This is a scope of work document for the Christian County, Kentucky roadway maintenance contract (FE01 024) detailing mowing and litter removal services across multiple state and local routes. The project encompasses 229.369 total miles of roadway maintenance across 24 separate route segments, including I-24, US-41, US-68, and various Kentucky state highways (KY-91, KY-109, KY-189, KY-800, and others). The contract requires Type 2 and Type 3 mowing services across 899 acres with a combined anticipated 1,995 mowing cycles, as well as litter removal across 79.5 miles with three removal cycles. The scope indicates that a Batwing Mower may be utilized on designated routes, and certain routes contain additional features such as retention basins requiring mowing. The maximum timeframe to complete a mowing cycle is 15 working days. The contract covers Christian County's 2022 maintenance year on a three-fifths cycle schedule.
The document specifies specific route segments identified by route number, project number, milepost locations, and detailed acreage and cycle requirements for each section. Certain routes marked with asterisks indicate where Batwing Mowers are permitted and where litter removal is required. One route (US-41A) contains two retention basins requiring mowing in addition to standard roadway maintenance. The specification provides comprehensive geographic parameters, defining route boundaries by adjacent county lines and intersecting roadways to ensure accurate service delivery across all designated segments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Route Number System County Project Number From To
Project Length
Type 2 Mowing Acres
Anticipat ed Number of Cycles
Type 3 Mowing Acres
Anticipat ed Number of Cycles
Litter Removal Miles
Number of Cycles
I24*# I Christian FE01 024 I24 069-093
Trigg Co Line
(MP 69.760)
Tennesee St Line
(MP 93.303)
23.543 211 1 639 2 24 5
KY 91 MP Christian FE01 024 0091 000-015
KY 1682
(MP 0.679)
Caldwell Co Line
(MP 15.132)
14.453 35 42 3
KY 109 RS Christian FE01 024 0109 010-033
US 41/68
(MP 10.945)
Hopkins Co Line
(MP 33.858)
22.913 83 147 3
KY 189 RS/MP Christian FE01 024 0189 000-016
Todd Co Line
(MP 0.00)
Muhlenberg Co Line
(MP 16.111)
16.111 59 77 3
KY 800 SU/RS Christian FE01 024 0800 006-014
US 41
(MP 6.535)
KY 189
(MP 14.463)
7.928 29 39 3
KY 813 RS Christian FE01 024 0813 000-004
KY 189
(MP 0.00)
Hopkins Co Line
(MP 4.326)
4.326 16 14 3
KY 1296 RS Christian FE01 024 1296 000-005
KY 1348
(MP 0.00)
US 41
(MP 5.155)
5.155 9 9 3
KY 1348 RS Christian FE01 024 1348 000-010
KY 398
(MP 0.00)
KY 800
(MP 10.159)
10.159 37 40 3
KY 1914 RS Christian FE01 024 1914 000-005
KY 800
(MP 0.00)
KY 189
(MP 5.931)
5.931 22 23 3
US 41*# MP Christian FE01 024 0041 000-011 M
Todd Co Line
(MP 0.000)
Pennyrile Pkwy
(MP 10.390)
10.39 38 52 3 10.3 3
US 41 MP Christian FE01 024 0041 014-031
KY 1682
(MP 14.786)
Hopkins Co Line (MP 31.574)
16.79 40 49 3
US 41A*#^ MP Christian FE01 024 0041A 000-014 M
Tennessee State Line (MP 0.000)
Pennyrile Pkwy
(MP 13.243)
13.243 48 137 3 13.2 3
US 68B*# MP Christian FE01 024 0068B 000-012 M
US 68
(MP 0.000)
US 68
(MP 11.026)
11.026 40 166 3 11 3
KY 1682*# MP Christian FE01 024 1682 000-005 m
US 68
(MP 0.000)
KY 107
(MP 5.894)
5.894 21 80 3 5.8 3
KY 1682 MP Christian FE01 024 1682 005-0014
KY 107
(MP 5.89)
KY189
(MP 14.973)
9.083 22 22 3
US 68*# MP Christian FE01 024-0068 000-008
Trigg Co Line
(MP 0.00)
KY 1682
(MP 7.137)
7.137 26 126 3 7.1 3
US 68*# MP Christian FE01 024-0068 014-022
US 68B
(MP 14.120)
Todd Co Line
(MP 21.114)
6.994 25 153 3 7 3
Christian Co 2022 (3/5 Cycles)
KY 788*# MP Christian FE01 024-0788 000-001
Ft. Campbell Military (MP 0.00)
US 41A
(MP 1.111)
1.111 4 10 3 1.1 3
KY 107 MP Christian FE01 024 0107 020-036
Grimes Ave
(MP 20.02)
Todd Co Line
(MP 36.151)
16.131 59 81 3
KY 398 RS Christian FE01 024 0398 000-006
KY 91
(MP 0.00)
Beach Rd
(MP 6.120)
6.12 21 21 3
KY 800 MP Christian FE01 024 0800 000-006
KY 109
(MP 0.00)
KY 1348
(MP 6.351)
6.351 23 27 3
KY 800 MP Christian FE01 024 0800 014-018
KY 189
(MP 14.463)
KY 107
(MP 18.569)
4.106 15 20 3
KY 1338 MP Christian FE01 024 0800 000-004
KY 109
(MP 0.00)
Hopkins Co Line
(MP 4.474)
4.474 16 21 3
Total 229.369 899 1995 79.5
* A Batwing Mower may be used on this route(s).