This is a project plan and construction document set for Curtis Parkway Phase I in Gordon County, Georgia, prepared for the City of Calhoun. The project involves the reconstruction of approximately 0.44 miles of Curtis Parkway from station 101+00 to 125+50, with actual construction occurring between stations 101+44.87 and 124+66.48. The work includes mill and inlay asphalt paving, drainage improvements, utility relocation, sidewalk construction, sign installation, and erosion control measures. Key quantities include approximately 8,373 tons of recycled asphalt concrete in various grades, 4,842 linear feet of concrete curb and gutter, 228 cubic yards of Class B concrete, 300 cubic yards of rock excavation, and comprehensive storm drain piping ranging from 18 to 30 inches in diameter. The design accommodates a 35 miles per hour speed limit on this urban roadway classified as 7U-Local (Urban) within District 14. Plans were completed on July 10, 2026, and the project involves coordination with multiple utility providers including Georgia Power, AT&T, Comcast, Atlanta Gas Light, and the City of Calhoun for water, sewer, and electric services.
The project requires contractor submission of staging narratives for approval by the City and Engineer of Record prior to construction commencement, with formal staging plans subject to owner review and acceptance. A Notice ofIntent (N.O.I.) is required for this project, and contractors are responsible for obtaining all necessary permits. The contractor must provide an environmentally approved disposal site for existing bridge and construction debris at no additional cost to the department. Erosion and sediment control measures are detailed throughout the specifications, including temporary silt fencing, inlet sediment traps, rock filter dams, and permanent turf reinforcement matting. The project includes permanent utility easements and requires maintenance of all existing drainage structures within construction limits at no additional cost. Right-of-way acquisition and property easements are indicated on the construction plans, with multiple parcels and owners identified for coordination during the project phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rev_7 ISSUE FOR BID Phase II 7_21_2026.pdf | ||
| Curtis Parkway Phases I _ II Bid Package .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEGIN PROJECT
STA 101+00
END PROJECT
STA 125+50
CURTIS PARKWAY
STA 101+44.87
LAUREL CREEK ROAD
STA 11+14.68
(BEGIN CONSTRUCTION)
CURTIS PARKWAY
STA 109+72.53
PROFESSIONAL COURT
STA 11+00.88
CURTIS PARKWAY
STA 116+56.41
DOGWOOD DRIVE SOUTH
STA 10+83.33
CURTIS PARKWAY
STA 124+66.48
DOGWOOD DRIVE NORTH
STA 10+87.13
(END CONSTRUCTION)
.4
.4
PROJECT
MILES
PLANS COMPLETED 07-10-2026
REVISIONS
0.4397
0.4397
PLAN AND PROFILE OF PROPOSED
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
0.4397
LENGTH OF PROJECT
8,800 (2022)TRAFFIC A.D.T.:
12,600 (2045)TRAFFIC A.D.T.:
1,200TRAFFIC D.H.V.:
0.54DIRECTIONAL DIST:
SPEED DESIGN:
2%24 HR.TRUCKS %:
2%% TRUCKS:
DESIGN DATA:
GORDON
COUNTY No.129
BIND THE CITY OF CALHOUN IN ANY WAY.
HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT
UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS.
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
LOCATION & DESIGN
7U-LOCAL(URBAN)
FUNCTIONAL CLASS:
DISTRICT NO. 14.
COUNTY AND IS 100% IN CONG.
THIS PROJECT IS 100% IN GORDON
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
Project No.
gordon county, georgia city of calhoun
01-0001
LOCATION SKETCH
35 MPH
CURTIS PARKWAY - PHASE I
COVER-1
COVER-2
CUSTOM 1:4000
REQ'D R/W REQ'D R/W
PERMANENT UTILITY EASEMENT
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
PERMANENT UTILITY EASEMENT
DE131
DE
DE9 DE10 DE129
DE130
11+00
10+00
10+00
10+00
11+00
10+00
R R
NEW
ECHOTA
Adairsville
136C
53Sp
Calhoun
R
GORDON
HusseyJ
7/21/2026 GPLOT-ORD
gplotborder-ORD-PO.tbl
_01.dgn
CONCOV
DRAWING No.
Snapshot
HusseyJ Snapshot
Text Box
DRAWING NO. DESCRIPTION DESCRIPTIONDRAWING NO.
T-15A RAISED PAVEMENT MARKER LOCATION NON-LIMITED ACCESS ROADWAY40-0024
T-14 DETAIL OF PAVEMENT MARKING HATCHING40-0023
T-13C DETAILS OF PAVEMENT MARKING WORDS (SHEET 3 OF 3)40-0022
T-13B DETAILS OF PAVEMENT MARKING WORDS (SHEET 2 OF 3)40-0021
T-13A DETAILS OF PAVEMENT MARKING WORDS (SHEET 1 OF 3)40-0020
T-12B PAVEMENT MARKINGS - ARROWS40-0019
T-12A DETAILS OF PAVEMENT MARKING ARROW LOCATION40-0018
T-11A PAVEMENT MARKING PLACEMENT NON-LIMITED ACCESS ROADWAY40-0017
T-5C DETAILS OF WARNING SIGNS40-0016
T-5B DETAILS OF REGULATORY SIGNS SHEET 2 OF 240-0015
T-5A DETAILS OF REGULATORY SIGNS SHEET 1 0F 240-0014
T-4 DETAILS OF CARDINAL DIRECTION SIGNS40-0013
T-3B DETAILS OF SQUARE TUBE POST (BREAKAWAY SIGN SUPPORT)40-0012
T-3A TYPE 7, 8, AND 9 SQUARE TUBE POST INSTALLATION DETAIL40-0011
T-2 DETAILS FOR TYPICAL FRAMING40-0010
T-1 DETAILS OF SIGN PLATES40-0009
S-7 SERRATED SLOPE DETAIL BENCHING DETAIL40-0008
S-4 SHOULDER PAVING AND SURFACING AT GUARDRAIL40-0007
P-7 PAVEMENT EDGE TREATMENT ASPHALT AND CONCRETE PAVEMENT40-0006
D-7 BERM DITCHES SIDE DITCHES SURFACE DITCHES40-0005
D-4 DITCH DROP INLET WITH FABRICATED SAFETY GRATE AND WEIR OPENINGS40-0004
A-4 DETACTABLE WARNING SURFACE TRUNCATED DOME SIZE, SPACING AND ALIGNMENT REQUIREMENTS40-0003
A-3 CONCRETE SIDEWALK DETAILS, CURB CUT (WHEEL CHAIR) RAMPS40-0002
A-1 DRIVEWAYS WITH TAPERED ENTRANCES CONCRETE VALLEY GUTTERS40-0001
GEORGIA DETAILS
SIGNING AND MARKING PLANS 26-0001 TO 26-0004
UTILITY PLANS 24-0001 TO 24-0004
CROSS SECTIONS 23-0001 TO 23-0012
DRAINAGE PROFILE 22-0001 TO 22-0006
DRAINAGE AREA MAP 21-0001 TO 21-0003
MAINLINE PROFILE 15-0001 TO 15-0003
CONSTRUCTION PLAN 13-0001 TO 13-0004
CONSTRUCTION LAYOUT / STAKEOUT 11-0001
SUMMARY OF QUANTITIES 06-0001 TO 06-0003
TYPICAL SECTIONS 05-0001
GENERAL NOTES 04-0001 TO 04-0003
REVISION SUMMARY 03-0001
INDEX 02-0001 TO 02-0002
COVER 01-0001
INDEX
D-24C TEMPORARY SILT FENCE (SHEET 3 OF 4)56-0003
D-24B TEMPORARY SILT FENCE (SHEET 2 OF 4)56-0002
D-24A TEMPORARY SILT FENCE (SHEET 1 OF 4)56-0001
EROSION CONTROL CONSTRUCTION STANDARDS AND DETAILS
WATERSHED MAP/SITE MONITORING LOCATION55-0001
BMP LOCATION DETAILS54-0001 TO 54-0012
EROSION CONTROL DRAINAGE AREA MAP53-0001
EROSION CONTROL LEGEND AND INFORM CODE SHEET52-0001 - 52-0007
ESPCP GENERAL NOTES51-0001 TO 51-0004
EROSION CONTROL COVER SHEET50-0001
EROSION CONTROL
9102 TRAFFIC CONTROL DETAIL FOR LANE CLOSURE OF TWO-LANE HIGHWAY41-0025
9100 TRAFFIC CONTROL GENERAL NOTES, STANDARD LEGEND, MISCELLANEOUS DETAILS41-0024
9033 MILEPOSTS41-0023
9032B CONCRETE CURB & GUTTER, CONCRETE CURBS, CONCRETE MEDIANS41-0022
9031U PRECAST OR BUILT-IN-PLACE JUNCTION BOXES PIPE COLLARS, PIPE ELBOW & PIPE CURVED ALIGNMENT41-0021
9031S MEDIAN DROP INLET (PRECAST OR BUILT-IN-PLACE)41-0020
9030C DELINEATORS & MARKERS AND ALTERNATE POSTS41-0019
9003 FEDERAL AID AND STATE RIGHT OF WAY MARKERS41-0018
4386 GUARDRAIL LOCATIONS AT MEDIANS AND TURNOUTS 31 INCH GUARDRAIL HEIGHTS41-0017
4384 GUARDRAIL TERMINALS, TYPE 12A, 12B AND 12C 31 INCH GUARDRAIL HEIGHT41-0016
4383 GUARDRAIL ANCHORAGE TYPE I 31 INCH GUARDRAIL HEIGHT41-0015
4381 POST AND OFFSET BLOCKS FOR "W" AND "T' BEAM GUARDRAIL 31 INCH GUARDRAIL HEIGHT41-0014
4380 "W" BEAM GUARDRAIL 31 INCH GUARDRAIL HEIGHT41-0013
4000W GUARDRAIL WARRANT GUIDES (LENGTHS OF ADVANCEMENT, CLEAR ZONE DISTANCES, FILL HEIGHT EMBANKMENTS)41-0012
1034DP PRECAST CATCH BASINS FOR USE WITH CURB (6' OR 8" HT.) AND GUTTER IN SAGS OR LOW POINTS41-0011
1034D CATCH BASINS FOR USE WITH CURB (6' OR 8" HT.) AND GUTTER IN SAGS OR LOW POINTS41-0010
1033DP PRECAST CATCH BASINS FOR USE WITH (6" OR 8" HT.) AND GUTTER41-0009
1033D CATCH BASINS FOR USE WITH (6" OR 8" HT.) & GUTTER41-0008
1030D3 STANDARD CONCRETE & METAL PIPE CULVERTS SHEET 3 0F 341-0007
1030D2 STANDARD CONCRETE & METAL PIPE CULVERTS SHEET 2 0F 3 41-0006
1030D1 STANDARD CONCRETE & METAL PIPE CULVERTS SHEET 1 0F 3 41-0005
1019AP STANDARD PRECAST DROP INLETS41-0004
1019A STANDARD DROP INLETS (BUILT IN PLACE)41-0003
1011AP STANDARD PRECAST REINFORCED CONCRETE MANHOLE41-0002
1011A STANDARD BRICK MANHOLE41-0001
GEORGIA STANDARDS
T-15C DETAILS OF RAISED PAVEMENT MARKERS40-0025
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
CruzBarcenasL
GPLOT-ORD
gplotborder-ORD.tbl
_02.dgn
4:30:02 PM
GPLN-CE
0001-_02
GORDON COUNTY
INDEX
DRAWING NO. DESCRIPTION DESCRIPTIONDRAWING NO.
