This is a Performance Work Statement (PWS) for facility inspection and certification services at the National Oceanic and Atmospheric Administration (NOAA) Fisheries Southeast Fisheries Science Center (SEFSC).

The contractor must provide comprehensive inspection, maintenance, and certification services across four SEFSC facilities located in Panama City, Florida; Miami, Florida; Pascagoula, Mississippi; and Galveston, Texas. Key service requirements include: (1) routine safety equipment inspections (emergency showers, eyewash stations, AEDs, emergency lighting) on monthly and annual schedules; (2) fire control sprinkler system inspections and certifications per NFPA 13 and NFPA 25; (3) fire extinguisher inspections for over 150 units; (4) fire alarm system inspections per NFPA 72; (5) backflow preventer testing and certification for fire protection and domestic water systems; (6) HVAC inspection and preventive maintenance twice annually including chemical water treatment; (7) emergency standby generator maintenance and testing twice yearly with annual load bank testing; (8) elevator maintenance, repair, inspection, and certification including 24/7 emergency monitoring for the Miami facility (Galveston and Pascagoula elevators covered under separate contracts); and (9) annual lab fume hood certifications. The contractor must maintain a Contract/Program Manager as key personnel with a Bachelor's degree in relevant field or Associate's degree plus four years specialized experience, active PMP/CFM/FMP certification, OSHA 30-hour certification, minimum eight years facility operations experience, and four years supervisory experience. All personnel must complete mandatory training including sexual assault/harassment prevention, NOAA defensive driving, IT security awareness, and NOAA safety training within thirty days of starting. Performance standards require 95% on-time completion of work orders with no more than two complaints monthly, 21-day backfill of vacant positions, and zero lapses in service delivery. Monthly status reports and invoices are due by the 15th of each month, with contractor travel requiring COR approval at least two weeks in advance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) National Oceanic and Atmospheric Administration

NOAA Fisheries Southeast Fisheries Science Center

SEFSC Facility Inspections and Certifications Services

1.0 - BACKGROUND

The National Oceanic and Atmospheric Administration (NOAA) Fisheries, , Southeast Fisheries Science Center (SEFSC) conducts critical fisheries science research at its headquarters site in Miami, FL and at six other research stations located from Beaufort, NC to Galveston, TX.

The SEFSC has a need for a prime contractor to manage comprehensive inspection and certification services across the Center’s facilities in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX.

The contractor shall provide all personnel, equipment, tools, materials, supplies, supervision, transportation, and services necessary to perform the services as outlined in this PWS.

2.0 - PLACE OF PERFORMANCE

Performance on this contract shall occur at each of the SEFSC facilities located in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX.

Facility details for each location is as follows:

DRAFT

2.1 - Miami Facility, 75 Virginia Beach Drive, Miami, Florida, 33149: NOAA’s Southeast Fisheries Science Center's Miami facility is located on Virginia Key, 3 miles east of Miami and north of Key Biscayne, Florida. The Bureau of Commercial Fisheries, one of NOAA’s predecessor agencies, established the facility in 1965 as the Tropical Atlantic Biological Laboratory. It was built on 5 acres given to the federal government by Dade County (now Miami-Dade County) for marine research. The facility provides 46,300 square feet of working space with offices, research laboratories, and a library. Leaking HVAC chiller pipes remains one of the most prominent facility related challenges at the Miami site. A separate contract is being pursued to address that. The facility is also consistently faced with king tides encroaching the parking lot.

Square Footage:

● Main building: Approximately 60,0000 square feet (three story)

● Annex Building: Approximately 400 square feet (one story)DRAFT

2.2 - Panama City Facility, 3500 Delwood Beach Rd, Panama City, Florida 32408: The Panama City facility was originally established in 1966 as the Eastern Gulf Marine Laboratory of the U.S. Bureau of Sport Fisheries and Wildlife, one of NOAA’s predecessor agencies. With the donation of 11 acres of land from the Panama City Chamber of Commerce, construction of a new building with direct access to St. Andrews Bay was completed in 1972.

Square Footage:

● Two buildings (single story) approximately 16,000 square feet total

2.3 - Pascagoula Facility, 3209 Frederic St, Pascagoula, Mississippi 39567: The facility in Pascagoula was established in 1950 under the Department of Interior as a Bureau of Commercial Fisheries field station. In 1970, the laboratory was transferred to NOAA Fisheries. In 2009 the building was rebuilt following Hurricane Katrina. The facility achieved a Gold rating in the Leadership in Energy and Environmental Design Rating System, making it the first environmentally “green” facility in the city. It is also the home port of the NOAA Ships Gordon Gunter, Oregon II, and Pisces, which conduct scientific surveys of the health and abundance of fishery resources and marine mammals in the Gulf of America and U.S. South Atlantic.

