Restain Kitchen Cabinets - Statement of Work.pdf

PDF 135 KB Posted

Attached to
Re-Stain Kitchen Cabinets
Solicitation number
FA303023Q0022
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA303023Q00220002 SF 30.pdf PDF
Solicitation Amendment FA303023Q00220001 SF 30.pdf PDF
Kitchen Cabinets 1-1.jpg JPG image
Solicitation - FA303023Q0022.pdf PDF
Kitchen Cabinets 1-2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

RE-STAIN CABINETRY – FIRE STATION

GOODFELLOW AFB – Fire Station Bldg. 3321

1. DESCRIPTION:

Scope: This statement of work entails: Prep cabinets, light sanding all woodwork upper and lower which includes doors, drawers, insides, and facings. Re-stain entirely all cabinetry

The Contractor shall provide all personnel, equipment, tools, material, transportation, labor, and supervision required to complete all work described.

Location: Building 3321 Base Fire Station

2. PERSONNEL: Contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of company or by wearing appropriate badges that contain the company name and employee name.

3. GENERAL TASKS:

a. The Contractor shall visit the job site to verify location, conditions, quantities and dimensions prior to starting work. The Contractor shall coordinate with the government representative prior to their visit to the job site.

b. The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits, and contract documents and shall not congest the site with any materials or equipment without prior written authorization. The Contractor shall store his other materials and equipment at the site reserved by the government at the end of each workday.

c. The Contractor shall plan operations so as to keep temporary work from blocking access to completed work. If, however, conflict with normal traffic access occurs, the Contractor shall provide temporary bypass routing until such temporary work is complete.

d. Toilet facilities inside may not be available for use by Contractor’s personnel.

e. The Contractor shall take all actions to prevent work-generated refuse from entering storm drainage systems. Actions may include installation of temporary plugs, screens, strainers, or similar measures to prevent entry into systems or other actions, as necessary.

f. The Contractor-generated refuse and waste shall be hauled from the worksite as required to a disposal area to be selected by the Contractor, and shall be located outside the physical boundaries of the installation. This refuse and waste material shall be kept neat, orderly, and safe for workers at all times.

g. During the performance period of this contract, and until final completion and acceptance thereof, the Contractor shall exercise the utmost care to avoid accidents or injuries to persons or property. The Contractor shall place and maintain all necessary barriers and safeguards, if necessary, about the work site for the prevention of accidents and shall take all precautions required to protect personnel and property to include the general public and properties adjacent to the work site.

h. The Contractor shall provide a full time quality control function to ensure that all materials and workmanship are in strict accordance with industry standards and this statement of work.

Installation and materials shall conform to the requirements of applicable codes to include all of the following:

1) OSHA

2) AFOSHA

3) CoE

4) U.S. Consumer Product Safety Commission

5) NFPA 70 – National Electrical Codes

4. SPECIFICATIONS:

Products will be installed using the manufacturers recommended methods, and must be installed by a professional who is knowledgeable of these products to prevent exclusion of any warranty on materials. Upon completion of each phase the Contractor shall request a final inspection. The

Government shall inspect all work before acceptance. All work identified during the final inspection not meeting the criteria specified by this statement of work shall be repaired by the

Contractor at no additional cost to the Government.

5. SPECIFIC TASKS:

a. PRIOR TO STARTING: Contractor will contact the PROJECT

MANAGER/CUSTOMER to finalize the work schedule.

b. Specific Tasks – Prep work – covering floors, countertops, furniture, surfaces, etc.

c. Specific Tasks – sanding, etc.

d. Specific Tasks etc. – Re-stain…

6. PERIOD OF PERFORMACE: Performance period shall not exceed 5 calendar days for install or completion of work. In the event the contractor encounters problems that may prevent or delay scheduled work, the contractor shall contact the contracting office POC for this requirement

7. FEDERAL AND AETC HOLIDAYS

Plan and coordinate personnel to perform the required tasks Monday through Friday, excluding Federal holidays. AETC Family Days are announced each year. Contractors are required to either work on AETC Family Days or take time off IAW contractor’s business practice. At times, the 17 TRG campus operates two shifts to meet student loads. The

Contractor may be required to work alternate shift times. Normal hours will be 0700-1600, Monday through Friday. Operational hours may vary between a fall and spring schedule.

List of Federal Holidays and AETC Family Days:

Federal Holiday Observed

2022 2023

New Year’s Day 01 Jan 31 Dec 21 2 Jan

Martin Luther King’s 3rd Monday in January 17 Jan 16 Jan

President’s Day 3rd Monday in February 21 Feb 20 Feb

Memorial Day Last Monday in May 30 May 29 May

Juneteenth 19 Jun 20 Jun 19 Jun

Independence Day 4 Jul 4 Jul 4 Jul

Labor Day 1st Monday in September 5 Sep 4 Sep

Columbus Day 2nd Monday in October 10 Oct 9 Oct

Veterans Day 11 Nov 11 Nov 10 Nov

Thanksgiving Day 4th Thursday in November 24 Nov 23 Nov

Christmas Day 25 Dec 26 Dec 25 Dec

8. SECURITY REQUIREMENTS: The contractors shall comply at all times with base law enforcement and security requirements to include base pass requirements.

a. Contractor Installation Access Pass. Before arrival, a government identification card-holding person from the sponsoring agency, base contracting office/administrator or applicable local project manager will submit a request for base access using the wing’s Base Access List (BAL) memorandum as a form of registration for each credential applicant. The base sponsor/sponsoring agency/contract officer and the contracted management team should establish an accountability process to account for each applicant, to oversee the BAL process, and to retrieve installation passes when access is no longer required. Base sponsors/sponsoring agencies or contract officers will ensure the BAL is accurate, it is signed and forwarded to the 17

SFS Pass & Registration section for completion of the vetting and fitness determination processes. The BAL should be delivered to Pass & Registration, located at the Visitor Control

Center (VCC). When delivery is not possible, the BAL may be forwarded to Pass & Registration via a “.mil” email account located on Goodfellow AFB. The BAL will include pertinent visitor information, reason for entry, frequency of entry, destination, times each day requiring entry, and duration of request.

b. Contractor Initial (and periodic) Installation Access Screening. Contractors will provide Pass and Registration with two forms of identification, one of which will be a state issued photo identification. Prior to being allowed access, a minimum of a background/National Crime

Information Center (NCIC) check will be completed on all contractors, requesting unescorted access for official business. This screening process will validate the contractor's suitability to visit Goodfellow and certify that the contractor does not pose an increased threat to the base populace. The contractor will then be issued a temporary Defense Biometric Identification

System (DBIDS) pass or AF Form 75A through the expiration date on the BAL request. Possession of an authorized access pass does not automatically authorize or guarantee access to the installation. The individual must still have a valid purpose to be on the installation and properly sponsored, as applicable.

c. Access Denial. If it is determined a contractor requesting access has been convicted of a felony or pled guilty to a felony charge within the past 10 years, or is considered not fit to obtain authorized access based on the information obtained during the identity vetting, or criminal history indicates the individual may present a threat to the good order, discipline and morale of the installation, Security Forces personnel will deny entry. The contractor will be informed of the access denial, will be issued an Access Denial Letter, and will be informed on how they may appeal this order.

d. Access Denial Appeal Process. When denied access, contract visitors will be informed to report back their manager. If the contract worker and management are considering an appeal, it will be submitted by letter to the 17 SFS Commander, within 30 days of access denial. The contract manager should first contact the military contract officer/administrator or on-base sponsor for additional guidance and clarification. The appeal may be delivered to the installation

Visitor Control Section or mailed to Security Forces, addressed to 17 SFS/CC, 361 Apache Trail, Goodfellow AFB, 76908. The contractor's appeal should discuss all facts and reasons to support rescinding access denial. The 17 TRW/CC will approve/disapprove all appeals for entry.

e. For installation access on non-duty hours or down days:

1. Identify which workers need access on weekends, federal holidays/family days, and down days.

2. Ensure only workers that are already vetted are on the Extended-Hours request (no new personnel). New personnel require a new BAL and formal vetting.

3. Complete the “After Hours” BAL for workers requiring down day access to the installation.

4. Identify the vehicle requirements. If operations cannot support the search procedures for large vehicles/special purpose equipment, the request may be declined unless arrangements are made to deliver the vehicle/equipment prior, during normal duty hours.

5. During the above-mentioned days, the contract officer, contract representative sponsoring ID cardholder is required to be present during hours of the work request.

6. All BALs are (re)accomplished each time employees or personnel change, not to exceed 180 days. Oversight for BAL updates and establishment of procedures to ensure

Physical Access Control System (PACS) credentials and locally created access credentials from individuals who no longer require installation access is the responsibility of the contracting officer/contract administrator.

7. When an employee (regardless of position) is no longer employed by the contractor or subcontractor all DBIDS passes are to be returned to the Contract Officer/Administrator or to the Visitor Control Center. If a local issued access credential/pass is not returned, the contract officer may withhold funds or the Installation Commander may consider permanent debarment to the installation. Immediate access denial may be initiated by

Pass & Registration updating the DBIDS database until disposition of the DBIDS pass is resolved.

f. Traffic Laws. Contractor and employees shall comply with Texas transportation code, base traffic regulations and posted signs while on the installation.

g. WEAPONS, FIREARMS, AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle or privately-owned vehicles while on base.

h. The Contractor shall be responsible for safeguarding Government property associated with the required work. At the close of each work period, facilities, equipment and materials shall be secured.

9. CONSERVATION OF UTILITIES: The Contractor shall instruct their employees in utilities conservation practices and shall be responsible for operating under conditions, which preclude the waste of Government utilities.

10. GOVERNMENT FURNISHED UTILITIES AND SERVICES: The Government shall provide the following without costs to the Contractor:

a) Primary Power

11. COMPLIANCE WITH LAWS: Contractor activities are NOT exempt from air emission, storm water, hazardous waste, and other environmental compliance rules and regulations. The

Contractor shall comply and ensure that all Sub-Contractors comply with all applicable federal, state, and local laws, regulations, ordinances and standards related to environmental matters. The

Contractor shall also comply and ensure that all Sub-Contractors comply with all specific instructions or directions given to the Contractor by Goodfellow AFB regarding environmental matters.

12. WARRANTY: The Contractor shall identify all items being installed that are guaranteed or under warranty for more than a one-year period, and provide validated copies of the manufacturer’s warranty. All warranty information shall be filed by the Contractor in the

Government’s name. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty.

END STATEMENT OF WORK