTS (F.A.T.):

REQUIREMENTS SUMMARY SHEET

OLD HICKORY DAM 69 KV GSU TRANSFORMERS

(4) COMPLETELY ASSEMBLED AND WITNESSING OF FACTORY ACCEPTANCE TESTS

(3) COMPLETED CORE/COIL ASSEMBLY, BUT PRIOR TO TANKING

(2) AFTER COMPLETION OF WINDINGS BUT PRIOR TO LANDING ON CORE

(1) DESIGN REVIEW MEETING

∙ INSPECTIONS: GOVERNMENT INSPECTIONS PERFORMED DURING

FOR ONE WEEK PRIOR TO OIL FILLING.

∙ INTERIOR PAINT: PRIMER COAT, OIL-RESISTANT FINISH COAT - WHITE. ALLOW TO CURE

SLIP COATING.

STAINLESS STEEL CABINETS, SHALL REMAIN UNPAINTED. COVER TO RECEIVE A NON-

(MUNSELL 5BG 7/0.4 HIGH-GLOSS). CORROSION RESISTANT SURFACES, AND

∙ EXTERIOR PAINT: PRIMER COAT, EPOXY BASE COAT, POLYURETHANE TOP COAT

MATCH-MARKED FOR EASE OF REASSEMBLY.

∙ ASSEMBLY: TRANSFORMER TO BE FULLY ASSEMBLED, WITH REMOVABLE COMPONENTS

SURGE ARRESTERS:

GROUND PAD.

TO DISCHARGE COUNTERS, AND FROM THE DISCHARGE COUNTERS TO A

∙ GROUNDING: #4/0 AWG INSULATED GROUNDING CONDUCTORS FROM ARRESTERS

∙ MOUNTING: REMOVABLE BRACKETS ON TOP OF TRANSFORMER

∙ RATINGS: 48 KV MCOV; 60 KV DUTY-CYCLE

G-003

T R

A N

S F

O R

M E

R R

E Q

U

IR

E M

E N

T S

S U

M M

A R

Y S

H E

E T

O H

P -5

.0

-0

/3

O H

P .0

G

-0 .d g n

∙ SFRA TEST SHIPPING BUSHING: 2.5 KV CLASS, 45 KV BIL, 100 AMP

∙ CORE GROUNDS: 2.5 KV CLASS, 45 KV BIL, 100 AMP

(TWO 200:5 CT, C400 RELAYING ACCURACY)

∙ NEUTRAL (H0): 25 KV CLASS, 150KV BIL, 200 AMP, COMPOSITE EXTERIOR WITH RIS) CONDENSER CORE DESIGN

FOR THE TRANSFORMER TEMPERATURE MONITOR SYSTEM)

CONTAMINATION, 125 ºC TEMPERATURE RISE RATING (BUSHING CURRENT TRANSFORMERS AS REQUIRED

∙ PRIMARY WINDING (X): 25 KV CLASS, 150 KV BIL, 5,000 AMP, PORCELAIN CONSTRUCTION, LOW CORONA BULK-TYPE, LIGHT

(PROVISIONS FOR FUTURE INSTALLATION OF TWO MRCT)

RESIN-IMPREGNATED SYNTHETIC (RIS)CONDENSER CORE DESIGN

∙ SECONDARY WINDING (H): 230KV CLASS, 900 KV BIL, 1,200 AMP, COMPOSITE EXTERIOR WITH

∙ FREQUENCY: 60 HZ

∙ MAXIMUM LOAD LOSSES AT 69 KV: 90 KW

∙ MAXIMUM NO-LOAD LOSSES AT 69 KV: 180 KW

∙ MAXIMUM SOUND LEVEL (ONAF)AT 69 KV: 68 DB

∙ OIL PRESERVATION SYSTEM: NITROGEN GAS BLANKETED

∙ TEMPERATURE RISE: 65 ºC

5 TAPS; 2 @ +2.5%, 2 @ -2.5% OF SELECTED NOMINALDETC 2:

NOMINAL TAP SELECTOR 161 OR 69 KVDETC 1:

∙ SECONDARY WINDING (H) DETC(S):

∙ IMPEDANCE: 7.5 % (H-X, 69kV)7.5 - 12% (H-X, 161 kV)

∙ PHASING: THREE-PHASE

∙ BIL LEVELS, KV: 650 (H) / 110 (X) / 150 (H0)

∙ VOLTAGE RATINGS: 161,000 Y x 69,000 Y (H) - 13,200 DELTA (X)

∙ KVA RATING: 75,000 / 100,000

∙ COOLING CLASS: ONAN/ONAF

∙ TYPE: CLASS II GSU POWER TRANSFORMER

VERTICAL-DRAFT.COOLING FANS:∙

HOT-DIP GALVANIZED.RADIATORS:∙

CONSTRUCTION.

ORIENTED STEEL. MAXIMUM DESIGN FLUX DENSITY OF 1.75 TESLA. STEP-LAP

LAMINATIONS MAXIMUM THICKNESS OF 0.270MM, COLD-ROLLED, GRAIN-CORE:∙

COMPONENTS.

SEISMIC CALCULATIONS REQUIRED FOR MAIN TANK AND ALL MAJORSEISMIC:∙

DESIGN LOADS FOR EACH EYE SHALL BE TWO TIMES THE ACTUAL LOAD.LIFTING EYES:∙

DESIGNED FOR PAD MOUNTING WITH SEISMIC WELDING TO STEEL PLATES.BASE:∙

CAGE AND LOCKABLE LADDER GUARD, POWDERCOATED YELLOW.

FIXED STEEL LADDER WITH WALK-THRU HANDRAIL ACCESS, SAFETYACCESS LADDER:∙

ANCHOR POST.

LUG, DBI-SALA MODEL 8517412, DESIGNED FOR USE WITH THE DBI-SALA FALL ARREST

QTY 2 UNI-ANCHOR PLATE ANDPORTABLE FALL ARREST ANCHOR POST MOUNTING PLATE:∙

STAINLESS STEEL BALL-TYPEVALVES:∙

CROSS-SECTION.

O-RING GASKETS SHALL NOT BE USED FOR GASKET GROOVES OF RECTANGULAR

EXCEPTION THAT THE LOW-VOLTAGE BUSHINGS GASKETS WILL BE VITON.

NITRILE NBR (BUNA-N), DURO 50-70, 25% COMPRESSION, WITH THEGASKETS:∙

24-INCH DIAMETER (MINUMUM ONE)MAN-HOLE:∙

∙ SURGE ARRESTER DISCHARGE COUNTERS (BOWTHORPE SC13)

∙ PORTABLE FALL ARREST SYSTEM ANCHOR POST WITH DAVIT ARM (DBI-SALA, MODEL 8516691)

∙ ELECTRONIC PRESSURE MONITOR, WITH THREE SENSORS ON MAIN TANK (QUALITROL 930)

WINDING TEMPERATURE MEASUREMENT (QUALITROL QTMS)

∙ TRANSFORMER TEMPERATURE MONITOR WITH COOLING CONTROLS AND FIBER-OPTIC

∙ ON-LINE DISSOLVED GAS AND MOISTURE CONTENT MONITOR (SERVERON TM8)

∙ DIRECTED-FLOW PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING (QUALITROL XPRD)

∙ DUAL-TANK NITROGEN REGULATOR CABINET WITH ELECTRICAL PACKAGE

∙ OIL LEVEL INDICATOR

∙ WTI AND OTI GAUGES

LETTERING.

CONTROL AND POWER CABINETS SHALL BE ANODIZED ALUMINUM OR STAINLESS STEEL WITH ENGRAVED BLACK

LOW-VOLTAGE BUSHINGS MADE OF STAINLESS STEEL WITH BLACK LETTERING. DEVICE NAMEPLATES WITHIN THE

ALSO BE PROVIDED. EQUIPMENT NAMEPLATES SHALL BE PROVIDED FOR THE HIGH-VOLTAGE BUSHINGS AND

CALCULATED X/R RATIO. AN ADDITIONAL DIAGRAM NAMEPLATE FOR SLING LOCATIONS AND LIFT POSITIONS SHALL

PLANT LOCATION, GOVERNMENT CONTRACT NUMBER, PRESSURE AND VACUUM THE TANK WILL WITHSTAND, AND

∙ NAMEPLATES: CAST BRONZE OR STAINLESS STEEL; IEEE C57.12.00, TABLE 7, INCLUDING MANUFACTURING DATE,

- FOLD-DOWN MAINTENANCE TRAY ON INSIDE OF CONTROL CABINET DOOR.

HUMIDISTAT / THERMOSTAT CONTROL.

- PTC RESISTOR DESIGN ENCLOSURE HEATERS WITH INTEGRAL FANS, AND INDUSTRIAL GRADE

- 120 V AC, 20 A HOSPITAL GRADE GFCI RECEPTACLE MOUNTED INSIDE THE CONTROL CABINET.

- 120 V AC, 1,000 LUMEN LED TYPE A19 LAMPS WITH DOOR-ACTUATED SWITCH.

- ALL CIRCUITS, WIRING AND EQUIPMENT RATED GREATER THAN 120 V AC TO BE MOUNTED IN POWER CABINET.

VIEWING.

PANEL WITHIN CONTROL CABINET, WITH WEATHERPROOF WINDOW PROVIDED IN CABINET DOOR FOR

- TRANSFORMER TEMPERATURE MONITOR (QUALITROL QTMS), WITH HMI MODULE MOUNTED ON SWING

WEATHERPROOF WINDOW PROVIDED IN CABINET DOOR FOR VIEWING.

- TWO 10 PT. ANNUNCIATORS (SEL MODEL 2533) MOUNTED ON SWING PANEL WITHIN CONTROL CABINET, WITH

∙ SPECIAL FEATURES:

- 125 AND 250 V DC CIRCUITS - RATED 125/250 OR 250 V DC, AND 10,000 A INTERRUPTING

- 120 V AC CIRCUITS - RATED 250 V DC AND 120/240 OR 240 V AC, AND 10,000 A INTERRUPTING

- 480 V AC CIRCUITS - RATED 600 V AC AND 35,000 A INTERRUPTING AT 480 V AC

∙ MOLDED-CASE CIRCUIT BREAKERS:

120 V AC CIRCUITS - 10 A

- SINGLE-BREAK INDUCTIVE LOAD INTERRUPTING RATING: 125 V DC CIRCUITS - 1.5 A;

- RATED FOR 600 V AC OR 250 V DC

∙ SWITCHES:

120 V AC CIRCUITS - 6.0 A

- SINGLE-CONTACT INDUCTIVE LOAD INTERRUPTING CAPACITY: 125 V DC CIRCUITS - 1.0 A;

- RATED FOR 125 V DC OR 120 V AC; MEETS REQUIREMENTS OF NEMA ICS5; 10 A CONTACTS

∙ AUXILIARY RELAYS:

∙ TERMINAL BLOCKS: 600 V, 30 A MINIMUM, 90 ºC RATED TERMINATIONS.

BOXES SHALL BE CAST ALUMINUM WITH CAST COVERS AND LIQUID-TIGHT HUBS.

ALL CONDUIT THREADED JOINTS SHALL HAVE A CONDUCTIVE JOINT COMPOUND APPLIED. OUTLET AND JUNCTION

∙ CONDUIT: ALL WIRING TO BE RUN IN CONDUIT. WIRE RUNS THROUGH TANK REINFORCING CHANNELS NOT ALLOWED.

PHASE C - YELLOW; GROUNDED NEUTRAL - WHITE; INSULATED GROUND - GREEN/YELLOW

∙ WIRING: XLPE; 3-PHASE POWER CONDUCTORS COLOR CODED: PHASE A - BROWN; PHASE B - ORANGE;

COOLING FANS - 480 V AC, 3-WIRE, 3-PHASE, 60 HZ

∙ GOVERNMENT-FURNISHED POWER: CONTROL POWER - 125 V DC; ANNUNCIATION POWER - 125 V DC;

SIDE PANELS OF ENCLOSURES.

VIEWING QUALITROL QTMS AND ANNUNCIATOR IN CONTROL CABINET. SOLAR SHIELDING ON TOP, FRONT AND

∙ CABINET MATERIAL: WEATHER-PROOF TYPE 304 STAINLESS STEEL WITH LOCKING PROVISIONS. WINDOWS FOR

∙ ANALOG TEMPERATURE GAUGE FUNCTIONAL VERIFICATION

∙ BUSHING CURRENT TRANSFORMER ROUTINE TESTS

CAPACITANCE AND POWER FACTOR TESTS DURING TRANSFORMER F.A.T.

