Requirements and Specifications.pdf

PDF 239 KB Posted

Attached to
Rapid Cooldown Cryostat System Federal contract opportunity
Solicitation number
NB686060-21-00958
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

Other files for this federal contract opportunity

Other files attached to Rapid Cooldown Cryostat System, newest first.
File Type Posted
NB686060-21-00958 Atch C -Experience Submittal Form.docx DOCX document
Trade off Combined Synopsis-Solicitation.pdf PDF
Summary Requirement and Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: Rapid-cooldown dipstick-based cryostat system Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6)

General Statement of Need We are in need of a cryogenic system with rapid cooldown times to enable us to test samples in a shorter timespan. In particular, we are interested in systems with a cooldown time under 60 minutes, to allow us to rapidly measure multiple samples over the course of a day.

Items and/or Ancillary Services

Item 1: PLEASE SEE ATTACHED .txt FILE, WE ARE UNABLE TO FORMAT THIS DOCUMENT SO EVERYTHING

WILL APPEAR JUMBLED BELOW

Quantity: 1 Specifications: [List specifications here as Specification 1.1, Specification 1.2, etc.

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

#### MAIN-ITEM REQUIREMENTSItem 1: Rapid-cooldown cryostat systemQuantity: 1Specifications:- Minimum temperature below 1.6K- Continuous operation: Sample exchange must not require warmup of entire system- Rapid cooldown time after sample exchange. Maximum 60 minute cooldown time after exchanging sample (for cooldown from 300K→2K). Note that it is acceptable for the initial system cooldown times to be much longer- Sample space 50mm diameter- "Cryogen-free" (must not require external supply of cryogenic liquid helium)- "Pulse-tube" type cold head to reduce vibrations- One sample probe/dipstick included#### SEPARATELY PRICED OPTIONS AND SERVICES:Item 2: Optical-access window Quantity: 1Specifications:- Allows line-of-sight optical access to sample- Set of fuzed quartz windows- Set of aluminum blanks to cover windows when optical access not needed ()Item 3: Temperature controllerQuantity: 1Specifications:- Four channel temperature controller- Heater capable of 50W- Compatible with Lakeshore temperature sensorsItem 4: Vacuum pumping stationQuantity:

1Specifications:- Turbo pump + roughing pump pumping stationItem 5: Additional sample probe/dipstickQuantity: 1Specifications:- 2x 24-wire connections- Calibrated temperature sensor

Service Requirements / Item Specifications

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days

Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 2

☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A

[Enter shipping and delivery information by item here.] Shipping criteria:

☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

☒ Delivery of goods, installation, and training shall be completed no later than:

Nov 1, 2021 ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☒ N/A

[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☐ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☒ Power available Voltage: 200 (V) Max Current: 50 (A) Phase: Three phase Frequency: 60 (Hz) NEMA Plug Type: Unknown (i.e.: NEMA L5-20P) Environment: Common Lab / Office Environment Other power consideration: [List any other power considerations here] ☒ Utility connections: Cooling water, 6-9L/min @ 5-25C ☐ Other considerations: Click or tap here to enter text.

Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 3

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☒ Labor ☒ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☒ Warranty length: 24 months Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A

[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 21 business days ☒ Inspection and acceptance plan: Before inspection can occur, requires installation which may take as much as 2 weeks.

☐ Other: [Enter other requirements here]

Maintenance ☒ N/A

[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment

[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian)

Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 4

☒ N/A Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]

Travel ☒ N/A

[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Rapid-cooldown dipstick-based cryostat system
Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6)
General Statement of Need
Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .