Performance Work Statement 11-24-26.pdf

PDF 1 MB Posted

Attached to
Facility Janitorial, Grounds, and Pest Management Services for NOAA's Southeast Fisheries Science Center
Solicitation number
REQUIREMENTS-27-0082-3
Issued by

About this file

This is a Performance Work Statement (PWS) for facility janitorial, grounds maintenance, and pest management services at the National Oceanic and Atmospheric Administration (NOAA) Fisheries Southeast Fisheries Science Center (SEFSC).

The contractor must provide comprehensive services across four facilities: Miami, FL (60,000 sq ft main building plus 400 sq ft annex); Panama City, FL (16,000 sq ft total); Pascagoula, MS (49,326 sq ft across four buildings); and Galveston, TX (70,000+ sq ft across ten main campus and wetlab buildings). Services include janitorial operations (bare floor care, carpet cleaning, restroom sanitation, window/door cleaning), grounds maintenance (mowing, pruning, mulching, fertilization, irrigation system management), and integrated pest management (IPM) using preventative and non-chemical controls with restricted chemical applications near aquatic research areas. The contract requires the contractor to furnish all personnel, equipment, materials, supplies, and supervision. Working hours are Monday-Friday 0700-1700 at Miami, Panama City, and Pascagoula; 0730-1630 at Galveston. Janitorial service begins at Galveston immediately (base year), Panama City in May 2027, and Pascagoula October 1, 2027; Miami receives no janitorial services. Grounds maintenance begins at Miami in month seven of the base year, and Pascagoula and Galveston in the base year; Panama City receives no grounds services throughout the contract term.

The Contract Program Manager must hold a Bachelor's degree in relevant field or Associate's degree plus four years specialized experience, possess PMP/CFM/FMP certification, OSHA 30-hour certification, and minimum eight years facility operations experience with four years supervisory/management experience. Janitorial staff require only neat appearance, U.S. work eligibility, and English language proficiency. The contractor must maintain a Contract Manager available within sixty minutes during operating hours and must replace vacant positions within twenty-one days. Performance standards require 95% compliance with work order response timelines (no more than two complaints monthly), and specific quality levels for restroom sanitation (95% satisfactory rating), floor care (weekly inspections with four-hour re-performance windows), and grounds maintenance (bi-weekly inspections with twenty-four-hour re-performance windows). Deductions include 5% monthly reduction for more than three validated restroom complaints and $100 per incident for missing OSHA-compliant wet floor signage. Monthly status reports and invoices due by the 15th of each month; contractor travel requires COR approval at least two weeks prior. All personnel must complete mandatory government-provided training within thirty days including sexual assault/harassment prevention, NOAA defensive driving, IT security awareness, NOAA safety training, and records management. The government furnishes Common Access Cards, office equipment, power tools, service manuals, government vehicles, and forklifts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) National Oceanic and Atmospheric Administration

NOAA Fisheries Southeast Fisheries Science Center

SEFSC Facility Janitorial, Grounds, and Pest Management Services

1.0 - BACKGROUND

The National Oceanic and Atmospheric Administration (NOAA) Fisheries, , Southeast Fisheries Science Center (SEFSC) conducts critical fisheries science research at its headquarters site in Miami, FL and at six other research stations located from Beaufort, NC to Galveston, TX.

The SEFSC has a need for a prime contractor to manage facility janitorial, grounds maintenance, and pest management services across the Center’s facilities in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX.

The contractor shall provide all personnel, equipment, tools, materials, supplies, supervision, transportation, and services necessary to perform the services as outlined in this PWS.

2.0 - PLACE OF PERFORMANCE

Performance on this contract shall occur at each of the SEFSC facilities located in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX.

Facility details for each location is as follows:

DRAFT

2.1 - Miami Facility, 75 Virginia Beach Drive, Miami, Florida, 33149: NOAA’s Southeast Fisheries Science Center's Miami facility is located on Virginia Key, 3 miles east of Miami and north of Key Biscayne, Florida. The Bureau of Commercial Fisheries, one of NOAA’s predecessor agencies, established the facility in 1965 as the Tropical Atlantic Biological Laboratory. It was built on 5 acres given to the federal government by Dade County (now Miami-Dade County) for marine research. The facility provides 46,300 square feet of working space with offices, research laboratories, and a library. Leaking HVAC chiller pipes remains one of the most prominent facility related challenges at the Miami site. A separate contract is being pursued to address that. The facility is also consistently faced with king tides encroaching the parking lot.

Square Footage:

● Main building: Approximately 60,0000 square feet (three story)

● Annex Building: Approximately 400 square feet (one story)

2.2 - Panama City Facility, 3500 Delwood Beach Rd, Panama City, Florida 32408: The Panama City facility was originally established in 1966 as the Eastern Gulf Marine Laboratory of the U.S. Bureau of Sport Fisheries and Wildlife, one of NOAA’s predecessor agencies. With the donation of 11 acres of land from the Panama City Chamber of Commerce, construction of a new building with direct access to St. Andrews Bay was completed in 1972.

Square Footage:

● Two buildings (single story) approximately 16,000 square feet total

2.3 - Pascagoula Facility, 3209 Frederic St, Pascagoula, Mississippi 39567: The facility in Pascagoula was established in 1950 under the Department of Interior as a Bureau of Commercial Fisheries field station. In 1970, the laboratory was transferred to NOAA Fisheries. In 2009 the building was rebuilt following Hurricane Katrina. The facility achieved a Gold rating in the Leadership in Energy and Environmental Design Rating System, making it the first environmentally “green” facility in the city. It is also the home port of the NOAA Ships Gordon Gunter, Oregon II, and Pisces, which conduct scientific surveys of the health and abundance of fishery resources and marine mammals in the Gulf of America and U.S. South Atlantic.

Square Footage:

● Main Laboratory Building, 3209 Frederic Street: 45,000 square feet

○ Two story, both have elevators and stairs

● Gulf Marine Support Facility, 151 Watts Avenue: 2,266 square feet

○ Single story

● Harvesting Systems Building, 202 Delmas Avenue: 2,000 square feet

○ Single story

● Port Complex Guard Houses: 60 square feet each (2 each)

○ Single story

DRAFT

https://www.usgbc.org/leed https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/oregon-ii https://www.omao.noaa.gov/marine-operations/ships/pisces

2.4 - Galveston Facility Main campus - 4700 Avenue U, Galveston, Texas 77551; Wetlab Campus - located at 4900 Fort Crockett Blvd, Galveston, Texas 77551: In 1929, a U.S. Fish & Wildlife Service fisheries field station was established in Galveston, Texas on Offatts Bayou. The field station originally focused on oyster research. In 1931, the laboratory became one of four field stations to do shrimp research in the Gulf of America (formerly Gulf of Mexico). The present facility was established in 1950 at the historic Fort Crockett in Galveston, as a Bureau of Commercial Fisheries, later NOAA Fisheries, facility. It was renovated in 2008 and contains more than 70,000 square feet of offices and laboratories in 10 buildings with a 130,000-gallon seawater system. Research space is shared with NOAA’s Flower Garden Banks National Marine Sanctuary and the Texas Marine Mammal Stranding Network. The age of the structures at the Galveston facility present consistent challenges.

Main Campus

● Building 302 - 10,780 square feet (two story)

● Building 306 - 10,780 square feet (two story)

● Building 301 - 1,920 square feet (single story)

● Building 301 (Pump House) 455 square feet (single story addition)

● Building 305 - 1,925 square feet (single story)

● Building 307 - 3,415 square feet (single story) https://www.fisheries.noaa.gov/southeast/historic-fort-crockett-and-galveston-laboratory

● Maintenance/Archive Building - 3,500 square feet (single story)

● HAZMAT Building - 748 square feet (single story)

Wetlab Campus

● Boat Barn - 5,020 square feet (single story)

● Material Storage "Turtle Hospital" - 1,678.01 square feet (single story)

● Turtle Barn - 6,048 square feet (single story)

● Longline Building -916 square feet (single story)

● WetLab -7,770 square feet (single story)

● Texas Marine Mammal Stranding Network -4,830 square feet (single story)

● HAZMAT Building -162 square feet (single story)

2.5 - Working Hours The normal hours of operation for each site are as follows:

Miami - Monday through Friday 0700 to 1700 Panama City - Monday through Friday 0700 to 1700 Pascagoula - Monday through Friday 0700 to 1700 Galveston - Monday through Friday 0730 to 1630

Occasionally, work outside the required schedule may be necessary to perform maintenance or repairs due to system shutdown or accommodate normal facility operation. Any changes to the contractor employee working hours must be approved by the site's facility manager.

3.0 - OVERVIEW

Each of the facilities identified above has a federal site facility manager. That person is responsible for their facility’s management and the completion of any needed maintenance, repair, inspections, safety and certifications needed at their facility. They coordinate and manage the facility to meet the needs of the facility’s programs, occupants and stakeholders. Site facility managers have no staff to support them in their role. Contract support is used to acquire that support.

4.0 - TASKS

4.1 - Task 1: Facility Operations and Maintenance

4.1.4 - Grounds Maintenance - FFP DRAFT

Facility grounds maintenance is site-specific and will include the maintenance of areas/items such as flowerbeds, lawns, grass areas, plants, trees, shrubs, hedges, groundcovers, shorelines, and erosion control measures.

Facility grounds maintenance is needed for the last seven months of the base year, and all future option years at the Miami facility. Facility grounds maintenance is needed for the base year and all future option years for the Pascagoula and Galveston facilities. Facility grounds maintenance will not be needed for Panama City through the life of this contract.

Maintain plants, trees, shrubs, ground cover, and lawns in a manner that prolongs life and sustains a healthy appearance. The contractor shall perform and coordinate all tasks in a professional and competent manner such that they are completed timely and safely in accordance with the specific requirements identified below.

● Trees and Shrubs:

Tree supports should be kept in good condition and functioning at all times and removed when no longer needed. All trees and shrubs should be fully protected. Tree stakes, tree ties, and guy wire shall be of materials that are comparable to those existing on site, and shall be replaced or repaired by the contractor as needed. Supports or braces are to be repositioned as often as necessary to prevent damage to the tree or shrub trunk. Sand pans can be used for trees and shrubs to protect the plant trunk from the mower, and help to avoid over-watering. Keep shrubs and trees trimmed to present an attractive appearance.

● Pruning:

Trees and shrubs shall be kept pruned (up to thirteen feet) to clear all roads, drives, and walking areas. Any limbs and branches touching or brushing buildings or other structures are also to be pruned to provide clearance and free air circulation around the plant. Dead and diseased foliage or branches shall be removed and disposed of.

