Performance Work Statement 11-24-26.pdf

PDF 1 MB Posted

Attached to
Facility Operations, Maintenance, and Repairs for NOAA's Southeast Fisheries Science Center
Solicitation number
REQUIREMENTS-27-0082-1
Issued by

About this file

This is a Performance Work Statement (PWS) for facility operations, maintenance, and repair services at the Southeast Fisheries Science Center (SEFSC), a NOAA Fisheries division.

The contractor shall provide comprehensive facility management services across four locations: Miami, FL (60,000 sq ft main building, 400 sq ft annex); Panama City, FL (16,000 sq ft total); Pascagoula, MS (49,326 sq ft across multiple buildings); and Galveston, TX (70,000+ sq ft across 10+ buildings). Normal operating hours vary by site (0700-1700 or 0730-1630 Monday-Friday). Primary tasks include facility operations and maintenance (FFP), tenant support and miscellaneous work, hazardous materials and waste management with safety compliance (FFP), specialty trade and emergency services (T&M), and overtime/travel (T&M). The contractor must respond to emergency situations within two hours and may be required to work outside normal hours. Task 1 deliverables include work order completion, emergency responses, and grounds maintenance coordinated through a Computerized Maintenance Management System (CMMS—Nuvolo platform planned for deployment summer 2027). Key personnel requirements include a Contract Program Manager with a Bachelor's degree in relevant field or Associate's plus four years' experience, active PMP/CFM/FMP certification, OSHA 30-Hour certification, minimum eight years in facility operations, and four years in supervisory/multi-disciplinary trade management. A Safety and Environmental Compliance Specialist (minimum five years' experience, OSHA certification required) must manage chemical inventory in the NOAA Fisheries Risk & Safety Solutions system, maintain 98% inventory accuracy with annual 100% reconciliation, conduct hazard assessments, manage hazardous waste and permits, and ensure full compliance with OSHA, EPA, and state/local environmental regulations. Maintenance Mechanics require three years' experience in multi-trade work (plumbing, electrical, HVAC, carpentry, painting). Mandatory government-provided training includes Sexual Assault/Harassment Prevention, NOAA Defensive Driving (initial and every three years), IT Security Awareness, NOAA Safety Training, and Records Management 101, all due within 30 days of start. Performance standards require 95% on-time completion of work requests (no more than two complaints per month), 21-day backfill for vacant positions, and zero service lapses. The government furnishes Common Access Cards, office equipment, tools, government vehicles, and preventive maintenance references; contractor provides all other personnel, supervision, equipment, and specialized supplies. Contract management deliverables include a post-award kickoff meeting within ten business days, security clearance information within five business days, monthly status reports by the 15th of each month, and travel approval at least two weeks in advance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) National Oceanic and Atmospheric Administration

NOAA Fisheries Southeast Fisheries Science Center

SEFSC Facility Operations, Maintenance, and Repair Services

1.0 - BACKGROUND

The National Oceanic and Atmospheric Administration (NOAA) Fisheries, , Southeast Fisheries Science Center (SEFSC) conducts critical fisheries science research at its headquarters site in Miami, FL and at six other research stations located from Beaufort, NC to Galveston, TX.

The SEFSC has a need for a prime contractor to manage comprehensive operations, maintenance, and repair services across the Center’s facilities in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX. The primary tasks within this Performance Work Statement (PWS) include, but are not limited to:

● Safety and hazardous material management

● Facility operations

● Facility maintenance

● Emergency response

● Tenant support

● Emergency repair services

The contractor shall provide all personnel, equipment, tools, materials, supplies, supervision, transportation, and services necessary to perform the services as outlined in this PWS.

2.0 - PLACE OF PERFORMANCE

Performance on this contract shall occur at each of the SEFSC facilities located in Panama City, FL, Miami, FL, Pascagoula, MS and Galveston, TX.

Facility details for each location is as follows: DRAFT

2.1 - Miami Facility, 75 Virginia Beach Drive, Miami, Florida, 33149: NOAA’s Southeast Fisheries Science Center's Miami facility is located on Virginia Key, 3 miles east of Miami and north of Key Biscayne, Florida. The Bureau of Commercial Fisheries, one of NOAA’s predecessor agencies, established the facility in 1965 as the Tropical Atlantic Biological Laboratory. It was built on 5 acres given to the federal government by Dade County (now Miami-Dade County) for marine research. The facility provides 46,300 square feet of working space with offices, research laboratories, and a library. Leaking HVAC chiller pipes remains one of the most prominent facility related challenges at the Miami site. A separate contract is being pursued to address that. The facility is also consistently faced with king tides encroaching the parking lot.

Square Footage:

● Main building: Approximately 60,0000 square feet (three story)

● Annex Building: Approximately 400 square feet (one story)

DRAFT

2.2 - Panama City Facility, 3500 Delwood Beach Rd, Panama City, Florida 32408: The Panama City facility was originally established in 1966 as the Eastern Gulf Marine Laboratory of the U.S. Bureau of Sport Fisheries and Wildlife, one of NOAA’s predecessor agencies. With the donation of 11 acres of land from the Panama City Chamber of Commerce, construction of a new building with direct access to St. Andrews Bay was completed in 1972.

● Two buildings (single story) approximately 16,000 square feet total

2.3 - Pascagoula Facility, 3209 Frederic St, Pascagoula, Mississippi 39567: The facility in Pascagoula was established in 1950 under the Department of Interior as a Bureau of Commercial Fisheries field station. In 1970, the laboratory was transferred to NOAA Fisheries. In 2009 the building was rebuilt following Hurricane Katrina. The facility achieved a Gold rating in the Leadership in Energy and Environmental Design Rating System, making it the first environmentally “green” facility in the city. It is also the home port of the NOAA Ships Gordon Gunter, Oregon II, and Pisces, which conduct scientific surveys of the health and abundance of fishery resources and marine mammals in the Gulf of America and U.S. South Atlantic.

● Main Laboratory Building, 3209 Frederic Street: 45,000 square feet

○ Two story, both have elevators and stairs

● Gulf Marine Support Facility, 151 Watts Avenue: 2,266 square feet

○ Single story

● Harvesting Systems Building, 202 Delmas Avenue: 2,000 square feet

○ Single story

● Port Complex Guard Houses: 60 square feet each (2 each)

○ Single story https://www.usgbc.org/leed https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/gordon-gunter https://www.omao.noaa.gov/mo/ships/oregon-ii https://www.omao.noaa.gov/marine-operations/ships/pisces

2.4 - Galveston Facility Main campus - 4700 Avenue U, Galveston, Texas 77551; Wetlab Campus - located at 4900 Fort Crockett Blvd, Galveston, Texas 77551: In 1929, a U.S. Fish & Wildlife Service fisheries field station was established in Galveston, Texas on Offatts Bayou. The field station originally focused on oyster research. In 1931, the laboratory became one of four field stations to do shrimp research in the Gulf of America (formerly Gulf of Mexico). The present facility was established in 1950 at the historic Fort Crockett in Galveston, as a Bureau of Commercial Fisheries, later NOAA Fisheries, facility. It was renovated in 2008 and contains more than 70,000 square feet of offices and laboratories in 10 buildings with a 130,000-gallon seawater system. Research space is shared with NOAA’s Flower Garden Banks National Marine Sanctuary and the Texas Marine Mammal Stranding Network. The age of the structures at the Galveston facility present consistent challenges.

Main Campus

● Building 302 - 10,780 square feet (two story)

● Building 306 - 10,780 square feet (two story)

● Building 301 - 1,920 square feet (single story)

● Building 301 (Pump House) 455 square feet (single story addition)

● Building 305 - 1,925 square feet (single story)

● Building 307 - 3,415 square feet (single story) https://www.fisheries.noaa.gov/southeast/historic-fort-crockett-and-galveston-laboratory

● Maintenance/Archive Building - 3,500 square feet (single story)

● HAZMAT Building - 748 square feet (single story)

Wetlab Campus

● Boat Barn - 5,020 square feet (single story)

● Material Storage "Turtle Hospital" - 1,678.01 square feet (single story)

● Turtle Barn - 6,048 square feet (single story)

● Longline Building -916 square feet (single story)

● WetLab -7,770 square feet (single story)

● Texas Marine Mammal Stranding Network -4,830 square feet (single story)

● HAZMAT Building -162 square feet (single story)

2.5 - Working Hours The normal hours of operation for each site are as follows:

Miami - Monday through Friday 0700 to 1700 Panama City - Monday through Friday 0700 to 1700 Pascagoula - Monday through Friday 0700 to 1700 Galveston - Monday through Friday 0730 to 1630

Occasionally, work outside the required schedule may be necessary to perform maintenance or repairs due to system shutdown or accommodate normal facility operation. Any changes to the contractor employee working hours must be approved by the site's facility manager.

3.0 - OVERVIEW

Each of the facilities identified above has a federal site facility manager. That person is responsible for their facility’s management and the completion of any needed maintenance, repair, inspections, safety and certifications needed at their facility. They coordinate and manage the facility to meet the needs of the facility’s programs, occupants and stakeholders. Site facility managers have no staff to support them in their role. Contract support is used to acquire that support.

4.0 - TASKS

4.1 - Task 1: Facility Operations and Maintenance

4.1.1 - Work Order Management (Firm Fixed Price (FFP)) The SEFSC plans to utilize a Computerized Maintenance Management System (CMMS) to capture essential aspects of facility management, such as tenant work requests, request status, contractor personnel assigned, priority of requests and planned and completed responses to the request. The system shall capture maintenance requests, inspections, certifications, maintenance scheduling, completed work, updating assets, and generating reports across the four sites.

Currently the NOAA Fisheries headquarters is field testing a CMMS system called Nuvolo at the Northwest Fisheries Science Center (NWFSC). Upon successful testing, NOAA Fisheries plans to deploy it across all Fisheries facilities in summer 2027. The SEFSC equipment inventory found in Appendix A2 provides the basis for the system.

● When Nuvulo is deployed, the SEFSC will provide contractor access and training.

Contractor staff shall use the CMMS to manage work requests and to track and complete work orders.

4.1.2 - Facility Operations - FFP The contractor shall operate, monitor, and help manage facility systems to ensure normal operations:

● Perform opening and closing duties for buildings and controlled access areas.

● Operation of boilers, pumps, and associated mechanical equipment.

● Operate and monitor HVAC systems, including central systems, mini-splits, and window units.

● Monitor and support building security and safety systems, including access controls, gates, and exterior mechanical areas.

● Maintain safe exterior grounds, walkways, and roadways, including snow and ice removal as needed (e.g. cleaning and pressure washing, roadways, sidewalks, curbs, and walking surfaces).

4.1.3 - Facility Maintenance - FFP The contractor shall perform preventive and routine maintenance to maintain facility systems in good working order:

● Perform routine preventive maintenance for onsite systems according to manufacturer recommendations and industry best practices.

● Utilize plaster or compound to patch minor holes and cracks in walls and ceilings

● Replace bulbs in light fixtures

● Assisting the Facility Manager in repairs or replacement of light fixtures

● Repair or replace sinks, water coolers, and toilets

● Paint structures (e.g. paint handrails and sections of a wall after repair) and equipment

● Paint parking lot stripes

● Replace damaged paneling, floor tiles, and ceiling tiles

● Repair or replace signage

● Maintain and repair paved surfaces, which will include making minor repairs such as filling potholes and deep cracks or repairing crumbling surfaces on all Government owned/leased paved surfaces, including roads, walkways, and parking lots

● Repair roof leaks

● Hang doors and install door frames and hardware and replace broken window panes

● Perform operation, maintenance, and repair service work on building systems which include mechanical, hydraulics, minor carpentry, minor painting, and machine servicing

● Assist with performing general maintenance on and operate equipment and machinery such as stand-by generators, sea water system, HVAC system and associated equipment, light electrical (fixtures, exit signs), light refrigeration (water coolers, ice machines), light plumbing (faucets, spigots, commodes), door/window components, grounds keeping equipment (lawn mowers edgers, blowers)

● Assist with operating and maintaining utility systems and equipment controlled by air, natural gas, electricity, and water

● Assist with preventative maintenance of shop tools and equipment by assisting with adjusting, cleaning, troubleshooting, monitoring, and repairing equipment

4.1.6 - Facility Repairs - Time and Materials (T&M) The contractor shall supply needed materials/supplies and perform repairs necessary to maintain functional infrastructure:

● Structural and building repairs (e.g., deck replacement, door replacement, minor wall repairs).

● Mechanical, electrical, plumbing, and HVAC system repairs, excluding work requiring licensed specialists beyond the contractor’s assigned team.

● Ensure all work areas are safe, clean, and tools/equipment are returned to designated storage areas.

● Specialized equipment requiring manufacturer-certified technicians shall be addressed through coordination with the site facility manager. See Task 7 for more information on special repair projects.

4.1.7 - Emergency Responses - T&M The contractor shall provide emergency response support as needed to maintain safe and functional facility operations. The contractor must respond to emergency situations within two hours of notification. Emergencies include, but are not limited to, loss or restoration of power, failure of critical equipment (e.g., HVAC systems, freezers, power generators), or other situations that could impact facility operations or safety. Responses required outside of normal working hours shall be considered overtime (OT) and compensated in accordance with the provisions outlined in Task 8 of the contract.

Task 1 Deliverables:

● Complete facility maintenance and repairs as coordinated through the work order system or directly through each site facility manager

● Emergency responses as requested across all four facilities

● Grounds maintenance services provided at all sites, as requested by facility mangers

● Include Task 1 consolidated repair/maintenance updates, trends, upcoming work, issues encountered, training (planned/taken), planned absences and recommendations (if any) within the monthly report.

4.2 - Task 2: Tenant Support and Miscellaneous Work

Work performed under this task may include, but is not limited to the following:

● Relocation, movement, or reconfiguration of furniture within tenant spaces

● Painting, wall repairs, or flooring replacement requested by occupants

● Installation, modification, or relocation of electrical outlets or circuits

● Minor assembly, installation, or setup of equipment or furnishings within tenant areas

● Ad hoc support for occupant needs, temporary configurations, or special projects

● Configuration and setup of chair layouts to support meetings or events in the auditorium

● Stripping, waxing, and buffeting floors

● Pressure washing building exterior

● Document shredding

● Pest control

Tenants will create work requests within CMMS to initiate services. All work performed under this task shall be coordinated and prioritized in consultation with the site facility manager. The contractor shall perform all services in a manner that minimizes disruption to tenants and ensures compliance with applicable safety, security, and building standards.

Task 2 Deliverables:

● Accomplish work requests as indicated within the CMMS work request or received directly through site facility managers.

4.4 - Task 4: Hazardous Materials, Hazardous Waste and Safety Support Services - FFP The contractor shall provide hazardous materials, hazardous waste and safety support to assist SEFSC in maintaining compliance with all applicable Occupational Safety and Health Administration (OSHA), U.S. Environmental Protection Agency (EPA), State, and local environmental, health, and safety regulations. Appendix A3 provides programmatic information regarding the basis for and breadth of this service need.

The expected qualifications and certifications for this role are provided below in the QUALIFICATIONS and CERTIFICATIONS section.

Travel is expected for this position, primarily across SEFSC facility locations from Beaufort, NC to Galveston, TX, though other locations may also be necessary. Travel is likely to occur once or twice a quarter. Overtime for this service is not anticipated.

Services for this task shall include, but are not limited to the following:

● Regulatory Compliance Support:

Assist in monitoring, supporting, and maintaining compliance with OSHA, EPA, and other applicable environmental, health, and safety regulations across all facility maintenance, laboratory, and shop operations.

● Training, Records, and Certifications:

Maintain, update, and manage accurate safety training, certification, and qualification records for assigned personnel, ensuring records are current, complete, and available for NOAA review.

● Assist in developing, coordinating, and delivering required training programs related to safety, environmental compliance, hazardous materials, and hazardous waste handling.

● Audits, Assessments, and Inspections:

Assist in conducting safety audits, hazard assessments, and inspections to identify potential risks and regulatory non-compliance.

Participate in regulatory inspections and audits as requested, provide facility-related information and records, and coordinate corrective actions through closure with affected parties and local management.

● Liaison and Coordination:

Serve as a liaison between local staff and external organizations, including Federal and State regulatory agencies, and local authorities having jurisdiction.

Support the preparation, review, and submission of required reports related to safety, environmental compliance, and regulatory inspections in accordance with established timelines and documentation standards.

● Hazardous Waste and Chemical Management:

Assist in coordinating and managing hazardous waste and chemical programs, including:

○ Hazardous waste designation and profiling

○ Chemical inventory management; maintain inventory for each site, post changes within 15 business days, do a full physical reconciliation every year, keep safety data sheets, and flag problem chemicals

○ Managing and responding to laboratory waste disposal pickup requests

○ Reviewing, signing, tracking, and maintaining hazardous waste manifests and supporting documentation

○ Developing workflows to ensure compliant use, consolidation, storage, labeling, classification, packaging, transportation, emissions, discharge, and disposal of chemicals and hazardous wastes

● Permits and Regulatory Documentation

Determine, obtain, maintain, and file required permits from local, State, and Federal agencies related to hazardous waste and environmental compliance.

● Plans, Procedures, and Documentation:

Assist in developing, reviewing, implementing, and updating standard operating procedures (SOPs), safety and environmental compliance plans, policies, guidance documents, and training materials to ensure alignment with applicable regulations and agency policies.

● Emergency Preparedness and Drills:

Assist in planning, leading, and facilitating safety and environmental drills, including tabletop and functional exercises, to evaluate readiness, communication protocols, procedures, and regulatory compliance.

● Specialized Support:

Assist in coordinating annual fume hood certifications, including scheduling, tracking, and documentation

Prepare draft equipment-specific energy control procedures for SEFSC equipment, and support the annual periodic inspection, for government approval

Assist in planning, leading, and facilitating meetings with SEFSC staff and stakeholders related to safety and environmental compliance initiatives.

● General Compliance Requirement Perform the following work in full compliance with applicable Federal, State, and local environmental, health, and safety laws and regulations.

