Requirements and Specifications.pdf
PDF 239 KB Posted
- Attached to
- Rapid Cooldown Cryostat System Federal contract opportunity
- Solicitation number
- NB686060-21-00958
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NB686060-21-00958 Atch C -Experience Submittal Form.docx | DOCX document | |
| Trade off Combined Synopsis-Solicitation.pdf | ||
| Summary Requirement and Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Rapid-cooldown dipstick-based cryostat system Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6)
General Statement of Need We are in need of a cryogenic system with rapid cooldown times to enable us to test samples in a shorter timespan. In particular, we are interested in systems with a cooldown time under 60 minutes, to allow us to rapidly measure multiple samples over the course of a day.
Items and/or Ancillary Services
Item 1: PLEASE SEE ATTACHED .txt FILE, WE ARE UNABLE TO FORMAT THIS DOCUMENT SO EVERYTHING
WILL APPEAR JUMBLED BELOW
Quantity: 1 Specifications: [List specifications here as Specification 1.1, Specification 1.2, etc.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
#### MAIN-ITEM REQUIREMENTSItem 1: Rapid-cooldown cryostat systemQuantity: 1Specifications:- Minimum temperature below 1.6K- Continuous operation: Sample exchange must not require warmup of entire system- Rapid cooldown time after sample exchange. Maximum 60 minute cooldown time after exchanging sample (for cooldown from 300K→2K). Note that it is acceptable for the initial system cooldown times to be much longer- Sample space 50mm diameter- "Cryogen-free" (must not require external supply of cryogenic liquid helium)- "Pulse-tube" type cold head to reduce vibrations- One sample probe/dipstick included#### SEPARATELY PRICED OPTIONS AND SERVICES:Item 2: Optical-access window Quantity: 1Specifications:- Allows line-of-sight optical access to sample- Set of fuzed quartz windows- Set of aluminum blanks to cover windows when optical access not needed ()Item 3: Temperature controllerQuantity: 1Specifications:- Four channel temperature controller- Heater capable of 50W- Compatible with Lakeshore temperature sensorsItem 4: Vacuum pumping stationQuantity:
1Specifications:- Turbo pump + roughing pump pumping stationItem 5: Additional sample probe/dipstickQuantity: 1Specifications:- 2x 24-wire connections- Calibrated temperature sensor
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days
Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 2
☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
[Enter shipping and delivery information by item here.] Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than:
Nov 1, 2021 ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☒ N/A
[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☐ N/A
[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☒ Power available Voltage: 200 (V) Max Current: 50 (A) Phase: Three phase Frequency: 60 (Hz) NEMA Plug Type: Unknown (i.e.: NEMA L5-20P) Environment: Common Lab / Office Environment Other power consideration: [List any other power considerations here] ☒ Utility connections: Cooling water, 6-9L/min @ 5-25C ☐ Other considerations: Click or tap here to enter text.
Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☒ Labor ☒ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☒ Warranty length: 24 months Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 21 business days ☒ Inspection and acceptance plan: Before inspection can occur, requires installation which may take as much as 2 weeks.
☐ Other: [Enter other requirements here]
Maintenance ☒ N/A
[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment
[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian)
Requirements / Specifications: Rapid-cooldown dipstick-based cryostat system 4
☒ N/A Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]
Travel ☒ N/A
[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail specifications/requirements for an item and/or ancillary services. |
| TITLE: Rapid-cooldown dipstick-based cryostat system |
| Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6) |
| General Statement of Need |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .