Request for Quote DeBlocker 2031ZAQ00300_Revised_OPE Review.docx

DOCX document 182 KB Posted

Attached to
DEBLOCKER TESTING SERVICES
Solicitation number
2031ZA24Q00300
Issued by

About this file

This document is a Request for Quote (RFQ) for Deblocker Testing Services issued by the Department of the Treasury's Bureau of Engraving and Printing (BEP). The RFQ is part of market research for a potential future acquisition of deblocker equipment.

The BEP's Western Currency Facility in Texas and the new Washington D.C. Currency Replacement Facility require deblocker equipment to support the preparation of sheets for automatic feeding in their print and inspect operations. The purpose of the testing is to evaluate the technical capabilities of commercial deblocking equipment relative to the BEP's draft system requirements. Vendors will be provided up to 60,000 intaglio printed sheets by the BEP to perform the deblocking services at their own facilities over a 3-5 day period. The BEP will witness the testing and collect data on the separation quality and separation rate. All test materials must be either returned to the BEP or destroyed at the vendor's facility at the conclusion of testing. This is a firm fixed-price contract with no authorized travel expenses.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTE

2031ZA24Q00300

DEBLOCKER TESTING SERVICES

Responses Due NLT Aug 29, 2024

SECTION A – GENERAL INFORMATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12 & 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

A. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-05/effective date of 22 May 2024.

B. This procurement is unrestricted and the associated NAICS code are 323120, Research and Development Miscellaneous Special Industry Machinery.

C. The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this procurement.

[END OF SECTION]

SECTION B – PRICING SCHEDULE

Base Year

CLIN
SUPPLIES/SERVICES
QTY
UNIT
UNIT PRICE
TOTAL
0001
Deblocker Testing Services
1
EA

SECTION C – STATEMENT OF WORK (SOW) Comment by Magd, Andrew: Has the SOW been reviewed by Legal and Policy as well as BEP security? Usually the actionable package goes through various offices for review before Source Selection plan or solicitation plan is created. Please confirm.

C.1 Introduction/Background:

The BEP’s Western Currency Facility (WCF) located in Fort Worth, Texas and new Washington D.C. Currency Replacement Facility (DCRF) located in Beltsville, Maryland are in need of deblocker equipment to support the preparation of sheets for automatic feeding in BEP print and inspect operations. This acquisition is part of market research for the potential future acquisition of deblocker equipment. By evaluating commercial deblocking equipment, BEP hopes to understand the equipment capabilities in the market and learn ways to assess the degree to which a stack of sheets has been adequately deblocked.

C.2 Objective/Scope/Purpose:

These deblocking services are being procured as part of the BEP’s market research to determine the capabilities of deblocker equipment in the commercial market.

The purpose of the test is to gather market research on the technical capabilities of the vendor’s deblocker equipment relative to the draft system requirements found in the statement of work below.

C.3System Requirements:
To successfully demonstrate separation capabilities, the vendor shall utilize BEP paper.
The vendor is to perform the deblocking services using deblocker equipment with the following minimum capabilities:

A. A method to remove smaller segments of intaglio printed sheets from a stack of up to 10,000 intaglio printed sheets on a skid.

B. A method to “break” or separate those sheets so they are no longer stuck together.

C. A method to re-stack those sheets onto the skid. The number of sheets stacked on a skid is up to 10,000 sheets.

D. A method of jogging/aligning the sheet edges on two sides to make a straight stack, straight within +/- 1/32” on the leading and side-guide edges.

E. Optional: It is preferred to have a method to demonstrate or measure adequate separation after processing.

BEP will provide personnel to advise the vendor on separation of sheets quality and separation rate requirements, to witness the performance of the testing and to ask and answer questions relative to the SOW. The vendor will be provided up to 60,000 intaglio printed sheets by BEP.

The BEP will supply test sheets for reference to set up the deblocker to be tested.

C.4BEP Team:
Bureau of Engraving and Printing will provide a team to coordinate and witness the test being performed on the deblocker equipment. After contract award, BEP will inform vendors of the number of team members and the names of who will be part of the BEP team.

C.5 Project Schedule:

The following is the general timeline for the testing to be performed by each vendor. The specific timeline for each vendor will be developed as part of the coordination of the testing and availability of BEP personnel.
Day 0 – Arrival of paper for the testing at vendor’s facility. Test materials to be securely stored in an area in accordance with Section C.14 requirements below.
Day 1 – Demonstration for BEP Personnel, Deblocker Setup, and Start of Testing. BEP team arrival. Vendor to install the paper onto the deblocker with BEP assistance on any questions that may be asked and provide insight on conditions and deblocker settings were during separation of exemplar sheets. Vendor to demonstrate deblocker features to BEP team as part of starting up and preparing the deblocker for the testing. BEP will provide sheets for the vendor to setup and prepare the deblocker. BEP will observe and collect data on the separation quality and separation rate. Vendor will notify the BEP when they have reached acceptable separation quality based on exemplar sheets and are ready to proceed on to the testing.
Days 2 – Continuation of testing: Vendor to continue to deblock test sheets, demonstrating the capabilities of the deblocker. Vendor to continue demonstrate features to BEP team as part of starting up and preparing the deblocker for the testing using BEP testing material. BEP will continue to observe and collect data on the separation quality and separation rate. Vendor will continue to notify the BEP when they have reached acceptable separation quality based on exemplar sheets and are ready to proceed on to the testing. Two additional days may be used for further testing if required by the Technical Lead.
Final Day– Shipment or Destruction of Test Materials: On the final day of testing, shipment of test materials to BEP from vendor’s facility for further qualitative observations of the separation quality and destruction of test materials shall occur.
However, if no further qualitative observations of sheets are required and vendor’s facility has an approved method of destruction at their facility by BEP Office of Security, the destruction of the test materials at the vendor’s facility shall occur in accordance with Sections C.10 and C.11 below. A certificate of destruction from the vendor or their designee shall annotate the type of material, quantity of material destroyed. The certificate shall be provided to the Technical Lead.
C.6Demonstration:
On Day 1 of the project plan, the vendor shall provide a demonstration to all BEP personnel in attendance at the testing, ensuring the BEP Subject Matter Experts (SMEs) for various systems are familiar with said systems and controls of the deblocker equipment as necessary to adequately assess the equipment performance. Vendors shall allow BEP personnel to record video of the equipment’s performance onsite during testing and keep those recordings for BEP records. BEP personnel will assess the performance of the equipment and the results of deblocked sheets onsite.

C.7 Materials:

The BEP will provide the following materials for the performance of the testing on the deblocker:
BEP Paper
The deblocker shall be setup utilizing BEP paper upon approval from the Technical Lead. Up to 60,000 intaglio printed sheets will be printed at BEP for testing.
BEP will arrange for shipment of intaglio printed sheets to the vendor’s facility for use during the testing.
- Bank Note 50-subject paper
o 818 mm wide x 700 mm long
o Embedded Generic Thread
o Generic watermark
C.8Performance/Delivery Period:
The period of performance shall be for one (1) Base Period of 3-5 days.
The testing start date will be set within 30 days after contract award.
A kick-off meeting shall be set within 5 days after contract award.
C.9Place of Performance:
Testing shall be held at the vendor’s facility where the deblocker equipment is located.

Contractor shall provide the following delivery information when scheduling delivery of test materials to the vendor’s facility:

· Name of Receiver (e.g. Contractor)

· Vendor Facility Address

· Point of contact information BEP will provide the following delivery information when scheduling delivery of test materials from BEP facility to vendor’s facility:

· Name of Sender (e.g. Technical Lead)

· Name of Carrier

· Contract/Purchase Order number

· Total number of cartons and/or pallets

· Total weight

· Date and time of delivery

· Mode of transportation (e.g., van, truck, automobile)

· Point of contact information Shipping shall be F.O.B. Destination within Consignee's Premises.

C.10Security Requirements:
In preparation for using BEP test materials such as the Crane paper, the vendor shallundergo a Security Audit, and must have an approved Security Plan in place within 30 daysof contract award. An approved Security Plan must be in place prior to the receipt of anymaterials for the performance of the testing.
Office of Security personnel will perform the Security Audit to identify any deficiencies in the vendor’s site that must be addressed. A detailed Security Plan shall be created and approved by both parties specifying the actions required to safeguard the production materials. Note: the vendor can provide a copy of a current audit and security plan if one has been recently conducted. BEP Office of Security will determine if the submitted Security Plan is approved for this project. Only authorized personnel shall be present during the performance of the testing. Vendor shall provide fencing/screens or other means to limit egress around the deblockerbeing utilized for the testing. Paper shall be stored in approved rooms or containers.
C.11Certificate of Destruction and Demonstration Materials:
During the testing, all test lots shall be clearly labeled and stored. At the conclusion of the testing, all supplied materials shall be segregated, with agreement of the Technical Lead, into groups of material that will be shipped back to the BEP for further processing and materials that shall remain and be destroyed by the contractor. Within thirty (30) days all material scheduled for destruction shall be processed and document/evidence of the destruction shall be provided to Technical Lead after test conclusion.
At the conclusion of testing, and upon confirmation with the Technical Lead, all materials identified for return to the BEP shall be packaged and shipped back to the BEP c/o the Technical Lead or his/her designee.
All test materials shall be returned and delivered to the following address:

Bureau of Engraving and Printing 14th & C Street, SW Washington, DC 20009 The Contractor shall contact the BEP Receiving Section on 202-874-2333 at least forty-eight (48) hours in advance to schedule all deliveries for destruction. Receiving hours for deliveries to the BEP are 7:30 a.m. to 2:30 p.m., local time, Monday through Friday, excluding U.S. Federal Holidays and the BEP Year-End-Shutdown Period. The following Delivery information shall be provided when scheduling delivery appointments to the BEP:

· Name of Sender (e.g. Contractor)

· Name of Carrier

· Contract/Purchase Order number

· Total number of cartons and/or pallets

· Total weight

· Date and time of delivery

· Mode of transportation (e.g., van, truck, automobile)

· Point of contact information Shipping shall be F.O.B. Destination within Consignee's Premises.

Unless BEP Office of Security approved vendor’s facility for conducting destruction of test material, contractor shall provide destruction services for destroying test material on their site.

C.12Travel:
There will be no authorized travel expenses on this contract.
C.13WCF & DCF Environmental, Health, and Safety Requirements:
All contractors must comply with the requirements and procedures established through the BEP Environmental, Health, and Safety (EHS) office. Any chemicals that will be used must be EHS approved prior to the chemicals being brought on site. The COR will coordinate all BEP EHS requirements.
All equipment delivered to the BEP shall be designed to minimize all risks of injury to BEP employees. All equipment shall be in full compliance with government and commercial safety and health regulations and requirements. The following are specific safety and environmental requirements for major production machinery for the BEP. Contractor shall follow the materials regarding the safety requirements found in Attachment 1 - 75D-07.0-06 EHS Requirements for Large Equipment Purchases.Comment by Magd, Andrew: These attachments need to be added to Section J.Comment by Read, Kimberly: Added

The contractor shall follow the requirements contained in Attachment 2A - 75W-08.0-02 EHS Contractor Requirements WCF and Attachment 2B – 75D-07.0-04 EHS Contractor Requirements DCF. This document is included as an attachment to this contract.

The contractor shall follow environmental health and safety instruction communicated to them by the WCF and DCF Environmental Health and Safety representatives.

The BEP contractually transfers responsibility to its contractors for compliance with applicable environmental, health, safety laws and regulations. Contracted services must be performed in a manner consistent with the BEP EHS Requirements for Large Equipment Purchases, BEP Document Control number 75D-07.0-06: EHS Requirements for Large Equipment Purchases. The applicable contents of the EHS attachment shall be adhered to.

C.14Physical Security:
The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use under this Contract. The Contractor personnel shall recognize that BEP deals with sensitive information and other proprietary information, which are valuable, special, and unique assets. All information pertinent to BEP’s information technology resources is highly sensitive and may not be released to third parties without the express, written consent of BEP. This information requires strict control procedures to preclude unauthorized disclosure or dissemination. Information pertinent to personnel is protected from unauthorized disclosure under the provisions of the Privacy Act of 1974 (5 U.S.C. 552a). Contractor personnel shall not divulge, disclose, or communicate in any manner, any information to any third party without prior written consent of the BEP. Contractor personnel shall protect information and treat it as strictly confidential and will abide by the security requirements of BEP. A violation of this paragraph shall be a material violation of this Contract. Should the Contractor receive or suspect they have learned of sensitive or classified information, the Contractor shall identify and report suspicions to the Technical Lead. The Contractor employee will not be interfacing or accessing BEP IT infrastructure on this contract. All data from the testing shall be provided to the Technical Lead at the conclusion of the testing for analysis by BEP at its facility.

C.15 Identification of Contractor Employees:

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

C.16 Personnel Security Requirements:

Contractor personnel (to include subcontractors) performing work under this contract shall comply with all policies, regulations, requirements, and instructions from the BEP’s Office of Security. Additional requirements are specified within section H of the contract. Further, the Contractor shall sign and have notarized a Non-Disclosure Agreement (NDA) (Attachment 3- Vendor and BEP NDA) prior to the Government’s release of proprietary and/or sensitive information. The NDA will cover all work to be performed under this contract and shall apply to all contractor personnel as well as any subcontractors. Comment by Magd, Andrew: NDA will need to be added to Section J. Comment by Read, Kimberly: Added

SECTION D – PACKAGING AND HANDLING Comment by Magd, Andrew: Sections D & F need to reflect the discussion from Section C. BEP will deliver test materials to the vendor’s facility. Then destruction of test materials will take place at vendor’s facility if approved by Office of Security. If not, test materials will need to be shipped back to the BEP. OPE will be handling delivery and shipping of test materials.

The following instructions are required for any shipments to the BEP:

D.1 Notice of Packaging Slip Requirements:

The following outlines the Bureau of Engraving and Printing’s packaging slip requirements to ensure efficient processing of shipments:

· The Bureau of Engraving and Printing requires that all packaging slips be placed in a self-adhesive pack list envelope and affixed to the outside a shipment.

· Must be durable, in English, and printed on or affixed to the surface of a package or on a label, tag, or sign.

· Must not be unobscured by labels or attachments; and

· Must be located away from any other marking (such as advertising) that could substantially reduce its effectiveness.

D.2 General Items – Information Required for Each Shipment:

· Contract Number – The contract number BEP assigned to this purchase.

· Shipping Address – Point from which the merchandise was shipped.

· Telephone Number – The telephone number of the vendor contact to be called for inquires related to the merchandise.

· Customer Information – The name and telephone number of the party to which the merchandise is being shipped.

· Total Weight of Packages, Item number and the total number of items within the current shipment.

· If items are drop shipped from a supplier, you must ensure the proper contract number is written on the packaging slip by your supplier.

D.3 Line Items – Information Required for Each Line Item Included in the Shipment:

· Manufacturer Product Identification – Item Number assigned by manufacturer/supplier.

· Quantity Ordered – Quantity on the purchase order or unit of measurement.

· Quantity Shipped – With the packing slip.

· Quantity Backordered, where applicable.

D.4 Notice of Shipping Label Requirements:

Every box/skid must have at least one shipping label applied to it. The label is to include, at minimum, the following information:

· Manufacturer or Supplier – Name of Manufacturer or supplier/and

· Shipping Address – Point from which the merchandise was shipped/and

· BEP Contract Number – PO# or CC order #/and

· Customer Name & Telephone Number – First and last name, building and room #.

The vendor shall ensure that all items shipped to the BEP are properly labeled. Items may include but not be limited to closed containers, sealed boxes, wrapped packages, or strapped palettes. Failure to adhere to the packing slip and shipping label requirements could result in shipment rejection, processing delay, and payment delay. **

SECTION E – INSPECTION AND ACCEPTANCE

SECTION F – DELIVERY OR PERFORMANCE

F.1 Place of Delivery:

Bureau of Engraving and Printing Washington, D.C. Currency Facility (DCF) 14th & D Streets, S.W.

Washington, D.C. 20228

The BEP will not provide parking for the BEP Washington D.C. Facility.

F.2 Notification of Delivery:

The vendor shall be responsible for providing all materials and services required for the delivery and placement of the equipment, all support equipment and supplies at the designated installation site(s) within the BEP. The delivery services shall also include all freight, rigging, unpacking, and removal of packing materials from BEP premises. The BEP will not provide any assistance during deliveries.

The vendor shall notify the COR seven (7) days prior to scheduling equipment deliveries. Copies of the packing lists shall be included with this notification and a list of vendor employees who will need access to the BEP to perform installation and testing of the equipment.

F.3 Deliveries to Washington, DC Annex Building:

LOADING DOCK ON “D” STREET SW, BETWEEN 13th & 14th STREETS SW): Vendors must call the appointment hotline at (202) 874-2333 twenty-four (24) hours in advance to schedule approximate delivery times. The hotline is manned from 6:30 am to 2:15 pm Monday through Friday. A voicemail message maybe left after normal working hours. Deliveries are accepted between 8:00 am and 2:15 pm, Monday through Friday, excluding holidays.

Over the road vehicles having an overall height exceeding 12”6” (3.8 meters) empty, or an overall length exceeding 42’ (12.2 meters) cannot be accommodated at our receiving platform.

To resolve any delivery issue, please contact Shipping & Receiving at (202) 874-3620 care of Material Handler/Leader.

F.4Performance/Delivery Period:
The period of performance shall be for one (1) Base Period of 3-5 days.
The testing start date will be set within 30 days after contract award.
A kick-off meeting shall be set within 5 days after contract award.
F.5BEP Year End Shutdown Period and Federal Holidays:
(a)BEP observes the federal holidays that are listed on the Office of Personnel website at: https://www.opm.gov/fedhol/. The Presidential Inauguration Day is applicable only to the Washington, DC Currency Facility (DCF).
(b)BEP’s Y.E.S. Period typically occurs December 25th through January 1st of each calendar year.

F.6 Notice to the Government of Delays:

In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract or any delivery schedule or date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract or of a delivery, the Contractor shall immediately notify the CO and the COR, in writing, giving pertinent details, provided; however, that this data shall be informational only in character and that receipt thereof shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

SECTION G – CONTRACT ADMINISTRATION DATA

G.1CONTRACT ADMINISTRATION OFFICE
(a) This contract will be administered by:
Bureau of Engraving and Printing
Office of Acquisition
14th and C Streets, S.W.
Washington, D.C. 20228-0001

(b) Written communication to the Contracting Officer shall make reference to the contract number.

G. DTAR 1052.201-70, Contracting Officer’s Representative (COR) Appointment and Authority (APR 2015)

(a) The COR WILL BE APPOINTED AT CONTRACT AWARD.

(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term “technical direction” includes, without limitation, direction to the Contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.

(c) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:

(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;

(2) Constitutes a change as defined in the clause entitled “Changes”;

(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;

(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;

(5) Interferes with the Contractor's right to perform under the terms and conditions of the contract; or

(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.

(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.

(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government work day.

(f) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the clause entitled “Disputes.”

(End of clause)

G.3 DTAR 1052-232-7003, Electronic Submission of Payment Requests (APR 2015)

(a) Definitions. As used in this clause—

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available atwww.ipp.gov or any successor site.

(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with Treasury procedures.

(a) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer's written authorization with each payment request. (End of clause)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Type of Contract:

This is a Firm Fixed-Price type contract.

H.2 Identification of Contract Employees:

No interpretation of any provision of this contract, including applicable specification(s)/statement of work, shall be binding on the Government unless furnished or agreed to in writing by the Contracting Officer (CO).

H.3 Notice to the Government of Delays:

In the event the Contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately notify the CO and the COR, in writing, giving pertinent details, provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.4 Non-Disclosure of Non Public Information and Data:

During the period of performance of the contract, the Contractor may be granted access to Non Public information and data, which is the sole property of BEP, as well as proprietary information and data, which is the sole property of entities other than the contracting parties. In particular, the Contractor agrees that all information provided by representatives of BEP, either before or after contract award, concerning the design, manufacture, processing or transporting of United States currency is nonpublic. Such information will be shared only with employees or agents of the company having a need to know, and will not be disclosed to other persons without the written consent of the CO.

Further, the Contractor agrees to maintain the confidentiality of all such information and data and shall not disclose any information and data, interpretations of, and/or derivatives of, such information and data to any unauthorized party without the express written approval of the CO, or of the party in which title is wholly vested. The Contractor hereby agrees to include this clause in all subcontracts or consulting agreements relating to work under this contract. The Contractor shall be required to sign a Non-Disclosure Agreement. Comment by Magd, Andrew: NDA will be required for the vendor’s to sign due to the Crane NDA. Does discussion from the NDA need to be included in this section? Comment by Read, Kimberly: No

H.5 Indemnification

(a) Responsibility for Government Property: The Contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished, while in his custody and care for storage, repairs, or service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the Contractor, any subcontractor, or any employee, agent or representative of the Contractor or subcontractor.

If due to the fault, negligent acts (whether of commission or omission) and/or dishonesty of the Contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the Contractor's performance of this contract, the Contractor shall be responsible to the Government for such loss or damage, and the Government, at its option, may in lieu of payment thereof, require the Contractor to replace at his own expense, all property lost or damaged.

(b) Hold Harmless and Indemnification Agreement: The Contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any Contractor property or property owned by a third party occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operation, or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor.

(c) Government's Right of Recovery: Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the Contractor where such loss, destruction or damage is to Government property. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for any loss, destruction of, or damage to Government property, and upon the request of the Contracting Officer shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.

(d) Government Liability: The Government shall not be liable for any injury to the Contractor's personnel or damage to the Contractor's property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.

H.6 Organizational Conflicts of Interest

(a) The Contractor warrants that, to the best of the Contractor’s knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest (OCI), as defined in FAR 9.5, Organizational and Consultants Conflicts of Interest, or that the Contractor has disclosed all such relevant information.

(b) The Contractor agrees that if an actual or potential OCI is discovered after award, the Contractor shall make a full disclosure in writing to the Contracting Officer. This disclosure must include a description of actions, which the Contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict.

(c) The Contracting Officer may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid an OCI. If the Contractor was aware of a potential OCI prior to award or discovered an actual or potential conflict after award and did not disclose or misrepresented relevant information to the Contacting Office, the Government may terminate the contract for default, debar the Contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.

(d) The Contractor must include this clause in all subcontracts and in lower tier subcontracts unless a waiver is requested from, and granted by, the Contracting Officer.

(e) In the event that a requirement changes in such a way as to create a potential conflict of interest for the Contractor, the Contractor must:

1) Notify the Contracting Officer of a potential conflict, and;

2) Recommend to the Government an alternate approach which would avoid the potential conflict, or

3) Present for approval a conflict of interest mitigation plan that will:

· Describe in detail the changed requirement that creates the potential conflict of interest; and

· Outline in detail the actions to be taken by the Contractor or the Government in the performance of the task to mitigate the conflict, division of subcontractor effort, and limited access to information, or other acceptable means.

4) The Contractor must not commence work on a changed requirement related to a potential conflict of interest until specifically notified by the Contracting Officer to proceed.

5) If the Contracting Officer determines that it is in the best interest of the Government to proceed with work, notwithstanding a conflict of interest, a request for waiver must be submitted in accordance with FAR 9.503.

H.7 Disclosure of Conflicts of Interest It is the BEP policy to award contracts to only those Offerors whose objectivity is not impaired because of any related past, present, or planned interest, financial or otherwise, in organizations regulated by BEP or in organizations whose interests may be substantially affected by Departmental activities. Based on this policy, if at any time during the performance of this contract the Contractor knows of any Conflict of Interest situation affecting the organization, any of its officers or Key Persons working under this contract, has reason to believe that a conflict of interest situation might arise, or is made aware of an actual or potential conflict of interest situation:

(a) The Contractor shall immediately provide to the Contracting Officer a written statement which describes in a concise manner all past, present or planned organizational, financial, contractual or other interest(s) with that organization regulated by BEP, or with that organization or individual whose interests may be substantially affected by Departmental activities, and which is related to the work under this contract. The interest(s) described shall include those of the Contractor, its affiliates, consultants, Subcontractors and key personnel of any of the above. Past interest shall be limited to within one year of the date of the offeror's technical quote. Key personnel shall include any person owning more than 20% interest in the organization, and the organization's corporate officers, its senior managers and any employee who is responsible for making a decision or taking an action on this contract where the decision or action can have an economic or other impact on the interests of a regulated or affected organization.

(b) The Contractor shall describe in detail when it became aware of the actual or potential conflict of interest, what action the organization has taken or proposes to take to mitigate and / or rectify the situation, and why it believes, in light of the interest(s) identified in (a) above, that performance of the contract can still be accomplished in an impartial and objective manner.

(c) In the absence of any relevant interest identified in (a) above, the Contractor shall certify in its statement that to its best knowledge and belief no affiliation exists relevant to possible conflicts of interest. The Contractor must obtain the same information from any potential Subcontractors prior to award of a subcontract.

(d) The Contracting Officer will review the statement submitted and may require additional relevant information from the Contractor. All such information, and any other relevant information known to BEP, will be used to determine whether a conflict of interest exists or a situation exists that may create a conflict of interest. If any such conflict of interest is found to exist, the Contracting Officer may (1) terminate the contract, or (2) determine that it is otherwise in the best interest of the United States to continue the contract with the Contractor and (3) modify the contract to include appropriate provisions to mitigate or avoid such conflicts in the contract.

(e) If the Contractor refuses to provide the written statement called for in paragraph (a), or any additional information that the Contracting Officer may require, the Contracting Officer may terminate the Contract for convenience if he or she deems that termination is in the best interest of the Government.

H.8 Identification of Contract Employees All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All Contractor personnel shall clearly identify themselves as a Contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture, and shall state the name of the individual and the company they represent. Contractor personnel are prohibited from possessing weapons, firearms or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

H.9 Evaluation of Contractor Performance:

(a) Interim and final evaluations of Contractor performance will be prepared for this contract in accordance with FAR 42.1503. The final performance evaluations will be prepared at the time of completion of work.

(b) The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The Contractor will be permitted 60 calendar days to respond. Contractor response is voluntary. If the Contractor does not respond within 60 days, the Government will presume that the Contractor has no comment. Any disagreement between the parties regarding an evaluation will be referred to an individual at a level above the Contracting Officer, whose decision is final.

(c) Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.

Bureau of Engraving and Printing utilizes the Contractor Performance Assessment Reporting System (CPARS) and the Federal Awarded Performance and Integrity Information System (FAPIIS) to record and maintain past performance information. The past performance systems hosts a suite of web-enabled applications that are used to document Contractor performance information that is required by Federal Regulations.

The CPARS module assesses performance on contracts for Systems, Services, Information Technology, and Operations Support, Architect-Engineer contracts and performance on Construction contracts. CPARS reference material can be accessed at https://cpars.cpars.gov/cpars/app/home.do

Federal Awarded Performance and Integrity Information System (FAPIIS) http://www.fapiis.gov/fapiis/govt/datareports.jsp

The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the BEP Contract Specialist registers the contract in one of the systems listed above, the Contractor will receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail will also provide the Contractor with a User ID if the person does not already have a system User ID.

Once a performance evaluation has been prepared and is ready for comment, the Contractor representative will receive a system generated e-mail notification that the performance evaluation is electronically available for review and comment. The Contractor representative will receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from system. Contractors may access evaluations at one of the website listed above for review and comment in CPARS.

H.10 Safety:

State “Right to Know” laws and 29 CFR 1910.1200, Employees Hazard Communication Program, require manufacturers, importers and suppliers to label containers of toxic substances or hazardous chemicals with the chemical name and appropriate hazard warning and to provide Material Safety Data Sheets (MSDS) for these substances. Hazard Material Information not meeting the requirement will not be accepted (off-loaded) by the BEP.

All machinery delivered under this contract shall be in accordance with the BEP’s Safety, Health and Environmental requirements.

H.11 Accident Prevention:

The Contractor shall comply with safety practices as may be deemed necessary by the Bureau Safety Manager to ensure the safety and health of Contractor and Bureau employees.

When the Contractor’s performance requires the use of power-activated devices for welding, cutting or burning using open-flame or electric-arc equipment, the Contractor shall provide no less than three (3) days advanced written notice to the COR requesting approval for the use of the power-activated devices. The COR shall obtain clearance of such use through the Bureau Safety Manager and provide written confirmation of approval or disposal to the Contractor.

The Contractor shall take any other precautions necessary to protect all persons against injury at the work site and shall be held responsible for all damages to persons and property that occur as a result of his fault or negligence in performing the contract work.

Any Contractor personnel that are deemed to be working in an unsafe manner or endangering their own or others health may be removed from the Bureau under order of the Contracting Officer. Any Contractor personnel removed for failure to maintain a safe and healthy work environment may not be allowed to return to the Bureau’s property.

H.12 Bureau Working Restrictions:

When the project specifications permit the undertaking of contract work during Bureau working hours, such work must be performed without:

• Interfering with Government business;

• Unduly restricting traffic;

• Causing unsafe conditions for employees and visitors; and

• Adversely affecting the operation of Bureau equipment.

When, the Contracting Officer has determined that the Contractor’s work is in violation of any of the four restrictions above, the Contractor shall be required to perform the work at such time and under such conditions as are in the best interest of the Bureau. In this connection, the directions of the Contracting Officer shall be binding and shall be executed by the Contractor at no additional cost to the Government.

H.13 Parking:

All vehicles entering the facility are subject to inspection. There is no available parking at the DCF.

H.14 Utilities Provided:

For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the Government at no cost to the Contractor for the preparation and performance of the BAT and installation of the equipment at the Bureau. All extensions, wiring, hoses, etc., required for connection to such utilities shall be furnished by the Contractor. The Contractor will be required to participate in all BEP utility conservation programs. Long distance and FTS telephone services will not be provided. If the Contractor anticipates any interruption to a utility service, the Contractor shall provide written notification to the COR 10 calendar days prior to the utility interruption.

H.15 Bureau’s Regulations:

All persons working on Bureau premises under the terms of the Contract shall, while on the premises, be under the administrative direction of the Contracting Officer and shall be subject to all general rules and regulations governing the Bureau and, in particular, all applicable security regulations. If the contract requires contract employees to work on Bureau premises for a period of time exceeding five calendar days, such employees will be subject to an appropriate preliminary personnel security check to be conducted by the Bureau's Office of Security. Such employees shall be approved by the Contracting Officer prior to commencing work on the premises. Employees who do not meet established security criteria shall not be permitted to work on the premises.

H.16 Permits and Licenses – General:

In the performance of work hereunder, the Contractor shall obtain and maintain in effect all necessary permits and licenses required by Federal, State, or local government, or subdivision thereof, or of any other duly constituted public authority. The Contractor shall comply with all laws and regulations applicable to work to be performed hereunder.

H.17 Compliance with Occupational Safety and Health Act of 1980 Government Owned Facilities/Equipment:

Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1980, as amended (OSHA). If at any time during the performance of this contract, the Government - furnished facilities and/or equipment do not conform to OSHA standards, the Contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.

H.18 Security Requirements:

BEP’s facilities are considered to be secure government facilities; therefore visitors to BEP may be given a visitor’s security badge by security personnel and escorted by Government authorized personnel. Visitor security badges shall be worn above the waist, clearly visible, with picture or front side front forward at all times. Visitor security badges are to be returned upon leaving the site.

H.19 Personnel Security Requirements:

Personnel Security Clearance. Contractor and subcontractor employees involved in the repair, maintenance, installation, modification, inspection, or any other capacity requiring access to the BEP, access to the BEP computer systems or information contained therein, or other information pertinent to BEP personnel or security operations shall be subjected to suitability investigations, conducted by the BEP, before assignment to perform work under this contract.

All Contractor and subcontractor personnel requiring access to the BEP or working on the BEP contract will be required to complete and submit, to the COR, all security forms furnished by the Personnel Security Division, commensurate with the sensitivity of their positions.

Upon receipt of the Performance Work Statement, the Office of Security will provide an assessment of access level and the type of background investigation that will be granted as well as the appropriate Position Sensitivity Levels which will be assigned to all positions occupied by Contractor and Subcontractor employees. The position sensitivity of all positions occupied by Contractor and Subcontractor employees, which involve access to the Personal Computer function, including those involved in the inspection of the work are designated as Low Risk. Should other positions be identified, requiring a higher sensitivity, the position sensitivity shall be designated as High Risk. Access to the BEP and placement in these positions require that the BEP conduct a Full Field Background investigation, and that it be favorably completed. Required security packets are required to be submitted to the COR, within ten (10) working days, for use by Personnel Security Division, Office of Security. The Contractor shall submit packages of all personnel expected to be present at the Bureau for extended periods of time in excess of ten (10) working days no later than ninety (90) days prior to the delivery of the equipment to the Bureaus.

The BEP reserves the right to deny access to its facilities and/or security systems, following adjudicative guidelines set forth in Executive Order 10450 and applicable supplemental directives, to any individual about which an adverse suitability determination is made. Failure to submit the required security investigation packet or to truthfully answer all questions contained in security investigation packets shall constitute grounds for denial of access clearance.

The selected Contractor shall not provide access to employees, or subcontract employees, until written access clearance is provided by the Personnel Security Branch, office of Security, BEP. Contractors and subcontractors are responsible for reporting all changes to the COR within five (5) days of the occurrence of the change concerning any of their employees, which may affect the suitability of their employees for access to the BEP or placement in any of these positions including additions, or deletions.

The COR shall maintain a current listing of access requirements and provide that information to the Personnel Security Division, BEP. The Personnel Security Division will inform the COR of all access denials. The reason for the denial will not be provided to the company contact in accordance with the Privacy Act of 1974.

This is the start of the file's text. The full file is on GovTribe.