Restroom Trailers- SON 150725.pdf

PDF 141 KB Posted

Attached to
Trailor Mounted Restroom
Solicitation number
FA468625Q012
Issued by

About this file

This document is a Statement of Need (SON) from the 9th Reconnaissance Wing at Beale Air Force Base for a temporary bathroom trailer. The Air Force Combat Ammunition Course currently uses a single restroom for both genders in building 1319 and requires a 12-month rental of a trailer-mounted restroom to address facility limitations. The specific requirements include a 2-station temporary restroom trailer with separate facilities for each gender, featuring individual locks, sinks, mirrors, showers, toilets, and overhead lighting. The trailer must have a 120v/20amp electrical connection with a 100-foot power cord extension, self-contained waste and potable water tanks, and weekly waste tank emptying. The contractor must deliver the trailer as soon as possible after award, coordinating delivery at least two weeks in advance, and remove the trailer within 30 days of the lease ending.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

9TH RECONNAISSANCE WING (ACC)

BEALE AIR FORCE BASE, CALIFORNIA

10 July 2025

MEMORANDUM FOR 9 CONS/PKB

FROM: 9 MUNS

SUBJECT: Statement of Need for Temporary Bathroom Trailer

1. General Scope: The Contractor shall provide delivery/lease of a trailer mounted restroom to

Beale AFB, CA

2. Background: Currently Air Force Combat Ammunition Course uses one restroom for both genders within building 1319

3. Impact: Complies with Presidential Executive Order and removes any possible incidents with washroom usage

4. Requirements: The trailer mounted restroom requires the following:

• Rental of trailer-mounted restroom

• 12 months rental

• 2 station temporary restroom trailer

• 120v /20amp electrical connection with 100 feet of extension on power cord

• Self-contained waste tank

• Self-contained potable water tank

• Weekly emptying of waste tank

• 2 stations(l restroom for each gender) locks on interior of each station

• Sinks for handwashing for each station

• Mirrors above sink for each station

• Shower for each station

• Toilet for each station

• Each Stations shall be equipped with overhead lighting

5. Delivery: The Contractor shall deliver the trailer as soon as possible after receipt of award. The contractor shall coordinate delivery with the government point of contact listed in the inspect and acceptance section of the contract at least two weeks prior to anticipated delivery.

6. Pick up: The Contractor shall coordinate pick up/removal of the trailer with the government point of contact listed in the inspect and acceptance section of the contract shall within 30 days of the lease ending.

File details come from the government source that posted it. Updated .