○ Monthly waste storage area inspection

○ Waste paperwork and lab packing

○ Universal waste (lamps, batteries)

○ Chemical inventory in the NOAA Fisheries system (RSS)

○ Tier II chemical report (EPCRA)

○ Oil spill plan (SPCC)

○ Underground storage tanks

○ Wastewater discharge permits (NPDES / sewer)

○ Lockout/tagout

○ Report standby generator statistics (load tests, fuel, etc)

○ Confined spaces

○ Fixed ladders

○ Job hazard analyses (JHA)

○ Chemical hygiene plans

○ Emergency plans and drills

○ Hazard and deficiency tracking log

○ Outside inspections

○ Incident reporting

Task 4 Deliverables:

● Provide hazardous materials, hazardous waste and safety support services noted in the PWS across the entire SEFSC

● Determine, obtain, maintain, and file required permits from local, State, and Federal agencies related to hazardous waste and environmental compliance

● Prepare draft equipment-specific energy control procedures for SEFSC equipment, and support the annual periodic inspection, for government approval

4.7 - Task 7: Specialty Trade, Emergency Services and Other Repairs - T&M

The SEFSC will occasionally need facility maintenance/repair supplies, specialists or licensed technicians to quickly address a facility system issue. To perform repair work at SEFSC facilities promptly, and restore normal operations; or if the work to be performed is beyond the expertise, skillset, licensing, certification, tools, or experience of the onsite maintenance team;

specialty trade services may be provided by the contractor under this task.

The contractor shall furnish necessary supplies, qualified specialists or licensed technicians to perform work under this task.

All specialists and technicians shall:

● Possess all required licenses, certifications, and experience applicable to their trade and the specific work assigned

● Comply with all applicable federal, state, and local codes and regulations

● Perform work in accordance with manufacturer recommendations and industry best practices

● Provide their own specialized tools, testing equipment, and personal protective equipment

Projects within this task shall be initiated by the COR or CO. The COR/CO will initiate a project via email to the contractor PM. The COR/CO will describe the project and ask the PM for a cost estimate and timeline to complete the project. Services under this task shall not exceed $25,000.00 per instance and must be approved in writing by the COR/CO prior to project initiation.

The SEFSC may require additional specialty trades not explicitly listed in this task. Such services shall be provided when determined necessary by the COR.

Task 7 Deliverables:

● Prompt response to work order requests for special repairs

4.8 - Task 8: Overtime (OT) and Travel - T&M

Overtime is anticipated and authorized at the rates and up to the ceiling set forth in the price schedule. Overtime shall be approved in advance, in writing, by the COR. Any overtime worked in excess of the pre authorized amount is at the contractor’s own risk and expense.

The SEFSC will occasionally need additional facility operation, maintenance, and repair support services after normal working hours.

When requested by an emergency work order, building automation or by the site facility manager, the contractor shall provide qualified personnel to perform emergency or urgent repairs outside normal working hours. The contractor shall provide current contact information for personnel performing on-site work.

Travel may be required under this contract. If required, the contractor shall travel as approved by the COR for training or conduct other official business covered under this contract. The contractor may be authorized to use government owned vehicles provided that the contractor personnel has completed the NOAA/GSA Defensive Driving training within the last three years.

The COR will provide the contractor with 24-hour advance notice for additional services and/or travel. The emergency services and travel shall be managed by the COR annually across all sites.

Task 8 Deliverables:

● Report travel completed during the month of reporting covered, and any planned travel, in the monthly contract status report

5.0 - QUALIFICATIONS

All contractor personnel assigned to SEFSC facilities shall possess the minimum qualifications applicable to their assigned position prior to commencing work. The contractor shall ensure that all personnel maintain required qualifications, licenses, and certifications throughout the period of performance.

It shall be the full responsibility of the contractor to organize, furnish, maintain, supervise, and direct a workforce, which, within the limitations and provisions of this contract, is thoroughly capable of safely, efficiently, and effectively performing the work set forth in this contract.

The following positions must meet the qualifications outlined below:

5.1 - Contract Program Manager The contractor shall provide a Contract/Program Manager who shall be key personnel and responsible for all aspects of the contract.

● Bachelor’s Degree (B.A. or B.S.) in Business Administration, Facility Management, Engineering, or a related field; OR an Associate’s Degree with an additional four (4) years of specialized technical experience (totaling 12+ years).

● Active Project Management Professional (PMP), Certified Facility Manager (CFM), or Facility Management Professional (FMP).

● OSHA 30-Hour General Industry or Construction Safety Certification.

● Minimum eight (8) years of direct experience in commercial or federal facility operations, maintenance, and support services.

● Minimum four (4) years of experience in a supervisory/program management capacity managing multi-disciplinary trades (HVAC, electrical, plumbing, janitorial, and grounds).

● Proven experience managing subcontracted specialty vendors (e.g., elevator certification under ASME A17.1, backflow prevention, arc flash studies).

5.2 - Maintenance Mechanic Performs plumbing, painting, electrical, millwork, and other general repairs

● Minimum of three (3) years of experience performing general building maintenance and repair work

● Demonstrated proficiency in multiple trades, including plumbing repairs, painting, replacement of general electrical components such as switches and receptacles, carpentry, flooring, doors and hardware, and millwork

● Ability to safely use hand and power tools required to perform assigned tasks

● Knowledge of applicable safety practices, codes, and standards related to general maintenance work

● Ability to follow written instructions and document completed work

● Preference for candidates with HVAC experience

5.3 - Safety and Environmental Compliance Specialist

● Minimum of five (5) years of experience in occupational safety, industrial hygiene, or environmental compliance, preferably in facility maintenance, laboratory, or institutional environments.

● Demonstrated knowledge of OSHA regulations, EPA regulations, and federal environmental statutes, including Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA).

● Demonstrated knowledge of OSHA regulations, EPA regulations, and other applicable federal, state, and local environmental and safety requirements.

● Experience developing, implementing, and monitoring safety programs, environmental compliance plans, and corrective action measures.

● Strong analytical, communication, and documentation skills sufficient to develop reports, safety plans, and recommendations for corrective actions.

● Ability to train and advise staff on safety procedures and regulatory compliance.

6.0 - CERTIFICATIONS

Contractor resources shall possess and maintain all certifications required by law, regulation, code, manufacturer, and this PWS for their assigned duties. All certifications shall be current and valid throughout the period of performance. The contractor shall maintain certification documentation and provide such documentation to the government upon request. Failure to maintain required certifications or the required number of certified personnel within specified timeframes may be considered a deficiency in contract performance.

6.1 - Safety and Environmental Compliance Specialist

● OSHA Safety Certification (e.g., OSHA 30-Hour General Industry or equivalent).

● Training or certification demonstrating knowledge of hazardous materials management and environmental regulatory compliance, including RCRA and CERCLA requirements, as applicable to facility operations and maintenance activities.

Optional professional certifications (preferred but not required) such as:

● Certified Safety Professional (CSP)

● Certified Industrial Hygienist (CIH)

● Environmental compliance or hazardous materials management certifications relevant to institutional facilities

The maintenance mechanic and janitorial resource roles have no certification requirements.

7.0 - STAFFING

7.1 - Contract Manager Responsibilities The Contract Manager shall be key personnel and serve as the central point of contact for the government and shall be responsible for overall management and coordination of contractor personnel. The Contract Manager shall also receive any notices of deficiency or complaints from the government.

● The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor.

● The Contract Manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

● The Contract Manager shall be available during facility hours of operation within sixty minutes to meet by phone with government personnel to discuss problem areas.

● The Contract Manager shall work with the site facility managers to efficiently process work requests and work orders and manage overall facility service needs.

The Contract Manager shall be able to communicate fluently in English, as well as to read and write English.

7.2 - Standards of Conduct The contractor shall maintain discipline for resources they have deployed at the SEFSC facilities, and take reasonable precautions to prevent unlawful or disorderly conduct by contractor employees. The government reserves the right to direct the contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The contractor shall immediately replace any employee who is removed, at no cost to the Government.

The standards of conduct are as follows:

● Neglect of duties shall not be tolerated. The contractor shall allow no sleeping while on duty, unreasonable delays, or failure to carry out assigned tasks. Contractor personnel shall not conduct personal business during work hours.

● Disorderly conduct, use of abusive or offensive language, quarreling, intimidation, and fighting shall not be tolerated.

● Contractor employees shall not possess, sell, consume, or be under the influence of drugs, alcohol or other intoxicants while on duty.

● Contractor employees may be subject to criminal action as allowed by law under certain circumstances. These include but are not limited to:

○ Falsification or unlawful concealment, removal, mutilation, or destruction of any official document or record or concealment of material facts by willful omission from official documents or records

○ Theft, vandalism, or unauthorized use of Government property

○ Unethical or improper use of official authority or credentials

○ Security violations

○ Organizing or participating in gambling

7.3 - Adequate Workforce The contractor shall at all times maintain adequate workforce for the uninterrupted performance of all tasks defined within this PWS. Consistent onsite service is particularly important for the maintenance and janitorial services that are needed regularly.

7.4 - Security Clearance Process To initiate the security clearance process, the contractor shall provide the following required information for all individuals who will be working on site, or using agency computer resources to the COR or facility site manager:

● Full Name

● Cell Phone Number

● Email address

● Resume

● U.S. Citizenship or Green Card Holder confirmation

A SEFSC Trusted Agent will manage the security process for each onsite contractor resource.

The Trusted Agent will contact each onsite personnel directly with links, clear instructions, and due dates for completing the required forms to support the security process..

The contractor is responsible for providing appropriate oversight to ensure that all necessary documentation required for security processing, is provided to the Trusted Agent.

7.5 - Nonpersonal Services Personnel performing services under this contract will be controlled, directed and supervised at all times by management personnel of the contractor. Personnel will be capable of performing independent of and without the supervision of any government official. Actions of contractor employees may not be interpreted or implemented in any manner that results in any employee creating or modifying Federal policy, obligating the appropriated funds of the government, overseeing the work of federal employees, providing direct personal services to any federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation. NOAA will perform the inspection and acceptance of the completed work.

8.0 - ADDITIONAL REQUIREMENTS

8.1 - Keys Issued The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons.

No keys issued to the contractor by the government shall be duplicated.

9.0 - SCHEDULE OF DELIVERABLES

The following is a schedule of broad (not task specific), contract deliverables, including administrative deliverables, required during the period of performance of this contract:

Table 2 - Schedule of Deliverable Deliverable Description Frequency Quantity Deliver

To Post-Award Kickoff Meeting

Attend a Post-Award Kickoff Meeting.

Within ten business days of award

One meeting COR, CO DRAFT

Deliverable Description Frequency Quantity Deliver To

Security Clearance Process (See Additional Requirements section of the

PWS)

Provide information on personnel who will be working onsite.

Within five business days of award

One combined submission of all personnel

COR,

Trusted Agent

Progress Meetings

Attend progress meetings requested by the COR and/or CO. The meeting purpose will be to review performance, discuss issues, provide input and recommendations as needed.

As requested N/A COR

Monthly Status Report (MSR) -must be included in the invoice package

The report shall detail major accomplishments during the month, problems / resolutions, issues / mitigation plan, recommendations and tracking of cumulative and planned travel.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically by email

COR,

CO

Monthly Invoice Package

The invoice shall include travel/documentation and accompany (including travel approval prior to travel taking place) the MSR.

Monthly by the 15th of each month covering the previous month

One PDF copy submitted electronically into the IPP system

COR,

CO

Contractor Travel Approval

Contractor travel must be approved by COR prior to the trip, travel requests shall be submitted via email to the COR detailing purpose of the trip

At least 2 weeks prior to travel taking place

Electronically by email

COR

Contract Task Deliverables

Specific deliverables are dependent on each specific task being performed.

Contract task deliverables as prescribed by the PWS task

As identified per task

Site facility manager DRAFT

10.0 - PERFORMANCE REQUIREMENTS SUMMARY

This contract includes a Performance Requirements Summary (PRS). The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the COR. Evaluation of the contractor’s overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR and individual site facility managers. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the CO.

10.1 - Surveillance The COR shall contact onsite personnel (site facility managers and tenants) for input regarding contract services.

10.2 - Procedure Customer complaints shall be tracked as follows:

● Government or on-site personnel shall contact the COR or site facility manager with complaints.

● COR shall document complaints.

● If the COR determines the complaint is invalid, the complainant shall be notified. The

COR or site facility manager shall retain a copy of the complaint in the file.

● If the COR determines the complaint is valid the contractor shall be notified, with a copy to the CO, and the contractor shall be given reasonable time to correct the problem. The COR shall determine a reasonable time frame to correct the problem.

● The COR shall, at minimum, e-mail the contractor and CO of any valid complaints.

● If the contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint the contractor shall notify the COR and CO. The COR and CO shall review the matter and reassess the validity of the complaint.

● The COR shall consider complaints resolved unless notified otherwise by the complainant.

10.3 - Performance Standard The PRS tables below detail the required service outcomes, performance standards, acceptable quality levels, monitoring methods and incentives/disincentives. Random monthly inspections may be done by the COR and site facility managers. The site facility managers shall notify the COR of any complaints so they may take appropriate action.

If the required services listed in this contract are not performed to the standard specified in the

AQL column of the table below, the government reserves the right to take reasonable steps to positively affect performance.

Table 3: Contract Management and Staffing Operations

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive

1, 2 Responsive and timely completion of work orders

Tenant and facility manager requests are responded to and completed timely, according to the initial request in the facility management software

Performance standards met at least 95% of the time.

No more than two (2) complaints per month.

COR and Task Monitor may solicit or receive intermittent feedback from staff.

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected and/or a negative review in the

CPARS.

1, 2, 4, 9

Contractor provided onsite resources are consistently available

Vacant positions are filled rapidly (onsite resource vacancies shall not result in a lapse in service for any task)

Backfill resources are identified by the contractor within 21 days

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance may result in withholding or deducting invoice payment until issues are corrected and/or a negative review in the

CPARS.

All Services are provided timely as identified by PWS and work orders

No lapse or late service performance shall occur

Onsite and subcontracte d resource accomplish all required services as

Monitored by the COR and site facility managers

Acceptable or higher performance shall result in a positive review in the CPARS.