Square Footage:

● Main Laboratory Building, 3209 Frederic Street: 45,000 square feet

○ Two story, both have elevators and stairs

● Gulf Marine Support Facility, 151 Watts Avenue: 2,266 square feet

○ Single story

● Harvesting Systems Building, 202 Delmas Avenue: 2,000 square feet

○ Single story

● Port Complex Guard Houses: 60 square feet each (2 each)

○ Single story https://www.usgbc.org/leed https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/oregon-ii https://www.omao.noaa.gov/marine-operations/ships/pisces

2.4 - Galveston Facility Main campus - 4700 Avenue U, Galveston, Texas 77551; Wetlab Campus - located at 4900 Fort Crockett Blvd, Galveston, Texas 77551: In 1929, a U.S. Fish & Wildlife Service fisheries field station was established in Galveston, Texas on Offatts Bayou. The field station originally focused on oyster research. In 1931, the laboratory became one of four field stations to do shrimp research in the Gulf of America (formerly Gulf of Mexico). The present facility was established in 1950 at the historic Fort Crockett in Galveston, as a Bureau of Commercial Fisheries, later NOAA Fisheries, facility. It was renovated in 2008 and contains more than 70,000 square feet of offices and laboratories in 10 buildings with a 130,000-gallon seawater system. Research space is shared with NOAA’s Flower Garden Banks National Marine Sanctuary and the Texas Marine Mammal Stranding Network. The age of the structures at the Galveston facility present consistent challenges.

Main Campus

● Building 302 - 10,780 square feet (two story)

● Building 306 - 10,780 square feet (two story)

● Building 301 - 1,920 square feet (single story)

● Building 301 (Pump House) 455 square feet (single story addition)

● Building 305 - 1,925 square feet (single story)

● Building 307 - 3,415 square feet (single story) https://www.fisheries.noaa.gov/southeast/historic-fort-crockett-and-galveston-laboratory

● Maintenance/Archive Building - 3,500 square feet (single story)

● HAZMAT Building - 748 square feet (single story)

Wetlab Campus

● Boat Barn - 5,020 square feet (single story)

● Material Storage "Turtle Hospital" - 1,678.01 square feet (single story)

● Turtle Barn - 6,048 square feet (single story)

● Longline Building -916 square feet (single story)

● WetLab -7,770 square feet (single story)

● Texas Marine Mammal Stranding Network -4,830 square feet (single story)

● HAZMAT Building -162 square feet (single story)

2.5 - Working Hours The normal hours of operation for each site are as follows:

Miami - Monday through Friday 0700 to 1700 Panama City - Monday through Friday 0700 to 1700 Pascagoula - Monday through Friday 0700 to 1700 Galveston - Monday through Friday 0730 to 1630

Occasionally, work outside the required schedule may be necessary to perform maintenance or repairs due to system shutdown or accommodate normal facility operation. Any changes to the contractor employee working hours must be approved by the site's facility manager.

3.0 - OVERVIEW

Each of the facilities identified above has a federal site facility manager. That person is responsible for their facility’s management and the completion of any needed maintenance, repair, inspections, safety and certifications needed at their facility. They coordinate and manage the facility to meet the needs of the facility’s programs, occupants and stakeholders. Site facility managers have no staff to support them in their role. Contract support is used to acquire that support.

4.0 - TASKS

4.3 - Task 3: Routine Inspections - FFP

4.3.1 - Safety Equipment Inspections The contractor shall perform monthly and annual inspections as applicable to the following systems and equipment:

● Emergency showers and eyewash stations

● Automated External Defibrillator (AED) devices – monthly inspection of pads and battery; annual functional test per manufacturer guidance

● Emergency egress lighting – monthly test button check; annual full-power failure test to confirm battery provides 90 minutes of lighting

Please see Appendix A2 for a complete list of the above equipment and the location of each.

4.3.2 - Fire Control Sprinkler System Inspections The contractor shall perform all required annual inspections, testing, and certification of sprinkler systems located in each of the SEFSC facilities, in accordance with National Fire Alarm and Signaling Code (NFPA) 13, NFPA 25, and all applicable local, state, and federal regulations. Deficiencies shall be documented and shared with the site facility manager, and the contractor shall provide a cost proposal for corrective work upon request. Please see Appendix A1 and A2 for a list of each system within the four SEFSC facilities, and its location.

4.3.3 - Fire Extinguisher Inspections There are over 150 fire extinguishers in buildings at the four SEFSC facilities. Annual inspection, testing and repair is needed as well as the replacement of defective extinguishers as needed. Please see Appendix A1 and Appendix A2 for a list of each extinguisher and its site and location.

4.3.4 - Fire Alarm System Inspections The contractor shall perform annual inspection, testing, monitoring and maintenance of the facility fire alarm system(s) in accordance with NFPA 72 and other AHJ requirements.

Upon completion of each inspection and test, the contractor shall document all deficiencies, impairments, and noncompliant conditions identified during testing. The contractor shall provide a written report to the site facility manager detailing the results of testing, including a clear description of each deficiency, its code reference, and recommended corrective action.

Corrective repairs resulting from identified deficiencies are not included under this task unless specifically authorized by the COR. At the government’s request, the contractor shall submit a detailed cost proposal and estimated schedule to correct identified deficiencies. No corrective work shall be performed without prior written approval from the COR and/or CO.

Appendix A1 provides a listing of the systems in place at each facility. Appendix A2 provides detailed equipment system and component listings at each site.

4.3.5 - Backflow Preventer Inspections The contractor shall inspect, test, maintain, certify, and repair all backflow prevention assemblies associated with fire protection and domestic water systems in accordance with applicable state regulations, local authority requirements, and manufacturer recommendations and the requirements below. Appendix A1 identifies the number of backflow devices at each site.

Appendix A2 provides the location of each device at each site.

Inspection and Testing:

● Annual testing and certification of all backflow prevention assemblies by a licensed Backflow Prevention Assembly Tester.

● Verification of proper valve operation and pressure differentials.

● Inspection for leaks, corrosion, damage, tampering, or unauthorized modifications.

● Verification of proper accessibility and identification of each assembly.

● Submission of all required testing reports and certifications to the Owner and local

Authority Having Jurisdiction (AHJ).

Preventative Maintenance:

● Cleaning of assemblies and associated strainers.

● Lubrication of moving parts where applicable.

● Exercise and operation of shutoff valves.

● Verification of freeze protection and enclosure conditions where applicable.

Corrective Repairs:

● Repair or replacement of defective check valves, relief valves, shutoff valves, gaskets, and associated components.

● Restoration of assemblies that fail annual certification testing.

● Emergency response for significant leaks or failures affecting fire protection systems.

Deliverables:

● Annual Backflow Test Report.

● Certification documentation required by local authorities.

● Deficiency and repair recommendations.

● Updated inventory of all backflow prevention devices.

4.3.6 - HVAC Inspections and Preventive Maintenance The contractor shall furnish all labor, supervision, tools, equipment, transportation, consumable materials, replacement filters, lubricants, testing instruments, and incidental items necessary to inspect, maintain, evaluate, test, and repair the government-owned HVAC chillers and cooling towers, as well as walk in freezers and coolers identified in Appendix A1, twice per year. The preventive maintenance shall include HVAC Chemical Water Treatment on the open condenser water loop and the closed chilled water loop for the centrifugal liquid chiller and evaporative cooling towers.

Note that the Galveston main campus facility is currently undergoing major renovation of its HVAC system (through a separate contract), estimated to be complete in spring/summer 2027.

The current system uses chilling towers; feeding the cooled water to the buildings. The new system uses geothermal ground loops. Once complete, the Galveston main campus chillers will be removed as will the inspection requirement for those chillers.

4.3.7 - Generator Inspection and Preventive Maintenance The contractor shall furnish all labor, supervision, tools, equipment, transportation, consumable materials, replacement filters, lubricants, testing instruments, and incidental items necessary to inspect, maintain, evaluate, test, and repair government-owned emergency standby generators identified in Appendix A1 twice per year (unless otherwise noted).

The Galveston site has an existing contract in place covering generator inspections/maintenance through 9/30/2028. Beyond that date Galveston generator maintenance will move into this requirement. All other sites require generator maintenance during the contract base year and future option years of this contract.

Bi-annual preventive maintenance shall include the following minimally required items:

● Complete visual inspection of the generator and enclosure.

● Inspection of the engine and alternator.

● Inspection of the automatic transfer switch (ATS), where applicable.

● Engine oil and filter replacement, as required by manufacturer maintenance intervals.

● Replacement of fuel, air, and coolant filters, as required.

● Inspection of coolant level and condition.

● Inspection of hoses, belts, clamps, and engine accessories.

● Battery inspection, cleaning, terminal service, charger inspection, and battery load testing.

● Inspection of the fuel system for leaks.

● Annual fuel analysis report

● Inspection of exhaust system components.

● Inspection of electrical wiring and control components.

● Inspection of vibration isolators and mounting hardware.

● Verification of block heater operation.

● Verification of battery charger operation.

● Lubrication of components as recommended by the manufacturer.

● Recording of generator operating hours.

● Verification of all alarms and safety shutdown functions.

Operational Testing for Each Visit:

● Start and exercise each generator.

● Verify automatic and manual operating modes.

● Verify transfer switch operation, where permitted.

● Record operating voltage, frequency, oil pressure, coolant temperature, engine speed, battery voltage, and operating hours.

● Identify abnormal operating conditions.

● Provide recommendations for corrective action when deficiencies are identified.

Load Tests:

● Each machine shall be load tested annually to verify the machine can pull the rated load

Task 3 Deliverables;

● Complete necessary inspections across all campus locations initiated either through the work order system, or directly from the site facility manager

● Provide summary information in the monthly status report.

4.5 - Task 5: Elevator Maintenance, Repair, Inspection, Certification and Support - FFP

The contractor shall provide comprehensive maintenance, inspection, repair, emergency phone monitoring and improvement/upgrade services for the elevators listed in Table 1 at the SEFSC (unless otherwise noted). Services shall include all labor, supervision, materials, tools, equipment, transportation, and management necessary to meet the requirements of this task.

Service on the Galveston and Pascagoula elevators is not needed on day one. An existing contract is in place for both. Service for the Pascagoula elevator will not be required until after 8/30/28. Service for the two Galveston elevators will not be required through the life of this contract. The Miami elevator will require service throughout the base year of this contract, until replaced. The Miami elevator is expected to be replaced in the summer of 2027. Once replaced, the new elevator will be maintained through this contract.

Table 1 – SEFSC Elevators

Number Building Manufacturer Capacity

In pounds (lbs)

Last Cat 5 Testing Date and Next Due Date

1 Galveston Building 302

Schindler - SN GO-GC 45995

2,100 10/2026; 10/2031

2 Galveston Building 306

Schindler 330A - SN B7915-01

2,100 10/2026; 10/2031

3 Pascagoula Schindler - SN 120164-

2,500

4/2022; 4/2027

● Recurring Preventive Maintenance (PM):

The contractor shall perform recurring preventive maintenance, inspection, testing, and minor repairs necessary to ensure the safe, reliable operation of the elevator systems identified in Table 1, in accordance with manufacturer recommendations, industry standards, and applicable regulatory requirements (unless otherwise noted). Note that the Galveston elevators will not need any maintenance or certification through this contract as they are covered on a separate contract.

● PM Services

Preventive maintenance services shall include the systematic inspection, adjustment, lubrication, servicing, repair, or replacement of components, as required for proper operation.

● PM Components:

Pump Unit: Pumps, V-belts, strainers, silencers, springs, and gaskets Jack Unit: Guide bearings, packing, and packing glands Controller: Relays, starters, resistors, contacts, coils, leads, transformers, fuses, timing devices, and solid-state components Valves: Relief, pilot, lowering, leveling, and checking valves and associated components Dispatching Equipment: Relays, resistors, starters, contacts, coils, leads, fuses, transformers, timing devices, and solid-state components

● Selector:

Electrical or mechanical drive components, cams, starter contacts, relays, resistors, leads, transformers, solid-state components, and floor buttons

● Car Components:

Power door operators, door protective devices, door hangers, door contacts, load-weighing equipment, pulleys, bearings, belts, safety devices, emergency call devices to ensure that systems are properly communicating per Emergency Services guidelines, guide shoes, and subflooring

Number Building Manufacturer Capacity In pounds (lbs)

Last Cat 5 Testing Date and Next Due Date

4 Miami Armstrong - SN 77216 4,000 N/A this elevator will be replaced (seperate contract) in 2027

● Hoist-way Components:

Deflector and secondary sheaves, buffers, governor tension assemblies, limit switches, compensating sheaves, chains or cables, traveling cables, pulleys, bearings, belts, wiring, door interlocks, hangers, gibs, and auxiliary closers

● Fixtures:

Car and hall buttons, indicators, control panels, signal fixtures, lamps, sockets, key switches, and locks (lamp and socket replacement during scheduled maintenance only)

● Hydraulic Oil Reservoir:

Maintain hydraulic fluid at proper operating levels in accordance with manufacturer requirements

● Inspection:

The contractor shall perform all inspections and testing required by applicable codes and regulations.

● Services:

○ Annual safety inspections

○ Firefighter emergency operation testing

○ Emergency power testing (if applicable)

○ Door safety testing

○ Operational testing following repairs

○ Acceptance testing following major repairs

● Certification

The contractor shall coordinate all activities necessary to obtain elevator operating certificates. These services shall occur during the base year and successive option years.

The contractor shall:

● Schedule inspections with the Authority Having Jurisdiction (AHJ)

● Prepare and submit required applications

● Coordinate all inspection appointments

● Attend inspections

● Correct deficiencies related to the contractor's work

● Coordinate re-inspections when required

● Obtain final operating certificates

● Process all certification documentation

● Provide copies of certificates and inspection reports to the Government

● Post certificates as required by local regulations

Exclusions:

If applicable, the contractor shall submit a list of excluded items or components not covered under this contract for government review and approval. For approved excluded items, the contractor shall provide:

● Unit labor rates for installation (base and option years)

● Applicable markup rates

● The Government reserves the right to exercise options to restore elevator systems to normal operation as expeditiously as possible.

Preventive Maintenance Program and Testing:

The contractor shall develop, update, and maintain an approved Maintenance Control Program (MCP) for all elevators listed in Table 1 needing service. The MCP shall comply with city and state requirements and include all required inspections and testing.

The MCP shall include, but is not limited to:

● Scheduled preventive maintenance and inspections

● Annual Category 1 (Cat 1) testing for all elevators

● 5-year Category 5 (Cat 5) testing for applicable elevators

● Quarterly fire service testing

● Performance of all services in accordance with the applicable regulatory schedule

Initial Actions Upon Contract Award

● Immediately upon contract award, the contractor shall:

● Perform required annual Cat 1 testing for all elevators.

● Provide test tags and update MCP Category 1 documentation

Schedule and complete Cat 5 testing for elevators in accordance with Table 1

The contractor shall furnish, deliver, and remove all required test weights, issue test tags, and update MCP documentation accordingly. This requirement is a one-time, non-recurring task to establish compliance status at contract commencement.

● Emergency Services and Compliance

● The contractor shall provide:

○ 24/7 emergency service capability

○ 24/7 elevator emergency phone monitoring

○ Shall perform “Post Storm” checks to ensure the elevators are in proper working order following major storms or major power outages

○ Emergency point-of-contact information

○ All services performed in compliance with applicable city, county, and state regulations

● Regulatory Deficiency Resolution:

The contractor shall assist the government in resolving deficiencies identified by regulatory agencies.

● Task 5 Deliverables:

○ Prompt response to emergency work order requests

○ Elevator emergency phone service monitoring

○ Timely response to work orders for inspection and certification

○ Summary information for this task shall be included in the monthly status report.

4.6 - Task 6: Routine Annual Certifications - FFP

The contractor shall perform all required testing, inspection, and calibration necessary to maintain certifications for the systems listed below. All work shall comply with applicable federal, state, and local codes and regulations, including any other Authorities Having Jurisdiction (AHJ). Qualified and licensed personnel will be used to perform testing, inspection, calibration, or other work necessary to meet the requirements of this task.

4.6.1 - Lab Fume Hood Certifications

Annually calibrate and certify chemical fume hoods. Certifications must be performed by certified fume hood technicians. Please see Appendix A1 for a table listing the number of hoods at each location and Appendix A2 for more information on each hood, such as the facility and location at the facility.

Task 6 Deliverables:

● Timely response to certification work order requests

● Document the results of all certification efforts. Identify any deficiencies, noncompliant conditions, or maintenance issues directly to the site facility manager. The contractor shall also provide summary information within the contract monthly report, including recommended corrective actions and relevant code references.

5.0 - QUALIFICATIONS

All contractor personnel assigned to SEFSC facilities shall possess the minimum qualifications applicable to their assigned position prior to commencing work. The contractor shall ensure that all personnel maintain required qualifications, licenses, and certifications throughout the period of performance.

It shall be the full responsibility of the contractor to organize, furnish, maintain, supervise, and direct a workforce, which, within the limitations and provisions of this contract, is thoroughly capable of safely, efficiently, and effectively performing the work set forth in this contract.

The following positions must meet the qualifications outlined below:

5.1 - Contract Program Manager The contractor shall provide a Contract/Program Manager who shall be key personnel and responsible for all aspects of the contract.

● Bachelor’s Degree (B.A. or B.S.) in Business Administration, Facility Management, Engineering, or a related field; OR an Associate’s Degree with an additional four (4) years of specialized technical experience (totaling 12+ years).

● Active Project Management Professional (PMP), Certified Facility Manager (CFM), or Facility Management Professional (FMP).

● OSHA 30-Hour General Industry or Construction Safety Certification.

● Minimum eight (8) years of direct experience in commercial or federal facility operations, maintenance, and support services.

● Minimum four (4) years of experience in a supervisory/program management capacity managing multi-disciplinary trades (HVAC, electrical, plumbing, janitorial, and grounds).

● Proven experience managing subcontracted specialty vendors (e.g., elevator certification under ASME A17.1, backflow prevention, arc flash studies).

7.0 - STAFFING

7.1 - Contract Manager Responsibilities The Contract Manager shall be key personnel and serve as the central point of contact for the government and shall be responsible for overall management and coordination of contractor personnel. The Contract Manager shall also receive any notices of deficiency or complaints from the government.

● The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor.

● The Contract Manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

● The Contract Manager shall be available during facility hours of operation within sixty minutes to meet by phone with government personnel to discuss problem areas.

● The Contract Manager shall work with the site facility managers to efficiently process work requests and work orders and manage overall facility service needs.

The Contract Manager shall be able to communicate fluently in English, as well as to read and write English.

7.2 - Standards of Conduct The contractor shall maintain discipline for resources they have deployed at the SEFSC facilities, and take reasonable precautions to prevent unlawful or disorderly conduct by contractor employees. The government reserves the right to direct the contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The contractor shall immediately replace any employee who is removed, at no cost to the Government.

The standards of conduct are as follows:

● Neglect of duties shall not be tolerated. The contractor shall allow no sleeping while on duty, unreasonable delays, or failure to carry out assigned tasks. Contractor personnel shall not conduct personal business during work hours.

● Disorderly conduct, use of abusive or offensive language, quarreling, intimidation, and fighting shall not be tolerated.

● Contractor employees shall not possess, sell, consume, or be under the influence of drugs, alcohol or other intoxicants while on duty.

● Contractor employees may be subject to criminal action as allowed by law under certain circumstances. These include but are not limited to:

○ Falsification or unlawful concealment, removal, mutilation, or destruction of any official document or record or concealment of material facts by willful omission from official documents or records

○ Theft, vandalism, or unauthorized use of Government property

○ Unethical or improper use of official authority or credentials

○ Security violations

○ Organizing or participating in gambling

7.3 - Adequate Workforce The contractor shall at all times maintain adequate workforce for the uninterrupted performance of all tasks defined within this PWS. Consistent onsite service is particularly important for the maintenance and janitorial services that are needed regularly.

7.4 - Security Clearance Process To initiate the security clearance process, the contractor shall provide the following required information for all individuals who will be working on site, or using agency computer resources to the COR or facility site manager:

● Full Name

● Cell Phone Number

● Email address

● Resume

● U.S. Citizenship or Green Card Holder confirmation

A SEFSC Trusted Agent will manage the security process for each onsite contractor resource.

The Trusted Agent will contact each onsite personnel directly with links, clear instructions, and due dates for completing the required forms to support the security process..

The contractor is responsible for providing appropriate oversight to ensure that all necessary documentation required for security processing, is provided to the Trusted Agent.

7.5 - Nonpersonal Services Personnel performing services under this contract will be controlled, directed and supervised at all times by management personnel of the contractor. Personnel will be capable of performing independent of and without the supervision of any government official. Actions of contractor employees may not be interpreted or implemented in any manner that results in any employee creating or modifying Federal policy, obligating the appropriated funds of the government, overseeing the work of federal employees, providing direct personal services to any federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation. NOAA will perform the inspection and acceptance of the completed work.

8.0 - ADDITIONAL REQUIREMENTS

8.1 - Keys Issued The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons.

No keys issued to the contractor by the government shall be duplicated.

9.0 - SCHEDULE OF DELIVERABLES

The following is a schedule of broad (not task specific), contract deliverables, including administrative deliverables, required during the period of performance of this contract:

Table 2 - Schedule of Deliverable Deliverable Description Frequency Quantity Deliver

To Post-Award Kickoff Meeting

Attend a Post-Award Kickoff Meeting.

Within ten business days of award

One meeting COR, CO

Security Clearance Process (See Additional Requirements section of the

PWS)

Provide information on personnel who will be working onsite.

Within five business days of award

One combined submission of all personnel

COR,

Trusted Agent

Progress Meetings

Attend progress meetings requested by the COR and/or CO. The meeting purpose will be to review performance, discuss issues, provide input and recommendations as needed.

As requested N/A COR

Monthly Status Report (MSR) -must be included in the invoice package

The report shall detail major accomplishments during the month, problems / resolutions, issues / mitigation plan, recommendations and tracking of cumulative and planned travel.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically by email

COR,

CO

Monthly Invoice Package

The invoice shall include travel/documentation and accompany (including travel approval prior to travel taking place) the MSR.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically into the IPP system

COR,

CO

Contractor Travel Approval

Contractor travel must be approved by COR prior to the trip, travel requests shall be

At least 2 weeks prior

Electronically by email

COR DRAFT

Deliverable Description Frequency Quantity Deliver To submitted via email to the COR detailing purpose of the trip to travel taking place

Contract Task Deliverables

Specific deliverables are dependent on each specific task being performed.

Contract task deliverables as prescribed by the PWS task

As identified per task

Site facility manager

10.0 - PERFORMANCE REQUIREMENTS SUMMARY

This contract includes a Performance Requirements Summary (PRS). The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the COR. Evaluation of the contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR and individual site facility managers. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the CO.

10.1 - Surveillance The COR shall contact onsite personnel (site facility managers and tenants) for input regarding contract services.

10.2 - Procedure Customer complaints shall be tracked as follows:

● Government or on-site personnel shall contact the COR or site facility manager with complaints.

● COR shall document complaints.

● If the COR determines the complaint is invalid, the complainant shall be notified. The

COR or site facility manager shall retain a copy of the complaint in the file.

● If the COR determines the complaint is valid the contractor shall be notified, with a copy to the CO, and the contractor shall be given reasonable time to correct the problem. The COR shall determine a reasonable time frame to correct the problem.

● The COR shall, at minimum, e-mail the contractor and CO of any valid complaints.

● If the contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint the contractor shall notify the COR and CO. The COR and CO shall review the matter and reassess the validity of the complaint.

● The COR shall consider complaints resolved unless notified otherwise by the complainant.

10.3 - Performance Standard The PRS tables below detail the required service outcomes, performance standards, acceptable quality levels, monitoring methods and incentives/disincentives. Random monthly inspections may be done by the COR and site facility managers. The site facility managers shall notify the COR of any complaints so they may take appropriate action.

If the required services listed in this contract are not performed to the standard specified in the AQL column of the table below, the government reserves the right to take reasonable steps to positively affect performance.

Table 3: Contract Management and Staffing Operations

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive

1, 2 Responsive and timely completion of work orders

Tenant and facility manager requests are responded to and completed timely, according to the initial request in the facility management software

Performance standards met at least 95% of the time.

No more than two (2) complaints per month.

COR and Task Monitor may solicit or receive intermittent feedback from staff.

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected and/or a negative review in the

CPARS.

1, 2, 4, 9

Contractor provided onsite resources are consistently available

Vacant positions are filled rapidly (onsite resource vacancies shall not result in a lapse in service for any task)

Backfill resources are identified by the contractor within 21 days

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive payment until issues are corrected and/or a negative review in the

CPARS.

All Services are provided timely as identified by PWS and work orders

No lapse or late service performance shall occur

Onsite and subcontracte d resource accomplish all required services as prescribed by the PWS and work orders

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected, performance penalties, and/or a negative CPARS review

Table 4: Critical Facility Infrastructure, Utility Plants & Life Safety

Performance Objective

Performance Threshold / AQL

Method of Surveillance

Deduction / Incentive / Disincentive

4.1 Emergency

Standby Generator Maintenance & Testing

(PWS Task 3)

Maintain 100% emergency power readiness for critical life-support, aquarium, and laboratory electrical loads.

• 100% adherence to semi-annual PM schedule.

• Annual full load-bank testing completed within 30 days of the due date.

• Annual fuel lab analysis report submitted within 14 calendar days of sampling.

• Zero unexcused ATS/generator start failures during commercial outages.

• 100% Inspection of service logs, oil/fuel lab analysis reports, and automatic exercise records.

• Real-time remote telemetry review during outage events.

• Non-compliant visits re-performed within 24 hours at contractor expense.

• Withholding of 15% of monthly generator line item (CLIN) for every 10 days of overdue servicing.

• Negative CPARS rating for unscheduled generator outage caused by deferred

PM.

4.2 Elevator

Safety, MCP & AHJ Operating Certificates

(PWS Task 5)

Ensure continuous, safe vertical transportation and full compliance with ASME A17.1 and municipal/state operating codes.

• Zero lapse in municipal/state operating certificates.

• 100% on-time execution of annual Category 1 and 5-year Category 5 tests.

• Entrapment emergency response: On-site technician arrival within sixty (60) minutes.

• Routine service call response:

Within four (4) hours.

• Minimum 98% operational uptime per elevator per billing cycle.

• 100% review of AHJ certificates and inspection reports.

• Audit of maintenance control program (MCP) logs.

• Verification of electronic dispatch time-stamps.

• Deduction of $500 per calendar day per car for operation with expired AHJ certificates.

• Deduction of $250 per hour for failure to meet the 60-minute entrapment SLA.

• Unplanned downtime exceeding 2% results in a pro-rated invoice deduction from the elevator CLIN.

4.3 Arc Flash

Hazard Analysis & Safety Labeling

(PWS Task 6)

Deliver accurate, engineered short-circuit studies and

NFPA 70E-

compliant hazard labels to protect personnel from high-voltage arc flash hazards.

• 100% of electrical distribution components surveyed and analyzed.

• Calculations and short-circuit coordination study stamped and signed by an active, licensed Professional Engineer (PE).

• Industrial-grade, UV-resistant NFPA 70E labels installed on 100% of analyzed electrical equipment with zero errors.

• 100% Technical Review of PE study deliverables by NOAA Engineering /

SECO.

• 100% physical inspection of electrical room equipment labels prior to final invoice approval.

• Rejection and return of engineering deliverable without payment until fully corrected.

• Deficient or missing labels shall be replaced within five (5) business days at contractor expense.

4.4 Potable Water

Backflow Prevention Assembly Testing

(PWS Task 3)

Protect municipal and campus potable water supplies from cross-connection contamination and maintain AHJ regulatory compliance.

• 100% of assemblies tested and recertified annually by a state-licensed Backflow Prevention Assembly Tester.

• Test reports filed with local water authority/AHJ prior to expiration deadlines.

• Failed assemblies repaired, rebuilt, and re-tested within forty-eight

(48) hours.

• 100% audit of testing certification documents, tester license credentials, and AHJ submission transmittals.

• Re-performance within 24 hours at contractor expense.

• Contractor liable for all municipal shut-off fees, fines, and emergency re-plumbing expenses caused by delinquent testing.

11.0 - CONFIDENTIALITY AND DATA PRIVACY

This contract may require that services contractors have access to Privacy Information. Service contractors are responsible for maintaining confidentiality of all subjects and materials and may be required to sign and adhere to a Non-Disclosure Agreement (NDA).

The government has unlimited rights to all documents/materials produced under this contract.

All documents and materials, to include the source code of any software produced under this contract, shall be government owned and the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO.

All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.

12.0 - GOVERNMENT FURNISHED RESOURCES

Item(s) Quantity Condition Location Common Access Card As needed Good All sites Office desks, phones, computers, and chairs As needed Good All sites Portable power tools (e.g., saws, drills, sanders, etc.) As needed Good All sites

Stationary power tools (e.g., table saw, radial arm saw, drill press, lathes, etc.) As needed Good All sites

Preventive Maintenance References (e.g., service manuals, technical bulletins, etc.) As needed Good All sites

Government Owned Vehicles As needed Good All sites Forklift and pallet jacks As needed Good All sites

13.0 - TRAINING

Training is authorized for NOAA Fisheries/DOC specific systems and requirements. The following training is currently required to be completed under this contract. When a full-time contractor employee attends training for one working day or longer, the contractor shall provide a qualified substitute at no additional cost to the Government.

The COR may authorize additional training that is necessary for the contract and not commercially available.

13.1 - Government-Provided versus Contractor-Provided Training Some required training may be provided by the Government at no cost to the contractor, subject to availability and scheduling. Regardless of source, the contractor remains responsible for training completion and currency.

Any training not provided by the Government, including costs associated with fees, certifications, renewals, travel, labor time, or related expenses, shall be provided and paid for by the contractor at no additional cost to the Government.

13.2 - Mandatory Government-Provided Training The following Government-provided training shall be completed within thirty calendar days of starting onsite work, unless otherwise specified:

13.3 - General and Administrative Training

● Sexual Assault/Sexual Harassment Prevention and Response Training in accordance with

NAM 1330-52.222-70(b)(6) (required for all contractors)

● NOAA Defensive Driving Training (initial and every three years thereafter)

● Information Technology (IT) Security Awareness Training (annual or as required by

NOAA)

● NOAA Safety training (required for all contractors working at a Government facility)

● Records Management 101

13.4 - Training Documentation and Reporting The contractor shall maintain a current training matrix for all assigned personnel working at SEFSC facilities.

At a minimum, the matrix shall include:

● Employee name

● Training title and description

● Training provider

● Date completed

● Refresher or expiration date (if applicable)

Training records shall be made available to the Government upon request and provided to the COR as required.

Additional commercial or non-contract specific training may be permitted under the following circumstances: 1) prior written approval is obtained from the COR, 2) there is no additional cost to the Government for attendance, 3) the time is not billed to the Government, and 4) there is no relief/change for deliverable due dates

14.0 - GOVERNMENT-OWNED VEHICLES

The contractor is authorized to operate Government-owned vehicles.

NOAA Manual 209-10 requires that NOAA workers that drive Government vehicles, as a part of their duties, must complete defensive driver training prior to driving a vehicle on official business and every three years thereafter. Completion of the NOAA Defensive Driver Training course in the Commerce Learning Center satisfies that requirement.

15.0 - DOCUMENTATION AND RECORDS

All documentation, records and schedules as described in this PWS are the responsibility of the contractor, are the property of the Government and shall be turned over to the Government upon completion or termination of the contract. All records are subject to the Freedom of Information and/or Privacy Acts and any requests for release of any records shall be handled accordingly.