D-56 STONE RIPRAP AND SAND BAG TEMPORARY CHECK DAMS56-0012
D-55B RIPRAP OUTLET PROTECTION (SHEET 2 0F 2)56-0011
D-55A RIPRAP OUTLET PROTECTION (SHEET 1 0F 2)56-0010
D-46 STONE FILTER RING56-0009
D-43 ROCK FILTER DAM56-0008
D-42 INLET SEDIMENT TRAPS56-0007
D-41 CONSTRUCTION EXIT56-0006
D-35 PERMANENT SOIL REINFORCING MAT56-0005
D-24D TEMPORARY SILT FENCE (SHEET 4 OF 4)56-0004
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
CruzBarcenasL
GPLOT-ORD
_02.dgn
4:31:03 PM
0002-_02
INDEX
DATE DRAWING NO. REVISION DATE DRAWING NO. REVISION
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
11/1/2023
HusseyJ
GPLOT-ORD
_03.dgn
4:59:10 PM
0001-_03
REVISION SUMMARY
(URBAN SHOULDER) CONC VALLEY GUTTER, 8 IN.
CONCRETE - DRIVEWAY CONCRETE, 8 IN THICK
GRADED AGGREGATE BASE, 6".
220 LB/SY RECYCLED ASPHALT CONC, 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME
ASPHALT - (SURFACE COURSE FROM THE MAINLINE),
COMMERCIAL:
(URBAN SHOULDER) CONC VALLEY GUTTER, 6 IN.
CONCRETE - DRIVEWAY CONCRETE, 6 IN THICK,
GRADED AGGREGATE BASE, 6".
ASPHALT - (SURFACE COURSE FROM THE MAINLINE),
RESIDENTIAL:
DRIVES SHALL BE CONSTRUCTED USING:
PRIOR TO MAKING ANY REVISIONS TO LOCATION, WIDTH, AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED.
TIE IN POINT, IF APPLICABLE. THE CONTRACTOR SHALL OBTAIN THE APPROVAL FROM THE ENGINEER
CONTRACTOR SHALL CONSTRUCT DRIVEWAYS TO MATCH THE LOCATION OF EXISTING DRIVEWAYS AT THE
IN THE PLANS. EXISTING DRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST AVAILABLE DATA; THE
OTHERWISE IN THE PLANS. COMMERCIAL DRIVES SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE
GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE AT THE THROAT UNLESS NOTED
REPLACED AS FOLLOWS: ASPHALT FOR ASPHALT, CONCRETE FOR CONCRETE AND ASPHALT FOR EARTH /
PAVED WITH CONCRETE UNLESS OTHERWISE NOTED IN THE PLANS. ALL OTHER DRIVEWAYS SHALL BE
REQUIRED RIGHT OF WAY, WHICHEVER IS GREATER. ALL DRIVEWAYS OVER 11% IN GRADE SHALL BE
10. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED BACK TO THE TIE IN POINT OR
INFORMATION.
SEE SECTION 201 OF THE STANDARD SPECIFICATION AND SUPPLEMENTS THERETO FOR ADDITIONAL
SOLID WASTE FACILITY, A PERMITTED INERT WASTE LANDFILL, OR IN AN ENGINEERED FILL.
DISPOSED OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED IN EITHER A PERMITTED
TO CONSTRUCTION ACTIVITIES OCCURRING IN THEM. ALL COMMON FILL OR EXCESS MATERIAL
1. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE ENVIRONMENTALLY APPROVED PRIOR
BID FOR THE PROJECT.
9. THE COST FOR SHEETING OR SHORING, IF REQUIRED, WILL BE INCLUDED IN THE OVERALL
SAW CUTTING TO BE INCLUDED IN THE BID SUBMITTED.
8. SAW CUTTING MAY BE REQUIRED IN ORDER TO ACHIEVE A NEAT LINE AND COST OF
BE FILLED WITH FLOWABLE FILL.
AND GRUBBING. EXISTING PIPE THAT REMAINS IN PLACE UNDER THE ROADWAY SHOULD
ENGINEER. REMOVAL OF PIPE SHALL BE INCLUDED IN THE PRICE BID FOR CLEARING
SHALL BE REMOVED UNLESS OTHERWISE NOTED ON PLANS OR DIRECTED BY THE
7. ALL EXISTING DRAINAGE STRUCTURES INCLUDING HEADWALLS NO LONGER IN USE
COST TO THE OWNER.
DRAINAGE STRUCTURE AS A RESULT OF THE PROJECT WILL BE CLEANED OUT AT NO ADDITIONAL
THROUGHOUT THE DURATION OF THE PROJECT. ANY DEBRIS THAT GOES INTO AN EXISTING
6. ALL EXISTING DRAINAGE STRUCTURES WITHIN THE LIMITS OF THE PROJECT SHALL BE MAINTAINED
WILL NEED TO BE SUBMITTED AND APPROVED BY THE CITY AND ENGINEER OF RECORD.
AS PART OF THE CONTRACT AWARD. ONCE PROJECT HAS BEEN AWARDED, FORMAL STAGING PLANS
OWNER'S REVIEW AND ACCEPTANCE OF THE PROPOSED STAGING WILL BE WEIGHED AND CONSIDERED
(INCLUDING SHORT DURATION DETOURS) AS NEEDED THROUGHOUT THE CONSTRUCTION PROCESS.
5. A STAGING NARRATIVE SHALL BE SUBMITTED BY THE CONTRACTOR AS PART OF THE BID PACKAGE
FOR THIS PROJECT PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL PERMITS REQUIRED
3. AN N.O.I. IS REQUIRED FOR THIS PROJECT.
ADDITIONAL COST TO THE DEPARTMENT.
IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING BRIDGE/CONSTRUCTION DEBRIS AT NO
PROJECT'S LIMITS. THE CONTRACTOR SHALL PROVIDE AN ENVIRONMENTALLY APPROVED SITE AS SHOWN
2. THERE IS NO KNOWN SUITABLE PLACE TO BURY EXISTING BRIDGE/CONSTRUCTION DEBRIS WITHIN THE
UTILITY OWNER SERVICE
(SHANNON WILLIAMS) 706-604-7487
GEORGIA POWER
ELECTRIC
706-602-6129
CITY OF CALHOUN
(BRIAN TOWERS) 706-581-6167
NORTH GEORGIA EMC
(TODD BAGLEY) 706-236-3913
AT&T
(BRAD CARRICK) 706-602-6156
CALNET-TELECOMMUNICATIONS
(JODY CHILDRESS) 706-252-5045
COMCAST
470-259-5586
ATLANTA GAS LIGHT
770-548-0359
CITY OF CALHOUN
ELECTRIC
TELECOMMUNICATIONS
ELECTRIC
TELECOMMUNICATIONS
TELECOMMUNICATIONS/CABLE TV
GAS
WATER
SEWER706-602-6101
CITY OF CALHOUN
OF WAY, WHICHEVER IS GREATER, AS DIRECTED BY THE CITY'S REPRESENTATIVE.
DURING CONSTRUCTION SHALL BE RE-SODDED BACK TO THE TIE IN POINT OR REQUIRED RIGHT
11. ALL ESTABLISHED GRASSED/SODDED COMMERCIAL OR RESIDENTIAL YARDS THAT ARE DISTURBED
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
7/21/2026
HusseyJ
GPLOT-ORD
gplotborder-ORD-PO.tbl
_04.dgn
10:51:11 AM
0001-_04
GENERAL NOTES
IN THE CENTER OF THE SIGN AND FLUSH WITH THE BACK OF THE SIGN.
½ INCH x (WIDTH OF SIGN) ALUMINUM OR GALVANIZED STEEL STRAP LOCATED
6. EACH 42 OR 48 INCH WIDE x 18 OR 24 INCH HIGH SIGN REQUIRES ONE 2 INCH x
INCH DIAMETER, DRILLED OR PUNCHED, AS SHOWN ON THE SIGN PLATE DETAILS.
WIDTH FROM THE EDGE OF THE SIGN. SIGN PLATE BOLT HOLES SHALL BE ⅜
THE SIGN. THE CENTERLINE OF EACH POST SHALL BE INSET 1/6TH OF THE SIGN
WITH THE BACK OF THE SIGN WITH ONE EACH ACROSS THE TOP AND BOTTOM OF
SIGN) ALUMINUM OR GALVANIZED STEEL STRAPS. THE STRAPS SHALL BE FLUSH
SHALL BE MOUNTED ON TWO POSTS WITH 2 EACH 2 INCH x ½ INCH x (WIDTH OF
5. SINGLE PLATE, HORIZONTAL RECTANGULAR SIGNS OVER 48 INCHES IN WIDTH
UNSTIPULATED DISTANCE BEHIND GUARDRAIL.
4c. WHEN GUARDRAIL IS PRESENT OR BEING PROPOSED, SIGNS SHALL BE POSTED AN
BE AT LEAST 2 FEET FROM THE CURB FACE TO THE NEARER EDGE OF THE SIGN(S).
GREATER. THE HORIZONTAL CLEARANCE IN NON-MOUNTABLE CURB SECTIONS SHALL
NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF THE SIGN(S), WHICHEVER IS
SHALL BE 6 FEET FROM THE EDGE OF THE PAVED SHOULDER OR 12 FEET FROM THE
4b. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON ALL OTHER ROADWAYS
NORMAL EDGE OF PAVED SHOULDER, OR EDGE OF GRADED SHOULDER WHEN PRESENT.
CLEARANCE FOR STANDARD HIGHWAY SIGNS ON RAMPS SHALL BE 2 FEET FROM THE
THE SIGN(S), UNLESS SPECIFIED OTHERWISE IN THE PLANS. HORIZONTAL
SHALL BE 32 FEET FROM THE NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF
4a. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON INTERSTATE HIGHWAYS
OF 7 FEET ABOVE THE SIDEWALK.
SIDEWALK IS PROPOSED OR EXISTING, THE SIGNS SHALL BE ERECTED AT A HEIGHT
THE NORMAL EDGE OF PAVEMENT TO THE BOTTOM OF THE SIGN OR ASSEMBLY. IF
3. ALL STANDARD HIGHWAY SIGNS SHALL BE ERECTED AT A HEIGHT OF 7 FEET ABOVE
OPERATIONS.
PROJECT ENGINEER WITHOUT PRIOR APPROVAL FROM THE OFFICE OF TRAFFIC
EDITION. NO SIGN LOCATION SHALL BE CHANGED BY THE CONTRACTOR OR BY THE
SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT
FIELD CONDITIONS WHERE NECESSARY, BUT SHALL BE WITHIN THE LIMITATIONS
2. SIGN ERECTION STATIONS ARE APPROXIMATE AND MAY BE ADJUSTED TO MEET
SUPPLEMENTAL SPECIFICATIONS, AND/OR SPECIAL PROVISIONS.
TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND THE GEORGIA SPECIFICATIONS,
ACCORDANCE WITH THE DETAILS SHOWN IN THE PLANS, THE MANUAL ON UNIFORM
1. ALL STANDARD HIGHWAY SIGNS SHALL BE FABRICATED AND ERECTED IN
OR ARE CONTRARY TO THESE SIGN PLANS.
ENGINEER, BE REQUIRED TO REMOVE ANY EXISTING SIGNS THAT ARE DUPLICATED
17. THE CONTRACTOR WILL, AS REQUESTED BY THE DISTRICT TRAFFIC OPERATIONS
BE SHOWN ON ALL R552-1 (LIMITED ACCESS) SIGNS IN THIS PROJECT, IF ANY.
16. REFER TO PLAN SHEETS FOR LOCATION OF THE DISTRICT ENGINEERS OFFICE TO
MISCELLANEOUS SIGNS.
15. FOR DETAILS OF SPECIAL DESIGN HIGHWAY SIGNS, SEE DETAILS OF
UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, FOR DETAILS.
OR SPUR SHALL USE 4 INCH SERIES "D" LETTERS. REFER TO THE MANUAL ON
14. ALL INTERSTATE, U.S., AND GEORGIA SHIELDS REQUIRING ALT, BUS, CONN, LOOP,
PUNCHED, SHALL BE REQUIRED TO PROPERLY MOUNT THE ASSEMBLY.
ON THE POST(S), ADDITIONAL⅜INCH DIAMETER HOLE(S), DRILLED OR
13. WHERE SIGNS WITHIN AN ASSEMBLY EXTEND BELOW THE STANDARD MOUNTING HOLES
WITHIN AN ASSEMBLY.
12. A ½ INCH MINIMUM AIR SPACE SHALL BE REQUIRED BETWEEN ALL SIGN PLATES
SIGNING SHALL HAVE TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING.
PORTION OF THE S5-1) SIGNS. ALL REGULATORY SIGNS WITHIN THE SCHOOL ZONE
SHALL BE USED FOR SCHOOL ZONE (S1-1, S2-1, S3-1, S4-3, AND THE TOP
11. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW GREEN REFLECTIVE SHEETING
BE USED FOR ALL WARNING SIGNS.
10. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW REFLECTIVE SHEETING SHALL
RED SERIES SIGNS (R1-1, R1-2, R1-3P, R5-1, R5-1A, R5-1B).
9. TYPE 11 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR ALL
OR CLASS 2 ADHESIVE BACKING IS PERMISSIBLE.
AS SPECIFIED BELOW OR SPECIFIED OTHERWISE IN THE PLANS. EITHER CLASS 1
ALL STANDARD HIGHWAY SIGNS REQUIRING REFLECTORIZED BACKGROUNDS EXCEPT
8. TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR
TYPICAL FRAMING DETAILS.
FRAMES. FOR DETAILS AND STRAP SPECIFICATIONS REFER TO SIGN ASSEMBLY-
7. SIGN ASSEMBLIES SHALL BE MOUNTED ON ALUMINUM OR GALVANIZED STEEL STRAP
GENERAL NOTES - STANDARD SIGNS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
SmithRya
GPLOT-ORD
11:30:43 AM
0002-_04
BOTTOM OF THE SIGN.
ABOVE THE GROUNDLINE AND MAXIMUM HEIGHT OF 10 FEET ABOVE THE NORMAL EDGE OF PAVEMENT TO THE
13. SPECIAL ROADSIDE SIGNS ERECTED ON STEEP CUT SLOPES SHALL HAVE A MINIMUM CLEARANCE OF 1 FOOT
PAVEMENT TO THE NEAR EDGE OF THE SIGN UNLESS SPECIFIED OTHERWISE IN THE PLANS.
12. HORIZONTAL CLEARANCE FOR SPECIAL ROADSIDE SIGNS SHALL BE 32 FEET FROM THE NORMAL EDGE OF
BY THE PROJECT ENGINEER WITHOUT PRIOR APPROVAL FROM THE DISTRICT OFFICE OF TRAFFIC OPERATIONS.
CONTROL DEVICES, CURRENT EDITION. NO SIGN LOCATION SHALL BE CHANGED BY THE CONTRACTOR OR
NECESSARY, BUT SHALL BE WITHIN THE LIMITATIONS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC
11. SIGN ERECTION STATIONS ARE APPROXIMATE AND MAY BE ADJUSTED TO MEET FIELD CONDITIONS WHERE
10. FOR DETAILS OF SPECIAL ROADSIDE SIGNS SEE DETAILS OF SPECIAL ROADSIDE SIGNS.
REFER TO GEORGIA STANDARDS 9041 AND 9042.
9. FOR ASSEMBLY DETAILS AND ASSEMBLY COMPONENTS DETAILS ON ALUMINUM BOLTED EXTRUDED PANELS, RECOMMENDED BY THE MANUFACTURER, BUT SHALL CONFORM TO INTERSTATE SIGNING REQUIREMENTS.
8. SPACING BETWEEN LETTERS OR OTHER CHARACTERS THAT IS NOT SHOWN IN THE PLANS MAY BE
7. LEGENDS FOR OVERHEAD HIGHWAY SIGNS SHALL BE APPLIED TO SIGN VIA SILK SCREEN OR DIRECT APPLY
TRAFFIC CONTROL DEVICES, CURRENT EDITION.
6. FOR DETAILS OF U.S. AND INTERSTATE SHIELDS AND ARROWS, REFER TO THE MANUAL ON UNIFORM
SHALL BE PER THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION.
(VERY HIGH INTENSITY), REFLECTIVE SHEETING BACKGROUNDS WITH NO BORDERS. INTERSTATE SHIELDS
GEORGIA SHIELD LEGENDS SHALL BE BLACK NUMERALS AND LETTERS SILK SCREENED ON WHITE, TYPE 9
5. SHIELDS SHALL BE 0.08 INCH ALUMINUM OF THE SIZE AND SHAPE SPECIFIED IN THE PLANS. U.S. AND
SHEETING LETTERS, NUMERALS, SYMBOLS, AND BORDERS ON 0.032 INCH ALUMINUM CUTOUTS.
4. LEGENDS FOR SPECIAL ROADSIDE SIGNS SHALL BE WHITE, TYPE II (VERY HIGH INTENSITY), REFLECTIVE
(VERY HIGH INTENSITY), REFLECTIVE SHEETING, UNLESS SPECIFIED OTHERWISE IN THE PLANS.
3. BACKGROUND FOR SPECIAL ROADSIDE SIGNS SHALL BE STANDARD INTERSTATE GREEN, TYPE 9
2. SPECIAL ROADSIDE SIGNS SHALL BE FABRICATED USING ALUMINUM BOLTED EXTRUDED PANELS.
GEORGIA STANDARD SPECIFICATIONS AND/OR SPECIAL PROVISIONS.
TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND ALL SUPPLEMENTS THERETO, AS WELL AS TO THE
1. SPECIAL ROADSIDE SIGNS SHALL CONFORM TO THE REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM
THESE POSTS IN ANY WAY WITHOUT APPROVAL FROM THE DISTRICT OFFICE OF TRAFFIC OPERATIONS.
20. BREAK-AWAY POSTS MARKED WITH AN (*) ARE SPECIAL DESIGN. THE CONTRACTOR SHALL NOT CHANGE
THE COST FOR THIS WORK SHALL BE INCLUDED IN THE OVERALL PRICE BID FOR THE PROJECT.
DISTANCE SHALL BE IN ACCORDANCE WITH SECTION 201 OF THE GEORGIA STANDARD SPECIFICATIONS.
A MINIMUM SIGHT DISTANCE OF 1000 FEET. CLEARING OF OBSTACLES TO OBTAIN THE MINIMUM SIGHT
19. THE CONTRACTOR SHALL ENSURE THAT ALL SPECIAL ROADSIDE SIGNS INSTALLED BY THIS PROJECT HAVE
GUARD RAIL.
18. THE NEAR EDGE OF SIGNS ERECTED BEHIND GUARD RAIL SHALL BE 6 FEET BEHIND THE FACE OF THE
ON GEORGIA STANDARD 9054A.
OF FURNISHING AND PLACING REINFORCEMENT STEEL AND STUB POSTS AS SHOWN IN THE FOOTING DETAILS
17. FOR BREAK-AWAY POSTS THE CONTRACT BID PRICE FOR CLASS "A" CONCRETE SHALL INCLUDE THE COST
COMPLETION OF GALVANIZING.
16. GALVANIZED STEEL I-BEAMS SHALL HAVE ALL IDENTIFICATION NUMBERS RE-ESTABLISHED AFTER
9054B, AND 9054C.
DETAILS FOR SPECIAL ROADSIDE SIGNS WITH BREAK-AWAY POSTS, REFER TO GEORGIA STANDARDS 9054A, ACCORDING TO GEORGIA STANDARDS PRIOR TO ORDERING MATERIALS. FOR ERECTION AND FOUNDATION
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE CORRECT LENGTHS AND SIZES
15. POST LENGTHS, POST SIZES, AND FOOTING SIZES FOR SPECIAL ROADSIDE SIGNS ARE ESTIMATED, ONLY.
MAINTAINED.
AND MAINLINE PAVED SHOULDERS TO THE RIGHT AND LEFT EDGES OF THE SIGN, RESPECTIVELY SHALL BE
THE PHYSICAL NOSE OF THE RAMP. A MINIMUM CLEARANCE OF 2 FEET FROM THE EDGES OF THE RAMP
14. EXIT GORE SIGNS SHALL BE ERECTED WITHIN A RANGE OF 25 FEET MINIMUM TO 100 FEET MAXIMUM FROM
GENERAL NOTES - SPECIAL ROADSIDE SIGNS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
SmithRya
GPLOT-ORD
11:31:47 AM
0003-_04
GADOT
LOWNDES
GADOT
LOWNDES
H. PAVEMENT REINFORCING FABRIC
G. MILL 3.5 INCHES
F. RECYCLED ASPH CONC LEVELING, INCL BITUM MATL AND H LIME
B. RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCLUDE BITUM MATL & H LIME, 220 LB/SY
A. RECYCLED ASPH CONC 12.5 MM SUPERPAVE. GP 2 ONLY. INCLUDE BITUM MATL & H LIME 165 LB/SY
MILL AND OVERLAY SECTION (EXISTING PAVEMENT):
D. GR AGGR BASE CRS, 8 INCH, INCL MATL
C. RECYCLED ASPH CONC 25 MM SUPERPAVE, GP1 OR 2, INCLUDE BITUM MATL & H LIME, 330 LB/SY
B. RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCLUDE BITUM MATL & H LIME, 220 LB/SY
A. RECYCLED ASPH CONC 12.5 MM SUPERPAVE. GP 2 ONLY. INCLUDE BITUM MATL & H LIME 165 LB/SY
MAINLINE PAVEMENT:
NOT TO SCALENOT TO SCALE
SLOPE : SEE ROADWAY PLANS FOR SUPERELEVATION RATES AND TRANSITIONS.
