Dynamometer System Upgrade Requirements Document Summary
This is a Requirements Document for NIST's procurement of a Kistler dynamometer data acquisition system upgrade for the Engineering Laboratory. The procurement seeks one complete Dynamometer System Upgrade package consisting of four line items: (1) Kistler 5167A LabAmp laboratory charge amplifier, quasi-static hardware; (2) Kistler 5167A license; (3) Kistler 1677BA5 connecting cable; and (4) Kistler 1678A5 extension cable. All items must be brand-name new equipment in original manufacturer's packaging with original documentation and software. The system upgrade is designed to measure real-time, SI-traceable cutting forces during machine tool operations with digital communication, digital data collection, and measurement of both cutting forces and moments. Delivery is required within 6 weeks after receipt of order (ARO) on an FOB Destination basis to NIST Gaithersburg Campus, Maryland (Building 301, Shipping and Receiving, 100 Bureau Drive). The awardee must confirm shipment details with the Designated Government Official and Contracting Officer prior to delivery due to limited NIST facility access.
The hardware specifications require 8-channel configuration with Fischer input connectors, Ethernet interface, supply voltage of 18-30 Vdc, analog outputs of ±10V with BNC connectors, KiConnect compatibility, and Precision Time Protocol (PTP) synchronization. The connecting and extension cables must each feature 8 conductors, Fischer 9-pole straight flange connectors rated IP65 or higher, and 5-meter lengths. Payment is structured at 100% upon installation, acceptance, successful testing, and demonstration of technical compliance with a Net 30-day payment term. The Government reserves the right to conduct performance tests with the existing Kistler 9257B dynamometer and visual inspection for defects, with acceptance determination within 30 days of receipt. A minimum one-year warranty applies post-acceptance, and partial shipments or invoices are not permitted unless pre-approved by the Contracting Officer.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIREMENTS DOCUMENT
Title: Dynamometer System Upgrade Requesting Lab: Engineering Laboratory
I. BACKGROUND INFORMATION
Purpose/Objective: NIST seeks the procurement of a Kistler dynamometer data acquisition system for use with an existing Kistler dynamometer to measure real-time, SI-traceable cutting forces during machine tool operations. An existing Kistler dynamometer must be upgraded with a new data acquisition (DAQ) system to measure real-time, SI-traceable cutting forces. The new capabilities of the DAQ system include digital communication, digital data collection, and measurement of both cutting forces and moments.
II. SCOPE
The Contractor shall deliver a quantity of one (1) Dynamometer System Upgrade per the specified minimum requirements, composed of one (1) Kistler 5167A hardware, one (1) Kistler 5167A license, one (1) Kistler 1677BA5 connecting cable, and one (1) Kistler 1678A5 extension cable. The Dynamometer System Upgrade is henceforth also known as the “deliverable” or “system” or “equipment” and is inclusive of FOB Destination delivery and warranty.
III. MINIMUM REQUIREMENTS
The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award.
Experimental, prototype, or custom items will not be considered. The use of “gray market” components are not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Line Item 0001: Kistler 5167A hardware -BRAND NAME ONLY- Description: Kistler LabAmp® laboratory charge amplifier, quasi-static Quantity: 1
A. Technical Specifications
a. Compatible with Kistler 9257B dynamometer
b. Signals: Charge
c. Measuring ranges: ±100 ... 1 000 000 pC
d. Housing: Desktop version with tilt feet
e. KiConnect compatible (for use with KiStudio or KiCloud)
f. Interface: Ethernet
g. Supply voltage: 18 ... 30 Vdc
h. Analog outputs: ±10 V, BNC neg. connectors
i. Virtual channels for calculations
j. Precision Time Protocol (PTP) synchronization
k. Configured with 8 channels and Fischer input connectors
l. Includes power supply and ethernet cable
Line Item 0002: Kistler 5167A license -BRAND NAME ONLY- Description: License for LabAmp 5167A Quantity: 1
A. Technical Specifications
a. Supports data acquisition
b. Does not support function generation
Line Item 0003: Kistler 1677BA5 connecting cable -BRAND NAME ONLY- Description: Connecting cable for multicomponent dynamometers Quantity: 1
A. Technical Specifications
a. 8 conductors
b. Fischer 9-pole straight flange connector at every end
c. Each connector is rated IP65 or higher
d. Length of 5 m
e. Metal hose/sheath protection
Line Item 0004: Kistler 1678A5 extension cable -BRAND NAME ONLY- Description: Extension cable with high insulation Quantity: 1
A. Technical Specifications
a. 8 conductors
b. Fischer 9-pole straight flange connector at every end
c. Each connector is rated IP65 or higher
d. Length of 5 m
e. Ground-isolated
IV. DELIVERABLES
Description Quantity or Format Due Date
Kistler LabAmp® laboratory charge amplifier, quasi-static
1 6 weeks ARO
License for LabAmp 5167A 1 6 weeks ARO
Connecting cable for multicomponent dynamometers
1 6 weeks ARO
Extension cable with high insulation
1 6 weeks ARO
Standards of Acceptance: The NIST TPOC or COR shall review the Dynamometer System Upgrade and respond with an acceptance or request for revision via email to the Contractor Point of Contact (POC) within 30 days of receipt of the deliverable. This section applies to deliverables which must be reviewed and approved for acceptances (draft plans, drawings, etc.)
V. PLACE OF PERFORMANCE
NIST Gaithersburg Campus, MD
VI. PERIOD OF PERFORMANCE/LEAD TIME
30 days after receipt of the deliverable
VII. DELIVERY TERMS
Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided in the above table.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:
National Institute of Standards and Technology Shipping and Receiving 100 Bureau Drive, Building 301 Gaithersburg, MD 20899 C/O POC Gregory W. Vogl, Building 233
***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***
VIII. INSPECTION & ACCEPTANCE
In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
Performance Tests:
1. Performance tests with existing NIST-owned Kistler 9257B dynamometer.
NIST may choose at its discretion to forego this part of acceptance testing.
A visual inspection of the equipment will be performed by the NIST TPOC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will test, inspect, and accept or reject the equipment within 30 days of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.
IX. WARRANTY
The contractor shall warranty the deliverable for a period of a minimum of 1 year after receipt and acceptance of the deliverable by the Government, and the warranty shall be in accordance with terms in FAR 52.212-4.
X. PAYMENT SCHEDULE
Advance payment is not authorized. The Contractor must invoice in arrears according to the payment schedule. The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
1. 100% after installation and acceptance by the TPOC of fully installed system, AND
2. After the successful completion of the testing requirements set forth in this document under section set forth in this document, AND
3. After successful demonstration by the instrumentation that it performs IAW the technical requirements set forth in this document AND
4. After receiving an invoice submitted properly, IAW the purchase order terms and conditions.
NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.
***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***