Poor performance

Task Desired Outcome

Performance Standard

AQL Monitoring Method

Incentive/ Disincentive prescribed by the PWS and work orders may result in withholding or deducting invoice payment until issues are corrected, performance penalties, and/or a negative CPARS review

Table 5: Environmental Compliance, Hazardous Waste & Chemical Management

Performance Objective

Performance Threshold /

AQL

Method of Surveillance

Deduction / Incentive / Disincentive

5.1 Chemical

Inventory Management (RSS System)

(Appendix A3/ PWS Task 4)

Maintain real-time inventory visibility and hazard tracking in the NOAA Fisheries Risk & Safety Solutions (RSS) system across all research laboratories.

• New chemicals entered into RSS within fifteen

(15) business days of campus delivery.

• 100% physical chemical reconciliation completed annually by December 31.

• Inventory accuracy rate of ≥ 98% based on random audit counts.

• Zero unmapped Extremely Hazardous Substances

(EHS).

• Quarterly random sampling:

COR/ESOHM audits a 10% sample of laboratory shelves against active RSS database records.

• Annual 100% reconciliation audit.

• Inventory discrepancies exceeding 2% require full contractor re-inventory of the affected laboratory wing within five

(5) business days at no cost.

• Invoicing for chemical support withheld until annual reconciliation achieves 100% sign-off.

11.0 - CONFIDENTIALITY AND DATA PRIVACY

This contract may require that services contractors have access to Privacy Information. Service contractors are responsible for maintaining confidentiality of all subjects and materials and may be required to sign and adhere to a Non-Disclosure Agreement (NDA).

The government has unlimited rights to all documents/materials produced under this contract.

All documents and materials, to include the source code of any software produced under this contract, shall be government owned and the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO.

All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.

12.0 - GOVERNMENT FURNISHED RESOURCES

Item(s) Quantity Condition Location Common Access Card As needed Good All sites Office desks, phones, computers, and chairs As needed Good All sites Portable power tools (e.g., saws, drills, sanders, etc.) As needed Good All sites

Stationary power tools (e.g., table saw, radial arm saw, drill press, lathes, etc.)

As needed Good All sites

Preventive Maintenance References (e.g., service manuals, technical bulletins, etc.) As needed Good All sites

Government Owned Vehicles As needed Good All sites Forklift and pallet jacks As needed Good All sites

13.0 - TRAINING

Training is authorized for NOAA Fisheries/DOC specific systems and requirements. The following training is currently required to be completed under this contract. When a full-time contractor employee attends training for one working day or longer, the contractor shall provide a qualified substitute at no additional cost to the Government.

The COR may authorize additional training that is necessary for the contract and not commercially available.

13.1 - Government-Provided versus Contractor-Provided Training Some required training may be provided by the Government at no cost to the contractor, subject to availability and scheduling. Regardless of source, the contractor remains responsible for training completion and currency.

Any training not provided by the Government, including costs associated with fees, certifications, renewals, travel, labor time, or related expenses, shall be provided and paid for by the contractor at no additional cost to the Government.

13.2 - Mandatory Government-Provided Training The following Government-provided training shall be completed within thirty calendar days of starting onsite work, unless otherwise specified:

13.3 - General and Administrative Training

● Sexual Assault/Sexual Harassment Prevention and Response Training in accordance with NAM 1330-52.222-70(b)(6) (required for all contractors)

● NOAA Defensive Driving Training (initial and every three years thereafter)

● Information Technology (IT) Security Awareness Training (annual or as required by

NOAA)

● NOAA Safety training (required for all contractors working at a Government facility)

● Records Management 101

13.4 - Training Documentation and Reporting The contractor shall maintain a current training matrix for all assigned personnel working at SEFSC facilities.

At a minimum, the matrix shall include:

● Employee name

● Training title and description

● Training provider

● Date completed

● Refresher or expiration date (if applicable)

Training records shall be made available to the Government upon request and provided to the COR as required.

Additional commercial or non-contract specific training may be permitted under the following circumstances: 1) prior written approval is obtained from the COR, 2) there is no additional cost to the Government for attendance, 3) the time is not billed to the Government, and 4) there is no relief/change for deliverable due dates

14.0 - GOVERNMENT-OWNED VEHICLES

The contractor is authorized to operate Government-owned vehicles.

NOAA Manual 209-10 requires that NOAA workers that drive Government vehicles, as a part of their duties, must complete defensive driver training prior to driving a vehicle on official business and every three years thereafter. Completion of the NOAA Defensive Driver Training course in the Commerce Learning Center satisfies that requirement.

15.0 - DOCUMENTATION AND RECORDS

All documentation, records and schedules as described in this PWS are the responsibility of the contractor, are the property of the Government and shall be turned over to the Government upon completion or termination of the contract. All records are subject to the Freedom of Information and/or Privacy Acts and any requests for release of any records shall be handled accordingly.

Table 5: Environmental Compliance, Hazardous Waste & Chemical Management

File details come from the government source that posted it. Updated .