∙ EACH HIGH-VOLTAGE AND HIGH-VOLTAGE NEUTRAL BUSHING SHALL UNDERGO

∙ ALL ELECTRICAL AND ELECTO-MECHANICAL DEVICES SHALL BE FUNCTIONALLY TESTED

∙ DE-ENERGIZED TAP CHANGERS MECHANICAL OPERATIONAL TEST (5 COMPLETE CYCLES)

CONFIGURATION

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER IN THE SHIPPING

AND OIL FILLED

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER FULLY ASSEMBLED

- CABLE INTEGRITY TEST REQUIRED

∙ SWEEP FREQUENCY RESPONSE ANALYSIS (WITH ELECTRONIC DATA FILES)

∙ LEAKAGE REACTANCE (WITH ELECTRONIC DATA FILES)

500 PC; ONE HOUR LEVEL: 300 PC

∙ INDUCED VOLTAGE TEST ACCEPTANCE CRITERIA: 7,200 CYCLE ENHANCEMENT LEVEL:

∙ AUDIBLE SOUND LEVEL TESTS SHALL BE PERFORMED ON ONE TRANSFORMER

∙ LIGHTNING IMPULSE TESTS

TRANSFORMERVOLTAGE RATINGS ON ONE

∙ TEMPERATURE RISE TESTS SHALL BE PERFORMED AT EACH COOLING STAGE FOR BOTH HIGH

∙ ALL 'ROUTINE' TESTS (IEEE C57.12.00, TABLE 17)

H

Y D

R O

E L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R

L D

H

IC

K O

R Y

L O

C K

A N

D D

A M

C U

M B

E R

L A

N D

T R

A N

S F

O R

M E

R S

U P

P L

Y

D E

S

IG

N D

F

IL

E

R

B

B O

U W

M A

N

(REFERENCE SPECIFICATION SECTION 48 19 23.04 26)

∙ (QTY 1): VALVE OF EACH TYPE

∙ (QTY 1): PRESSURE REGULATOR FOR NITROGEN EQUIPMENT

∙ (QTY 1): FUSE OF EACH TYPE AND RATING

∙ (QTY 3): FIBER OPTIC EXTENSION CABLE

∙ (QTY 1): CRATED RADIATOR COMPLETE WITH INLET AND OUTLET ISOLATING VALVES

∙ (QTY 2): COOLING FAN COMPLETE WITH MOTOR

∙ (QTY 1): BUSHING CURRENT TRANSFORMER OF EACH TYPE AND RATING

∙ (QTY 1): OIL TEMPERATURE INDICATOR

∙ (QTY 1): WINDING TEMPERATURE INDICATOR

∙ (QTY 1): LIQUID LEVEL INDICATOR

∙ (QTY 1): TRANSFORMER TEMPERATURE MONITOR MODULE OF EACH TYPE

∙ (QTY 1): ELECTRONIC PRESSURE MONITOR AND ONE PRESSURE TRANSDUCER

∙ (QTY 1): PRESSURE RELIEF DEVICE SEAL KIT AND RECOMMENDED SPARE PARTS KIT

∙ (QTY 1): PRESSURE RELIEF DEVICE

∙ (QTY 1): RELAY AND CONTACTOR OF EACH TYPE AND RATING

∙ (QTY 1): COMPLETE SPARE ANNUNCIATOR DEVICE

∙ (QTY 2): SET OF GASKETS FOR TRANSFORMER REASSEMBLY

∙ (QTY 1): COMPLETE GASKET SET

∙ (QTY 3): STORAGE STANDS FOR ALL SPARE BUSHINGS

∙ (QTY 1): 25 KV LOW-VOLTAGE WINDING BUSHING

∙ (QTY 1): 25 KV HIGH-VOLTAGE NEUTRAL BUSHING

∙ (QTY 1): 230 KV HIGH-VOLTAGE WINDING BUSHING

c la ri fi e d l o a d /n o -l o a d l o s s e s a t k V