Requested RFP Pricing Form C GLX Wheel Truing machine.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Wheel Truing machine Riverside car house
- Solicitation number
- BD-21-1206-40000-40000-63525
- Issued by
- Middlesex County, Massachusetts
About this file
This document is a Requested RFP Pricing Form C for the procurement and installation of a Wheel Truing machine at the Riverside car house, issued by the Massachusetts Bay Transportation Authority (MBTA). The form includes a schedule of prices for labor, equipment and materials, and general conditions, overhead, and profit for the total lump sum bid amount. The document also includes a 5% contingency that can be used at the sole discretion of the MBTA for unforeseen conditions or work not clearly defined in the scope. The existing wheel truing machine is to be removed and credited to the MBTA.
The pricing form requires the vendor to complete the green cells with their proposed pricing. The MBTA reserves the right to self-perform the contingency work or solicit other proposals. No information is provided on the overall contract value, funding sources, or timeline for this procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Form C: Requested RFP Pricing Form | ||||||
| VENDOR NAME | ||||||
| Form C | ||||||
| Schedule of Prices 1 | A | B | C | = A + B + C | ||
| LABOR | EQUIPMENT & MATERIALS | GENERAL CONDITIONS, OVERHEAD & PROFIT | Total Cost | |||
| 1 | Riverside carhouse | $ - 0 | ||||
| 2 | CONTINGENCY (5%) 2 | $ - 0 | ||||
| 3 | Resale value of exisiting Wheel Truing machine (credit to MBTA) | |||||
| 4 | Total Lump Sum Bid Amount | $ - 0 | ||||
| 1. Prices listed are to be lump sum prices and include all work to procure and install wheel truing machine and emove existing wheel truing machine. Includes bonding, permits, cleaning, testing and certification, etc. |
2. Contingency is used at the sole discretion of the MBTA. Contingency is used when conditions are not included in the scope of work, unforseen conditions or not clearly defined. Contractor will submit a proposal for the use of contingency to be approved by the MBTA representative. The MBTA reserves the right to self-perform the contingency work or solict other proposals.
Bidder to complete Green Cells