This document is a Request for Quote (RFQ) from the Ohio Department of Natural Resources (ODNR) for the replacement of roofs on 18 cabins at Lake Hope State Park in Vinton County, Ohio. The project requires services to replace the roofs of 2 different styles of cabins - Forest Cabins 35 through 41 and Wildlife Cabins 42, 45, 48, 49, 52, 53, 54, 55, 56, 57, and 58. The work is to be completed no later than May 30, 2024. Site visits are available by appointment only, and the contract will be awarded to the lowest responsive and responsible bidder.
The RFQ specifies that this is an MBE (Minority Business Enterprise) set-aside opportunity in accordance with Ohio Revised Code 125.081. The RFQ includes detailed scope of work requirements, such as the demolition of existing roofing materials, installation of new roofing systems, and disposal of all construction materials. Pricing is to be provided per cabin for each style. Invoicing and payment instructions are also provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Name or Title of the Service or Supply: DNR Lake Hope State Park - Roof Replacements for 18 Cabins
Ordering Location and Address: Lake Hope State Park 29371 Wheelabout Rd.
McArthur, OH 45651
MBE SET-ASIDE IN ACCORDANCE WITH ORC 125.081
Project Background: Lake Hope State Park requires services to replace the roofs of 18 cabins due to age and wear and tear. There are 2 different styles of cabins that need replacements. The cabins are Forest Cabins 35 through 41 and Wildlife Cabins 42,45,48,49,52,53,54,55,56,57 and 58. Please include pricing per cabin for each style. Work is to be completed no later than May 30, 2024.
Specifications/Scope of Work:
General Requirements:
1. The awarded Contractor will be required to sign a Services Agreement. Example attached.
2. Contractor will be responsible to provide all materials needed to replace the roofs.
3. Contractor will provide dumpster for all trash and disposal/removal of all construction materials and site cleanup to include removal of nails and scrap.
4. Contractor will be responsible for all permits, including the Ohio Department of Commerce permit.
5. There are 2 different styles of cabins, pricing will be broken down by the style of cabins. Style one are Forest Cabins 35 through 41 and style two are Wildlife Cabins 42, 45, 48, 49, 52, 53, 54, 55, 56, 57 and 58.
Demolition:
1. Existing shingles, felt paper, ridge caps, valley flashing, pipe boots, drip edge, etc. to expose plywood sheeting.
2. As needed, replace damaged roof decking and any rotten wood that would preclude the proper installation of the new roofing materials. NOTE: All wood repairs will require Park Manager approval on a per incident basis before any repairs should be made, any repairs made that did not receive prior approval will not be included in any final change order pricing adjustment.
Install: Steep slope roofing systems according to manufacturer’s specifications.
1. Install new 1-1/2" Drip edge around the perimeter of the cabin.
2. Install new ice/water shield at all eaves, valleys, and penetrations larger than 6".
3. Install all new synthetic roofing underlayment of remainder of roof decking.
4. Install all new valley metal.
5. Install all new pipe boots, flashing, and metals according to manufacturer’s specifications and sealant around chimney flashing.
6. Install all new hip/ridge cap shingles at all hips and ridges.
7. Install all new full length ridge vent for ventilation according to manufacturer's specifications.
8. Install Energy rated Owens corning Oakridge dimensional shingles with Streakguard Algae
Resistant Protections, 110 mph wind protections and lifetime manufacturer's warranty.
Map:
Delivery: Lake Hope State Park 29371 Wheelabout Rd.
McArthur, OH 45651 Jason Garey – (740) 274-4965; jason.garey@dnr.ohio.gov
Completion Date: No later than May 30, 2024
Site Visit & Point of Contact.
Site visits available by appointment only. To schedule an appointment, contact: Jason Garey at (740) 274-4965.
Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.
Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.
mailto:jason.garey@dnr.ohio.gov
Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Bill to information:
Origin-DNR-484
All invoices must be submitted DIRECTLY to Ohio Shared Services (OSS).
There are three options available to submit invoices to OSS:
• EMAIL the invoice to: invoices@ohio.gov
• FAX the invoice to: 1-614-485-1039
• MAIL the invoice to: Ohio Shared Services, PO Box 182880, Columbus, Ohio 43219
In order to process your invoice, please make sure all the required information listed below is on your invoice before submitting it to OSS or they will be returned for not being a proper invoice.
1. Must include the Purchase Order (PO) number assigned. You may shorten it to the last five digits.
2. Supplier full name as it appears on your PO.
3. The Ship to and/or service facility name and full address
4. Unique invoice number
5. Date of service or date work was completed.
6. Complete itemization of services performed, materials or goods supplied and/or labor furnished.
7. Line charge(s). If parts are included, please break out the line charges with product and charges separately.
8. No State of Ohio sales tax
9. Remit to address must match our records for payment
10. This PO is only valid for the goods and/or services received through June 30, 2024.
11. Any goods/services received after June 30, 2024 will require a new PO.
The awarded supplier will be required to sign a Services Agreement. Example attached.
mailto:invoices@ohio.gov
File details come from the government source that posted it. Updated .