● Mulching:

Maintain and replace existing mulch as necessary. Replacement mulch shall be commercial grade shredded hardwood bark, synthetic composite (such as Rubberific), or equivalent. It shall be free of sticks, stones, clods, or other foreign material. A sample of proposed mulch and chips shall be submitted to and approved by the facility manager prior to use. All areas to be mulched shall be raked, debris removed, edge reestablished, and any excess mulch buildup worked into existing soil or removed, at the discretion of the site facility manager, prior to mulch application.

● Mowing and Edging:

Mow and edge all turf areas at a frequency and method that ensures that all areas present an attractive appearance at all times. Mulching mowers are to be used; however, non-mulching mowers are permitted at some sites and shall be approved by the site’s facility manager. Grass clipping shall be cleared from walkways and roadways, and disposed of properly. Grass shall be maintained and groomed to a height of no less than 2.5”; unless otherwise specified by the facility manager.

● Leaf Removal:

The contractor shall remove leaves, as necessary, to maintain a neat and clean appearance. Throughout the year, the contractor shall remove minor accumulations due to isolated leaf drop and shall check all storm drain openings on the premises and remove any leaves or debris that have accumulated. Care shall be taken to remove leaves in existing mulched areas to maintain a neat and clean appearance without substantial reduction in mulch depth or damage to herbaceous or woody plant material.

● Over-seeding, Dethatching, and Plugging:

Over-seed, dethatch, and plug as necessary to prevent bare areas and promote even growth of turf areas, following common and local landscaping practices.

● Fertilization:

All lawn, trees and ground cover shall be fertilized consistent with common local landscaping practices. Fertilizer used shall be of a balanced type that supplies all nutrients required for providing sustainable growth and development. The fertilizer application rate for the trees will be determined by tree type, girth, and height. Prior to application, the contractor shall schedule time of application with the site facility manager.

● Flowerbeds and Plants:

Flowerbeds are to be free from weeds and debris. Replacement plants will be supplied and arranged by the contractor in an attractive and professional manner.

● Soil and Ground Cover:

Soil shall be aerated (frequency is dependent on the type of soil and grass but not less than one aeration-per year) by manual or mechanical methods of piercing the ground to provide an adequate air supply to the soil and promote sustained plant life.

Soil shall be cultivated to ensure the topsoil is loose for the purposes of gas exchange, water penetration, and soil aeration.

All areas shall be maintained to promote healthy and sustained growth. Ground cover must present a neat appearance.

The contractor shall mow unimproved grounds to present a neat, well-maintained appearance. Height of weeds, native grasses, etc. on unimproved grounds at border stations shall be between 1.5” and 2.5” inches in height.

● Weeds:

All areas (excluding unimproved grounds) are to be free of weeds.

● Irrigation:

The contractor shall conduct a walk-through and inspect all irrigation systems (sprinklers, rain and freeze sensors, and drip systems) and submit a list of all damages to those systems to the site facility manager.

All watering cycles shall be conducted at times that minimize inconvenience to the building occupants and visitors, and maximize percolation. Entrances and exits shall not be wet during the arrival and departure of occupants and visitors. Watering shall be accomplished using a drip, soaker hose, or other water-saving irrigation system devices.

The contractor shall operate watering systems that use automatic timers coupled with rain/freeze sensors, in an efficient manner that considers local weather and local mandates. During periods of water restrictions, watering guidelines by the local water district shall apply. The contractor shall not be responsible for the replacement of landscaping materials that die as a result of a lack of proper access to water during these periods of water restrictions by municipalities.

When mechanical irrigation is not available or is malfunctioning, the contractor shall use alternative hand watering methods such as gator bags, or equivalents to ensure, promote, and maintain healthy growth.

● Adjust, Clean, and Set Automatic Controllers:

Irrigation systems on automatic controllers shall be adjusted, cleaned, and set for the most energy efficient watering periods. When watering lawns, the contractor shall make sure that the sprinklers and drip heads are clean and adjusted so that the water ejects evenly and covers all lawn areas and shrubs.

Irrigation systems that are damaged by the contractor due to neglect shall be repaired by the contractor. The contractor shall be responsible for all costs incurred to repair and test the system. Repairs shall be performed by the contractor. All repairs shall be performed by qualified individuals using industry practices.

The contractor shall be responsible to notify the facility site manager in the event of operational malfunctions, breakages, or failures to the irrigation system, which affects the contractor’s ability to provide proper irrigation to building(s) landscaping. Failure to make timely notification to the site manager shall result in the contractor replacing damaged landscaping.

● Policing:

All campus grounds areas (including, but not limited to, exterior areas, fences, and parking lots) shall be free of papers, trash, and other discarded material.

4.1.5 - Pest Management - FFP Pest control may be requested by site facility managers at several of the sites. When requested, the contractor shall furnish all management, licensed personnel, equipment, materials, and supervision necessary to provide comprehensive Integrated Pest Management (IPM) services across all interior spaces, outbuildings, covered walkways, and immediate perimeter grounds (extending 10 feet from building foundations) at the Galveston, Pascagoula, Miami and Panama City sites. The primary focus shall be preventative, non-chemical controls, structural exclusion, biological suppression, and targeted, minimal-risk applications.

● Integrated Pest Management Plan (IPMP):

Within 15 days of award the contractor shall reach out to each site facility manager to determine whether the site manager wishes to pursue pest management through this contract. For each participating site, the contractor shall develop an Integrated Pest Management Plan (IPMP) and deliver it to each participating site facility manager and the Contracting Officer’s Representative (COR) within 30 days from contract award.

● The IPMP shall specify:

○ Identification of target pests, biological action thresholds, and exclusion methodologies.

○ Non-chemical control measures (e.g., sanitation adjustments, mechanical trapping, exclusion, caulking/sealing of entry points).

○ Proposed Environmental Protection Agency (EPA)-registered pesticides, including active ingredients, Safety Data Sheets (SDS), and label application directions.

○ Specific exclusion procedures and restricted-use protocols for wet laboratories, seawater systems, specimen storage areas, and dining/breakroom spaces.

○ Applicator state licensing and certification credentials.

The contractor shall not apply any chemical formulation until the COR, in consultation with the site facility managers, formally approves the IPMP in writing.

Specific Performance Requirements

● Facility Monitoring and Surveillance:

The contractor shall conduct monthly monitoring inspections of all interior structural spaces (offices, conference rooms, warehouses, mechanical rooms, shops, attics, crawlspaces) and exterior perimeter zones. The contractor shall inspect, service, clean, and re-bait (using non-toxic monitoring blocks or mechanical traps)

○ Provide continuous early detection of pest populations prior to structural colonization or food/water source contamination.

○ 100% of installed traps and monitoring stations shall be serviced monthly in accordance with the approved IPMP; all rodent monitoring stations must be tamper-resistant, anchored, and locked.

● Pest Suppression and Population Thresholds:

The contractor shall execute non-chemical, physical, and targeted chemical treatments when pest activity reaches or exceeds established action thresholds (e.g., detection of one or more rodents, cockroaches, venomous spiders, or structural-infesting insects).

Interior spaces shall be maintained free from active pest infestations, nests, droppings, runways, and insect trails, ensuring zero interruption to scientific and administrative operations.

Pest management shall result in zero visual evidence of live infestation in general office and administrative areas within 48 hours of treatment; zero tolerance for pests in food-preparation/break areas, laboratories, and animal holding areas.

● Chemical Application Restrictions in Aquatic & Research Zones:

The contractor shall restrict all pesticide applications in or adjacent to wet laboratories, seawater recirculation manifolds, experimental aquarium rooms, and specimen holding tanks to non-volatile baits, gel formulations, or enclosed mechanical traps. Broadcast spraying, space spraying, aerosol fogging, and dusting of chemical pesticides are strictly prohibited inside or within 50 feet of any active aquatic system or air intake louvers.

Pest management shall result in a complete avoidance of chemical introduction, aerosol drift, or water contamination that could endanger living marine organisms or invalidate research data.

There shall be zero mortality or toxic contamination of research specimens resulting from pest control operations; full compliance with EPA FIFRA labeling and the NOAA Fisheries ESOH Program Guide.

● Emergency Callback & Remediation Service:

The contractor shall respond on-site to unscheduled service calls for emergency pest sightings (e.g., rodents, stinging insects, venomous pests, or active insect swarms) within the required operational window.

4.9 - Task 9: Janitorial Service - FFP

The SEFSC requires comprehensive janitorial service to keep each of the facilities clean;

providing a functional environment to the tenants and the stakeholders served. The requirements detailed below establish the mandatory cleaning standards, performance benchmarks, and maintenance procedures for interior floor care, restrooms, fixtures, surfaces, and general facility upkeep to ensure a clean, safe, and professional environment. All consumables, materials and supplies needed for this task are to be provided by the contractor.

The Galveston facility will need janitorial service for the Base and all option years. Janitorial service shall be provided for all buildings of the Galveston Main Campus and only the Wetlab Building on the Wetlab campus. Starting in May 2027, the Panama City facility will need janitorial service. Starting 10/1/2027, the Pascagoula facility will also need janitorial services.

The Miami facility will not need janitorial services through the life of this contract.

Interior Floor Care

● Bare floors:

Floors, base moldings, and grout shall be cleaned and kept free of debris including but not limited to dirt, water streaks, mop marks, string, gum, tar, and other foreign matter.

The floors shall maintain their natural luster and not have a dull appearance.

The contractor shall clean wet mopped floors using disinfectant cleaner(s) with additional scrubbing, if necessary. Surfaces, baseboards, and corners shall be kept clean and dry.

Walls, baseboards, and other surfaces shall be free of splashing, streaks, swirl marks, detergent residue, or any evidence of oil, stains, film, debris, standing water, or markings from the equipment. There shall be no visible buildup of finish in corners or crevices.

Wet floors shall be identified with appropriate signs for safety.

● Asphalt Floors:

Damp mopping shall be the only method of wet cleaning performed by the contractor for floors containing asphalt material.

● Stripping and Finishing:

The contractor shall remove the old finish or wax and apply new sealant in accordance with standard commercial practices every six months or as necessary. The contractor shall remove all spots. There shall be no evidence of gum, burns, scuffmarks, or wax build-up in corners or crevices.

Walls, baseboards, and other surfaces shall be free of finish residue and marks from equipment. Floors shall be free of streaks, map strand marks, and skipped areas. The finished area shall have a uniform luster.

● Sealing:

The sealant must adhere to the floor. The contractor shall evenly coat floor areas with slip resistant sealant.

Carpet and Rugs

● Extraction (public areas only):

Build-up, spills, or crusted material shall be removed along with spots and smears.

There shall be no areas of deterioration or fuzzing to the carpets and rugs as a result of harsh brushing or scrubbing. Cleaned areas of carpets and rugs shall be reasonably blended with surrounding carpets.

● Spot Cleaning

Carpet surfaces shall be free of removable spots, soiled traffic patterns, dirt, dust, debris, gum, and crusted material.

● Vacuuming

Carpet surfaces are to be free of dirt, dust, and other debris. Vacuuming shall be done at a frequency that will protect the integrity of the carpet and prolong wear.

● Floor Mats and Runners:

The contractor shall furnish and replace mats and runners as needed, with type, style and color input from the site facility manager. Mats and runners shall be free of removable spots, soiled traffic patterns, dirt debris, gum, and crusted material. They shall receive scheduled cleanings and routine inspections based upon the manufacturer’s instructions.

Any mats and runners that are found to be non-repairable or cannot be cleaned shall be brought to the attention of the site facility manager, so they can be replaced.

● Carpet Cleaning

Deep carpet cleaning shall be available and performed when requested.

Restroom and Shower Rooms

● Cleaning:

Areas shall be cleaned with disinfectant cleaner. Fixtures shall maintain a high level of luster and be free of dust, mold, mildew, streaks, and encrustation. Partitions, doors, vents, sills, and walls shall be free of dust, dirt, bodily fluid and waste, and graffiti.

Restrooms shall be free of discarded material and trash shall be emptied to prevent the containers from overflowing.

● Floors

The quality standard for providing this service is the same as that described for Interior Floor Care above.

● Receptacles

The contractor will furnish and replace receptacles, when necessary. The contractor shall empty, clean waste receptacles before they are full. Waste receptacles shall be sanitized as needed to prevent odor and stains.

● The contractor will provide and make available for use, consumable supplies such as, but not limited to, trash bags, toilet tissue, hand soap, paper towels, hand sanitizer, and disposable toilet seat covers.

Fixtures

● Clean and Sanitize Fixtures and surfaces (washbasins, urinals, modesty panels, toilets, shower stalls, etc.)

shall be clean with no dust, spots, soil substances, discoloration, mold, build-up, or excess moisture.

● Water Coolers

All coolers shall be free of dirt, watermarks, and all other debris or encrustation. Water coolers shall be sanitized and present a lustrous appearance.

Surfaces

● Horizontal Surfaces:

All surfaces shall be free of dust, dirt, oil spots, or smudges.

● Metal, Brass, and Woodwork:

Surfaces (including corners, crevices, molding, ledges, hand rails, grills, doors, door knobs, door frames, kick plates, etc.) shall be free of dust, streaks, spots, hand marks, oil, smudges, dirt, soil substances, encrustation, and streaks. Metal polish shall be used on a bi-annual basis.

● Glass Cleaning:

All glass, clear partitions, mirror surfaces, bookcases, and other glass (within approximately 70” of the floor) shall be clean and free of dirt, dust, streaks, smudges, watermarks, spots and grime, and shall not be cloudy. There shall be no water spots on the glass or adjacent fixtures and furniture.

Walls

● Clean Spots and Marks:

Wall surfaces shall be free of smudges, marks, dirt, and spots. Cleaning should not cause discoloration.

High Cleaning

● High Surfaces:

Surfaces between 70 inches and 120 inches shall be cleaned free of dirt dust, and cobwebs. Where glass is present, both sides shall be clean and free of streaks. This does not include removal of vents, tiles, or fixtures.

Trash and Wastebaskets

● Trash:

All trash (including restrooms) shall be collected and removed to a location designated by the site facility manager. Trash containers shall be emptied and kept clean, odor-free, and free of dirt, dust, debris, residue, and spilled material. Plastic liners for all trash, debris containers shall not be torn, worn, or contain residue. The contractor shall notify the site facility manager of any item or material identified by the Environmental Protection Agency (EPA), and State and local regulatory agencies as hazardous waste, hazardous materials, or Universal Waste is observed in the trash receptacles.

Typical prohibited wastes include but are not limited to fluorescent light bulbs, thermostats, thermometers, most chemicals, and batteries (40 CFR Parts 260-273).

Stairways

● Exposed Surfaces, Treads, Risers, and Landings:

Stairways, entrances, landings, railing risers, ledges, grills, doors radiators, and surrounding areas shall be free of dirt, dust, litter, and debris.

● Plate Glass:

All glass (to include glass over and in exterior and vestibule doors, all plate glass around entrances, lobbies, and vestibules) shall be clean and free of dirt, grime, streaks, and moisture and shall not be cloudy.

Windows

Windows shall be clean and free of dirt, grime, streaks, and moisture and shall not be cloudy. Window sashes, sills, woodwork, and other surroundings of glass shall be wiped free of drippings and other watermarks. The exterior surface of building windows shall be cleaned annually. Cleanings of both sides of the windows shall be coordinated to maximize cost effective operations as directed by the site facility manager.

Doors

Doors shall be clean and free of dirt, grime, streaks and stains. Door sashes, sills, woodwork, and other surroundings of glass shall be wiped free of drippings and other watermarks. The exterior surface of exterior doors shall be cleaned as needed to remove dirt, grime, streaks and stains.

Blinds and Coverings (not including drapes, curtains, and unique coverings)

● Dusting of Blinds and Coverings:

All blinds and coverings, cord tapes, and valances shall be clean and free of dust and spots. Blinds and coverings that are not operating properly shall be replaced by the contractor.

● Policing:

All building areas (including, but not limited to, the building, exterior areas, fences, and parking lots) shall be free of papers, trash, and other discarded material.

● Interior and Atrium Plants (plants in the community areas, not those within individual offices or cubicles):

Plants shall be free of dust and dead leaves and properly hydrated. Fertilize, prune, and treat for infestation. Any dead or withered plants, due to contractor’s neglect, shall be replaced by the contractor at no additional expense to the Government. The site facility manager shall provide guidance on which plants are included under this item.

Public Areas

All public areas (seating areas, snack bars, and vending machine areas) shall be clean, sanitized, and free of spillages, food crumbs, spots, smudges, marks, and soils. Floors shall be maintained in accordance with the floor care standard services requirements of this contract. The contractor is not required to clean coffee pots, microwaves, toaster ovens, or refrigerators.

Task 9 Deliverables:

● Adequate resources at Panama City, Pascagoula and Galveston to provide the janitorial services identified in the PWS.

● Timely response to tenant janitorial work requests

5.0 - QUALIFICATIONS

All contractor personnel assigned to SEFSC facilities shall possess the minimum qualifications applicable to their assigned position prior to commencing work. The contractor shall ensure that all personnel maintain required qualifications, licenses, and certifications throughout the period of performance.

It shall be the full responsibility of the contractor to organize, furnish, maintain, supervise, and direct a workforce, which, within the limitations and provisions of this contract, is thoroughly capable of safely, efficiently, and effectively performing the work set forth in this contract.

The following positions must meet the qualifications outlined below:

5.1 - Contract Program Manager The contractor shall provide a Contract/Program Manager who shall be key personnel and responsible for all aspects of the contract.

● Bachelor’s Degree (B.A. or B.S.) in Business Administration, Facility Management, Engineering, or a related field; OR an Associate’s Degree with an additional four (4) years of specialized technical experience (totaling 12+ years).

● Active Project Management Professional (PMP), Certified Facility Manager (CFM), or Facility Management Professional (FMP).

● OSHA 30-Hour General Industry or Construction Safety Certification.

● Minimum eight (8) years of direct experience in commercial or federal facility operations, maintenance, and support services.

● Minimum four (4) years of experience in a supervisory/program management capacity managing multi-disciplinary trades (HVAC, electrical, plumbing, janitorial, and grounds).

● Proven experience managing subcontracted specialty vendors (e.g., elevator certification under ASME A17.1, backflow prevention, arc flash studies).

5.4 - Janitor/Grounds There are no specific qualification requirements for janitorial staff beyond the following:

● Personnel shall present a neat appearance and be dressed appropriately for the work to be completed.

● Personnel shall be eligible to work in the United States.

● Personnel shall be able to read, write, speak, and understand English.

7.0 - STAFFING

7.1 - Contract Manager Responsibilities The Contract Manager shall be key personnel and serve as the central point of contact for the government and shall be responsible for overall management and coordination of contractor personnel. The Contract Manager shall also receive any notices of deficiency or complaints from the government.

● The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor.

● The Contract Manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

● The Contract Manager shall be available during facility hours of operation within sixty minutes to meet by phone with government personnel to discuss problem areas.

● The Contract Manager shall work with the site facility managers to efficiently process work requests and work orders and manage overall facility service needs.

The Contract Manager shall be able to communicate fluently in English, as well as to read and write English.

7.2 - Standards of Conduct The contractor shall maintain discipline for resources they have deployed at the SEFSC facilities, and take reasonable precautions to prevent unlawful or disorderly conduct by contractor employees. The government reserves the right to direct the contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The contractor shall immediately replace any employee who is removed, at no cost to the Government.

The standards of conduct are as follows:

● Neglect of duties shall not be tolerated. The contractor shall allow no sleeping while on duty, unreasonable delays, or failure to carry out assigned tasks. Contractor personnel shall not conduct personal business during work hours.

● Disorderly conduct, use of abusive or offensive language, quarreling, intimidation, and fighting shall not be tolerated.

● Contractor employees shall not possess, sell, consume, or be under the influence of drugs, alcohol or other intoxicants while on duty.

● Contractor employees may be subject to criminal action as allowed by law under certain circumstances. These include but are not limited to:

○ Falsification or unlawful concealment, removal, mutilation, or destruction of any official document or record or concealment of material facts by willful omission from official documents or records

○ Theft, vandalism, or unauthorized use of Government property

○ Unethical or improper use of official authority or credentials

○ Security violations

○ Organizing or participating in gambling

7.3 - Adequate Workforce The contractor shall at all times maintain adequate workforce for the uninterrupted performance of all tasks defined within this PWS. Consistent onsite service is particularly important for the maintenance and janitorial services that are needed regularly.

7.4 - Security Clearance Process To initiate the security clearance process, the contractor shall provide the following required information for all individuals who will be working on site, or using agency computer resources to the COR or facility site manager:

● Full Name

● Cell Phone Number

● Email address

● Resume

● U.S. Citizenship or Green Card Holder confirmation

A SEFSC Trusted Agent will manage the security process for each onsite contractor resource.

The Trusted Agent will contact each onsite personnel directly with links, clear instructions, and due dates for completing the required forms to support the security process..

The contractor is responsible for providing appropriate oversight to ensure that all necessary documentation required for security processing, is provided to the Trusted Agent.

7.5 - Nonpersonal Services Personnel performing services under this contract will be controlled, directed and supervised at all times by management personnel of the contractor. Personnel will be capable of performing independent of and without the supervision of any government official. Actions of contractor employees may not be interpreted or implemented in any manner that results in any employee creating or modifying Federal policy, obligating the appropriated funds of the government, overseeing the work of federal employees, providing direct personal services to any federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation. NOAA will perform the inspection and acceptance of the completed work.

8.0 - ADDITIONAL REQUIREMENTS

8.1 - Keys Issued The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons.

No keys issued to the contractor by the government shall be duplicated.

9.0 - SCHEDULE OF DELIVERABLES

The following is a schedule of broad (not task specific), contract deliverables, including administrative deliverables, required during the period of performance of this contract:

Table 2 - Schedule of Deliverable Deliverable Description Frequency Quantity Deliver

To Post-Award Kickoff Meeting

Attend a Post-Award Kickoff Meeting.

Within ten business days of award

One meeting COR, CO DRAFT

Deliverable Description Frequency Quantity Deliver To

Security Clearance Process (See Additional Requirements section of the

PWS)

Provide information on personnel who will be working onsite.

Within five business days of award

One combined submission of all personnel

COR,

Trusted Agent

Progress Meetings

Attend progress meetings requested by the COR and/or CO. The meeting purpose will be to review performance, discuss issues, provide input and recommendations as needed.

As requested N/A COR

Monthly Status Report (MSR) -must be included in the invoice package

The report shall detail major accomplishments during the month, problems / resolutions, issues / mitigation plan, recommendations and tracking of cumulative and planned travel.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically by email

COR,

CO

Monthly Invoice Package

The invoice shall include travel/documentation and accompany (including travel approval prior to travel taking place) the MSR.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically into the IPP system

COR,

CO

Contractor Travel Approval

Contractor travel must be approved by COR prior to the trip, travel requests shall be submitted via email to the COR detailing purpose of the trip

At least 2 weeks prior to travel taking place

Electronically by email

COR

Contract Task Deliverables

Specific deliverables are dependent on each specific task being performed.

Contract task deliverables as prescribed by the PWS task

As identified per task

Site facility manager DRAFT

10.0 - PERFORMANCE REQUIREMENTS SUMMARY

This contract includes a Performance Requirements Summary (PRS). The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the COR. Evaluation of the contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR and individual site facility managers. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the CO.

10.1 - Surveillance The COR shall contact onsite personnel (site facility managers and tenants) for input regarding contract services.

10.2 - Procedure Customer complaints shall be tracked as follows:

● Government or on-site personnel shall contact the COR or site facility manager with complaints.

● COR shall document complaints.

● If the COR determines the complaint is invalid, the complainant shall be notified. The

COR or site facility manager shall retain a copy of the complaint in the file.

● If the COR determines the complaint is valid the contractor shall be notified, with a copy to the CO, and the contractor shall be given reasonable time to correct the problem. The COR shall determine a reasonable time frame to correct the problem.

● The COR shall, at minimum, e-mail the contractor and CO of any valid complaints.

● If the contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint the contractor shall notify the COR and CO. The COR and CO shall review the matter and reassess the validity of the complaint.

● The COR shall consider complaints resolved unless notified otherwise by the complainant.

10.3 - Performance Standard The PRS tables below detail the required service outcomes, performance standards, acceptable quality levels, monitoring methods and incentives/disincentives. Random monthly inspections may be done by the COR and site facility managers. The site facility managers shall notify the COR of any complaints so they may take appropriate action.

If the required services listed in this contract are not performed to the standard specified in the

AQL column of the table below, the government reserves the right to take reasonable steps to positively affect performance.

Table 3: Contract Management and Staffing Operations

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive

1, 2 Responsive and timely completion of work orders

Tenant and facility manager requests are responded to and completed timely, according to the initial request in the facility management software

Performance standards met at least 95% of the time.

No more than two (2) complaints per month.

COR and Task Monitor may solicit or receive intermittent feedback from staff.

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected and/or a negative review in the

CPARS.

1, 2, 4, 9

Contractor provided onsite resources are consistently available

Vacant positions are filled rapidly (onsite resource vacancies shall not result in a lapse in service for any task)

Backfill resources are identified by the contractor within 21 days

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected and/or a negative review in the

CPARS.

All Services are provided timely as identified by PWS and work orders

No lapse or late service performance shall occur

Onsite and subcontracte d resource accomplish all required services as

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive prescribed by the PWS and work orders may result in withholding or deducting invoice payment until issues are corrected, performance penalties, and/or a negative CPARS review

Table 6: Custodial, Sanitation & Grounds Operations

Performance Objective

Performance Threshold /

AQL

Method of Surveillance

Deduction / Incentive / Disincentive

6.1 Restroom &

Shower Room Sanitation & Consumables

(PWS Task 9)

Maintain completely sanitized, odor-free, and fully provisioned restroom and shower facilities for staff and public visitors.

• Restrooms cleaned, sanitized, and restocked daily.

• Zero visible encrustation, mold, or soil on plumbing fixtures.

• Consumable dispensers (soap, towels, paper) never depleted.

• Acceptable Quality Level: ≥ 95% satisfactory rating on monthly surveillance inspections.

• Random sampling:

COR utilizes a standardized 20-point cleanliness checklist across 15% of facility restrooms daily.

• Validated occupant complaints.

• Validated unsanitary condition or empty dispenser must be rectified within two (2) hours of notice.

• More than three

(3) validated customer complaints per month results in a 5% deduction from the monthly custodial CLIN.

6.2 Laboratory &

Public Floor Care

(PWS Task 9)

Preserve structural flooring integrity, eliminate slip/trip/fall hazards, and maintain professional facility aesthetics.

• Bare floors kept swept, damp-mopped, and free of dirt, gum, streaks, or wax buildup.

• Floor stripping and slip-resistant re-sealing completed every six (6) months.

• Carpets vacuumed, spot-cleaned, and free of traffic path soiling.

• Wet floor caution signage deployed 100% of the time during damp cleaning.

• Periodic surveillance:

Weekly visual inspection of corridors, public lobbies, and laboratory walkways.

• Floor care failures (e.g., mop streaks, sticky residue, skipped areas) re-performed within four (4) hours.

• Failure to display OSHA-compliant safety signs during wet floor cleaning triggers an immediate safety violation and a $100 deduction per incident.

6.3 Grounds

Upkeep, Pruning & Storm Drainage Management

(PWS Task 9)

Maintain grounds to prevent structural encroachment, ensure storm drain clearance, and uphold Center aesthetics.

• Turf maintained between 2.5” and 3.5” in height.

• Storm drain grates 100% free of leaves, pine straw, and vegetative debris at all times.

• Tree and shrub limbs pruned to provide minimum 13-foot roadway/walkwa y clearance and zero contact with building roofs/walls.

• Periodic surveillance:

Bi-weekly grounds walkthrough by COR or Site Facility Manager.

• Re-performance within twenty-four

(24) hours of notice.

• If a contractor fails to clear blocked storm drains prior to a declared severe weather event, the Government reserves the right to cure via third-party and backcharge the contractor for all costs incurred.

11.0 - CONFIDENTIALITY AND DATA PRIVACY

This contract may require that services contractors have access to Privacy Information. Service contractors are responsible for maintaining confidentiality of all subjects and materials and may be required to sign and adhere to a Non-Disclosure Agreement (NDA).

The government has unlimited rights to all documents/materials produced under this contract.

All documents and materials, to include the source code of any software produced under this contract, shall be government owned and the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO.

All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.

12.0 - GOVERNMENT FURNISHED RESOURCES

Item(s) Quantity Condition Location Common Access Card As needed Good All sites Office desks, phones, computers, and chairs As needed Good All sites Portable power tools (e.g., saws, drills, sanders, etc.) As needed Good All sites

Stationary power tools (e.g., table saw, radial arm saw, drill press, lathes, etc.) As needed Good All sites

Preventive Maintenance References (e.g., service manuals, technical bulletins, etc.) As needed Good All sites

Government Owned Vehicles As needed Good All sites Forklift and pallet jacks As needed Good All sites

13.0 - TRAINING

Training is authorized for NOAA Fisheries/DOC specific systems and requirements. The following training is currently required to be completed under this contract. When a full-time contractor employee attends training for one working day or longer, the contractor shall provide a qualified substitute at no additional cost to the Government.

The COR may authorize additional training that is necessary for the contract and not commercially available.

13.1 - Government-Provided versus Contractor-Provided Training Some required training may be provided by the Government at no cost to the contractor, subject to availability and scheduling. Regardless of source, the contractor remains responsible for training completion and currency.

Any training not provided by the Government, including costs associated with fees, certifications, renewals, travel, labor time, or related expenses, shall be provided and paid for by the contractor at no additional cost to the Government.

13.2 - Mandatory Government-Provided Training The following Government-provided training shall be completed within thirty calendar days of starting onsite work, unless otherwise specified:

13.3 - General and Administrative Training

● Sexual Assault/Sexual Harassment Prevention and Response Training in accordance with

NAM 1330-52.222-70(b)(6) (required for all contractors)

● NOAA Defensive Driving Training (initial and every three years thereafter)

● Information Technology (IT) Security Awareness Training (annual or as required by

NOAA)

● NOAA Safety training (required for all contractors working at a Government facility)

● Records Management 101

13.4 - Training Documentation and Reporting The contractor shall maintain a current training matrix for all assigned personnel working at SEFSC facilities.

At a minimum, the matrix shall include:

● Employee name

● Training title and description

● Training provider

● Date completed

● Refresher or expiration date (if applicable)

Training records shall be made available to the Government upon request and provided to the COR as required.

Additional commercial or non-contract specific training may be permitted under the following circumstances: 1) prior written approval is obtained from the COR, 2) there is no additional cost to the Government for attendance, 3) the time is not billed to the Government, and 4) there is no relief/change for deliverable due dates

14.0 - GOVERNMENT-OWNED VEHICLES

The contractor is authorized to operate Government-owned vehicles.

NOAA Manual 209-10 requires that NOAA workers that drive Government vehicles, as a part of their duties, must complete defensive driver training prior to driving a vehicle on official business and every three years thereafter. Completion of the NOAA Defensive Driver Training course in the Commerce Learning Center satisfies that requirement.

15.0 - DOCUMENTATION AND RECORDS

All documentation, records and schedules as described in this PWS are the responsibility of the contractor, are the property of the Government and shall be turned over to the Government upon completion or termination of the contract. All records are subject to the Freedom of Information and/or Privacy Acts and any requests for release of any records shall be handled accordingly.

● Integrated Pest Management Plan (IPMP):
Within 15 days of award the contractor shall reach out to each site facility manager to determine whether the site manager wishes to pursue pest management through this contract. For each participating site, the contractor shall develop an Integrated...
● The IPMP shall specify:
Table 6: Custodial, Sanitation & Grounds Operations

File details come from the government source that posted it. Updated .