REVISED ADDENDUM #1- NRP OC BOATHOUSE NATURE CTR.pdf

PDF 65 KB Posted

Attached to
NRP ROOF REPLACEMENT PROJECT
Solicitation number
BPM037757
Issued by
Worcester County, Maryland

About this file

This document is an Addendum #1 for the NRP Ocean City Boathouse Nature Center Roof Replacement project, Project No. P-036-220-010, located in Worcester County, Maryland. The addendum provides clarifications and revisions to the project scope, including changes to the removal and replacement of boot flashing on plumbing vent pipes, the removal and installation of new soffit material, and the removal of specifications for ridge vents and exhaust vent hoods. The pre-bid meeting minutes and sign-in sheet are also made part of this addendum. Contractors are instructed to use the revised bid form when submitting their bids.

The related state and local contract opportunity is for the NRP Roof Replacement Project, which requires the contractor to provide all labor, equipment, materials, supplies, insurance, etc. necessary to remove and replace the existing asphalt roof, gutters, and downspouts at the NRP Boathouse located in Ocean City, Maryland, within Worcester County. No additional details are provided regarding pricing terms, set-asides, incumbents, funding requirements or sources, or contract term and renewal options.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 1 June 28, 2023

Addendum #1-#3

Project No # P-036-220-010

Roof Replacement

NRP Ocean City Boathouse

Answers/Clarifications of issues from the Pre-Bid Meeting held on June 20th, 2023.

Please make the following changes in the specifications for the referenced project:

1. Page IV-1, A. SCOPE, 2, c.

REMOVE: c. Remove and replace the boot flashing on 1 plumbing vent pipe.

ADD: c. Remove and replace the boot flashing on 2 plumbing vent pipes.

2. PageIV-1, A. SCOPE, 2, j.

ADD: j. Remove and properly dispose of existing soffit material. Install new soffit.

3. PageIV-4, F. MATERIALS AND SUPPLIES, 2, g.

REMOVE: g. Ridge Vent: Shall be 12” Filtered vent manufactured by CertainTeed or an approved equal.

PageIV-6, G. METHOD OF WORK, 2. Specifics: d.

REMOVE: d. Cut ridge vents in the sheathing 3”(inches) from the top of the ridge and start and end 6”(inches) from each ridge end as recommended by the ridge vent manufacturers instructions.

4. Page IV-6, G. METHOD OF WORK, 2. Specifics: i.

REMOVE: i. Properly install the galvanized steel exhaust vent hood as per the manufacturer’s instructions. Ensure that the joints are sealed with the approved duct mastic sealants and tapes.

The Pre-bid meeting minutes and Sign-in sheet are made part of this addendum.

Please use the attached REVISED BID FORM when submitting your Bid.

-END OF ADDENDUM NO. 1-

File details come from the government source that posted it. Updated .