DATA. LOCATIONS OF NORMAL CROWN & FULL S.E. NOTED ON CONSTR CENTERLINE.
NOTE: FOR METHOD OF SUPERELEVATION SEE CONSTR PLAN & PROFILE SHEETS-CURVE
SEE PLAN SHEETS.
EXISTING GROUND.
SHOULDER MAY BE GRADED AWAY FROM ROADWAY TO FACILITATE THE SLOPE TIE TO
MILL AND INLAY STA 101+44.87-124+66.48
Profile Grade
CL
9'-0"
2%
5'-0" 1'-6"
2:1 MAX
11'-0"11'-0"
Travel Lane
2'-6"
Sidewalk
Shoulder
2:
MAX
SUPER ELEVATED SECTION
SLOPE = RATE OF S.E.
Existing Lane
11'-0"
Widening
11'-0"
Travel Lane
SEE PLANS
Paved Shoulder
Remove Existing
2'-6"
Profile Grade
CL
2% 2%
9'-0"
2%
5'-0" 1'-6"
2:1 MAX
2:
MAX
11'-0"11'-0"
Travel Lane Travel Lane
2'-6"
Sidewalk
Shoulder
TANGENT SECTION
Existing Lane
11'-0"
11'-0"
Widening
Existing Lane
Paved Shoulder
Remove Existing Paved Shoulder
Remove Existing
2'-6"
2%
5'-0"
2'-6"
6"
Shoulder
2:
MAX
2:1 MAX
2'-6"
2%
5'-0"
2'-6"
Shoulder
2:
MAX
2:1 MAX
2'-6"
6"
4/17/2026
CruzBarcenasL
GPLOT-ORD
_05.dgn
4:18:46 PM
Paved Shoulder
Remove Existing
Travel Lane
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
CruzBarcenasL
GPLOT-ORD
_05.dgn
4:18:46 PM
0001-_05
TYPICAL SECTIONS
A
B
F
G
A
B
C
D
A
B
F
G
A
B
C
DD H
MILL/INLAY CONSTRUCTION
MILL/INLAY CONSTRUCTION
SUMMARY OF QUANTITIES
ROADWAY PAVING ITEMS
TON TON TON TON GAL SY SY
M A
T L
H
L
IM
E S
U P
E R
P A
V E
G
P O
N L
Y
IN
C L
B
IT
U M
R E
C Y
C L
E D
A S
P H
C O
N C
.5
M M
B
IT
U M
M A
T L
H
L
IM
E S
U P
E R
P A
V E
G
P
O R
IN
C
L R
E C
Y C
L E
D A
S P
H C
O N
C
M
M
B
IT
U M
M A
T L
H
L
IM
E S
U P
E R
P A
V E
G
P
O
R
IN
C L
R E
C Y
C L
E D
A S
P H
C O
N C
M M
IN
C
L B
IT
U
M M
A T
L
H L
IM
E
R E
C Y
C L
E D
A S
P H
C O
N C
L E
V E
L
IN
G -1
T A
C K
C O
A T
/2 I
N D
E P
T H
M
IL
L A
S P
H C
O N
C P
V M
T
IN
C
L M
A T
L G
R A
G G
R B
A S
E C
R S
I
N C
H
ROADWAY LOCATION
TOTALS 111
LIN FT TP 1* TP 9+LOCATION & SIDE
ANCHORAGES
GUARDRAIL
TP 5
GUARDRAIL "W" BEAM
* QUANTITY INCLUDED IN CLASS B CONCRETE QUANTITIES.
** CONCRETE/ASPHALT DEMOLITION QUANTITIES TO BE INCLUDED IN GRADING COMPLETE.
IN
C
L L
A Y
O U
T A
N D
S A
W C
U T
D E
M O
L
IT
IO
N
A S
P H
A L
T P
A V
E M
E N
T
SY
LUMP SUM
TRAFFIC CONTROL
FIELD ENGINEER'S OFFICE- TYPE
TOTAL 1 EACH
GPS DATA COLLECTION & SUBMITTAL
LUMP SUM
AGGREGATE SURFACE COURSE
TOTAL 150 TONS
PVMT REF FAB STRIPS, TP2, 18 IN W
TOTAL 6700 LF
GRADING COMPLETE
LUMP SUM
BARRIER FENCE (ORANGE), 4 FT
TOTAL 250 LF
RIGHT OF WAY MARKERS
TOTAL 47 EACH
CLASS "B" CONCRETE
TOTAL 228 CY
6" X 30" TYPE 2, STD 9032-B
CONCRETE CURB & GUTTER
TOTAL 4842 LF
CHANGEABLE MESSAGE SIGN, PORTABLE, TYPE 3
TOTAL 2 EACH
SOD
TOTAL 9680 SY
FLOWABLE FILL
TOTAL 35 CY
AS DIRECTED
TOTAL
CURTIS PARKWAY
LAUREL CREEK RD (SW)
LAUREL CREEK RD (SE)
PRIVATE DR (PARCEL 1 SW)
PRIVATE DR (PARCEL 2 SE)
PRIVATE DRIVE 1 (PARCEL 22 SE)
PRIVATE DRIVE 2 (PARCEL 22 SE)
PROFESSIONAL CT
DOGWOOD DR (SE)
781.99
8.14
32.77
12.60
14.04
7.61
29.17
10.64
1042.65
10.86
43.69
16.80
18.72
10.15
38.90
14.18
1563.97
16.28
65.54
25.21
28.08
15.22
58.34
21.28
3551.59
20.43
43.51
188.34
46.49
47.54
63.89
81.78
153.92
7151.72
98.69
397.19
0.00
153.51
69.92
352.98
82.96
0.00
474.41
2.00
55.00
0.00
0.00
0.00
46.49
0.00
2140.66
23.82
88.14
37.67
40.00
23.49
83.37
32.95
30.78
DOGWOOD DR (NE)
PRIVATE DR (PARCEL 6 SW)
PRIVATE DR 1 (PARCEL 7 SW)
319.360.00
21.77
163.36
137.47
SUB-TOTAL
0.11
0.00
0.00
66.58
0.00
0.00
17.67
32.67
27.49
450.00
PRIVATE DR 2 (PARCEL 7 SW) 0.0080.330.0016.07
11.63
21.90
18.16
10.73
0.00
450.00
5.81
10.95
9.08
5.36
928.17
5.83
934.00
7.75
14.60
12.11
7.15
1237.56
5.44
1243.00
1856.34
6.66
1863.00
2594.79
5.21
2600.00
8373.55
2.45
8376.00
4600.42
5.58
4606.00
897.87
2.13
900.00**
RIPRAP (TYPE III), INCLUDING FILTER FABRIC
TOTAL 25 SY
STA 102+80 - 103+91 1
ROCK EXCAVATION
TOTAL 300 CY
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
7/21/2026
HusseyJ
GPLOT-ORD
_06.dgn
11:12:23 AM
0001-_06
550-5180 550-5240 550-5300
(LIN FT)
CLASS III
18 IN,
STORM DRAIN PIPE,
(LIN FT)
CLASS III
24 IN,
STORM DRAIN PIPE,
(LIN FT)
CLASS III
30 IN,
STORM DRAIN PIPE,
A-17
A-17.1
A-16
STRUCTURE NUMBER
A-21
A-20
A-19
A-18.1
668-1100 668-1110 668-2100 668-2110
(EA)
CATCH BASIN, GP 1
(LIN FT)
ADDL DEPTH
CATCH BASIN, GP 1,
(EA)
DROP INLET, GP 1
(LIN FT)
ADDL DEPTH
DROP INLET, GP 1,
500-3800
(CU YD)
INCL REINF STEEL
CLASS A CONCRETE,
STATION OFFSET
A-18
0+23.96 14.14
A-10.2
A-10.1.1
A-10.1
A-15.4
A-15.3
A-15.2
A-15.1.1
A-15.1
A-15
A-14.3
A-14.2
A-14.1
A-14
A-13.1
A-13
A-12
A-11
A-6
A-5
A-4.3
A-10
A-9
A-8
A-7.2
A-7.1
A-7
A-4.2
A-4.1
A-4
A-3
A-2
A-1
(EA)
MANHOLE, TP 1
STORM SEWER
(LIN FT)
ADDL DEPTH, CL 1
MANHOLE, TP 1,
STORM SEWER
668-4311668-4300 668-4400
(EA)
MANHOLE, TP 2
STORM SEWER
668-4411
(LIN FT)
ADDL DEPTH, CL 1
MANHOLE, TP 2,
STORM SEWER
SUMMARY OF ROADWAY DRAINAGE
38.43
36.16
298.49
41.00
210.66
41.00
156.24
40.38
27.00
53.47
41.00
22.21
18.74
27.02
40.45
23.49
38.81
34.70
71.40
59.10
78.25
41.95
61.83
60.70
264.19
63.22
81.90
30.05
46.18
114.54
118.98
65.99
65.83
56.25
92.21
78.16
297.81
58.00
22.12
B-2.3
B-2.2
B-2.1
B-2.D
B-2.C
B-2.B.1
B-2.B
B-2.A
B-2
TOTAL
AS DIRECTED
SUB-TOTAL
2.32
45.98
27.00
27.63
62.87
72.73
55.44
65.00
59.51
2.24
2.87
2.39
2.61
5.46
5.83
7.62
0.20
1.49
3.38
2.82
1.10
0.86
2.10
2.73
2.96
7.26
1978.65
133.35
2112.00
999.34
48.66
1048.00
456.09
15.91
472.00
32.26
4.74
37.00
14.68
4.32
19.00
10.22
0.78
11.00
8.22
0.78
2.32
0.68
3.00
124+22.00 -23.66
124+22.00 12.50
121+24.00 -26.00
121+24.00 15.00
119+14.00 -26.00
119+14.00 15.00
117+60.00 36.00
0+49.00 -13.50
13.500+49.00
-26.00117+20.00
12.50116+98.00
15.00117+20.00
33.74117+20.00
0+18.01 13.50
0+18.02 -13.52
114+62.00 -26.00
114+62.00 37.22
113+75.00 14.30
113+84.00 36.00
10+11.00 22.90
10+12.07 -23.26
112+40.00 -26.00
112+20.08 -54.94
112+00.00 -26.00
112+00.00 45.40
110+80.00 39.53
110+12.00 32.63
110+00.00 -50.02
109+44.00 -49.96
109+44.00 28.28
108+86.00 26.69
107+91.00 25.53
106+09.87 -49.49
