This document is a Requirements and Specifications file for a 1K helium-4 sorption cooler issued by the Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group at the National Institute of Standards and Technology (NIST). The agency requires three helium-4 sorption coolers capable of reaching 1 Kelvin temperatures, specifically for measuring superconducting-nanowire single photon detectors. Key technical specifications include: at least 250μW of cooling at 1K for 24 hours, a closed-cycle system reusable without additional cryogens, and a diameter smaller than 100mm.
The solicitation (NB686060-25-00612) includes detailed requirements for delivery, installation, and performance. Delivery, installation, and training must be completed within 8 weeks after receipt of order (ARO). Facility considerations specify three-phase power at 200V, 50A, and utility connections for cooling water. The equipment will be installed in a common laboratory environment, with government acceptance testing expected to take up to 21 business days. Installation may require up to two weeks, and a vendor technician will be on-site for setup and start-up services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Unrestricted LPTA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specifications: 1K helium-4 sorption cooler 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: 1K helium-4 sorption cooler Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6)
General Statement of Need We are in need of a He4 based sorption pump capable of reaching 1 Kelvin temperatures, for the purpose of measuring superconducting-nanowire single photon detectors
Items and/or Ancillary Services
Item 1: 1K helium-4 sorption cooler Quantity: 3 Specifications:
1.1: At least 250uW of cooling at 1K for 24 hours.
1.2. Closed-cycle system that can be used multiple times without adding additional cryogens
1.3 Must have a diameter smaller than 100mm
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
Click or tap here to enter text.
Service Requirements / Item Specifications Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here]
☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
[Enter shipping and delivery information by item here.] Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required
[Explain need for requirement here] Building has: ☐ Loading dock
☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here]
Requirements / Specifications: 1K helium-4 sorption cooler 2
Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than: 8 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☒ N/A
[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s)
[List any Work Order Number(s) here] ☐ Power available
Voltage: 200 (V) Max Current: 50 (A) Phase: Three phase Frequency: 60 (Hz) NEMA Plug Type: Unknown (i.e.: NEMA L5-20P) Environment: Common Lab / Office Environment Other power consideration: [List any other power considerations here]
☐ Utility connections: Cooling water, 6-9L/min @ 5-25C ☐ Other considerations: Click or tap here to enter text.
Requirements / Specifications: 1K helium-4 sorption cooler 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: Click or tap here to enter text.
Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here]
☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 21 business days ☒ Inspection and acceptance plan: Before inspection can occur, requires installation which may take as much as 2 weeks.
☐ Other: [Enter other requirements here]
Maintenance ☒ N/A
[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here]
☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment
[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian)
Requirements / Specifications: 1K helium-4 sorption cooler 4
☒ N/A Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]
Travel ☒ N/A
[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail specifications/requirements for an item and/or ancillary services. |
| TITLE: 1K helium-4 sorption cooler |
| Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6) |
| General Statement of Need |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .