REQUIREMENTS-27-0637 Draft SOW.pdf
PDF 224 KB Posted
- Solicitation number
- REQUIREMENTS-27-0637
About this file
This is a Statement of Work (SOW) for structural engineering services at the Northeast Fisheries Science Center (NEFSC) Milford Laboratory in Milford, Connecticut. The National Oceanic and Atmospheric Administration (NOAA) is seeking comprehensive structural assessment and temporary shoring services for Building #1 located at 212 Rogers Ave, Milford, CT 06460, which has experienced structural distress attributed to long-term seawater exposure. Primary areas of concern include Room 16 (floor slab delamination, corrosion, and concrete spalling) and Room 24 (diagonal cracking in CMU partition walls).
The contract requires four primary tasks over a base year (February 6, 2027 to February 5, 2028) plus three optional years covering monitoring only. Task 1 involves desktop review of structural drawings and comprehensive visual field investigation using ASTM D 4580 sounding procedures to map concrete delamination. Task 2 requires delivery of an inspection report with photographic documentation, crack mapping, root-cause analysis, and remediation recommendations with cost estimates, with draft report due within 21 calendar days of inspection completion and final report within 7 calendar days after NOAA comments. Task 3 mandates design and installation of temporary shoring using fourteen (14) Government-Furnished SureBuilt Standard Post Shore 350 units (6'6" to 11'5" height range, 6,445 to 4,400 lbs load rating) with professional engineer-stamped calculations and drawings, plus all supplemental materials and labor for installation in accordance with OSHA regulations. Task 4 requires development of a structural monitoring plan (submitted two weeks prior to shoring completion), bi-monthly inspections and adjustments for 12 months in the base year, and continuation through all three option years, including immediate alerts if movement exceeds predetermined thresholds. All work must comply with the International Building Code, ASCE 7, and OSHA 29 CFR Part 1926 Subpart Q.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REQUIREMENTS-27-0637 SSN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Northeast Fisheries Science Center (NEFSC) Structural Assessment and Shoring Building # 1
Milford Laboratory
212 Rogers Ave, Milford, CT 06460
1. PURPOSE/OBJECTIVE
Provide professional structural engineering services to evaluate multiple instances of observed structural distress within Building # 1 at the National Marine Fisheries Service (NMFS) Northeast Fisheries Science Center (NEFSC) Milford Lab in Milford, Connecticut. The Contractor will perform a comprehensive structural assessment, provide an inspection report, deliver a temporary shoring design using Government Furnished post shores, and implement a monitoring program. The objective of this work is to render safe the areas of concern with temporary shoring, and evaluate immediately adjacent areas of the structure to determine if adjacent areas are also in need of shoring.
The assessment, design, and monitoring will be used to stabilize the immediate area, track ongoing movement, and inform future permanent repairs.
2. BACKGROUND
The NEFSC Milford Laboratory Building 1 is a critical NOAA asset, serving as a leading center for sustainable aquaculture research. The research performed in Building 1 largely involves the use of seawater.
Several instances of observed structural distress exist within the facility that require immediate engineering attention. It is suspected that long-term exposure to seawater has caused this degradation of the structure.
Key localized areas of concern include:
● Room 16: The floor slab in Room 16 is showing advanced signs of distress, including surface delamination (indicated by hollow sounds upon impact), visible corrosion and rust stains, and concrete spalling.
● Room 24: Diagonal cracking is visible across the CMU partition walls, indicating potential structural movement or localized stress concentrations.
3. SITE LOCATION
The NMFS NEFSC Milford Laboratory Building 1 is located at:
212 Rogers Ave Milford, Connecticut 06460
4. DESCRIPTION OF WORK
The Contractor shall provide Engineering Services to complete a structural assessment and subsequent report to address the items outlined below.
TASK 1: INITIAL DESKTOP REVIEW & ON-SITE VISUAL INVESTIGATION
1. Desktop Review: Review existing structural and architectural drawings to understand the building's framing system and load paths.
2. Visual Investigation: Conduct a thorough visual and physical field investigation of the facility. The investigation must comprehensively evaluate all floors and areas of Building 1 to identify any other latent or secondary areas of structural distress; primary focus and concentrated effort shall be directed at Room 16 and Room 24.
a. Where concrete delamination is suspected (specifically including, but not limited to, the floor slab in
Room 16), the contractor shall utilize structural sounding methods to map the extent of the subsurface distress. Sounding shall be performed in accordance with Procedure B (Chain Drag) of ASTM D 4580
– Standard Practice for Measuring Delaminations in Concrete Bridge Decks by Sounding.
TASK 2: STRUCTURAL ASSESSMENT REPORT
i. Immediate Notification: Within one day of the completion of the inspection, the Contractor shall provide an email informing the Government of any major deficiencies that require immediate action.
ii. Inspection Report: Provide an inspection report to include an overview of findings, photographic documentation, crack mapping, root-cause analysis, and conceptual long-term repair recommendations.
1. Document, measure, and map the orientation, length, and width of all wall cracks, slab delamination, spalling, and distress features identified in Rooms 16 and 24, as well as any new distress areas discovered elsewhere in the building.
2. Report to include recommended remediations for any deficiencies including cost estimates to be used for budgetary estimates (engineering opinions of cost).
3. Draft report to be delivered within 21 calendar days of the completion of the inspection. NOAA will review and provide comments within 7 calendar days.
4. Provide final report within 7 calendar days after receiving NOAA comments.
TASK 3: TEMPORARY SHORING & INSTALLATION
1. Shoring Design: Provide a temporary shoring design for all distressed areas determined to require stabilization based on the findings of the on-site Building 1 visual inspection. The shoring is to remain in place for approximately 24 months to allow for funding to arrive for a future structural repair project.
a. Determine the required spacing, placement, layout, and structural load paths for the post shores across all affected areas. Design any necessary sill plates, headers, or temporary lateral bracing required to safely transfer loads to the floor structures below without causing secondary damage or overloading adjacent members. The layout shall consider the location and layout of existing scientific equipment and ongoing research.
b. The design shall utilize Government Furnished post shores.
i. Shoring Post Specifications:
● Model: Fourteen (14) SureBuilt Standard Post Shore 350 (SBPS350). The height range is 6’6” to 11’5”
● Load Rating: 6445 lbs down to 4,400 lbs (depending on the extended height.)
c. Provide engineering calculations justifying the shoring design for each identified area, based on the manufacturer specifications and allowable capacities of the provided GFP/GFE.
d. Drawings and calculations to be stamped by a professional engineer licensed in the state of
Connecticut.
2. Shoring Installation: Supply all necessary supplemental materials (lumber for sill plates/headers, bracing, fasteners, etc) and labor to safely and completely install the temporary shoring system in accordance with the stamped engineering drawings and OSHA regulations.
TASK 4: STRUCTURAL MONITORING & MAINTENANCE
1. Monitoring Plan & Submission: Develop and submit a proposed structural monitoring program for NOAA review and approval at least two (2) weeks prior to the scheduled completion of the temporary shoring installation. The plan shall specify the exact monitoring methodologies (e.g., crack tell-tale gauges, digital tiltmeters, or optical survey targets) used to track any ongoing movement, settlement, or crack propagation in the 2nd-floor CMU walls, distressed slabs, or other areas of concern. TASK 4 will be in the Base Period of Performance (POP) as well as all (3) three option years. Please see Section 5.
Period of Performance.
2. Inspection Frequency & Duration: Perform bi-monthly (every two months) inspections and monitoring of the installed shoring system and surrounding structural elements for a 12-month period.
3. Shoring Adjustments & Maintenance: During each bi-monthly inspection, the Contractor shall evaluate the shoring system's load distribution and perform any required physical adjustments to the post shores (e.g., tightening, releveling, or replacing components) to ensure the shoring solution continuously performs as originally designed and intended.
4. Reporting: Monitoring data shall be compiled and submitted to the Government following each scheduled reading interval, including immediate alerts if movement exceeds pre-determined structural thresholds.
5. PERIOD OF PERFORMANCE
The Period of Performance (POP) consists of one (1) Base Year covering Tasks 1 through 4, and three (3) Option Years covering Task 4 only. The Base Year commences upon issuance of the Notice to Proceed
(NTP).
Period of Performance CLINS / TASKS Date To and From
BASE YEAR TASK 1 - 4 2/6/2027 - 2/5/2028
OPTION YEAR 1 TASK 4 2/6/2028 - 2/5/2029
OPTION YEAR 2 TASK 4 2/6/2029 - 2/5/2030
OPTION YEAR 2 TASK 4 2/6/2030 - 2/5/2031
6. APPLICABLE CODES AND STANDARDS
The following codes, standards, and guidelines are to be considered and adhered to during the execution of this project:
1. International Building Code (IBC) / Connecticut State Building Code
2. ASCE 7 (Minimum Design Loads for Buildings and Other Structures)
3. OSHA 29 CFR Part 1926 Subpart Q (Concrete and Masonry Construction / Shoring)
7. SUBMITTALS/DELIVERABLES
TITLE FORMAT SCHEDULE/FREQUENCY*
Initial Site Investigation N/A Within 30 days after receiving NTP
Immediate Notification Email Within one (1) calendar day of investigation completion
Draft Structural Assessment Report
PDF Within 21 calendar days of investigation completion
Final Structural Assessment Report
PDF Within seven (7) calendar days of receiving NOAA Comments
Temporary Shoring Design & Calculations
PDF Within 21 calendar days of investigation completion
Temporary Shoring Installation N/A Within 21 calendar days of NOAA acceptance of Temporary Shoring Design & Calculations
Proposed Structural Monitoring Plan
PDF Two (2) weeks prior to completion of shoring installation
| Northeast Fisheries Science Center (NEFSC) |
| Milford Laboratory |
| 1. PURPOSE/OBJECTIVE |
| 2. BACKGROUND |
| 3. SITE LOCATION |
| The NMFS NEFSC Milford Laboratory Building 1 is located at: |
| 212 Rogers Ave |
| Milford, Connecticut 06460 |
| 4. DESCRIPTION OF WORK |
| The Contractor shall provide Engineering Services to complete a structural assessment and subsequent report to address the items outlined below. |
| TASK 1: INITIAL DESKTOP REVIEW & ON-SITE VISUAL INVESTIGATION |
| 1. Desktop Review: Review existing structural and architectural drawings to understand the building's framing system and load paths. |
| 2. Visual Investigation: Conduct a thorough visual and physical field investigation of the facility. The investigation must comprehensively evaluate all floors and areas of Building 1 to identify any other latent or secondary areas of structural distr... |
| a. Where concrete delamination is suspected (specifically including, but not limited to, the floor slab in Room 16), the contractor shall utilize structural sounding methods to map the extent of the subsurface distress. Sounding shall be performed in... |
| TASK 2: STRUCTURAL ASSESSMENT REPORT |
| TASK 3: TEMPORARY SHORING & INSTALLATION |
| TASK 4: STRUCTURAL MONITORING & MAINTENANCE |
| 5. PERIOD OF PERFORMANCE |
| 6. APPLICABLE CODES AND STANDARDS |
| 7. SUBMITTALS/DELIVERABLES |
File details come from the government source that posted it. Updated .