106+51.81 -50.24
-34.70107+11.00
26.00107+11.00
22.64104+14.00
28.89103+56.33
51.20103+56.80
104+14.00 -26.00
30+00.42 -13.50
30+00.42 13.50
10+01.53 22.92
102+10.00 46.73
10+60.37 -15.69
102+10.00 -26.00
102+75.00 -26.00
103+32.95 -41.20 1 8.22
207-0203
(CU YD)
TYPE II
BACKFILL MAT'L,
FOUNDATION
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
6/30/2026
HusseyJ
GPLOT-ORD
2:08:25 PM
0002-_06
LF
TEMPORARY EROSION CONTROL
LOCATION
T E
M
PO
R A
R Y
G R
A
SS
IN
G
M U
LC
H
S
IL
T F
E N
C E
T Y
P E
A C
O N
ST
R
U C
T
R E
M O
V E
M A
IN
T
E N
A C
E S
IL
T
F E
N C
E T
Y P
E C
M A
IN
T
E N
A C
E S
IL
T
F E
N C
E T
Y P
E A
S
IL
T F
E N
C E
T Y
P E
C C
O N
ST
R
U C
T
R E
M O
V E
R
IP
R A
P C
H E
C K
D A
M C
O N
ST
R
U C
T
R E
M O
V E
R
IP
R A
P C
H E
C K
D A
M M
A
IN
T E
N A
N C
E
IN
L
E T
S E
D T
R A
P C
O N
ST
R
U C
T
R E
M O
V E
IN
L
E T
S E
D T
R A
P M
A
IN
T E
N A
N C
E
CURTIS PKWY
ACRE TON LF LF LF LF EA EA EA EA
PERMANENT EROSION CONTROL
LOCATION
PE
R
M G
R A
SS
IN
G
A G
R
IC
U L
T U
R A
L L
IM
E
M
IX
E D
G R
A D
F E
R T
IL
IZ
E R
N
IT
R O
G E
N C
O N
T E
N T
F E
R T
IL
IZ
E R
M A
T S
S
L O
P E
S
E R
O
SI
O N
C O
N T
R O
L
CURTIS PKWY
ACRE TON TON LB SY
C O
N S
T R
U C
T
IO
N E
X
IT
M A
IN
T
E N
A N
C E
C O
N S
T R
U C
T
IO
N E
X
IT
LOCATION
AREA (SF)
(SF)
AREA TOTAL
TOTAL (LF)
POST LENGTH
HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11
ITEMS UNIT
THERMOPLASTIC SOLID TRAFFIC STRIPE, 12 IN. WHITE HATCH
PAVEMENT MARKING QUANTITES
LF
LF
LF
EA
THERMOPLASTIC SOLID TRAFFIC STRIPE, 6 IN. DOUBLE YELLOW
THERMOPLASTIC SOLID TRAFFIC STRIPE, 6 IN. WHITE
THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN. WHITE
TOTAL
4591 2296 350 4 4175
EA EA
18 18 43 433.00 6.00
3.00 3.60 0.60 150 2600
STA.TO STA.
SIDE
1.5 FT DEPTH
MATTING. TP 1,
TURF REINFORCING
DITCH PROTECTION
LOCATION
SQ.YD.
108+35 TO 112+20
111+56 TO 113+50
113+84 TO 116+36
116+86 TO 121+75
RT
RT
RT
LT
341.33
176.89
243.56
446.23
TOTAL 1208.01
TOTALS
STATION
STATION
TO
S
ID
E
FENCE SUMMARY
SIGN CODE
R2-1 (30x36)
W3-1 (36)
R1-1 (36)
R1-2A (30)
THERMOPLASTIC SOLID PAVEMENT MARKING, ARROW, TYPE2 WHITE RIGHT EA 16
THERMOPLASTIC SOLID TRAFFIC STRIPE, 12 IN. YELLOW HATCH
THERMOPLASTIC SKIP TRAFFIC STRIPE, 6 IN. WHITE 6' DASH, 10' SKIP
310LF
215LF
RAISED PVMT MARKERS, TP 1, YELLOW EA 80
QTY
QTY
9 2 18 18
8 2 16 18
CURTIS PARKWAY
3 1 3 9
91 99
122+46-125+16 LT 300
LF
WATER QUALITY INSPECTIONS
TOTAL 12 EACH
WATER QUALITY MONITORING & SAMPLING
TOTAL 4 EACH
EA
R O
C K
F
IL
T E
R D
A M
C O
N
ST
R U
C T
R
E M
O V
E
R O
C K
F
IL
T E
R D
A M
M A
IN
T
E N
A N
C E
EA
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
7/7/2026
HusseyJ
GPLOT-ORD
9:32:36 AM
0003-_06
BEGIN PROJECT
CURTIS PARKWAY STA 101+00
N:1635967.83
E:2067857.79
END CONSTRUCTION
CURTIS PARKWAY STA 124+66.48
N:1638319.60
E:2068014.92
BEGIN CONSTRUCTION
CURTIS PARKWAY STA 101+44.87
END PROJECT
CURTIS PARKWAY STA 125+50.00
STA 101+44.87 CURTIS PARKWAY
LAUREL CREEK RD SE STA 10+93.50
LIMIT OF CONSTRUCTION
STA 10+00
LIMIT OF CONSTRUCTION
COMMERCIAL DRIVE NO. 1 STA 10+21.02
LIMIT OF CONSTRUCTION
LAUREL CREEK RD SW STA 10+59.17
LIMIT OF CONSTRUCTION
COMMERCIAL DRIVE NO.2 STA 10+32.60
LIMIT OF CONSTRUCTION
PROFESSIONAL CT STA 10+51.51
LIMIT OF CONSTRUCTION
COMMERCIAL DR NO. 3 STA 10+10.01
LIMIT OF CONSTRUCTION
DOGWOOD DR SE STA 10+33.27
LIMIT OF CONSTRUCTION
DOGWOOD DR NE STA 10+35.95
CURTIS PARKWAY STA 124+66.48
DOGWOOD DR NE STA 10+87.13
CURTIS PARKWAY STA 116+56.41
DOGWOOD DR SE STA 10+83.33
CURTIS PARKWAY STA 113+31.55
COMMERCIAL DR NO. 3 STA 10+60.05
CURTIS PARKWAY STA 109+72.53
PROFESSIONAL CT STA 10+00.88
CURTIS PARKWAY STA107+58.31
COMMERCAIL DRIVE NO. 2 STA 10+82.61
CURTIS PARKWAY STA 106+37.03
COMMERCIAL DRIVE NO. 1 STA 10+72.52
SCALE IN FEET
0 100
CURVE# 3
PI 112+33.05
N 1,637,098.2620
E 2,067,972.2698
¬ 07°34'15.0" (LT)
D 06°32'59.07"
T 57.88'
L 115.59'
R 874.78'
E 1.91' ed 4.40%
D.S.35 mph
CURVE# 4
PI 114+82.78
N 1,637,336.4874
E 2,068,047.7590
¬ 16°33'48.8" (LT)
D 09°17'05.60"
T 89.82'
L 178.39'
R 617.09'
E 6.50' ed 5.20%
D.S. 35 mph
CURVE# 05
PI 119+42.86
N 1,637,797.4999
E 2,068,064.7312
¬ 07°28'13.2" (LT)
D 01°13'40.44"
T 304.62'
L 608.38'
R 4666.17'
E 9.93' ed NC %
D.S. 35 mph
CURVE# 1
PI 107+12.41
N 1,636,598.0139
E 2,067,848.6285
¬ 02°07'14.5" (RT)
D 04°54'15.97"
T 21.62'
L 43.24'
R 1168.24'
E 0.20' ed 3.33%
D.S. 35 mph
N00°47'14 .1"W
N02°11' 38.8"W
N02°19' 54.7"W N01°11'58.9"E
N01°56' 16.9"W
N00°57'40.8"E
N21°21'17.4"E
N17°40'06.8"E N02°32'35.5"E
N05° 44'4
9.2" W
N00°31'33.3"E N00°45'08.1"E P
C
P T
P C
P T
P C
P T
P C
P T
P C
P T
CURVE# 2
PI 108+96.34
N 1,636,781.8542
E 2,067,854.0958
¬ 15°07'02.6" (RT)
D 06°22'03.31"
T 119.40'
L 237.41'
R 899.80'
E 7.89' ed 4.40%
D.S. 35 mph
P I
P I
P I
P I
P I
N '1
.1
W
N
'4
.5
W
N
W
POB 10+00.00
POE 10+82.61
S
E S
E
S
E
POB 10+00.00
POE 11+00.88
11+00
N
W
POB 1
0+00
.00
POE 1
0+60 .05
S
W
POB 10+00.00
POE 10+83.33
10+00
N
W S
W S
W
POB 10+00.00
POE 10+87.13
10+00
N
E
10+00.0
10+41.81
PI 10+20.92
POB 10+00.0
POE 11+14.68
10+00
11+00
S
W
POE 10+93.50
N
E
POB 10+00.00
POE 10+72.52
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
CruzBarcenasL
GPLOT-ORD
_11.dgn
10:07:43 AM
0001-11
CONSTRUCTION LAYOUT
STA: 103+84.29
OFF: 50.00' Lt.
STA: 105+88.71
OFF: 50.00' Lt.
STA: 105+88.98
OFF: 60.00' Lt.
STA: 101+43.96
OFF: 87.04' Rt.
STA: 101+43.96
OFF: 100.00' Rt.
STA: 101+81.43
OFF: 100.00' Rt.
STA: 102+40.06
OFF: 49.92' Rt.
STA: 102+61.93
OFF: 50.00' Rt.
STA: 103+65.86
OFF: 70.00' Rt.
STA: 104+23.61
OFF: 70.00' Rt.
STA: 104+23.61
OFF: 50.00' Rt.
STA: 105+54.20
OFF: 50.00' Rt.
STA: 105+87.34
OFF: 50.02' Rt.
TYPE 12A TERM.
BEGIN W-BEAM
STA 103+00.00
TYPE I ANCHOR
END W-BEAM
STA 103+75.00
BEGIN TAPER
STA 105+87.94
BEGIN MILL & INLAY
STA 101+44.87
S T
A
O F
F
L t
S T
A
O F
F
STA: 103+65.01
OFF: 50.00' Rt.
STA: 103+36.90
OFF: 50.02' Lt.
LIMIT OF CONSTRUCTION
STA 10+22.52
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
R
R
R
B N
C
B N
C
E N
C
F L
A T
N
E
POB 0+00.00
POE 0+87.26
0+00
N
E
PC 10+00.00
PT 10+41.81
PI 10+20.92
POB 10+00.00
POE 11+14.68
10+00
11+00
POB 10+00.00
N
E
S
W
POE 10+93.50
10+00
N00°47'14.1"W N02°11'38.8"W N02°19'54.7"W N01°11'58.9"E
N01°56'16.9"W
P
B
.0
L A
U R E
E
K
A D
CURTIS PARKWAY
.8
.4
.5
.3
.4
.3
.4
.3
.2
.1
.1
.9
.6
.2
.1
.2
.4
.0
678.03
TAX PARCEL C51-134
D.B. 2056, P. 479
BODY SHOP TRAINING AND NUTRITIONAL, LLC
N/F
TAX PARCEL C68-003
P.B. 46, P. 235
D.B. 1404, P. 112
SEAN SAMPLES
N/F
TAX PARCEL C56A-027
P.B. 58, P. 34
D.B. 2608, P. 137
D.B. 2608, P. 132
EXCHANGE CALHOUN APARTMENTS, LLC
N/F
TAX PARCEL C53-093
D.B. XX, P. XX
BRENT STEPP CONST CO. INC.
N/F
T A
X P
A R
C E
L C
-0
H O
M E
O W
N E
R S A
S S
O C
IA
T
IO
N
V
IL
L A
G E
S O
F C
A L
H O
U N G
/F
TAX PARCEL C54-133
D.B. 1823, P. 277
OOTHCALOOGA RPTG-TK, LLC
N/F
.3
.2
.8
S
S N
24" CPP INV= 674.16
24" CMP INV= 674.09
18" CPP INV= 674.05
UNDER CONST
58' DIA
INLET NO TOP
INV= 674.18
18" CPP
24" CMP
P
INV= 670.30
24" CMP
INV= 666.99
W-HW/WW
72" CMP
H V
A C
H V
A C
M T
L /F
R B
L D
G
S
T
Y
W M
W M
W M
W V
W V
W V
W V (8
T E
L P
E D
C O
F D
C F
D C
V A
L V
E P
IT
G M
IP
F R 4 B
E N T
G V
E L
B X
IP
F R
P
IT
V A
L V
U
Y P
O L E
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
25 50 100
SCALE IN FEET
TO BE REMOVED
EXISTING SIDEWALK
TO BE REMOVED
EXISTING SIDEWALK
18"
B .3
B .2
B
B .1
B .B .1
B .B
B .C
B .D
18"
18"
30"
B .A
B
18"
30"
A
A
18"
A
A .3
REQ'D R/W REQ'D R/W
REQ'D R/W
DE98 DE
DE118
DE
DE4
DE3
DE28
DE
DE30
DE38
DE
D E
D E
DE
D E
D E
DE
D E
D E
D E
D E
D E
DE81
DE
DE117
DE2
DE127
DE223DE222DE221DE220
DE
DE200
DE
PERMANENT UTILITY EASEMENT
DE79 DE80
DE103
DE140
DE14
DE14
DE14
DE14
DE145
D
A
W I o
M A
T
H
I
T
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
12/29/2025
HusseyJ
GPLOT-ORD
_13.dgn
12:46:42 PM
0001-_13
MAINLINE PLAN
STA:
+51 .32
OFF:
60.
00' Lt
STA: 1
06+90.
OFF: 4
9.93 ' Rt
STA:
+31 .80
OFF:
50.
00' Rt
STA:
+77 .52
OFF:
50.
00' Rt
STA:
+12 .53
OFF:
50.
00' Rt
STA:
+97 .65
OFF:
50.
00' Rt
STA:
+97 .65
OFF:
60.
00' Rt
STA:
+76 .73
OFF:
60.
00' Rt
STA:
+33 .89
OFF:
60.
00' Rt
STA:
+33 .89
OFF:
50.
00' Rt
STA:
OFF:
END T
APER
STA 1
06+62
.09
BEGIN T
APER
STA 1
10+59
.46
END T
APER
STA 1
11+34
.94
LIMIT
OF C
ONSTRUCTION
STA 1
0+32
.60
STA 1
0+50
.88
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
STA: 111+46.17
OFF: 41.56' Lt.
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
R
R
R
R
R
E N
C
B F
S
E F
S
B F
S
E F
S
0 +
B N
C
F L
A T
R C
B F
S
E F
S
F
L A
T
R
C
B F
S
E F
S
B F
S
E F
S
R C
F L
A T
B N
C
B F
S
E F
S
N
W
N
W
N
W
POB 10+00.00
POE 10+82.61
S
E
S
E
S
E
POB 10+00.00
POE 11+00.88
11+00
10+00.00
10+60.05
N
E
POB 1
0+00
.00
POE 1
0+72
.52
N01 °56 '16
.9" W
N00° 57'4
0.8" E N21°21'17.4"E
P C
P T
P C
P T
P C
P I
P I
P I
0 1
P R
O F E S S I
O N
CURTIS PARKWAY
F F
.5
M T
L /F
R B
L D
G S
T
INV= 681.43
18" RCP
INV= 681.15
TOP= 684.45
MHST INV=680.82
18" CPP
INV= 684.78
INV= 684.88
18" C M P
INV= 685.79
INV= 689.16
W A
L L
" B
INV= 685.84
INV= 686.31
IP
F R
IP
F R
IP
F /2 " O
T P B
E N
T
M A
G N
A
IL
IP
F R
INV=680.61
24" CPP
TAX PARCEL C5
3-09
D.B.
XX, P.
XX
BRENT STEP
P CONST CO. IN
C.N/F
TAX PARCEL C53-041
P.B. 53, P. 17
D.B. 2359, P. 63
PROFESSIONAL BUILDING ASSOCIATES
N/F
TAX PARCEL C53-015
P.B. 53, P. 17
D.B. 706, P. 2
GORDON PARKWAY PROPERTIES, LLC
N/F
TAX PARCEL C68-004
75, P. 1570D.B.
8D.B. 2368, P. 9
D.B. 2368, P. 97
HERITAGE BAPTIST CHURCH OF CALHOUN, INC.
N/F
TAX PARCEL C6
8-00
P.B.
46, P . 235D.B.
4, P.
112SEAN SAMPLES
N/F
TAX PARCEL C6
8-00
P.B.
46, P . 235D.B.
4, P.
112SEAN SAMPLES
N/F
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
25 50 100
SCALE IN FEET
24"
18"
24"
24"
18"
24"
30"
18"
18"
24"
A
A .2
A .1
A
A 6 A
A .1
A .2
A
A
A
A .1
A .1.1
A
.2PERMANENT UTILITY EASEMENT
REQ'D R/W
DE85 DE86
DE109
DE110
DE119
DE120
DE121
DE122
DE
DE11
DE12
DE14
DE1
DE
DE32
DE39
DE45
DE61
D E
D E
D E
D E
D E
D E
D E
D E
D E
D E
D E
D E
DE88
D E
DE107
DE108
DE97
D E
DE78
DE82
DE83
DE105
DE87
DE77
DE84
DE131
DE
DE9
DE10
DE129
DE130
A
W I
M A
T
A
W I
M A
T
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
SmithRya
GPLOT-ORD
11:56:00 AM
0002-_13
STA: 11
2+90.7
OFF: 80
.00'
Lt.
STA: 11
4+46.7
OFF: 50
.00'
Lt.
STA: 11
5+71.3
OFF: 50
.00'
Lt.
STA: 11
2+90.4
OFF: 50
.00'
Rt.
STA: 11
2+90.3
OFF: 60
.00'
Rt.
STA: 11
3+71.3
OFF: 86
.92'
Rt.
STA: 11
3+71.4
OFF: 58
.37'
Rt.
STA: 11
3+95.5
OFF: 43
.60'
Rt.
STA: 11
6+17.1
OFF: 50
.00'
Rt.
STA: 11
6+17.1
OFF: 60
.00'
Rt.
STA: 11
6+50.1
OFF: 60
.00'
Rt.
STA: 11
6+99.4
OFF: 50
.00'
Rt.
LIMIT OF CONSTRUCTION
STA 9+59.1
LIMIT OF CONSTRUCTION
STA 10+33.2
STA: 11
6+50.0
OFF: 50
.00'
Rt.
STA: 11
4+68.5
OFF: 50
.00'
Rt.
STA: 11
5+70.8
OFF: 50
.00'
Rt.
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
STA: 11
6+35.6
OFF: 70
.98'
Rt.
R
R
R 2 '
R
E F
S
B F
S
E F
S
B N
C
E F
S
B F
S
0 +
E F
S
B N
C
N
W
POB 0+00.00
POE 0+50.01
0+00
S
E
POB 0+00.00
POE 0+70.54
0+00
N
W N
W N
W
POB 10+00.0
POE 10+60.0
S
W S
W S
W
POB 10+00.00
POE 10+83.33
10+00
N17°40'06.8"E
N02°32'3 5.5"E
P T
P C
P T
P C
P I
0 1
D O
G W
O
I
V E
S
O U T
H
CURTIS PARKWAY
" C
M P
/-INV= 685.79
INV= 689.16
W A
L L
" B
L L
" B
18" CMP
IN
V
.9
T
O P
.3
"X
C U
R B
IN
L E
T
18" CMP
IN
V
.0
T
O P
.2
"X
C U
R B
IN
L E
T
" C
P P
INV= 686.31
T O
P
.6
H
O M
E M
A D
E C
U R
B
IN
L E
T
IN
V
.4
IN
V
.9
" R
C P
IP
F R
IN
V
.8
W /F
E S
" C
M P
INV=680.61
24" CPP
IP
F 1/4" O
TP
IP
F R
TAX PARCEL C53-015
P.B. 53, P. 17
D.B. 706, P. 2
GORDON PARKWAY PROPERTIES, LLC
N/F
TAX PARCEL C53-0
14HUGHDON DAVIS
N/F
TAX PARCEL C53-0
14HUGHDON DAVIS
N/F
TAX PARCEL C68-004
75, P.
D.B.
D.B. 2368, P. 9
D.B. 2368, P. 97
HERITAGE BAPTIST CHURCH OF CALHOUN, INC.
N/F
TAX PARCEL C53-0
14BP.B. 54
, P. 102 D.B. 20
91, P. 4
77HAMILTON MEDICAL CENTER, INC.N/F
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
25 50 100
SCALE IN FEET
18"
18"
24"24"
18"
24"
24"
18"
18"
18"
A .2
A
A
A
A .1
A
A .3
A .2
A .1
A
A .1
A .1.1
A .2
A .3
A .4
A
REQ'D R/
W
REQ'D R/
W
DE90
DE100
DE111
DE121
DE122
DE123
DE124
DE
DE15
DE16
DE
DE21
DE22
DE49
DE50 DE51
DE58
DE
DE62
D E
D E
D E
D E 6D
E
D E
D E
D E
D E
D E
D E
DE89
DE101
DE12
DE132
DE133
DE134
DE135
DE148
DE1
DE15
DE151DE1
A
W I
M A
T
A
W I
M A
T
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/17/2026
SmithRya
GPLOT-ORD
12:02:29 PM
0003-_13
STA: 120+74.92
OFF: 50.00' Lt.
STA: 120+75.13
OFF: 55.00' Lt.
STA: 121+12.34
OFF: 55.00' Lt.
STA: 121+12.12
OFF: 50.00' Lt.
STA: 122+35.75
OFF: 50.00' Lt.
STA: 122+35.97
OFF: 55.01' Lt.
STA: 122+46.91
OFF: 55.00' Lt.
STA: 122+65.15
OFF: 55.00' Lt.
STA: 122+64.94
OFF: 50.00' Lt.
STA: 121+95.54OFF: 49.82' Rt.
STA: 124+37.31
OFF: 50.00' Rt.
END MILL & INLAY
STA 124+66.48
LIMIT OF CONSTRUCTIONSTA 10+36.89
(STATIONS 121+95.68 - 124+37.31)
MINIMIZE CLEARING
BUILDING NOT TO BE IMPACTED(PROTECT THROUGHOUT CONSTRUCTION)
STA: 121+95.68
OFF: 30.00' Rt.
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
S T
A
O F
F
R
N
E
POB 0+00.00
POE 0+72.53
0+00
N
W S
W S
W
POB 10+00.00
POE 10+87.13
10+00
N05°44'49.2"W
P T
P I
D O
G W
O
I
R T
H
CURTIS PARKWAY
.7
.6
.1
.1
.6
.8
.4
TAX PARCEL C53-014B
P.B. 54, P. 102
D.B. 2091, P. 477
HAMILTON MEDICAL CENTER, INC.
N/F
TAX PARCEL C67-009
P.B. 4, P. 44
D.B. 1054, P. 2
FAY BAKER
TEDDY RALPH BAKER & LOLA
N/F
TAX PARCEL C67-025
D.B. 205, P. 811
DONNA F. CAMPBELL
N/F
TAX PARCEL C53-014
HUGHDON DAVIS
N/F
.5
.4
.3
.5
TAX PARCEL C67-009
P.B. 4, P. 44
D.B. 1054, P. 2
FAY BAKER
TEDDY RALPH BAKER & LOLA
N/F
TAX PARCEL C53-014B
P.B. 54, P. 102
D.B. 2091, P. 477
HAMILTON MEDICAL CENTER, INC.
N/F
S N F F
.1
2 O U
T B
L D
G
M T
L B
L D
G W
IT
WOOD FENCE
A
R P
O R
T
H V
A C
B R
K B
L D
G
S
T
O D
E N F
E N
C E
IN
V
.2
T O
P
.8
"X
C U
R B
IN
L E
T
" R
C P
IN
V
.0
T O
P
.0
"X
C U
R B
IN
L E
T
IN
V
.5
" R
" R
IN
.2
T O
P
.9
"X
C U
R B
IN
L E
T
IN
V
.1
T O
P
.8
"X
C U
R B
IN
L E
T
" R
C P
IN
L E
T
" H
O L
" C
P P
W M
W M
IP
F R
4 B E N T
F F .5
G M
IP
F /2 " O
T P B
E N T
S A
T D
S H
IP
F /2 " O
T P B
E N T
IP
F /2 " C
H A
N N
E L
IR
O N B
E N
T
25 50 100
SCALE IN FEET
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
18"
18"
A
A .1
A
A .1
A
A
A
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
DE
DE
DE
DE
DE
D E
DE113 DE114 DE115DE25
D E
DE
DE63
DE
66 DE
D E
D E
D E
D E 2 D E
D E
DE112
DE136
DE13
DE14
DE147
DE13
DE139
A
W I
M A
T
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
12/29/2025
HusseyJ
GPLOT-ORD
1:12:14 PM
0004-_13
99+00 100+00 100+00 101+00 102+00 103+00 104+00 105+00
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
.8
.4
.0
.5
.2
.3
.6
.7
.9
.4
.7
-0.8888% 0.5877%
P
C
P V
T
V
L
150.00' VC
K = 101.59
DS = 35 mph
P V
I
105+00 106+00 107+00 108+00 109+00 110+00 111+00
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
.7
.0
.4
.8
.1
.6
.7
.8
.0
.0
.1
.6
.8
0.5877%
1" = 10'
VERTICAL
1" = 40'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/16/2026
CruzBarcenasL
GPLOT-ORD
_15.dgn
5:02:00 PM
0001-15
MAINLINE PROFILE
STA 101+44.87
BEGIN CONSTRUCTION
111+00 112+00 113+00 114+00 115+00 116+00 117+00
670 670
675 675
680 680
685 685
690 690
695 695
700 700
705 705
.8
.6
.8
.1
.3
.2
.9
.4
.6
.3
.5
.5
.6
0.5877%
1.6783%
0.5663%
P V
I
P
C
P V
T
P V
C
P V
T
150.00' VC
K = 137.54
DS = 35 mph
200.00' VC
K = 179.85
DS = 35 mph
117+00 118+00 119+00 120+00 121+00 122+00 123+00
680 680
685 685
690 690
695 695
700 700
705 705
710 710
715 715
.6
.5
.4
.9
.8
.5
.0
.2
.0
.1
.5
.5
.6
0.5663%
1.8012%
P
C
P V
T
150.00' VC
K = 121.46
DS = 35 mph
1" = 10'
VERTICAL
1" = 40'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/16/2026
CruzBarcenasL
GPLOT-ORD
5:03:09 PM
0002-15
123+00 124+00 125+00 126+00
680 680
685 685
690 690
695 695
700 700
705 705
710 710
715 715
720 720
.6
.2
.6
.8
.5
.9
.8
1.8012% -2.3927%
P V
I
P
V I P V
C
P V
T
P V
C
V H
I G
H
200.00' VC
K = 47.69
DS = 35 mph
150.00' VC
K = 49.64
DS = 35 mph
1" = 10'
VERTICAL
1" = 40'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
4/16/2026
CruzBarcenasL
GPLOT-ORD
5:14:51 PM
0003-15
STA 124+66.48
END CONSTRUCTION
24" CPP INV= 674.1
624" CMP INV= 674.0
918" CPP INV= 674.0
5UNDER CONST58' DIA
INLET NO TOP
INV= 674.1
18" CPP
24" CMP
INV= 670.3
24" CMP
INV= 666.9
W-HW/WW
72" CMP
IN
V
.1
" C
M P
INV= 681.43
18" RCP
INV= 681.15
TOP= 684.45
MHST
INV=680.82
18" CPP
INV= 684.78
INV= 684.88
" C
M P
/-INV= 685.79
INV= 689.16
W A
L L
" B
L L
" B
18" CMP
IN
V
.9
T
O P
.3
"X
C U
R B
IN
L E
T
18" CMP
IN
V
.0
T
O P
.2
"X
C U
R B
IN
L E
T
" C
P P
INV= 686.31
T O
P
.6
H
O M
E M
A D
E C
U R
B
IN
L E
T
IN
V
.8
W /F
E S
" C
M P
INV=680.61
24" CPP
A22
A25
A24A26
A23
A27
A31
A30
A29 A28
A34 A35
A34
A37
A36
A33
A32
A38
A34
A39
A40
A40
A42
A43
A41
A44
A45
A46
A46
A47
A48
A49
A50 A51
A52
A53
A54
A56
A57
A55
A33
24"
18"
24"
18"
24"
18"
24"
30"
18" 18"
18"
18"
24"
24"
30"
30"
18"
BEGIN CONSTRUCTION
STA 101+45
BEGIN PROJECT
STA 101+00
100 200
SCALE IN FEET
0 50
N
E
0+00.
POB
0+87.
POE
0+00
S
E
0+00.00
POB
0+70.54
POE
10+00.00
POB
10+82.61
POE
10+00.00
POB
11+00.88
POE
11+00
10+00.
POB
10+60.
POE
10+00 .00
PC
10+41.8
PT
10+20.
PI
10+00 .00
POB
11+14.6
POE
10+00
11+00
10+00.00
POB
10+00.0
POB
10+72.5
POE
10+93.50
POE
10+00
L A
U R
E
A D
P R
O F E S S I
O N
CURTIS P
ARKWAY
CURTIS PARKWAY
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/6/2026
HusseyJ
GPLOT-ORD
_21.dgn
11:41:24 AM
0001-_21
1234567
DRAINAGE AREA MAP
.4
IN
V
.9
" R
C P
IN
V
.2
T O
P
.8
"X
C U
R B
IN
L E
T
" R
C P
IN
V
.0
T O
P
"X
C U
R B
IN
L E
T
IN
V
.5
" R
" R
.2
T O
P
.9
"X
C U
R B
IN
L E
T
IN
V
.1
T O
P
.8
"X
C U
R B
IN
L E
T
" R
C P
IN
L E
T
" H
O L
" C
P P
A1
A3
A2
A4 A5
A6
A7
A8
A8
A9
A10
A11
A11
A12
A13
A8
A14
A15
A15
A17
A18
A16
18"
18"
18"
18"
24"
18"
18"
18"
END CONSTRUCTION
STA 124+65
END PROJECT
STA 125+50
100 200
SCALE IN FEET
0 50
N
E
0+00.00POB
0+72.53POE
0+00
N
W
0+00.00 POB
0+50.01 POE
0+00
10+00.00 POB
10+83.33 POE
10+00
10+00.00 POB
10+87.13 POE
10+00
D O
G W
O
I
V E
S
O U T
H
D O
G W
O
I
R T
H
CURTIS PARKWAY
CURTIS PARKWAY
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/6/2026
HusseyJ
GPLOT-ORD
11:44:17 AM
0002-_21
1234567
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/6/2026
HusseyJ
GPLOT-ORD
11:38:41 AM
0003-21
1" = 10'
VERTICAL
1" = 40'
HORIZONTAL
D
S T
A
O F
F
R
T
T O
I N
H
A D
D 'L
H
A-3
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
D
A-4 A-5
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
D
A-6
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
INV OUT = 674.99
INV IN = 675.56
CLASS III
56.25' - 24" STORM DRAIN
1.0133%
INV OUT = 674.06
INV IN = 674.99
CLASS III
92.21' - 24" STORM DRAIN
1.0086%
INV OUT = 669.17
INV IN = 669.75
CLASS III
58.00' - 30" STORM DRAIN
1.0000%
INV OUT = 672.77
INV IN = 673.56
CLASS III
78.16' - 30" STORM DRAIN
1.0108%
INV OUT = 669.75
INV IN = 672.77
CLASS III
297.81' - 30" STORM DRAIN
1.0141%
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
A
A-2
INV OUT = 668.94
INV IN = 669.17
CLASS III
22.12' - 30" STORM DRAIN
1.0400%
H
I N
T O
O F
F
R
T
S T
A
A-1
AREA = 11 SY
3DO = 7.5 FT
W = 12.28 FT
LA = 9.78 FT
V10 = 7.65 FPS
GA STD. DETAIL D55
TYPE III RIPRAP
0+00 1+00 2+00 3+00 4+00 5+00
630 630
635 635
640 640
645 645
650 650
655 655
660 660
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
705 705
710 710
.9
.8
.2
.4
.6
.8
.1
.2
.2
.1
.7
.9
A-7
A D
D 'L
H
H
I N
O F
F
R
T
S T
A
S
A-8
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A-9
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A-10
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A D
D 'L
H
H
I N
T O
O F
F
L
T
S T
A
E
A-11
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
E
A-12
A-13
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A-14
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
INV OUT = 681.40
INV IN = 682.22
CLASS III
81.90' - 24" STORM DRAIN
1.0012%
INV OUT = 681.09
INV IN = 681.40
CLASS III
30.05' - 24" STORM DRAIN
1.0318%
INV OUT = 680.62
INV IN = 681.09
CLASS III
46.18' - 24" STORM DRAIN
1.0178%
INV OUT = 679.47
INV IN = 680.62
CLASS III
114.54' - 24" STORM DRAIN
1.0040%
INV OUT = 676.88
INV IN = 678.07
CLASS III
118.98' - 24" STORM DRAIN
1.0001%
INV OUT = 676.22
INV IN = 676.88
CLASS III
65.99' - 24" STORM DRAIN
1.0002%
INV OUT = 675.56
INV IN = 676.22
CLASS III
65.83' - 24" STORM DRAIN
1.0026%
INV OUT = 674.99
INV IN = 675.56
CLASS III
56.25' - 24" STORM DRAIN
1.0133%
6+00 7+00 8+00 9+00 10+00 11+00
640 640
645 645
650 650
655 655
660 660
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
705 705
710 710
715 715
720 720
.7
.5
.2
.0
.7
.2
.5
.6
.4
.8
.6
.8
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/7/2026
HusseyJ
GPLOT-ORD
DRNG.dgn
10:23:57 AM
0001-22
DRAINAGE PROFILES
DRNG_P_Storm Drain Pipe50 - PROFILE A-21 TO A-3
DRNG_P_Storm Drain Pipe50 - PROFILE A-21 TO A-4
1" = 10'
VERTICAL
1" = 40'
HORIZONTAL
A-15
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A-16
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
S
A-17
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
D
INV OUT = 690.21
INV IN = 693.39
CLASS III
210.66' - 18" STORM DRAIN
1.5095%
INV OUT = 686.47
INV IN = 690.21
CLASS III
156.24' - 18" STORM DRAIN
2.3938%
INV OUT = 685.96
INV IN = 686.47
CLASS III
40.38' - 18" STORM DRAIN
1.2630%
INV OUT = 682.22
INV IN = 685.46
CLASS III
264.19' - 24" STORM DRAIN
1.2264%
12+00 13+00 14+00 15+00 16+00 17+00
650 650
655 655
660 660
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
705 705
710 710
715 715
720 720
725 725
730 730
.6
.9
.5
.4
.3
.8
.1
.9
.4
.8
.4
.9
A-18
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
D
A D
D 'L
H
H
I N
T O
O F
F
R
T
S T
A
E
A-19
A D
D 'L
H
H
I N
T O
O F
F
L
T
S T
A
E
A-20
H
I N
T O
O F
F
R
T
S T
A
E
A-21
INV OUT = 697.25
INV IN = 697.94
CLASS III
38.43' - 18" STORM DRAIN
1.7955%
INV OUT = 696.88
INV IN = 697.25
CLASS III
36.16' - 18" STORM DRAIN
1.0232%
INV OUT = 693.39
INV IN = 696.88
CLASS III
298.49' - 18" STORM DRAIN
1.1692%
18+00 19+00 20+00 21+00 22+00
655 655
660 660
665 665
670 670
675 675
680 680
685 685
690 690
695 695
700 700
705 705
710 710
715 715
720 720
725 725
730 730
735 735
.7
.1
.6
.9
.2
.7
.1
.9
.6
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/7/2026
HusseyJ
GPLOT-ORD
10:22:27 AM
0002-22
DRAINAGE PROFILES
DRAINAGE PROFILES
22-000310 40
SCALE IN FEET
0 20
A-17
INV OUT =690.21
INV IN =691.12
CLASS III
41.00' - 18" STORM DRAIN
2.2195%
A D
D 'L
H
.0
H
.8
IN
V
.6
T O
P
.0
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
A-17.1
A D
D 'L
H
.0
H
.9
IN
V
.7
T O
P
.2
O F
F
R
T
S T
A
.0
G A
S T
D
D
0+00 0+10 0+20 0+30 0+40 0+50 0+60
660 660
670 670
680 680
690 690
700 700
710 710
720 720
730 730
.7
.7
A-18 A-18.1
A D
D 'L
H
.0
H
.8
IN
V
.9
T O
P
.2
O F
F
L
T
S T
A
.0
G A
S T
D
D
INV OUT = 693.39
INV IN = 694.42
CLASS III
41.00' - 18" STORM DRAIN
2.5122%
A D
D 'L
H
.0
H
.0
IN
V
.9
T O
P
.4
O F
F
.0
R
T
S T
A
.0
G A
S T
D
D
0+00 0+10 0+20 0+30 0+40 0+50 0+60
660 660
670 670
680 680
690 690
700 700
710 710
720 720
730 730
.9
.8
A-15
INV OUT =687.10
INV IN =687.37
CLASS III
27.00' - 18" STORM DRAIN
1.0000%
INV OUT =686.56
INV IN =687.10
CLASS III
53.47' - 18" STORM DRAIN
1.0099%
INV OUT = 686.15
INV IN = 686.56
CLASS III
41.00' - 18" STORM DRAIN
1.0000%
INV OUT = 685.96
INV IN = 686.15
CLASS III
18.74' - 18" STORM DRAIN
1.0139%
A-15.4
A D
D 'L
H
.0
H
.5
IN
V
.9
T O
P
.3
O F
F
.5
L
T
S T
A
.0
G A
S T
D
A
T P
E
A-15.3
A D
D 'L
H
.0
H
.9
IN
V
.6
T O
P
.4
O F
F
.5
R
T
S T
A
.0
G A
S T
D
A
T P
E
A-15.2
A D
D 'L
H
.2
H
.2
IN
V
.1
T O
P
.8
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
A-15.1
A D
D 'L
H
.8
H
.8
IN
V
.7
T O
P
.0
O F
F
.0
R
T
S T
A
.0
G A
S T
D
D
A D
D 'L
H
.0
H
.5
IN
V
.9
T O
P
.0
O F
F
.7
R
T
S T
A
.0
G A
S T
D
S
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60
660 660
670 670
680 680
690 690
700 700
710 710
720 720
730 730
.6
.7
.3
.9
A-15.1
A D
D 'L
H
.8
H
.8
IN
V
.7
T O
P
.0
O F
F
.0
R
T
S T
A
.0
G A
S T
D
D
INV OUT = 686.1
5INV IN = 6
88.37
CLASS III
22.21' - 1
8" STORM DRAIN
9.9973%
A-15.1.1
A D
D 'L
H
.2
H
.2
IN
V
.9
T O
P
.9
O F
F
.5
R
T
S T
A
.0
G A
S T
D
A
T P
E
0+00 0+10 0+20 0+30 0+40 0+50
660 660
670 670
680 680
690 690
700 700
710 710
720 720
730 730
.5
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
11/05/2020
REVISION DATES
1/7/2026
HusseyJ
GPLOT-ORD
10:26:09 AM
DRAINAGE PROFILES
22-000410 40
SCALE IN FEET
0 20
A-14
INV OUT =683.49
INV IN =683.66
CLASS III
27.02' - 18" STORM DRAIN
0.6291%
A-14.3
A D
D 'L
H
.0
H
.5
IN
V
.1
T O
P
.5
O F
F
.5
R
T
S T
A
.0
G A
S T
D
A
T P
E
INV OUT =683.20
INV IN =683.49
CLASS III
40.45' - 18" STORM DRAIN
0.7169%
A-14.2
A D
D 'L
H
.0
H
.9
IN
V
.8
T O
P
.6
O F
F
.5
L
T
S T
A
.0
G A
S T
D
A
T P
E
INV OUT =682.22
INV IN =682.70
CLASS III
63.22' - 18" STORM DRAIN
0.7592%
A-14.1
A D
D 'L
H
.3
H
.6
IN
V
.2
T O
P
.3
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
A D
D 'L
H
.0
H
.8
IN
V
.7
T O
P
.1
O F
F
.2
R
T
S T
A
.0
G A
S T
D
S
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50
650 650
660 660
670 670
680 680
690 690
700 700
710 710
720 720
.4
.5
.6
.7
INV OUT = 682.40
INV IN = 683.74
CLASS III
23.49' - 18" STORM DRAIN
5.7037%
A-13.1
A D
D 'L
H
.4
H
.4
IN
V
.2
T O
P
.5
O F
F
.3
R
T
S T
A
.0
G A
S T
D
A
T P
E
A-13
A D
D 'L
H
.0
H
.6
IN
V
.9
T O
P
.1
O F
F
.0
R
T
S T
A
.0
G A
S T
D
S
0+00 0+10 0+20 0+30 0+40 0+50
650 650
660 660
670 670
680 680
690 690
700 700
710 710
720 720
.2
INV OUT = 678.79
INV IN = 682
.00
CLASS III
38.81' - 18"
STORM DRAIN
8.2167%
A-10.1
A D
D 'L
H
.6
H
.6
IN
V
.3
T O
P
.4
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
A-10.2
A D
D 'L
H
.0
H
.8
IN
V
.5
T O
P
.9
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
INV OUT = 678.07
INV IN = 678.79
CLASS III
71.40' - 18" STORM DRAIN
1.0083%
A-10
A D
D 'L
H
.1
H
.1
IN
V
.5
T O
P
.2
O F
F
.4
R
T
S T
A
.0
G A
S T
D
S
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30
650 650
660 660
670 670
680 680
690 690
700 700
710 710
720 720
.3
.3
.3
A-10.1
A D
D 'L
H
.6
H
.6
IN
V
.3
T O
P
.4
O F
F
.0
L
T
S T
A
.0
G A
S T
D
D
INV OUT = 678.79
INV IN = 679.14
CLASS III
34.70' - 18" STORM DRAIN
1.0088%
A-10.1.1
A D
D 'L
H
.0
H
.4
IN
V
.7
T O
P
.6
O F
F
.9
L
T
S T
A
.0
G A
S T
D
S
0+00 0+10 0+20 0+30 0+40 0+50
650 650
660 660
670 670
680 680
690 690
700 700
710 710
720 720
.7
.6
DRAWING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .