Response Form B - Technical Response.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
RFP - Light Rail Wheel Measuring Devices
Solicitation number
BD-20-1206-40000-40000-49322
Issued by
Suffolk County, Massachusetts

About this file

This document is a Request for Proposal (RFP) from the Massachusetts Bay Transportation Authority (MBTA) for the procurement of Light Rail Wheel Measuring Devices. The RFP outlines the required specifications for the measuring devices, including accuracy, repeatability, software and hardware requirements, and operational and support features. Vendors are required to provide detailed responses addressing the business, technical, and operational requirements outlined in the RFP. The RFP has a due date of 20 October 2020 and the contract term is not specified.

The RFP does not provide any details on pricing, set-asides, incumbents, or funding sources. Vendors are instructed not to disclose actual pricing information in their responses. The RFP is focused on the technical capabilities and operational support of the proposed light rail wheel measuring devices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP# Form B-Tech Response

Form B: Technical Response Sheet
RFP 45-20Light Rail Wheel Measuring Device
Commbuys 20-1206-40000-40000-49322

The following requested information is a mandatory part of the Request for Proposal (RFP). Failure to complete this form may be cause for the bid to be deemed as non-responsive and may result in disqualification. *Please do not reformat the cells or columns. Save file with the company name in the file name

Requested InfoInstructions
BusinessRespond free text in the Response column.
MeasurementsFill in the accuracy and repeatability of the proposed device
Software and HardwareSelect one of the five options from the drop-down list in the Response column for each questions. For each question, vendor is encouraged to elaborate on answers where appropriate. If you are partnering with other suppliers to deliver functionality, be sure to call out the vendor product and details.
Operation and SupportRespond free text in the Response column.

Business

Form B: Technical Response
RFP 45-20Light Rail Wheel Measuring Device
Commbuys 20-1206-40000-40000-49322
Vendor
Instructions: Please respond free text in the Response column.
Question IDQuestionsResponse (free text)
BUS-REQ-01Company name
BUS-REQ-02Describe the ownership and/or strategic partnerships of your company
BUS-REQ-03Total number of employees
BUS-REQ-04When was your company established? Provide a brief description of your organization's core businesses.
BUS-REQ-05When was your proposed solution first brought to market?
BUS-REQ-06Is there pending litigation against your company or specific to your proposed solution to this RFP? If so, please describe.
BUS-REQ-07Terminations: Describe any situation over the past three (3) years in which a customer has terminated an agreement with your company for cause relating to the types of services and/or technology solution being requested in this RFP prior to the end of term of the agreement.
BUS-REQ-08Does your firm require the MBTA to sign additional contracts or forms with additional terms and conditions? If so, please describe and submit a generic copy with this bid package.
BUS-GOV-01Do you have experience with customers in the public and / or transportation sector(s)? Provide short description(s) of that experience.
BUS-GOV-02Please list similar relevant projects for other public transit agencies or governments.

Measurements

Form B: Technical Response
RFP 45-20Light Rail Wheel Measuring Device
Commbuys 20-1206-40000-40000-49322
Vendor0

Directions: Fill in the highlighted cells with the Accuracy and Repeatability of your product

General Profile Accuracy

ApplicationAccuracyRepeatability
Wheel Profile
Rim Thickness
Rail Profile
Switch Profile
Wheel Defects
Runout
Brake Disc
Track Geometry
Wheel Diameter
Back-to-Back

Software and Hardware

Form B: Technical Response
RFP 45-20Light Rail Wheel Measuring Device
Commbuys 20-1206-40000-40000-49322
Vendor0

For each question, vendor is encouraged to elaborate on answers where appropriate. If you are partnering with other suppliers to deliver functionality, be sure to call out the vendor product and details.

Response Key
1) Not supported in current releaseThis feature is not supported in the current version. A solution addressing this requirement may need to be externalized or custom built outside of the COTS product.
2) Requires codingThis feature is possible but will require one or more moderately skilled to deeply skilled developers to code (e.g. firmware adjustment, JavaScript classes, functions, or methods that must be added or called from native functionality).
3) Configurable but outside of standard UI or hardware setupThis feature is possible, but may require technical support.
4) Out of the Box (OOTB) and configurable in web UIFeature and requirement is configured in the web UI by an application administrator.
5) OOTB and configurable directly on hardwareFeature and requirement is configured on the hardware itself by service provider.
Question IDCapability AreaQuestionsResponse Key answerResponse (free text)
SH-ADM-01GeneralDescribe the software and/or hardware requirements to run your proposed solution. Include operating system, CPU processor, memory and storage capacity, screen resolution, interface specifications.
SH-ADM-02General/AdministrationDoes your product provide the ability to define and assign system administrator-like roles to a predefined list of authorized users?
SH-DATA-01Data / Integration / ReportingDoes your system check the operating status of wheel measuring system? If so, how is this completed?
SH-DATA-02Data / Integration / ReportingDoes you system complete a self-diagnostics test. If so, what test are completed and when are those self-diagnostics initiated?
SH-DATA-03Data / Integration / ReportingDoes your product provide the ability to add custom attributes or metadata to truck objects (brand, model number, associated sensors, etc.)?
SH-DATA-04Data / Integration / ReportingDoes your product provide the ability to define and configure data type and possible values of custom attributes (e.g. predefined list, list based upon applications defined)?
SH-HARD-01Physical FeaturesPlease describe the physical features of your measuring device and the accompanying display unit (at a minimum, include size and weight)
SH-HARD-02DurabilityDoes your system is protected from dust, temperature, and/or other environmental factors? If so, please describe the protective gear. Include minimum and maximum temperatures at which the hardware can function properly.
SH-HARD-03DurabilityDescribe any protection or countermeasures against corrosion and humidity and adverse working conditions?
SH-HARD-04DurabilityWhat is the average lifespan of your system?
SH-PROD-01ProductCan parameters of an wheel measuring system can be edited in the software? If so, what parameters can be edited?

Operation and Support

Form B: Technical Response
RFP 45-20Light Rail Wheel Measuring Device
Commbuys 20-1206-40000-40000-49322
Vendor0

For each question, vendor is encouraged to elaborate on answers where appropriate. If you are partnering with other suppliers to deliver functionality, be sure to call out the vendor product and details.

Instructions: Please respond free text in the Reponses column.

Question IDCapability AreaQuestionsResponse (free text)
OS-IMPL-01ImplementationWhat level of orientation and training will you provide?
OS-IMPL-02ImplementationPlease provide the expected implementation plan for your product with the MBTA. Please include key milestones timing and summary points
OS-IMPL-03ProductWhat modules are available as add on? NOTE: DO NOT DISCLOSE ACTUAL PRICING IN THIS DOCUMENT
OS-OPS-01OperationDescribe how maintenance patches and major updates are deployed? Are updates included in the general license model?
OS-OPS-02OperationDescribe the steps needed to complete all of the 4 required capabilities of the measuring device (see section 2.1.1.2)?
OS-OPS-03OperationCan your device measure any the optional measurements? Describe the process to measure all optional measurements (see Section 2.1.1.3)?
OS-PURCH-01ProductDescribe how different modules are deployed and how they are packaged (e.g., multiple modules packaged in a single SKU).
OS-PURCH-02ProductAre multiple environments supported in the licensing cost? NOTE: DO NOT DISCLOSE ACTUAL PRICING IN THIS DOCUMENT.
OS-PURCH-03Purchasing ModelDescribe available purchasing models (e.g., perpetual, licensing, other). NOTE: DO NOT DISCLOSE ACTUAL PRICING IN THIS DOCUMENT.
OS-SUPP-01SupportWhat warranty / warranties do you offer for your system?
OS-SUPP-02SupportDo you offer any self-service support options? If so, what are they? If not, what support do you offer, and what is the availability of that support?
OS-SUPP-03SupportWhat are the standard availability and response times of end-user customer support?
OS-SUPP-04SupportWhat are the standard availability and response times of enterprise support?

Pricing Matrix

File details come from the government source that posted it. Updated .